Printed on
Recycled Paper
BUDGET
JUSTIFICATIONS
and Performance Information
Fiscal Year 2024
NOTICE: These budget
justications are prepared
for the Interior, Environment
and Related Agencies
Appropriations
Subcommittees. Approval for
release of the justications
prior to their printing in
the public record of the
Subcommittee hearings
may be obtained through
the Ofce of Budget of the
Department of the Interior.
The United States
Department of the Interior
NATIONAL PARK SERVICE
National Park Service FY 2024 Budget Justifications
i
Department of the Interior
NATIONAL PARK SERVICE
FISCAL YEAR 2024 BUDGET JUSTIFICATIONS
TABLE OF CONTENTS
OVERVIEW, TABLES, AND HIGHLIGHTS
General Statement ................................................................................................................................ Overview-1
National Park Service Organizational Chart ...................................................................................... Overview-17
National Park System Units ............................................................................................................... Overview-18
Park Visitation and Acreage .............................................................................................................. Overview-21
Unit Designations and Other Abbreviations ...................................................................................... Overview-30
Budget at a Glance ............................................................................................................................. Overview-34
Discretionary Appropriations ............................................................................................................. Overview-38
Mandatory Appropriations ................................................................................................................. Overview-42
Park and Program Table ..................................................................................................................... Overview-45
Statement of Receipts Collected and Reported .................................................................................. Overview-60
OPERATION OF THE NATIONAL PARK SYSTEM
Appropriation Overview ........................................................................................................................... ONPS-1
Summary of Requirements ....................................................................................................................... ONPS-2
Fixed Costs and Related Changes ............................................................................................................. ONPS-3
Appropriation Language, Changes, and Citations .................................................................................... ONPS-5
Justification of Program and Performance ................................................................................................ ONPS-9
Park Management ............................................................................................................................ ONPS-9
Resource Stewardship ...................................................................................................................... ONPS-9
Visitor Services .............................................................................................................................. ONPS-41
Park Protection............................................................................................................................... ONPS-55
Facility Operations & Maintenance ............................................................................................... ONPS-65
Park Support .................................................................................................................................. ONPS-75
External Administrative Costs ....................................................................................................... ONPS-85
CENTENNIAL CHALLENGE
Appropriation Overview ................................................................................................................................ CC-1
Summary of Requirements ............................................................................................................................ CC-2
Appropriation Language, Changes, and Citations ......................................................................................... CC-3
Justification of Program and Performance ..................................................................................................... CC-5
National Park Service FY 2024 Budget Justifications
ii
NATIONAL RECREATION AND PRESERVATION
Appropriation Overview .............................................................................................................................. NRP-1
Summary of Requirements .......................................................................................................................... NRP-3
Fixed Costs and Related Changes ................................................................................................................ NRP-4
Appropriation Language, Changes, and Citations ....................................................................................... NRP-5
Justification of Program and Performance
Natural Programs .............................................................................................................................. NRP-11
Cultural Programs ............................................................................................................................. NRP-21
Environmental Compliance and Review........................................................................................... NRP-35
International Park Affairs ................................................................................................................. NRP-37
Heritage Partnership Programs ......................................................................................................... NRP-41
Statutory and Contractual Aid .......................................................................................................... NRP-47
HISTORIC PRESERVATION FUND
Appropriation Overview .............................................................................................................................. HPF-1
Summary of Requirements .......................................................................................................................... HPF-2
Appropriation Language, Changes, and Citations ....................................................................................... HPF-3
Justification of Program and Performance
Grants-in-Aid ...................................................................................................................................... HPF-5
Grants-in-Aid to Save America’s Treasures ..................................................................................... HPF-17
Historic Preservation Fund Projects .................................................................................................. HPF-19
CONSTRUCTION
Appropriation Overview ........................................................................................................................ CONST-1
Summary of Requirements .................................................................................................................... CONST-3
Fixed Costs and Related Changes .......................................................................................................... CONST-4
Appropriation Language, Changes, and Citations ................................................................................. CONST-5
Justification of Program and Performance
Line Item Construction ................................................................................................................. CONST-7
FY 2024 Line Item Construction Plan ........................................................................................ CONST-10
FY 2024 Project Data Sheets ...................................................................................................... CONST-11
FY 2025-2028 Line Item Construction Plan ............................................................................... CONST-29
Special Programs ........................................................................................................................ CONST-35
Construction Planning ................................................................................................................ CONST-45
Construction Program Management & Operations ..................................................................... CONST-49
Management Planning ................................................................................................................ CONST-57
LAND ACQUISITION AND STATE ASSISTANCE - GAOA
Appropriation Overview .............................................................................................................. LASA-GAOA-1
Justification of Program and Performance
Federal Land Acquisition (GAOA) .................................................................................... LASA-GAOA-7
FY 2024 NPS LWCF Land Acquisition Requested Project List ...................................... LASA-GAOA-10
State Conservation Grants (GAOA) ................................................................................. LASA-GAOA-49
American Battlefield Protection Program ......................................................................... LASA-GAOA-53
LAND ACQUISITION AND STATE ASSISTANCE - GOMESA
Appropriation Overview ......................................................................................................... LASA-GOMESA-1
NATIONAL PARKS AND PUBLIC LAND LEGACY RESTORATION FUND (GAOA)
Appropriation Overview .............................................................................................................................. LRF-1
National Park Service GAOA Legacy Restoration Fund Projects ............................................................. LRF-15
National Park Service FY 2024 Budget Justifications
iii
RECREATION FEE PERMANENT APPROPRIATIONS
Appropriation Overview, Justification of Program, and Performance .................................................... RecFee-1
Summary Project Data Sheet for Recreation Fee – FY 2023 ....................................................... RecFee-13
Summary Project Data Sheet for Recreation Fee – FY 2024 ....................................................... RecFee-13
Project Data Sheets ...................................................................................................................... RecFee-14
OTHER PERMANENT APPROPRIATIONS
Justification of Program and Performance .................................................................................................. OPA-1
MISCELLANEOUS TRUST FUNDS
Justification of Program and Performance .................................................................................................. MTF-1
NATIONAL PARK CENTENNIAL CHALLENGE FUND
Justification of Program and Performance ................................................................................................ CC-M-1
VISITOR EXPERIENCE IMPROVEMENTS FUND REVOLVING ACCOUNT
Justification of Program and Performance ................................................................................................. VEIF-1
FEDERAL LANDS TRANSPORTATION PROGRAM
Appropriation Overview, Justification of Program, and Performance ....................................................... FLTP-1
FY 2023-2026 Federal Lands Transportation Program Plan ..................................................................... FLTP-5
SPECIAL EXHIBITS
Exhibit A: Deferred Maintenance & Repairs .......................................................................................... SpecEx-1
Exhibit B: Allocations Received from Other Accounts .......................................................................... SpecEx-3
Exhibit C: Budget Realignment .............................................................................................................. SpecEx-4
Exhibit D: Compliance with Section 403 ................................................................................................ SpecEx-5
Exhibit E: Statement on Land Exchanges ............................................................................................... SpecEx-7
Exhibit F: Employee Count by Grade ..................................................................................................... SpecEx-9
Exhibit G: Administrative Provisions ................................................................................................... SpecEx-10
Exhibit H: FY 2024 General Provisions ............................................................................................... SpecEx-12
National Park Service FY 2024 Budget Justifications
iv
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
Overview-1
Overview, Tables, and Highlights
National Park Service
FY 2024 Budget Justifications
General Statement
“...when I served as senator and Vice President, Jill and I made sure to take our
children and grandchildren to national parks all around the country. They’re
treasures and wonders that define the identity of us as a nation. They’re a birthright
that we pass down from generation to generation.”
-President Joseph R. Biden, Jr.
NPS Mission
The NPS Organic Act, 1916
“...The service thus established shall promote and regulate the use of the Federal
areas known as national parks, monuments, and reservations hereinafter specified by
such means and measures as conform to the fundamental purposes of the said parks,
monuments, and reservations, which purpose is to conserve the scenery and the
natural and historic objects and the wild life therein and to provide for the enjoyment
of the same in such manner and by such means as will leave them unimpaired for the
enjoyment of future generations...”
As the steward of 424 park units, 25 national scenic and national historic trails, and 66 wild and scenic
rivers, the National Park Service (NPS) is charged with conserving these lands and historic features that
were designated for their cultural and historic significance, scenic and environmental attributes, and
educational and recreational opportunities. Additionally, the NPS helps the Nation protect resources for
public enjoyment through its financial and technical assistance programs that support activities outside of
the National Park System.
The NPS serves a vital role connecting our republic and our citizens to our environment, our past, and
each other. It is the NPS that is responsible for safeguarding the irreplaceable magnificent natural
National Park Service FY 2024 Budget Justifications
Overview-2
wonders and significant historical and cultural resources. Recent additions to the National Park System,
like the New Philadelphia National Historic Site, ensure we are continuing America’s commitment to
appreciate the interwoven history that we have as Americans. Programs such as the Japanese American
WWII History National Network, Underground Railroad Network to Freedom, and Tribal Heritage grants
reflect the nation’s commitment for parks to serve as sources of support, validation, healing, and
connection for Black people, Indigenous people, people of color, and others who have been historically
marginalized and underserved. Because parks serve so many— welcoming nearly 312 million visitors in
2022— the National Park System is a driver of economic activity for our communities. While visitors
have inspirational, educational, and recreational experiences, they also provide an economic boon to
communities. In 2021, visitors spent $20.5 billion in local gateway regions; supporting more than 323,000
jobs, generating $14.6 billion in labor income, $24.3 billion in economic value added, and $42.5 billion in
total economic output.
1
Budget and Appropriations Overview
National Park Service Funding
Budget Authority ($000) 2022 Actual
2023
Enacted
2024
Request
Change
from 2023
Enacted
(+/-)
Current Appropriations 3,264,994 3,475,254 3,764,499 +289,245
Mandated and Other Transfers, Net -2,135 -3,300 -3,300 0
Current Budget Authority, Net
1
3,262,859 3,471,954 3,761,199 +289,245
Permanent Approprations
2
1,881,725 1,220,458 1,200,293 -20,165
Total Budget
Authority, w/o Supplemental
3
5,144,584 4,692,412 4,961,492 +269,080
Total FTE
4
18,622 19,390 20,759 +1,369
1
Net Current Budget Authority accounts for: in FY 2022, transfers out of $3,300,000 to the 400 Years of African American
History Commission, transfers in of $130,000 for drug trafficking deterrent actions, and $1,035,000 in receipts from the Medical
Services Fund; in FY 2023 transfers out of $3,300,000 to the 400 Years of African American History Commission; in FY 2024
transfers out of $3,300,000 to the 400 Years of African American History Commission.
2
Permanent Appropriations reflects budget authority after impact of sequestration or pop-ups, where applicable. FY 2022
amount includes $700,000,000 in funding from the Inflation Reduction Act of 2022 (P.L. 117-169). FY 2023 excludes allocation
transfer funding from the Inflation Reduction Act of 2022 (P.L. 117-169).
3
Total Budget Authority excludes: in FY 2022 $229,472,000 for supplemental disaster funding provided by the FY 2022
Extending Funding and Delivering Emergency Assistance Act (P.L. 117-43) ; in FY 2023 $1,500,000,000 for supplemental
disaster funding provided by the Consolidated Appropriations Act, 2023 (P.L. 117-238).
4
Amounts include FTE funded from discretionary appropriations, mandatory fund sources, reimbursable activity, allocation
accounts. Excludes 38 FTE provided under supplemental appropriations.
1
Cullinane Thomas, C., and L. Koontz. 2021. 2020 National Park Visitor Spending Effects: Economic Contributions to Local Communities,
States, and the Nation. Natural Resource Report NPS/NRSS/EQD/NRR—2022/2395. National Park Service, Fort Collins, Colorado.
www.nps.gov/subjects/socialscience/vse.htm
National Park Service FY 2024 Budget Justifications
Overview-3
The discretionary budget request for the NPS is $3.8 billion, an increase of $289.2 million compared to
the FY 2023 enacted, not including FY 2023 supplemental funding. This level supports an estimated
15,601 direct FTE (without FTE supported by supplemental funding) and 1,705 allocation and
reimbursable FTE. Recreation fee revenue and other mandatory funding sources provide funding of $1.2
billion supporting 3,453 FTE, a decrease of $20.2 million from FY 2023 Enacted. The total budget
authority for the FY 2024 request is $5.0 billion and 20,759 FTE.
The NPS FY 2024 request prioritizes advancing racial equity and support for underserved communities,
tackling the climate crisis in the National Park System, conserving our natural resources, and using
science to inform decisions. The request makes bold investments essential for the NPS’s continued
mission success in its second century while remaining committed to the daily mission of ensuring that the
American public continues to have an enriching experience at each site.
Operation of the National Park System (ONPS) –The FY 2024 budget request for this appropriation is
$3.2 billion. This includes $509.6 million for Resource Stewardship, $300.3 million for Visitor Services,
$457.7 million for Park Protection, $983.0 million for Facility Operations and Maintenance including
$136.0 million for repair and rehabilitation projects and $188.2 million for cyclic maintenance projects,
$697.3 million for Park Support and $241.8 million for External Administrative Costs. The FY 2024
operations budget includes an $86.8 million programmatic increase to support science and build NPS
resiliency to climate change and increase NPS conservation efforts. The operations account also includes
an $18.8 million investment to advance racial justice and tell the full stories of underserved communities.
This amount includes $3.0 million to support recent or potential new parks that preserve important places
and tell the stories of those that have been historically underrepresented. Additionally, to invest in the
future of our parks, this account supports $17.3 million to build park capacity throughout the National
Park System in visitor services, park protection, facility operations and maintenance and park support and
$8.2 million for new and critical responsibilities in NPS operations.
Centennial Challenge – The FY 2024 budget request for this appropriation is $15.0 million. Funding
would provide a Federal match to leverage partner donations for signature projects and programs at
national parks. The Centennial Challenge program is instrumental in garnering and fostering strong
partnerships. All Federal funds must be matched on at least a 1:1 basis, leveraging a total of at least $30.0
million.
National Recreation and Preservation (NR&P) – The FY 2024 budget request for this appropriation is
$95.2 million. This appropriation is dedicated to supporting local community efforts to preserve natural
and cultural resources. Natural resources programs funded in this account support collaborative and
community-driven efforts and outcome-focused investments to preserve and enhance rural landscapes,
urban parks and rivers, important ecosystems, cultural resources, and wildlife habitat. NPS cultural
programs support public participation in preservation of the Nation’s cultural heritage through National
Register Programs and research and training in historic preservation and conservation. The FY 2024 NPS
budget includes an increase of $3.0 million to fund a recently-established grant program to preserve
African American burial grounds and invests in staffing for grants administration to ensure proper
management of a growing workload of grants funded through this appropriation and the Historic
Preservation Fund. It also maintains funding for NR&P programs such as Rivers, Trails and Conservation
Assistance, National Register programs, Chesapeake Gateways and Trails, Native American Graves
National Park Service FY 2024 Budget Justifications
Overview-4
Protection and Repatriation, Japanese American Confinement Sites, American Battlefield Protection
Program Assistance, American Indian and Native Hawaiian Art and Culture, and the 9/11 Memorial Act.
This appropriation also supports management of Heritage Partnership Programs as well as cooperation
with other nations on park and heritage resource management issues.
Historic Preservation Fund (HPF) – The FY 2024 budget request for this appropriation is $177.9
million. This appropriation supports Historic Preservation Offices in States, territories, and Tribal lands to
preserve historically and culturally significant sites and provides competitive grants to other entities. As
part of the budget’s advancement of racial justice and equity for underserved communities, the request
includes $2.5 million for Tribal Heritage Grants to Federally-recognized Tribes, Alaska Native Villages
and Corporations, and Native Hawaiian Organizations to preserve and protect their cultural heritage. The
request also includes $62.2 million for grants to State Historic Preservation Offices and $23.0 million to
Tribal Historic Preservation Offices to help meet preservation responsibilities under the National Historic
Preservation Act to protect and preserve historic resources, based on local needs and priorities. This
appropriation also includes $11.0 million for grants-in-aid to Historically Black Colleges and Universities
(HBCUs) to support preservation of historic structures on HBCU campuses, $12.5 million for Paul Bruhn
Historic Revitalization Grants to support subgrant programs for historic preservation projects that
stimulate economic growth in rural areas, $30.3 million for Competitive grants to preserve historic sites
that tell the story of the struggle for African-American civil rights and equal rights in America, $10.0
million for Semiquincentennial Preservation Grants to support restoration and preservation of sites that
commemorate the founding of the nation, and $26.5 million for Save America’s Treasures grants to
support preservation of nationally significant sites and collections.
Construction – The FY 2024 budget request for this appropriation is $286.7 million. This appropriation
funds construction projects, equipment replacement, management, planning, operations, and special
projects. The request includes $128.7 million for line-item construction, including $4.0 million for the
remediation of abandoned mineral lands to clean up hazardous sites and return them to their natural
condition. The FY 2024 request also includes $15.9 million for zero emission fleet modernization
deployment and related infrastructure, $18.3 million for DOI Field Communications Modernization, and
$14.9 million to improve and expand NPS housing. The budget includes increases of $7.0 million to
address transportation barriers from underserved communities to national parks and $4.1 million for
Climate Vulnerability studies.
Budget Priorities
Conservation Initiative
The FY 2024 budget is an important step by the Biden-Harris Administration to address the critical
challenges of our time by increasing scientific capacity and improving strategic thinking and resource
planning to leave lands and waters preserved for future generations to use and enjoy. The Conservation
initiative directly supports several Administration priorities laid out in Executive Order 14008 – Tackling
the Climate Crisis at Home and Abroad including (1) conserve 30 percent of the nation’s lands and waters
by 2030 (the “America the Beautiful” Initiative), (2) support youth corps programs, and (3) support
climate resilience and adaptation.
National Park Service FY 2024 Budget Justifications
Overview-5
Park/Program Name Summary
Amount
($000) FTE
Operation of the National Park
System Appropriation $86,820 403
Youth Corps Programs
Expand Youth Corps Programs in
support of Conservation $31,000 10
Natural Resources Capacity
Enhance Capacity for Natural Resource
Stewardship Servicewide $28,500 228
Management and Policy Support
for Climate Change
Improve Science-Informed Resource
Management $12,500 92
Cultural Resources Climate
Assessment Team
Improve Climate Risk Assessments and
Responses for Cultural Resources $3,720 24
Inventory & Monitoring
Expand Capacity to Gather and Maintain
Natural Resource Data $3,100 15
Research Learning Centers
Support Scientific and Research
Collaboration $3,000 6
Cooperative Ecosystems Studies
Units (CESU)
Expand Interdisciplinary Partnerships for
Resource Stewardship $2,000 7
Natural Disaster Response
Capacity
Establish Permanent Expertise for
Disaster Responses $2,000 13
Public Health Protection
Enhance Capacity of the Office of Public
Health $1,000 0
Construction Appropriation $23,830 13
Zero Emission Fleet
Modernization Deployment and
Infrastructure
Install Equipment and Charging
Infrastructure to Support ZEVs $10,701 0
Emergencies and Unscheduled
Projects
Help Parks Recover from Disasters or
Climate Impacts $7,000 0
Climate Vulnerability
Assessments
Help Parks Understand and Adapt to
Climate Risks $4,129 13
Abandoned Mineral Lands
Projects
Improve Lands Impacted by Mineral
Extraction $2,000 0
Total $110,650 416
The NPS is a vital component of the governmentwide approach to address the impacts of climate change.
The FY 2024 budget includes multiple and varied investments to better understand and address resource
challenges on park lands stemming from climate change. It proposes targeted investments servicewide to
protect the nation’s treasured natural resources from 21st century threats. Stewardship of our natural
resources is a mission critical task for NPS and, as such, the task is ingrained in NPS units, programs,
budget activities and appropriations. For natural resource conservation, the FY 2024 budget seeks to
bolster existing successful programs protecting wildlife and landscape, fund climate change science and
resiliency, and increase resources supporting climate and natural resource decision making.
Fundamental to this effort is increasing operational budgets to improve the field capacity to engage in the
natural resource management activities in support of E.O. 14008 Tackling the Climate Crisis at Home and
Abroad. The budget also includes significant investments for the youth corps programs, the Inventorying
and Monitoring program, Research Learning Centers, Cooperative Ecosystem Studies Units, and natural
resource management teams.
National Park Service FY 2024 Budget Justifications
Overview-6
Racial Justice and Equity for Undeserved Communities
The Biden-Harris Administration, through Executive Order 13985 – Advancing Racial Equity and
Support for Underserved Communities, and Executive Order 14091 – Further Advancing Racial Equity
and Support for Underserved Communities Through the Federal Government, directs Federal agencies to
operate in an environment that advances equity for all, including people of color and others who have
been historically underserved, marginalized, and adversely affected by persistent poverty and inequality.
Park/Program Name Summary
Amount
($000) FTE
Operation of the National Park
System Appropriation
$18,825 32
Tribal Co-Stewardship
Expand Tribal co-stewardship of park
resources $7,075 0
Park Accessibility
Support Disability Community by
Improving Accessible Programming and
Projects $5,000 5
Increasing Representation in Our
Public Lands Start-up at New Units and Sites $3,000 8
Potential new parks
Support potential new parks that preserve
important places and tell the stories of
those that have been historically
underrepresented [$1,800] [0]
Brown v. Board of
Education National
Historical Park Summerton Site [$640] [4]
New Philadelphia NHS Initial Start Up [$295] [2]
Blackwell School NHS New Unit [$265] [2]
Native American Tourism and
Improving Visitor Experience
(NATIVE) Act
Support more inclusive national travel
and tourism strategy to benefit Tribes $2,500 13
Subsistence Managers
Support management of subsistence uses
of NPS lands in Alaska $1,000 5
National Networks
Establish Japanese American World War
II History Network $250 1
National Recreation and
Preservation $4,000 4
African American Burial
Grounds
Establish United States African
American Burial Grounds Preservation
Program $3,000 0
Grants Administration
Support growing workload for grants
administration $1,000 4
Historic Preservation Fund $2,500 0
Tribal Heritage Grants
Provide grants for the preservation and
protection of cultural heritage $2,500 0
Construction Appropriation $7,000 2
Transportation Barriers
Assess and Address Transportation
Barriers to Parks from Underserved
Communities $7,000 2
Total $32,325 38
National Park Service FY 2024 Budget Justifications
Overview-7
NPS is committed to presenting an inclusive and complete story of America in which everyone can see
themselves reflected in national parks. Targeted investments will help preserve the stories of the cultures
and history across America, engage new audiences, and expand access to America’s national parks and
programs. Additional resources include funding for the Increasing Representation in Our Public Lands
initiative, Japanese American WWII History National Network, and to address transportation barriers
from underserved communities to national parks as part of efforts to expand national parks visitation from
all communities.
The NPS is committed to respecting and strengthening Indigenous connections, enhancing our nation-to-
nation relationships, and fully upholding our trust and treaty responsibilities. To that end, the NPS FY
2024 budget proposes increases support for Tribal participation in management of Federal lands and
waters with cultural and natural resources of significance and value to Indian Tribes and their citizens,
new subsistence managers, and implementation of the Native American Tourism and Improving Visitor
Experience (NATIVE) Act.
The FY 2024 budget also demonstrates the NPS’s commitment to making parks accessible to all visitors
and employees proposing funding for the Park Accessibility for Visitors and Employees program, putting
accessibility on equal footing with other important facility and programmatic considerations and ensuring
NPS compliance with Federal laws and industry best practices.
Racial Justice and Equity for Underserved Communities Initiative: Increasing Representation in
Our Public Lands
The budget proposes $3.0 million and 8 FTE spread across multiple ONPS budget subactivities to
increase representation at parks. The funding supports start-up costs for new units or sites that were
recently added to the National Park System under the Biden-Harris Administration. The budget also
establishes a new funding line of $1.8 million that will be used at potential new parks to more rapidly
initiate site start-up.
Start-up for Potential New Parks (+$1,800,000 / +0 FTE) – Funding will support initial start-
up costs in establishing potential new parks following designation. Historically, the NPS has
requested funding in the fiscal year following establishment, rather than setting funding aside to
in advance of designation. Setting funds aside specifically for potential new parks demonstrates
the Biden-Harris Administration’s commitment to supporting our public lands. This funding will
be reserved for immediate needs at potential new parks, allowing the NPS to more rapidly hire
staff and cover operating expenses.
Brown v. Board of Education National Historical Park – Summerton (+$640,000 / +4 FTE)
Funding will support interpretive expenses, facility operations and utility costs, and staff to
support the visitor contact site at the new addition of the Summerton site in South Carolina.
While buildings are not expected to be in the NPS’s ownership immediately, the park requires
base funding to meet the basic operations and maintenance requirements.
New Philadelphia NHS (+$295,000 / +2 FTE) – Funding will support initial costs required to
establish this new park unit, including a site manager to provide leadership and supervision of
park operations and an interpreter to be responsible for the day-to-day activities of the new park.
Funding will also cover start-up and support costs for the new site’s first full year of operations.
National Park Service FY 2024 Budget Justifications
Overview-8
Blackwell School NHS (+$250,000 / +2 FTE) – Funding will support initial costs required to
establish this new park, including a site manager to provide leadership and supervision of park
operations and a park guide to be responsible for the day-to-day activities of the new park.
Funding will also support basic management and facility needs for the new site’s inaugural year
of operations.
Park Capacity
The budget proposes $25.4 million and 177 FTE spread across multiple ONPS budget subactivities for to
add capacity for current operations and address new and additional responsibilities at parks and central
offices.
Supporting Park Capacity
The budget proposes $17.3 million and 125 FTE to support basic operational capacity needs at all parks,
rivers, and trails. Funding is spread across multiple ONPS budget subactivities to strengthen critical
functions at parks. Between FY 2011 and FY 2022, the NPS has lost almost 19 percent of its ONPS-
funded Full-Time Equivalent capacity. Over the same period, over 30 units and other authorized sites
have been added to the National Park System, and visitation has grown by more than 30 million. This
proposed increase will provide parks additional funds for basic operations to better serve visitors and
resources and ease planning for urgent and emerging needs.
In addition to base funding, these increases provide much needed support for the United States Park
Police and for NPS criminal investigative services. At the USPP, funding supports additional recruit
classes, including salary, benefits, and equipment for newly initiated officers. For NPS criminal
investigative services, funding supports special agents. Criminal investigators are highly skilled and
specialized, stationed across the nation, and are charged with conducting complex, sensitive, and long-
term criminal investigations in coordination with law enforcement park rangers.
New and Critical Responsibilities
The budget proposes $8.2 million and 52 FTE spread across multiple ONPS budget subactivities for new
and critical responsibilities at parks and offices. Funding will support park requirements to manage new
responsibilities, to interface with the public and tribal governments, and to meet regulatory requirements.
Additional funding will increase operating capacity at parks and offices with new and critical needs,
broaden programming and maintenance activities, expand law enforcement presence, and improve park
safety and security.
Park/Program Name Summary
Amount
($000) FTE
Supporting Park Capacity Park Base Increase $10,050 92
Park Protection
Increase United States Park Police and
Investigative Capacity $7,215 33
New and Critical Responsibilities
Boston Area Parks Pay Inversion Correct Pay Inversion at Boston Parks $886 0
Birmingham Civil Rights NM,
Freedom Riders NM Staffing and Operations Capacity $620 6
Denali NP & Preserve
Denali Park Road Facilities Operation &
Maintenance $550 4
National Park Service FY 2024 Budget Justifications
Overview-9
Park/Program Name Summary
Amount
($000) FTE
Fort Smith NHS Park Protection Capacity $500 3
Public Health Officers Pay
Increase Enhance Organizational Capacity $375 0
Coltsville NHP Staffing and Operations Capacity $340 4
Bryce Canyon NP
Community Planning and Outreach
Capacity $305 3
Pea Ridge NMP Staffing and Operations Capacity $300 2
Zion NP Climate Change Adaptation Capacity $300 3
Joshua Tree NP
Law Enforcement and Maintenance
Capacity $290 3
Fredericksburg and Spotsylvania
NMP Staffing and Operations Capacity $260 2
Ala Kahakai NHT Maintaining Trails and Lands $250 2
Partnerships and Civic
Engagement
Expand capacity related to intellectual
property and other emerging issues $250 1
San Francisco Regional Office Tribal Liaison $250 1
Channel Islands NP Aviation Program $235 0
Saint-Gaudens NHP Staffing and Operations Capacity $225 4
César E. Chávez NM Interpretation and Education Capacity $215 2
Medgar and Myrlie Evers NM Staffing and Operations Capacity $215 2
Monocacy NB Interpretation and Education Capacity $200 2
Wolf Trap NP Security Screening Contract $200 0
North Cascades NP, Lake
Chelan NRA, Ross Lake NRA
Cultural Liaison for Indigenous
Communities $194 1
Keweenaw NHP Staffing and Operations Capacity $180 2
Port Chicago Naval Magazine
NMem Outreach and Visitor Services Capacity $176 2
NPS Liaison to the White House White House Visitors Office Capacity $165 0
Colonial NHP Staffing and Operations Capacity $150 1
Lake Mead NRA Wage Pay Differential $150 0
Point Reyes NS
Tribal Liaison and Cooperative
Assistance $150 1
Manassas NBP
Facility Operations and Maintenance
Capacity $130 1
Roosevelt Campobello IP Meeting Budget Request $119 0
Sub-Total, New and Critical $8,180 52
Total, Park Capacity $25,445 177
Boston Area Parks Pay Inversion (+$886,000 / +0 FTE) - This funding increase supports pay
increases not captured by the NPS Fixed Cost request, for parks in the Boston, Massachusetts
area, In FY 2023, the Office of Personnel Management (OPM) authorized the use of unrestricted
pay rates in accordance with 5 CFR § 532.801 in wage areas affected by pay inversion, which
included Boston, MA. Pay inversion occurs when rates of pay for a lower grade level are higher
than rates of pay for a higher grade level. Pay inversion produces recruitment, retention, and
promotion hardships in wage areas where it occurs. This pay inversion occurred when
National Park Service FY 2024 Budget Justifications
Overview-10
implementing the $15 per hour minimum rate of pay special rates, in accordance with OPM’s
Compensation Policy Memorandum (CPM) 2022-02, “Achieving a $15 Per Hour Minimum Pay
Rate for Federal Employees.” When a regular wage schedule inversion is corrected as a result of
this authority, any applicable special schedule in the same wage area should also be corrected so
as to not disadvantage the Federal employees on the associated special schedule.
Birmingham Civil Rights NM (+$620,000 / +6 FTE) – Funding will support operations and
administration at the Gaston Motel in Birmingham and the bus depot in Anniston and will help
the continued standing-up of this new park. Funding will enhance the visitor experience, address
infrastructure, interpretation, and maintenance needs; provide decision making closer to the front
line, and expand public access.
Denali NP & Preserve (+$550,000 / +4 FTE) – Funding will support increased capacity in
Facility Operations and Maintenance in personnel specifically for Denali Park Road. Intensifying
effects of climate change on the western portion of Denali Park Road are requiring more frequent
corrective maintenance. These positions will provide field-level oversight of heavy equipment
operators stationed at Toklat during the operating season and will plan for out-year maintenance
during the off-season. Funding also provides support for the park’s aviation program, radio and
dispatch staff, and operational safety and health. Aviation is an integral part of Denali’s year-
round operations. Summer aviation operations include flights by the park pilot in two park-owned
planes, high altitude helicopter for mountaineering operations, fire program helicopter, and
contract flights. Park policy requires a stand-alone Park Aviation Manager, which has only been
covered as collateral duty of existing employees, requiring a waiver from national aviation policy.
Fort Smith NHS (+$500,000 / +3 FTE) Funding will support implementation of a law
enforcement program at the park to address critical resource protection, and staff and visitor
safety issues. This park faces particular resource threats by virtue of its location, and has seen an
increase in boundary encroachment, Archaeological Resource Protection Act violations, resource
damage, and other criminal activity. The proposed increase would allow the park to have full
patrol coverage during periods of heaviest use to mitigate resource threats and safety issues.
Public Health Officers Pay Increase (+$375,000 / +0 FTE) – Funding will pay for fixed cost
increases for Public Health Officers not otherwise included in the fixed cost request. Public
Health Officers are not NPS FTE, and therefore not captured in the fixed cost calculation.
However, the bureau has agreement with the United States Public Health Service to pay their
salaries, which increase in accordance with approved pay scales. Funding in support of these pay
increases will make available other programmatic budget needs, which will enhance the
organizational capacity of the Public Health program, allow for mission essential inspection
travel, and ensure a strong public health presence to better address, prevent, and manage
environmental health risks, disease threats and rapidly emerging public health issues.
Coltsville NHP (+$340,000 / +4 FTE) – Funding will support initial operations and staffing as
the park has completed acquisition of the historic structures required in its authorizing legislation.
The park plans to stabilize, restore, and rehabilitate those structures into a visitor center,
National Park Service FY 2024 Budget Justifications
Overview-11
administrative offices, and potential leasing/concessions opportunities. This request will support
interpretive staffing, facility maintenance, and administrative support.
Bryce Canyon NP (+$305,000 / +3 FTE) Funding will support new staff positions dedicated to
building effective relationships, sharing Indigenous knowledge, and working with local
Indigenous communities. These new positions will additionally address visitor use management,
transportation, and sustainability as visitation and congestion increase within the park.
Pea Ridge NMP (+$300,000 / +2 FTE) – Funding will allow the park to restore critical
operational capacity for visitor services and facility management. In recent years, the park has
shared resources for these functions with another park, but that arrangement is not sustainable in
terms of cost and staff recruitment, retention, and morale issues.
Zion NP (+$300,000 / +3 FTE) – Funding will support the park’s visitor services and technical
resource management as staff work to protect natural and cultural resources, as well as provide
safety for visitors while managing climate change impacts. Funding will additionally support
novel techniques for Threatened Species habitat management and other ecosystem management
strategies.
Joshua Tree NP (+$290,000 / +3 FTE) – Funding will support law enforcement and trail
maintenance. With the FY 2022 budget, the park used the Land and Water Conservation Fund to
acquire 2,200 acres. New lands have a mix of informal trails, archeological resources, and scars
from other recreational use prior to park acquisition. Positions are needed to patrol and improve
the lands for safe recreation under NPS administration.
Fredericksburg/Spotsylvania NMP (+$260,000 / +2 FTE) – Funding will support staffing for
law enforcement and volunteer and youth coordination. This increase is necessitated by rapid
urbanization around the park, which have placed strain on the park’s capacity to address law
enforcement issues like boundary encroachments, vehicular accidents, vandalism, and incidents
involving loss of life, but they also present an opportunity to expand the park’s volunteer program
to improve community engagement. This local population growth has provided a welcome
expansion of recreational visits to the park and increased outreach opportunities.
Ala Kahakai NHT (+$250,000 / +2 FTE) – Funding will support staff to coordinate resource
management and to maintain trails and lands. The park has acquired or is in the process of
acquiring additional parcels. Additional staff will ensure management of the parcels will be
managed in compliance with cultural and natural resource requirements and resilient to climate
change. Staff will also ensure trails are maintained for safe and enjoyable visitor use.
Partnerships and Civic Engagement (+$250,000 / +1 FTE) – Funding will provide for
additional staff to support NPS brand and intellectual property management. Work includes goal
development, trademark inventory, coordination with user groups, record keeping, and other
activities. Funding would support a Trademark Specialist to focus on loss of trademark protection
for key intellectual property assets and risk management.
National Park Service FY 2024 Budget Justifications
Overview-12
San Francisco Regional Office Tribal Liaison (+$250,000 / +1 FTE) – Funding will support a
Native American Affairs Liaison in the San Francisco Regional Office. The liaison will have
regionwide responsibilities for representing the NPS, its programs, and the Region to Tribal
Governments and other Native American and Native Hawaiian groups and related organizations.
The liaison will provide advice in complex and sensitive issues regarding Tribal/NPS land issues,
treaty rights, NPS management policies and regulations affecting Tribal governments, park
specific regulations affecting tribes, and other related programs affecting Tribal relationships. The
liaison will also provide advice, training and technical assistance to park superintendents to carry
out Tribal consultations with American Indian Tribes and build mutually beneficial relationships.
Channel Islands NP (+$235,000 / +0 FTE) – Funding will support non-personnel needs of the
park’s aviation program. Hourly costs for the aviation program have increased by 32 percent
since 2012, yet the park budget for the activity has remained flat. Fixed wing and helicopter
support are used for crew changes in remote locations, and for emergency response.
Saint-Gaudens NHP (+$225,000 / +4 FTE) – Funding will support staffing to meet the needs of
increased visitation due to a recently-established performing arts program under a lease on a
large, donated property. It will allow the park to better care for visitor impacts on the landscape,
provide additional interpretive services, and develop a robust leasing and partnership program.
César E. Chávez NM (+$215,000 / +2 FTE) – Funding will support staff to develop an
integrated interpretation and education program. Interpretation is a key piece of the monument’s
purpose, and additional staff will help develop and execute programs and build relationships. This
additional funding and capacity will help the park better tell the complex and diverse set of stories
reflecting contributions to the farmworker movement; digital and Spanish-language programming
will allow the park to tell the stories to wider and more diverse audiences. The resources will also
help the park provide visitor services and interpretive opportunities coordinated with the partner
organization.
Medgar and Myrlie Evers NM (+$215,000 / +2 FTE) – Expands on funding provided in FY
2023 and provides support for law enforcement personnel and essential non-personnel services.
Law enforcement will not only protect visitors and staff at the site but will provide critical
support for resource protection—other monuments in the area have faced significant challenges
including vandalism and damage. Non-personnel services include much needed equipment and
supplies to operate and maintain the site, including information technology equipment, training,
fleet, space leasing, and law enforcement equipment.
Wolf Trap NP (+$200,000 / +0 FTE) Funding will enhance the visitor experience by
supporting contracted security personnel and metal detection screening for visitors entering the
Filene Center. Funding also supports perimeter access control, and roving patrols to provide a
visible security presence. The security contract helps to address deficiencies identified in
Department of the Interior-led security reviews. Tickets purchased for entertainment at the Filene
Center include a per-ticket fee, which yields approximately $300,000 per year in support of the
contract; this amount does not cover the entire cost of the required security screening, requiring
the park to support the additional costs.
National Park Service FY 2024 Budget Justifications
Overview-13
Monocacy NB (+$200,000 / +2 FTE) – Funding will support additional staffing for interpretive
services to address topics emerging from recently completed research and outreach: enslavement
and its lasting legacies, Native American habitation, monumentation, and the complexities of our
shared American history. It will also support additional law enforcement staffing to address
increasing visitation, recreational use, and criminal incidents including those involving illegal
drugs, gang activity, and cultural and natural resource damage. The park expects these changes to
allow the visitor center to operate daily, which is not possible with the current level of staffing.
North Cascades NP, Lake Chelan NRA, Ross Lake NRA (+$194,000 / +1 FTE) – Funding
will support a Tribal liaison position who would provide partnership with local Tribes to consult
with and integrate relevant Indigenous communities into park management efforts. In particular,
the liaison support will be critical as the park approaches relicensing of three dams on traditional
Tribal land, fire regime change, and more.
Keweenaw NHP (+$180,000 / +2 FTE) – Funding will support operating costs and staffing for
the visitor center, as well as staffing for year-round operation of a multi-park curatorial facility.
This level of staffing will allow the park to maintain daily, year-round visitor center hours to meet
growing visitation. The park’s curatorial staff would also serve Isle Royale NP and Pictured
Rocks NL. The park’s broader recruitment outreach strategies and pipelines include Tribal
communities.
Port Chicago Naval Magazine NMem (+$176,000 / +2 FTE) – Funding will support
interpretive staff to provide educational tours for visitors. These positions will help create a 21st
Century visitor experience by supporting public tours and community-based programming that
addresses values and ideals of service, sacrifice, courage, and the fight for social justice. Port
Chicago is located on an active military base, with access controlled by the US Army, and has
visitation restrictions for security reasons. Because of the access restrictions, visitation is almost
entirely dependent on the park having sufficient park guides.
NPS Liaison to the White House (+$165,000 / +0 FTE) – Funding will support the salary costs
for the White House Visitors Office, an unbudgeted expense incurred by the NPS since
approximately 1978. This funding will cover the administratively determined salaries for these
positions, costs which fluctuate from one administration to the next, and for which no FTEs or
funding have been allocated to the NPS.
Colonial NHP (+$150,000 / +1 FTE) – Funding will support Information Technology staffing
for Colonial NHP, which also provides administrative support for Fort Monroe NM and Captain
John Smith Chesapeake NHT. This will improve the park’s ability to meet information resource
requirements and support appropriate financial management for all three units.
Lake Mead NRA (+$150,000 / +0 FTE) Lake Mead National Recreation Area is the only park
or program within the National Park Service with a collective bargaining union that negotiates
wages outside of the Federal Wage System. Per agreement, wages are linked to the Bureau of
Reclamation Lower Colorado Dams Office. Annual salary increases for these employees have
been greater than those received by other NPS wage grade and/or general schedule employees.
National Park Service FY 2024 Budget Justifications
Overview-14
Between 2017 and 2023, the average annual increase for Lake Mead union employees was 2.98
percent, compared to a 2.48 percent average for similarly graded employees. Because these
employees fall outside of the traditional pay system, standard pay increases that otherwise are
capture in the NPS Fixed Cost request have not been captured, leading to an erosion of
purchasing power at the park.
Point Reyes NS (+$150,000 / +1 FTE) – Funding will support staff and cooperative assistance to
implement engagement objectives of the park’s partnership with the Federated Indians of Granton
Rancheria. The partnership will enhance interpretation and education of tribal history and culture,
incorporate Indigenous knowledge in the management of Tule Elk, ranch lands, and other priority
areas.
Manassas NBP (+$130,000 / +1 FTE) – Funding will support a project manager to coordinate
review of priority needs, strategic planning, and provide administrative oversight for projects.
This additional capacity will centralize these duties to streamline operations, improve the park’s
strategic approach to investments, and allow other staff to focus on their core work.
Roosevelt Campobello IP (+$119,000 / +0 FTE) – Funding will ensure the NPS’s contribution
to the international park is commensurate with funding provided by our Canadian partners and is
funded at the Roosevelt Campobello International Park Commission’s proposed level.
NPS Administrative Priorities
The budget proposes $27.9 million and 21 FTE spread across multiple ONPS and Construction budget
subactivities in support of several Administration and NPS priorities.
Park/Program Name Summary
Amount
($000) FTE
Operation of the National Park
System
$14,690 21
Contracting & Financial
Assistance
Improve and Expand Upon DEIA Efforts
in Contracting $1,545 2
Unigrid Brochure Meet Increased Printing Costs $625 3
Visitor Services on the Digital
Platform
Continue Efforts to Improve Digital
Tools $3,000 5
America 250
Support Visitor Services for Americas
Semiquincentennial Commemoration $2,000 11
Central IT Costs Invest in Bureau IT Modernization Needs $7,240 0
Law Enforcement Psychological
Screening
Increase Law Enforcement Capacity with
Contract $280 0
Construction $13,255 0
Housing Improvement Program
Continue Efforts to Improve and Expand
Housing Capacity $7,000 0
Department of the Interior Field
Communications Modernization
(DIFCOM) Initiative
Expand and Improve Remote Broadband
and Communications Capacity $6,255 0
Total, NPS Administrative Priorities: $27,945 21
National Park Service FY 2024 Budget Justifications
Overview-15
Information Technologies
Investments totaling $10.2 million to improve information technology systems and visitor services on
digital platforms support the Administration’s initiative to improve the customer experience and service
delivery under Executive Order 14058 and help the NPS achieve its goals as an OMB-designated High
Impact Service Provider (HISP). An increase of $1.5 million to better connect small businesses and
underserved communities with NPS contracting processes supports the Administration’s diversity, equity,
inclusion, and accessibility efforts under Executive Order 13985 and 14091. This funding will help the
NPS identify and address systematic barriers that unintentionally limit the ability of some vendors to fully
participate in procurement and financial assistance programs.
DOI Field Communication Modernization (DIFCOM)
On a given day, Interior field operations include firefighters battling fires in Eastern Oregon, NPS law
enforcement officers in Big Bend National Park interdicting smugglers, BLM search and rescue teams
providing assistance to a distressed family in the Sonoran desert, USGS installing early warning systems
on a high threat Aleutians volcano, FWS conducting duck counts for harvest management, and dozens of
other critical functions to effectively manage the Nation’s natural and cultural resources. Field
communications modernization helps enable capabilities being implemented across DOI communities of
practice. From first responder needs to applications such as hazard warning systems, resource
management data collection and, in-field collaboration, modernization enables last mile connectivity to
these tools in the field, improves safety, increases efficiency, and delivers better data for management
decisions.
The decades-old land mobile radio (LMR) systems that DOI operates have a backlog of at least $185
million to bring to acceptable condition and require tens of millions annually to maintain that condition.
Meanwhile, cost-effective modern solutions meet requirements for voice, high-speed data, and video,
while reducing the footprint of DOI-owned infrastructure and the costs of maintaining those systems.
Where replaced, the modern systems will support streamlined interoperability with other agencies. The
2024 budget includes $32.2 million for field communications modernization, including $6.3 million for
NPS. In 2024, DOI will focus on modernization in Alaska, the Southeastern United States, and the Pacific
Islands as, where feasible, it leverages deployment of communications networks outside of Interior’s
owned infrastructure, such as FirstNet and other dedicated public safety broadband, as well as improved
satellite systems in locations where terrestrial broadband is not feasible. This approach will assess and
invest in updated technology where it makes sense while considering the Department’s historical reliance
on the traditionally more expensive LMR network in areas of the country where LMR remains the most
reliable means of communication.
Good Accounting Obligation in Government Act Report
The Good Accounting Obligation in Government Act (GAO-IG Act, P.L. 115-414) enacted January 3,
2019, requires that Agencies report the status of each open audit recommendation issued more than one
year prior to the submission of the Agency’s annual budget justification to Congress. The Act requires
Agencies to include the current target completion date, implementation status, and any discrepancies on
closure determinations.
The Department of the Interior leadership takes audit follow-up very seriously and considers our external
auditors, to include the Government Accountability Office (GAO) and Office of the Inspector General,
National Park Service FY 2024 Budget Justifications
Overview-16
valued partners in not only improving the Departments management and compliance obligations but also
enhancing its programmatic and administrative operations. As stewards of taxpayer resources, the
Department applies cost-benefit analysis and enterprise risk management principles in recommendation
implementation decisions. The Departments GAO-IG Act Report will be available at the following link:
https://www.doi.gov/cj
The Services Organization
The NPS is headquartered in Washington, DC, with regional offices and additional central support
locations. The Director reports to the Department of the Interiors Assistant Secretary for Fish and
Wildlife and Parks, and has direct line authority over headquarters and Regional Directors. Headquarters-
based Associate and Assistant Directors provide policy and program management and oversight. Seven
Regional Directors oversee park management and operations, as well as regionalized programs, across the
12 Department of the Interior Unified Regions. (See organizational chart, next page.)
National Park Service FY 2024 Budget Justifications
Overview-17
National Park Service
Organizational Chart
Director
Deputy Director,
Operations
Associate Director,
Natural Resource
Stewardship and
Science
Associate Director,
Visitor and Resource
Protection
Associate Director,
Cultural Resources,
Partnerships, and
Science
Associate Director
Park Planning,
Facilities, and Lands
Associate Director,
Interpretation,
Education, and
Volunteers
Regional Directors
Deputy Director,
Congressional and
External Relations
Associate Director,
Partnerships and
Civic Engagement
Assistant Director,
Legislative and
Congressional
Affairs
Assistant Director,
Communications
Deputy Director,
Management and
Administration
Comptroller
Associate Director,
Visitor Services
Associate Director,
Workforce and
Inclusion
Associate Director,
Information
Resources
Chief of Staff
Chief, Equal
Employment
Opportunity
Native American
Affairs Liaison
National Park Service FY 2024 Budget Justifications
Overview-18
National Park System Units
In Alphabetical Order
1. Abraham Lincoln
Birthplace NHP
2. Acadia NP
3. Adams NHP
4. African Burial
Ground NM
5. Agate Fossil Beds
NM
6. Alagnak Wild River
7. Alibates Flint
Quarries NM
8. Allegheny Portage
RR NHS
9. Amistad NRA
10. Andersonville NHS
11. Andrew Johnson
NHS
12. Aniakchak NM
13. Aniakchak NPres
14. Antietam NB
15. Apostle Islands NL
16. Appalachian NST
17. Appomattox Court
House NHP
18. Arches NP
19. Arkansas Post
NMem
20. Arlington House,
The Robert E. Lee
Memorial NMem
21. Assateague Island
NS
22. Aztec Ruins NM
23. Badlands NP
24. Bandelier NM
25. Belmont-Paul
Women’s Equality
NM
26. Bent’s Old Fort NHS
27. Bering Land Bridge
NPres
28. Big Bend NP
29. Big Cypress NPres
30. Big Hole NB
31. Big South Fork
NR&RA
32. Big Thicket NPres
33. Bighorn Canyon
NRA
34. Birmingham Civil
Rights NM
35. Biscayne NP
36. Black Canyon of the
Gunnison NP
37. Blackstone River
Valley NHP
38. Blue Ridge Parkway
39. Bluestone NSR
40. Booker T.
Washington NM
41. Boston African
Amer. NHS
42. Boston Harbor
Islands NRA
43. Boston NHP
44. Brices Cross Roads
NBS
45. Brown v. Board of
Education NHP
46. Bryce Canyon NP
47. Buck Island Reef
NM
48. Buffalo NR
49. Cabrillo NM
50. Camp Nelson NM
51. Canaveral NS
52. Cane River Creole
NHP
53. Canyon de Chelly
NM
54. Canyonlands NP
55. Cape Cod NS
56. Cape Hatteras NS
57. Cape Krusenstern
NM
58. Cape Lookout NS
59. Capitol Reef NP
60. Capulin Volcano NM
61. Carl Sandburg Home
NHS
62. Carlsbad Caverns NP
63. Carter G. Woodson
Home NHS
64. Casa Grande Ruins
NM
65. Castillo de San
Marcos NM
66. Castle Clinton NM
67. Castle Mountains
NM
68. Catoctin Mountain
Park
69. Cedar Breaks NM
70. Cedar Creek and
Belle Grove NHP
71. César E. Chávez NM
72. Chaco Culture NHP
73. Chamizal NMem
74. Channel Islands NP
75. Charles Pickney
NHS
76. Charles Young
Buffalo Soldiers NM
77. Chattahoochee River
NRA
78. Chesapeake & Ohio
Canal NHP
79. Chickamauga and
Chattanooga NMP
80. Chickasaw NRA
81. Chiricahua NM
82. Christiansted NHS
83. City of Rocks NRes
84. Clara Barton NHS
85. Colonial NHP
86. Colorado NM
87. Congaree NP
88. Constitution Gardens
89. Coronado NMem
90. Cowpens NB
91. Crater Lake NP
92. Craters of the Moon
NM
93. Craters of the Moon
NPres
94. Cumberland Gap
NHP
95. Cumberland Island
NS
96. Curecanti NRA
97. Cuyahoga Valley NP
98. Dayton Aviation
NHP
99. De Soto NMem
100. Death Valley NP
101. Delaware NSR
102. Delaware Water Gap
NRA
103. Denali NP
104. Denali NPres
105. Devils Postpile NM
106. Devils Tower NM
107. Dinosaur NM
108. Dry Tortugas NP
109. Dwight D.
Eisenhower
Memorial
110. Ebey’s Landing
NHR
111. Edgar Allan Poe
NHS
112. Effigy Mounds NM
113. Eisenhower NHS
114. El Malpais NM
115. El Morro NM
116. Eleanor Roosevelt
NHS
117. Eugene O’Neill NHS
118. Everglades NP
119. Federal Hall NMem
120. Fire Island NS
121. First Ladies NHS
122. First State NHP
123. Flight 93 NMem
124. Florissant Fossil
Beds NM
125. Ford’s Theatre NHS
126. Fort Bowie NHS
127. Fort Caroline NMem
128. Fort Davis NHS
129. Fort Donelson NB
130. Fort Frederica NM
131. Fort Laramie NHS
132. Fort Larned NHS
133. Fort Matanzas NM
134. Fort McHenry NM &
Historic Shrine NM
135. Fort Monroe NM
136. Fort Necessity NB
137. Fort Point NHS
138. Fort Pulaski NM
139. Fort Raleigh NHS
140. Fort Scott NHS
141. Fort Smith NHS
142. Fort Stanwix NM
143. Fort Sumter and Fort
Moultrie NHP
144. Fort Union NM
145. Fort Union Trading
Post NHS
146. Fort Vancouver NHS
147. Fort Washington
Park
148. Fossil Butte NM
149. Franklin D.
Roosevelt Memorial,
NMem
150. Frederick Douglass
NHS
151. Frederick Law
Olmsted NHS
152. Fredericksburg/Spots
ylvania Battlefields
Memorial NMP
153. Freedom Riders NM
154. Friendship Hill NHS
155. Gates of the Arctic
NP
156. Gates of the Arctic
NPres
157. Gateway Arch NP
158. Gateway NRA
159. Gauley River NRA
160. General Grant
NMem
161. George Rogers Clark
NHP
162. George Washington
Birthplace NM
163. George Washington
Carver NM
National Park Service FY 2024 Budget Justifications
Overview-19
National Park System Units
In Alphabetical Order (continued)
164. George Washington
Memorial Parkway
165. Gettysburg NMP
166. Gila Cliff Dwellings
NM
167. Glacier Bay NP
168. Glacier Bay NPres
169. Glacier NP
170. Glen Canyon NRA
171. Golden Gate NRA
172. Golden Spike NHP
173. Governors Island
NM
174. Grand Canyon NP
175. Grand Portage NM
176. Grand Teton NP
177. Grant-Kohrs Ranch
NHS
178. Great Basin NP
179. Great Egg Harbor
NS&RR
180. Great Sand Dunes
NP
181. Great Sand Dunes
NPres
182. Great Smoky
Mountains NP
183. Greenbelt Park
184. Guadalupe
Mountains NP
185. Guilford Courthouse
NMP
186. Gulf Islands NS
187. Hagerman Fossil
Beds NM
188. Haleakala NP
189. Hamilton Grange
NMem
190. Hampton NHS
191. Harpers Ferry NHP
192. Harriet Tubman NHP
193. Harriet Tubman
Underground
Railroad NHP
194. Harry S. Truman
NHS
195. Hawaii Volcanoes
NP
196. Herbert Hoover NHS
197. Hohokam Pima NM
198. Home of FD
Roosevelt NHS
199. Homestead NHP
200. Honouliuli NHS
201. Hopewell Culture
NHP
202. Hopewell Furnace
NHS
203. Horseshoe Bend
NMP
204. Hot Springs NP
205. Hovenweep NM
206. Hubbell Trading Post
NHS
207. Independence NHP
208. Indiana Dunes NP
209. Isle Royale NP
210. James A Garfield
NHS
211. Jean Lafitte NHP &
Pres
212. Jewel Cave NM
213. Jimmy Carter NHP
214. John D. Rockefeller,
Jr. Memorial
Parkway
215. John Day Fossil Beds
NM
216. John F Kennedy
NHS
217. John Muir NHS
218. Johnstown Flood
NMem
219. Joshua Tree NP
220. Kalaupapa NHP
221. Kaloko-Honokohau
NHP
222. Katahdin Woods and
Waters NM
223. Katmai NP
224. Katmai NPres
225. Kenai Fjords NP
226. Kennesaw Mountain
NBP
227. Keweenaw NHP
228. Kings Canyon NP
229. Kings Mountain
NMP
230. Klondike Gold Rush
NHP
231. Knife River Indian
Village NHS
232. Kobuk Valley NP
233. Korean War
Veterans Memorial
234. Lake Chelan NRA
235. Lake Clark NP
236. Lake Clark NPres
237. Lake Mead NRA
238. Lake Meredith NRA
239. Lake Roosevelt NRA
240. Lassen Volcanic NP
241. Lava Beds NM
242. Lewis & Clark NHP
243. Lincoln Boyhood
NMem
244. Lincoln Home NHS
245. Lincoln Memorial,
NMem
246. Little Bighorn
Battlefield NM
247. Little River Canyon
NPres
248. Little Rock Central
High School NHS
249. Longfellow House –
Washington’s
Headquarters NHS
250. Lowell NHP
251. Lyndon B. Johnson
Memorial Grove on
the Potomac NMem
252. Lyndon B. Johnson
NHP
253. Maggie L. Walker
NHS
254. Mammoth Cave NP
255. Manassas NBP
256. Manhattan Project
NHP
257. Manzanar NHS
258. Marsh-Billings-
Rockefeller NHP
259. Martin Luther King,
Jr. Memorial
260. Martin Luther King,
Jr. NHP
261. Martin Van Buren
NHS
262. Mary McLeod
Bethune Council
House NHS
263. Medgar and Myrlie
Evers Home NM
264. Mesa Verde NP
265. Mill Springs
Battlefield NM
266. Minidoka NHS
267. Minute Man NHP
268. Minuteman Missile
NHS
269. Mississippi National
River & Rec Area
270. Missouri National
Recreational River
NW&SR
271. Mojave NPres
272. Monocacy NB
273. Montezuma Castle
NM
274. Moores Creek NB
275. Morristown NHP
276. Mount Rainier NP
277. Mount Rushmore
NMem
278. Muir Woods NM
279. N Park of American
Samoa, NP
280. Natchez NHP
281. Natchez Trace NST
282. Natchez Trace Pkwy
283. National Capital
Parks
284. National Mall
285. Natural Bridges NM
286. Navajo NM
287. New Bedford
Whaling NHP
288. New Orleans Jazz
NHP
289. New Philadelphia
NHS
290. New River Gorge
NP&Res
291. Nez Perce NHP
292. Nicodemus NHS
293. Ninety Six NHS
294. Niobrara National
Scenic Riverway
295. Noatak NPres
296. North Cascades NP
297. Obed Wild & Scenic
River
298. Ocmulgee NHP
299. Olympic NP
300. Oregon Caves
NM&Pres
301. Organ Pipe Cactus
NM
302. Ozark National
Scenic Riverways
303. Padre Island NS
304. Palo Alto Battlefield
NHP
305. Paterson Great Falls
NHP
306. Pea Ridge NMP
307. Pearl Harbor NMem
308. Pecos NHP
309. Pennsylvania Avenue
NHS
310. Perry’s Victory &
International Peace
Memorial NMem
311. Petersburg NB
312. Petrified Forest NP
313. Petroglyph NM
314. Pictured Rocks NL
315. Pinnacles NP
316. Pipe Spring NM
National Park Service FY 2024 Budget Justifications
Overview-20
National Park System Units
In Alphabetical Order (continued)
317. Pipestone NM
318. Piscataway Park
319. Point Reyes NS
320. Port Chicago Naval
Magazine NMem
321. Potomac Heritage
NST
322. Poverty Point NM
323. Prince William
Forest Park
324. Pu’uhonua o
Honaunau NHP
325. Pullman NHP
326. Puukohola Heiau
NHS
327. Rainbow Bridge NM
328. Reconstruction Era
NHP
329. Redwood NP
330. Richmond NBP
331. Rio Grande Wild &
Scenic River
332. River Raisin NBP
333. Rock Creek Park
334. Rocky Mountain NP
335. Roger Williams
NMem
336. Rosie the
Riveter/WWII Home
Front NHP
337. Ross Lake NRA
338. Russell Cave NM
339. Sagamore Hill NHS
340. Saguaro NP
341. Saint Croix Island
IHS
342. Saint Croix NSR
343. Saint Paul’s Church
NHS
344. Saint-Gaudens NHP
345. Salem Maritime
NHS
346. Salinas Pueblo
Missions NM
347. Salt River Bay NHP
& Ecological
Preserve
348. San Antonio
Missions NHP
349. San Francisco
Maritime NHP
350. San Juan Island NHP
351. San Juan NHS
352. Sand Creek Massacre
NHS
353. Santa Monica Mtns
NRA
354. Saratoga NHP
355. Saugus Iron Works
NHS
356. Scotts Bluff NM
357. Sequoia NP
358. Shenandoah NP
359. Shiloh NMP
360. Sitka NHP
361. Sleeping Bear Dunes
NL
362. Springfield Armory
NHS
363. Statue of Liberty NM
364. Ste. Genevieve NHP
365. Steamtown NHS
366. Stones River NB
367. Stonewall NM
368. Sunset Crater
Volcano NM
369. Tallgrass Prairie
NPres
370. Thaddeus
Kosciuszko NMem
371. Theodore Roosevelt
Birthplace NHS
372. Theodore Roosevelt
Inaugural NHS
373. Theodore Roosevelt
Island NMem
374. Theodore Roosevelt
NP
375. Thomas Edison NHP
376. Thomas Jefferson
Memorial
377. Thomas Stone NHS
378. Timpanogos Cave
NM
379. Timucuan Ecological
& Historic NPres
380. Tonto NM
381. Tule Lake NM
382. Tule Springs Fossil
Beds NM
383. Tumacacori NHP
384. Tupelo NB
385. Tuskegee Airmen
NHS
386. Tuskegee Institute
NHS
387. Tuzigoot NM
388. Ulysses S. Grant
NHS
389. Upper Delaware
Scenic &
Recreational River
390. Valles Caldera NPres
391. Valley Forge NHP
392. Vanderbilt Mansion
NHS
393. Vicksburg NMP
394. Vietnam Veterans
Memorial
395. Virgin Islands Coral
Reef NM
396. Virgin Islands NP
397. Voyageurs NP
398. Waco Mammoth NM
399. Walnut Canyon NM
400. War in the Pacific
NHP
401. Washington
Monument
402. Washita Battlefield
NHS
403. Weir Farm NHP
404. Whiskeytown Unit
NRA
405. White House
406. White Sands NP
407. Whitman Mission
NHS
408. William Howard Taft
NHS
409. William Jefferson
Clinton Birthplace
Home NHS
410. Wilson’s Creek NB
411. Wind Cave NP
412. Wolf Trap National
Park for the
Performing Arts
413. Women’s Rights
NHP
414. World War I
Memorial
415. World War II
Memorial
416. Wrangell-Saint Elias
NP
417. Wrangell-Saint Elias
NPres
418. Wright Brothers
NMem
419. Wupatki NM
420. Yellowstone NP
421. Yosemite NP
422. Yucca House NM
423. Yukon-Charley
Rivers NPres
424. Zion NP
National Park Service FY 2024 Budget Justifications
Overview-21
Park Visitation and Acreage
Park Units and Groups
FY 2022
Recreational
Visitation
13
FY 2022
Acreage
Federal
14
FY 2022
Acreage
Gross
15
Abraham Lincoln Birthplace NHP 267,081 344.50 344.50
Acadia NP 4,008,527 48,209.25 49,071.40
Adams NHP 16,971 9.17 23.82
African Burial Grounds NM 23,611 0.35 0.35
Agate Fossil Beds NM 16,972 2,730.08 3,057.87
Allegheny Portage Railroad NHS 182,177 1,255.02 1,284.27
Amache NHS
1
0 0.00 0.00
Amistad NRA 1,082,153 57,496.60 62,945.15
Andersonville NHS 54,239 500.88 515.61
Andrew Johnson NHS 54,407 16.68 16.68
Antietam NB 119,849 2,752.75 3,258.36
Apostle Islands NL 257,064 42,160.70 69,377.43
Appalachian NST
2
0 183,166.33 243,453.18
Appomattox Court House NHP 85,413 1,700.30 1,774.60
Arches NP 1,509,726 76,545.95 76,678.98
Arkansas Post NMem 24,049 663.91 757.51
Assateague Island NS 2,408,246 18,928.27 41,346.50
Aztec Ruins NM 54,152 266.78 318.40
Badlands NP 1,018,186 233,809.13 242,755.94
Baltimore Washington Parkway
3
0 0.00 0.00
Bandelier NM 235,269 33,654.44 33,676.67
Bent’s Old Fort NHS 24,913 735.60 798.54
Bering Land Bridge NPres 2,642 2,651,327.60 2,697,391.01
Big Bend NP 525,975 775,273.38 801,163.21
Big Cypress NPres 2,998,329 677,344.66 720,564.01
Big Hole NB 49,895 655.61 975.61
Big South Fork National River & Recreation Area 817,463 115,422.00 123,698.72
Big Thicket NPres 280,084 108,748.14 113,121.96
Bighorn Canyon NRA 220,558 68,490.87 120,296.22
Birmingham Civil Rights NM
4
0 0.88 0.88
Biscayne NP 702,763 171,395.41 172,971.11
Black Canyon of the Gunnison NP 284,379 30,730.20 30,779.83
Blackstone River Valley NHP
4
0 88.00 1,489.00
Blue Ridge Parkway 15,963,573 89,187.30 100,668.22
Bluestone NSR 16,590 3,032.00 4,309.51
Booker T. Washington NM 19,965 239.01 239.01
Boston African American NHS 379,791 0.00 0.59
Boston Harbor Islands NRA 29,508 245.57 1,482.31
Boston NHP 1,979,956 37.96 43.82
Brown v. Board of Education NHS 14,774 1.85 1.85
Bryce Canyon NP 2,304,205 35,832.58 35,835.08
Buffalo NR 1,263,496 94,067.84 94,293.08
Cabrillo NM 760,793 159.94 159.94
Camp Nelson NM 28,285 464.97 464.97
Canaveral NS 2,202,193 57,647.69 57,661.69
Cane River Creole NHP 14,862 62.39 205.50
Canyonlands NP 805,693 337,570.43 337,597.83
Cape Cod NS 3,924,813 27,549.84 43,608.39
National Park Service FY 2024 Budget Justifications
Overview-22
Park Units and Groups
FY 2022
Recreational
Visitation
13
FY 2022
Acreage
Federal
14
FY 2022
Acreage
Gross
15
Cape Hatteras Group - Cape Hatteras NS, Fort
Raleigh NHS, Wright Brothers NMem 3,686,171 31,127.36 31,294.82
Cape Lookout NS 548,790 25,173.62 28,243.36
Capitol Reef NP 1,265,693 241,223.33 241,904.50
Capulin Volcano NM 90,917 792.84 792.84
Carl Sandburg Home NHS 76,391 268.36 268.49
Carlsbad Caverns NP 400,061 46,427.26 46,766.45
Casa Grande Ruins NM & Hohokam Pima NM 67,415 472.50 2,162.50
Castillo de San Marcos NM & Fort Matanzas NM 1,293,018 317.82 319.49
Catoctin Mountain Park 469,998 5,889.79 5,890.92
Cedar Breaks NM 690,741 6,154.60 6,154.60
Cedar Creek and Belle Grove NHP
4
0 134.95 3,704.96
César E. Chávez NM 11,794 10.50 116.56
Chaco Culture NHP 41,313 32,840.14 33,960.19
Chamizal NMem 19,800 54.90 54.90
Channel Islands NP 333,960 79,018.62 249,561.00
Charles Pinckney NHS 13,162 28.45 28.45
Charles Young Buffalo Soldiers NM 3,450 59.66 59.66
Chattahoochee River NRA 3,469,919 5,271.19 12,416.75
Chesapeake & Ohio Canal NHP 4,472,711 14,451.17 19,628.10
Chickamauga & Chattanooga NMP 952,412 9,432.97 9,523.48
Chickasaw NRA 1,460,008 9,894.13 9,898.63
Christiansted NHS, Buck Island Reef NM, & Salt
River Bay NHP & Ecological Preserve 153,265 19,266.38 20,032.04
City of Rocks NRes 83,301 10,022.78 14,407.19
Colonial NHP 2,825,275 8,605.18 8,675.04
Colorado NM 482,657 20,536.39 20,536.39
Coltsville NHP
1
0 0.00 0.00
Congaree NP 212,934 26,600.96 26,692.60
Cowpens NB 215,133 790.90 841.56
Crater Lake NP 545,091 183,223.77 183,224.05
Craters of the Moon NM&Pres 242,198 737,658.78 752,377.33
Cumberland Gap NHP 748,049 24,530.56 24,546.83
Cumberland Island NS 67,640 19,524.92 36,346.83
Curecanti NRA 1,042,846 43,579.72 43,590.56
Cuyahoga Valley NP 2,879,958 20,514.63 32,571.89
Dayton Aviation NHP 82,858 85.10 110.56
De Soto NMem 198,634 24.78 30.00
Death Valley NP 1,228,814 3,355,171.58 3,408,395.63
Delaware Water Gap NRA 4,394,240 58,416.83 68,708.88
Denali NP&Pres 420,868 6,036,901.93 6,075,028.96
Devils Postpile NM 143,149 800.19 800.19
Devils Tower NM 484,794 1,346.91 1,347.21
Dinosaur NM 351,360 205,925.51 210,281.92
Dry Tortugas NP 83,458 61,481.22 64,701.22
Ebey’s Landing NHR
4
0 2,774.83 19,333.51
Edgar Allan Poe NHS
4
6,994 0.52 0.52
Effigy Mounds NM 57,749 2,489.26 2,526.39
Eisenhower NHS 23,013 690.46 690.46
El Malpais NM 164,599 109,946.76 114,347.12
El Morro NM 61,310 1,039.92 1,278.72
National Park Service FY 2024 Budget Justifications
Overview-23
Park Units and Groups
FY 2022
Recreational
Visitation
13
FY 2022
Acreage
Federal
14
FY 2022
Acreage
Gross
15
Eleanor Roosevelt NHS 17,423 180.50 180.50
Eugene O’Neill NHS 19,940 13.19 13.19
Everglades NP 1,148,991 1,508,652.75 1,508,938.57
Fire Island NS 387,797 6,242.18 19,580.65
First Ladies NHS 7,071 0.46 0.46
First State NHP
4
0 1,364.85 1,409.22
Flagstaff Area Parks - Sunset Crater Volcano NM,
Walnut Canyon NM, Wupatki NM 451,112 41,364.60 41,642.44
Flight 93 NMem 380,747 1,584.70 2,262.65
Florissant Fossil Beds NM 69,788 6,272.32 6,278.09
Fort Caroline NMem & Timucuan Ecological &
Historic Preserve 1,434,494 17,156.96 46,401.06
Fort Davis NHS 46,796 523.00 523.00
Fort Donelson NB 202,708 1,253.65 1,319.25
Fort Frederica NM 213,559 304.05 305.34
Fort Laramie NHS 39,924 871.78 873.11
Fort Larned NHS 26,377 679.66 718.39
Fort McHenry NM & Historic Shrine 198,840 43.26 43.26
Fort Monroe NM
4
0 327.12 367.12
Fort Necessity NB 253,947 894.47 902.80
Fort Point NHS 957,300 29.00 29.00
Fort Pulaski NM 466,618 5,365.13 5,623.10
Fort Scott NHS 25,660 16.77 20.11
Fort Smith NHS 115,497 37.96 75.00
Fort Stanwix NM 65,746 15.52 15.52
Fort Sumter and Fort Moultrie NHP 398,255 228.41 232.52
Fort Union NM 7,859 720.60 720.60
Fort Union Trading Post NHS 13,008 370.23 440.14
Fort Vancouver NHS 950,708 197.41 206.72
Fossil Butte NM 17,801 8,198.00 8,198.00
Frederick Law Olmsted NHS 12,704 7.21 7.21
Fredericksburg & Spotsylvania NMP 782,182 7,567.55 8,405.46
Freedom Riders NM
4
0 6.02 6.02
Friendship Hill NHS 16,227 661.44 674.56
Gates of the Arctic NP&Pres 9,457 8,308,013.20 8,472,505.52
Gateway Arch NP 1,583,413 90.96 192.83
Gateway NRA 8,740,144 20,445.66 26,606.63
Gauley River NRA 168,062 5,243.30 11,565.75
George Rogers Clark NHP 118,979 25.30 26.17
George Washington Birthplace NM 89,853 550.23 654.19
George Washington Carver NM 28,508 240.00 240.00
George Washington Memorial Parkway
5
7,876,495 6,721.91 6,904.84
Gettysburg NMP 749,265 5,200.55 6,032.07
Gila Cliff Dwellings NM 46,315 533.13 533.13
Glacier Bay NP&Pres 449,495 3,280,840.78 3,281,789.43
Glacier NP 2,950,985 1,012,897.68 1,013,126.39
Glen Canyon NRA 2,640,239 1,239,763.84 1,254,116.62
Golden Gate NRA 15,128,021 57,314.23 82,116.03
Golden Spike NHP 49,655 2,203.20 2,735.28
Governor’s Island NM 78,427 22.41 22.91
Grand Canyon NP 4,751,338 1,180,650.85 1,201,647.03
National Park Service FY 2024 Budget Justifications
Overview-24
Park Units and Groups
FY 2022
Recreational
Visitation
13
FY 2022
Acreage
Federal
14
FY 2022
Acreage
Gross
15
Grand Canyon Parashant NM
1
0 0.00 0.00
Grand Portage NM 91,494 709.97 709.97
Grand Teton NP 2,890,367 308,664.46 310,044.36
Grant-Kohrs Ranch NHS 23,279 1,491.46 1,618.43
Great Basin NP 141,502 77,180.00 77,180.00
Great Egg Harbor Scenic & Recreational River
4
0 0.00 43,311.42
Great Sand Dunes NP&Pres 503,024 136,373.84 149,031.73
Great Smoky Mountains NP 13,342,237 522,076.73 522,426.88
Guadalupe Mountains NP 229,422 86,367.10 86,367.10
Guilford Courthouse NMP 354,686 254.44 254.44
Gulf Islands NS 5,609,509 99,779.27 138,305.52
Hagerman Fossil Beds NM 23,622 4,334.65 4,351.15
Haleakala NP 1,034,533 33,480.65 33,480.80
Hampton NHS 12,201 62.04 62.04
Harpers Ferry NHP 371,912 3,561.02 3,669.19
Harriet Tubman NHP
4
0 0.50 31.50
Harriet Tubman Underground Railroad NHP
4
0 480.00 480.00
Harry S Truman NHS 19,878 12.59 12.59
Hawaii Volcanoes NP 1,602,807 344,812.18 344,812.18
Herbert Hoover NHS 98,215 181.11 186.80
Home of Franklin D Roosevelt NHS 85,603 838.43 838.43
Homestead NM of America 48,645 204.54 210.45
Honouliuli NHS
4
0 123.02 154.46
Hopewell Culture NHP 50,449 1,146.35 1,775.78
Hopewell Furnace NHS 56,325 848.06 848.06
Horseshoe Bend NMP 67,668 2,040.00 2,040.00
Hot Springs NP 2,317,284 5,026.10 5,554.15
Hovenweep NM 27,043 784.93 784.93
Independence NHP 2,469,209 34.76 44.87
Indiana Dunes NP 2,906,142 11,108.37 15,349.08
Isle Royale NP 25,467 539,281.91 571,790.30
James A Garfield NHS 29,076 7.82 7.82
Jean Lafitte NHP & Pres & Poverty Point NM 256,857 21,080.70 26,786.71
Jewel Cave NM 118,785 1,273.51 1,273.51
Jimmy Carter NHS 34,908 47.54 78.35
John D Rockefeller Jr Memorial Parkway 1,094,868 23,777.22 23,777.22
John Day Fossil Beds NM 165,200 13,456.16 14,062.19
John F Kennedy NHS 100 0.09 0.09
John Muir NHS 38,524 338.30 344.14
Johnstown Flood NMem 148,248 169.01 177.76
Joshua Tree NP 3,104,357 781,908.85 795,155.85
Kalaupapa NHP 35,007 22.88 10,778.88
Kaloko-Honokohau NHP 291,800 615.90 1,163.05
Katahdin Woods and Waters NM 44,600 87,564.27 87,564.27
Katmai NP&Pres, Aniakchak NM&Pres & Alagnak
WR 34,361 4,567,368.61 4,725,186.85
Kenai Fjords NP 390,563 603,129.86 669,650.05
Kennesaw Mountain NBP 1,381,306 2,897.53 2,913.63
Keweenaw NHP 14,573 135.78 1,870.00
Kings Mountain NMP 239,146 3,945.29 3,945.29
Klondike Gold Rush - Seattle Unit NHP 56,059 0.00 0.00
National Park Service FY 2024 Budget Justifications
Overview-25
Park Units and Groups
FY 2022
Recreational
Visitation
13
FY 2022
Acreage
Federal
14
FY 2022
Acreage
Gross
15
Klondike Gold Rush NHP 340,667 3,420.00 12,996.49
Knife River Indian Village NHS 9,404 1,595.85 1,751.00
Lake Clark NP&Pres 18,199 3,740,754.81 4,030,110.17
Lake Mead NRA 6,129,756 1,471,003.26 1,495,815.53
Lake Meredith NRA & Alibates Flint Quarry NM 1,309,043 46,056.74 46,348.60
Lake Roosevelt NRA 1,143,450 100,390.31 100,390.31
Lassen Volcanic NP 422,510 106,505.38 106,589.02
Lava Beds NM & Tule Lake NM 131,715 46,727.44 46,729.81
Lewis & Clark NHP 279,432 2,745.62 3,410.15
Lincoln Boyhood NMem 103,857 185.68 199.96
Lincoln Home NHS 139,123 12.03 12.24
Little Bighorn Battlefield NM 175,066 765.34 765.34
Little River Canyon NPres 749,420 11,170.45 15,291.63
Little Rock Central High School NHS 88,450 2.22 28.22
Longfellow House - Washington’s Headquarters
NHS 57,587 1.98 1.98
Lowell NHP 199,095 30.63 143.37
Lyndon B Johnson NHP 120,429 674.33 1,571.71
Maggie L Walker NHS 4,721 0.36 1.29
Mammoth Cave NP 664,150 52,007.62 54,016.29
Manassas NBP 512,843 4,426.31 5,073.44
Manhattan Project NHP 26,935 113.61 113.61
Manhattan Sites
6
3,431,897 9.49 10.20
Manzanar NHS 119,030 813.81 813.81
Marsh-Billings-Rockefeller NHP 58,342 555.07 643.07
Martin Luther King, Jr NHP 216,456 14.07 39.17
Martin Van Buren NHS 11,313 52.17 284.93
Medgar & Myrlie Evers Home NM 10,522 0.74 0.74
Mesa Verde NP 495,161 52,251.98 52,485.17
Mill Springs Battlefield NM
4
0 33.46 1,459.19
Minidoka NHS 14,127 388.30 396.30
Minute Man NHP 958,222 801.94 1,027.76
Minuteman Missile NHS 108,322 40.15 43.80
Mississippi NRRA 288,523 91.74 53,775.00
Missouri NRR 130,539 872.42 48,456.55
Mojave NPres & Castle Mountains NM 776,900 1,507,936.58 1,570,734.87
Monocacy NB 128,944 1,552.81 1,646.88
Montezuma Castle NM & Tuzigoot NM 499,808 1,380.22 1,827.41
Moores Creek NB 52,917 87.75 87.75
Morristown NHP 301,561 1,705.69 1,710.72
Mount Rainier NP 1,590,838 236,334.67 236,381.64
Mount Rushmore NMem 2,565,497 1,239.52 1,278.45
Muir Woods NM 791,870 522.98 553.55
Natchez NHP 51,432 97.43 119.75
Natchez Trace Parkway, Brices Cross Roads NBS,
Tupelo NB 6,646,909 52,209.30 52,382.46
Natchez Trace NST
7
0 0.00 10,995.00
National Capital Parks-East
8
2,890,798 14,572.88 14,849.78
National Mall & Memorial Parks
9
32,647,518 371.45 372.63
National Park of American Samoa 1,935 0.00 8,256.67
Natural Bridges NM 69,810 7,636.49 7,636.49
National Park Service FY 2024 Budget Justifications
Overview-26
Park Units and Groups
FY 2022
Recreational
Visitation
13
FY 2022
Acreage
Federal
14
FY 2022
Acreage
Gross
15
New Bedford Whaling NHP 12,113 0.34 34.00
New Orleans Jazz NHP 32,016 0.00 5.13
New Philadelphia NHS
10
0 0.00 0.00
New River Gorge NP&Pres 1,636,140 54,020.12 72,345.91
Nez Perce NHP 309,720 3,863.06 4,564.93
Nicodemus NHS 5,418 1.64 4.39
Ninety Six NHS 98,247 1,021.94 1,021.94
Niobrara NSR 79,898 1,030.40 29,088.57
North Cascades NP, Lake Chelan NRA, Ross Lake
NRA 1,060,022 679,965.73 684,294.65
Obed WSR 296,661 4,181.01 5,489.85
Ocmulgee Mounds NHP 151,949 1,607.60 3,431.05
Olympic NP 2,462,368 913,573.71 922,649.41
Oregon Caves NM & Pres 65,747 4,554.03 4,554.03
Organ Pipe Cactus NM 136,001 329,365.29 330,688.86
Ozark NSR 1,296,156 61,368.42 80,784.30
Padre Island NS 553,658 130,355.46 130,434.27
Palo Alto Battlefield NHS 185,361 1,814.94 3,426.87
Paterson Great Falls NHP 267,397 4.15 51.33
Pea Ridge NMP 81,767 4,278.75 4,300.35
Pearl Harbor NMem 1,468,853 21.64 21.64
Pecos NHP 51,967 6,410.44 6,693.50
Perry’s Victory & International Peace Memorial 90,058 23.14 25.38
Petersburg NB 191,900 2,709.63 9,350.21
Petrified Forest NP 519,157 147,144.45 221,390.21
Petroglyph NM 356,913 2,941.26 7,209.04
Pictured Rocks NL 957,118 35,771.46 73,235.97
Pinnacles NP 285,402 26,674.91 26,685.73
Pipe Spring NM 23,286 40.00 40.00
Pipestone NM 77,097 297.08 297.08
Point Reyes NS 2,439,429 65,234.35 71,053.38
Port Chicago Naval Magazine NMem 1,078 5.00 5.00
Potomac Heritage NST
4
0 0.00 0.00
President’s Park 755,629 18.07 18.07
Prince William Forest Park 293,664 14,611.80 16,059.05
Pullman NHP
4
0 0.40 0.40
Pu’uhonua O Honaunau NHP 299,617 419.80 419.80
Puukohola Heiau NHS 31,703 60.95 86.24
Rainbow Bridge NM 564 160.00 160.00
Reconstruction Era NHP
4
13,799 15.53 15.53
Redwood NP 467,854 77,746.46 138,999.37
Richmond NBP 169,494 4,066.34 8,143.26
Rio Grande WSR 278 0.00 13,123.39
River Raisin NBP 234,729 42.18 42.18
Rock Creek Park 2,029,435 1,755.21 1,755.21
Rocky Mountain NP 4,215,553 265,524.20 265,847.74
Roger Williams NMem 32,304 4.56 4.56
Ronald Reagan Boyhood Home NHS
1
0 0.00 0.00
Rosie the Riveter WWII Home Front NHP 33,751 0.00 145.19
Russell Cave NM 17,801 310.45 310.45
Sagamore Hill NHS 127,766 83.02 83.02
National Park Service FY 2024 Budget Justifications
Overview-27
Park Units and Groups
FY 2022
Recreational
Visitation
13
FY 2022
Acreage
Federal
14
FY 2022
Acreage
Gross
15
Saguaro NP 890,957 88,030.98 92,876.52
Saint Croix Island IHS 11,852 6.50 6.50
Saint Croix NSR & Lower Saint Croix NSR 807,051 40,768.73 92,743.08
Saint-Gaudens NHP 26,453 190.75 190.75
Salem Maritime NHS 239,808 8.93 9.02
Salinas Pueblo Missions NM 38,548 985.13 1,071.42
San Antonio Missions NHP 1,275,769 616.51 990.28
San Francisco Maritime NHP 3,028,445 30.03 49.86
San Juan Island NHP 740,889 2,114.52 2,145.56
San Juan NHS 976,469 53.20 75.13
Sand Creek Massacre NHS 4,937 6,503.34 12,583.34
Santa Monica Mountains NRA 792,688 25,162.38 153,125.53
Saratoga NHP 72,086 3,101.80 3,607.59
Saugus Iron Works NHS 23,544 8.51 8.51
Scotts Bluff NM 179,373 2,954.21 3,004.73
Sequoia NP & Kings Canyon NP 1,642,343 865,754.72 865,963.83
Shenandoah NP 1,526,544 199,329.12 200,445.92
Shiloh NMP 385,963 5,487.93 9,322.28
Sitka NHP 131,678 58.22 116.29
Sleeping Bear Dunes NL 1,528,723 57,812.94 71,310.21
Southeast Arizona Group
11
199,784 17,850.05 17,854.40
Southern Four Corners Group
12
437,950 520.09 84,360.09
Springfield Armory NHS 14,512 20.60 54.93
Statue of Liberty NM & Ellis Island 2,912,860 58.38 58.38
Ste. Genevieve NHP
4
0 13.05 17.47
Steamtown NHS 69,305 51.29 62.48
Stones River NB 452,102 650.14 709.49
Stonewall NM 1,578,361 0.12 7.70
Tallgrass Prairie NPres 26,790 33.12 10,882.67
Thaddeus Kosciuszko NMem 1,390 0.02 0.02
Theodore Roosevelt Inaugural NHS 18,961 1.18 1.18
Theodore Roosevelt NP & International Peace
Garden 678,722 69,702.12 70,446.89
Thomas Edison NHP 30,560 21.25 21.25
Thomas Stone NHS 5,067 328.25 328.25
Timpanogos Cave NM 149,969 250.00 250.00
Tonto NM 31,759 1,120.00 1,120.00
Tule Springs Fossil Beds NM
4
43,780 22,650.00 22,650.00
Tumacacori NHP 37,026 357.74 360.32
Tuskegee Airmen NHS 14,196 44.71 89.68
Tuskegee Institute NHS 9,299 8.92 57.92
Ulysses S. Grant NHS 31,672 9.60 9.60
Upper Delaware Scenic & Recreational River &
Middle Delaware NSR 269,673 30.75 76,972.89
Valles Caldera NPres 69,659 89,805.31 89,805.31
Valley Forge NHP 1,543,929 3,175.70 3,468.54
Vanderbilt Mansion NHS 326,356 211.65 211.65
Vicksburg NMP 428,070 2,468.66 2,524.11
Virgin Islands Coral Reef NM
4
0 11,608.48 12,708.07
Virgin Islands NP 210,798 13,105.24 15,052.33
Voyageurs NP 221,492 133,284.52 218,222.35
National Park Service FY 2024 Budget Justifications
Overview-28
Park Units and Groups
FY 2022
Recreational
Visitation
13
FY 2022
Acreage
Federal
14
FY 2022
Acreage
Gross
15
Waco Mammoth NM 85,546 7.11 107.23
War in the Pacific NHP 376,919 958.25 2,030.65
Washita Battlefield NHS 13,714 315.20 315.20
Weir Farm NHS 36,752 68.05 74.20
West. Arctic Parklands - Noatak NPres, Cape
Krusenstern NM, Kobuk Valley NP 52,178 8,891,507.05 8,986,883.70
Whiskeytown NRA 1,416,749 42,492.09 42,503.25
White Sands NP 726,669 146,344.31 146,344.31
Whitman Mission NHS 50,275 138.53 138.53
William Howard Taft NHS 26,549 1.92 3.64
William Jefferson Clinton Birthplace Home NHS 6,589 0.68 0.68
Wilson’s Creek NB 272,036 2,035.49 2,421.76
Wind Cave NP 612,288 33,970.84 33,970.84
Wolf Trap NP 448,575 130.28 130.28
Women’s Rights NHP 31,573 7.03 7.44
Wrangell-Saint Elias NP&Pres 65,236 12,280,604.41 13,175,791.37
Yellowstone NP 3,392,749 2,219,789.13 2,219,790.71
Yosemite NP 3,575,149 760,020.05 761,747.50
Yucca House NM
4
0 33.87 33.87
Yukon-Charley Rivers NPres 744 2,195,546.98 2,526,512.44
Zion NP 4,754,752 143,793.41 147,242.66
Grand Total 311,155,177 81,129,809.59 85,134,368.43
1
Amache NHS, Coltsville NHP, Grand Canyon Parashant NM, and Ronald Reagan Boyhood Home NHS are not officially park
units; therefore, visitation is not counted.
2
Appalachian NST – pedestrian traffic and multiple access points along the trail present problems in estimating visitation.
3
Counts for the Baltimore Washington Parkway are reported as part of National Capital Parks East.
4
Visitation information is not available for new parks, or for sites that are under development or renovation. These include:
Birmingham Civil Rights NM, Blackstone River Valley NHP, Cedar Creek and Belle Grove NHP, Ebey’s Landing NHR, Edgar
Allan Poe NHS, First State NM, Fort Monroe NM, Freedom Riders NM, Great Egg Harbor NS & RR, Harriet Tubman NHP &
Harriet Tubman Underground RR NHP, Honouliuli NHS, Mill Springs Battlefield NM, Potomac Heritage NST, Pullman NM,
Reconstruction Era NHP, Ste. Genevieve NHP, Tule Springs Fossil Beds NM, Virgin Islands Coral Reef NM, Yucca House NM.
5
George Washington Memorial Parkway group includes: Arlington House The R.E. Lee Memorial, Clara Barton NHS, George
Washington Memorial Parkway, LBJ Memorial Grove on the Potomac, and Theodore Roosevelt Island.
6
Manhattan Sites group includes: Castle Clinton NM, Federal Hall NMem, General Grant NMem, Hamilton Grange NMem,
Saint Paul’s Church NHS, and Theodore Roosevelt Birthplace NHS.
7
Visitation at Natchez Trace National Scenic Trail is included in the visitation data reported for Natchez Trace Parkway.
8
National Capital Parks-East group includes: Carter G. Woodson Home NHS, Frederick Douglass NHS, Fort Washington Park,
Greenbelt Park, Mary McLeod Bethune Council House NHS, National Capital Parks Central, National Capital Parks East, and
Piscataway Park.
9
National Mall and Memorial Parks group includes: Belmont-Paul Women’s Equality NM, Constitution Gardens, Dwight D.
Eisenhower Memorial, Franklin Delano Roosevelt Memorial, Ford’s Theatre NHS, Korean War Veterans Memorial, Lincoln
Memorial, Martin Luther King, Jr. Memorial, National Mall, Pennsylvania Avenue NHS, Thomas Jefferson Memorial, Vietnam
Veterans Memorial, Washington Monument, World War I Memorial, and World War II Memorial.
10
New Philadelphia NHS was established on December 29, 2022, and therefore does not appear in the FY 2021 visitation report
or the FY 2022 acreage report.
11
Southeast Arizona group includes: Chiricahua NM, Fort Bowie NHS, and Coronado NMem
12
Southern Four Corners group includes: Navajo NM, Canyon de Chelly NM, and Hubbell Trading Post NHS
13
FY 2022 data reflects visitation during the fiscal year from October 1, 2021 through September 30, 2022. The NPS also reports
calendar year visitation which reflects visitation from January 1, 2022 through December 31, 2022. Visitation counts will differ
between these ranges.
14
Federal Acreage includes only land or interests in land owned by the NPS and other Federal Agencies; it fluctuates when
ownership changes occur. Numbers do not add to total because of rounding.
15
Gross Acreage includes all land within the Authorized Boundary, encompassing land owned by the United States, including the
NPS and other Federal agencies, as well as State and local governments, and private organizations and persons. The Gross
National Park Service FY 2024 Budget Justifications
Overview-29
Acreage may not accurately reflect increases to NPS owned property, as it is a relatively static number and does not fluctuate
when ownership changes occur. Numbers do not add to total because of rounding.
National Park Service FY 2024 Budget Justifications
Overview-30
Unit Designations and Other Abbreviations
Abbreviation Description
IHS International Historic Site
NB National Battlefield
NBP National Battlefield Park
NBS National Battlefield Site
NHP National Historical Park
NHR National Historic Reserve
NHS National Historic Site
NHT National Historic Trail
NL National Lakeshore
NM National Monument
NM&Pres National Monument and Preserve
NMem National Memorial
NMP National Military Park
NNL National Natural Landmark
NP National Park
NPres National Preserve
NP&Pres National Park and Preserve
NR National River
NRA National Recreation Area
NRes National Reserve
NS National Seashore
NSR National Scenic River/Riverway
NST National Scenic Trail
NW&SR National Wild and Scenic River
ABAAS Architectural Barriers Act Accessibility Standards
ABPP American Battlefield Protection Program
AML Abandoned Mineral Lands
ANILCA Alaska National Interest Lands Conservation Act
API Asset Priority Index
ARPA Archeological Resource Protection Act
ASMIS Archeological Sites Management Information System
ATS Alternative Transportation System
BIL Bipartisan Infrastructure Law
BIRB Bureau Investment Review Board
BLM Bureau of Land Management
BOR Bureau of Reclamation
CAP Capital Asset Plans
CERCLA Comprehensive Environmental Response, Compensation and Liability Act
CERP Comprehensive Everglades Restoration Plan
CESI Critical Ecosystems Studies Initiative
CESU Cooperative Ecosystem Studies Units
CFR Code of Federal Regulations
CLC Cooperative Landscape Conservation
CLG Certified Local Government
CLI Cultural Landscapes Inventory
CLP Collaborative Landscape Planning
CR Continuing Resolution
CRDIP Cultural Resources Diversity Internship Program
CRGIS Cultural Resources Geographic Information System
CRPP Cultural Resources Preservation Program
CRV Current Replacement Value
National Park Service FY 2024 Budget Justifications
Overview-31
Abbreviation Description
CWA Clean Water Act
CWD Chronic Wasting Disease
DEI Diversity, Equity and Inclusion
DHS Department of Homeland Security
DM Deferred Maintenance
DO Director’s Order
DOC Department of Commerce
DoD Department of Defense
DOE Department of Energy
DOEd Department of Education
DOI Department of the Interior
DOL Department of Labor
DOS Department of State
DSC Denver Service Center
EA Environmental Assessment
EEO Equal Employment Opportunity
EIS Environmental Impact Statement
EMP Environmental Management Program
EO Executive Order
EPA Environmental Protection Agency
FAA Federal Aviation Administration
FASAB Federal Accounting Standards Advisory Board
FBMS Financial and Business Management System
FCI Facility Condition Index
FERC Federal Energy Regulatory Commission
FHWA Federal Highway Administration
FLETC Federal Law Enforcement Training Center
FLHP Federal Lands Highway Program
FLP Federal Lands to Parks Program
FLREA Federal Lands Recreation Enhancement Act
FMSS Facility Management Software System
FOIA Freedom of Information Act
FPI Federal Preservation Institute
FPPS Federal Personnel Payroll System
FTE Full-Time Equivalent
FWS U.S. Fish and Wildlife Service
FY Fiscal Year
GAO Government Accountability Office
GAOA Great America Outdoors Act
GIS Geographic Information System
GLRI Great Lakes Restoration Initiative
GMP General Management Plan
GOMESA Gulf of Mexico Energy Security Act
GPRA Government Performance and Results Act
GSA U.S. General Services Administration
HABS Historic America Buildings Survey
HAER Historic America Engineering Record
HALS Historic America Landscapes Survey
HAZMAT Hazardous Materials
HAZWOPER Hazardous Waste Operations and Emergency Response
HBCU Historically Black Colleges and Universities
HDP Heritage Documentation Programs
National Park Service FY 2024 Budget Justifications
Overview-32
Abbreviation Description
HFC Harpers Ferry Center
HIDTA High Intensity Drug Trafficking Area
HPF Historic Preservation Fund
HPP Heritage Partnership Program
HPS Heritage Preservation Services
HR Human Resources
HROC Human Resource Operations Center
I&M Inventory and Monitoring
IBC Interior Business Center
IDIQ Indefinite Delivery, Indefinite Quantity
IMARS Incident Management, Analysis, and Reporting System
IPMT Invasive Plant Management Team
IRA Inflation Reduction Act
IRB/BIRB Investment Review Board / Bureau Investment Review Board
IT Information Technology
LARS Land Acquisition Rating System
LASA Land Acquisition and State Assistance
LIC Line Item Construction
LRF Legacy Restoration Fund
LSI Leasehold Surrender Interest
LWCF Land and Water Conservation Fund
MABO Major Acquisition Buying Office
NAGPRA Native American Graves Protection and Repatriation Act
NAPA National Academy of Public Administration
NCPTT National Center for Preservation Technology and Training
NEPA National Environmental Policy Act
NGO Non-Governmental Organization
NHA National Heritage Area
NHPA National Historic Preservation Act
NLC National Leadership Council
NOAA National Oceanic and Atmospheric Administration
NPATMA National Parks Air Tour Management Act
NPF National Park Foundation
NPS National Park Service
NR&P National Recreation and Preservation
NRDA Natural Resource Damage Assessment
O&M Operations and Maintenance
OIA Office of International Affairs
OCS Outer Continental Shelf
OMB Office of Management and Budget
ONPS Operation of the National Park System
OPA Oil Pollution Act
OPA Other Permanent Appropriation
OPM Office of Personnel Management
OSHA Occupational Safety and Health Administration
PDS Project Data Sheet
PEPC Planning, Environment and Public Comment
PFMD Park Facility Management Division
PHS U.S. Public Health Service
PL Public Law
PLC Public Land Corps
PMIS Project Management Information System
National Park Service FY 2024 Budget Justifications
Overview-33
Abbreviation Description
PMO Project Management Office
POSS Point of Sale System
PPFL Park Planning, Facilities, and Lands
RFCP Recreation Fee Comprehensive Plan
RLC Research Learning Center
RM Recurring Maintenance
RM Resource Manual
RMP Resource Management Plan
ROD Record of Decision
RSS Resource Stewardship Strategy
RTCA Rivers, Trails and Conservation Assistance
SAT Save America’s Treasures grant program
SCA Student Conservation Association
SCORP State Comprehensive Outdoor Recreation Plan
SHPO State Historic Preservation Office/Officer
SO Secretarial Order
T&E Threatened and Endangered
THPO Tribal Historic Preservation Office/Officer
UMP Unit Management Plan
UPARR Urban Park and Recreation Recovery Fund
US United States
USACE U.S. Army Corps of Engineers
USC United States Code
USDA U.S. Department of Agriculture
USFS U.S. Forest Service
USGS U.S. Geological Survey
USPP U.S. Park Police
VA Value Analysis
VIP Volunteers-in-Parks
WCF Working Capital Fund
WNS White Nose Syndrome
YCC Youth Conservation Corps
YIP Youth Internship Program
YPP Youth Partnership Program
National Park Service FY 2024 Budget Justifications
Overview-34
Budget at a Glance
NPS Fiscal Year 2024
(Dollars in Thousands)
NPS FY 2024 Budget at a Glance (dollar amounts in thousands)
1
2022 Actual 2023 Enacted
2024 Fixed
Costs
2024 Internal
Transfers
2024
Program
Changes
2024
Request
Appropriation: OPERATION OF THE NATIONAL PARK SYSTEM
PARK MANAGEMENT
RESOURCE STEWARDSHIP 364,330 419,717 +15,289 -17,817 +92,448 509,637
Youth Corps Programs [0] [0] [0] [0] [+31,000] [31,000]
Cultural Resources Climate Assessment Team [0] [0] [0] [0] [+3,720] [3,720]
Park Capacity for Natural Resource Management [0] [0] [0] [0] [+28,500] [28,500]
Research Learning Centers [0] [0] [0] [0] [+3,000] [3,000]
Mgmt. & Policy Support for Climate Change Decision Making [0] [0] [0] [0] [+11,500] [12,500]
Cooperative Ecosystems Studies Units [0] [0] [0] [0] [+2,000] [2,000]
Inventory and Monitoring Program [46,214] [52,654] [+2,441] [0] [+3,100] [58,745]
Japanese American WWII History National Network [0] [0] [0] [0] [+250] [250]
New Subsistence Managers [0] [0] [0] [0] [+1,000] [1,000]
New & Critical Responsibilities [0] [0] [0] [0] [+740] [8,180]
Supporting Park Capacity [0] [0] [0] [0] [+563] [10,050]
Expand Tribal Co-Stewardship [0] [0] [0] [0] [+7,075] [7,075]
VISITOR SERVICES 260,210 308,487 +11,408 -29,011 +9,380 300,264
Semiquincentennial Commemoration [0] [0] [0] [0] [+2,000] [2,000]
Unigrid Brochure Printing [0] [0] [0] [0] [+625] [625]
Increasing Representation on Public Lands [0] [0] [0] [0] [+390] [3,000]
New & Critical Responsibilities [0] [0] [0] [0] [+2,085] [8,180]
Supporting Park Capacity [0] [0] [0] [0] [+1,280] [10,050]
Visitor Services on the Digital Platform [0] [0] [0] [0] [+3,000] [3,000]
PARK PROTECTION 407,757 429,396 +15,879 -1,764 +14,226 457,737
Law Enforcement Psychological Screening [0] [0] [0] [0] [+280] [280]
Special Agents [7,632] [7,888] [+415] [0] [+1,850] [10,153]
New & Critical Responsibilities [0] [0] [0] [0] [+1,950] [8,180]
Supporting Park Capacity [0] [0] [0] [0] [+1,781] [10,050]
United States Park Police Capacity [118,505] [123,419] [+6,106] [0] [+5,365] [134,890]
Natural Disaster Response Capacity [0] [0] [0] [0] [+2,000] [2,000]
Public Health Protection [3,525] [3,747] [+36] [0] [+1,000] [5,158]
FACILITY OPERATIONS & MAINTENANCE 914,790 938,677 +34,713 +3,312 +6,315 983,017
New & Critical Responsibilities [0] [0] [0] [0] [+1,094] [8,180]
Supporting Park Capacity [0] [0] [0] [0] [+3,896] [10,050]
Increasing Representation on Public Lands [0] [0] [0] [0] [+325] [3,000]
National Park Service FY 2024 Budget Justifications
Overview-35
NPS FY 2024 Budget at a Glance (dollar amounts in thousands)
1
2022 Actual 2023 Enacted
2024 Fixed
Costs
2024 Internal
Transfers
2024
Program
Changes
2024
Request
Mgmt. & Policy Support for Climate Change Decision Making [0] [0] [0] [0] [+1,000] [12,500]
PARK SUPPORT 612,654 609,514 +22,541 +42,701 +22,557 697,313
New & Critical Responsibilities [0] [0] [0] [0] [+2,311] [2,311]
Centralized Information Technology Costs [0] [0] [0] [0] [+6,386] [6,386]
Supporting Park Capacity [0] [0] [0] [0] [+2,530] [10,050]
Implement the NATIVE Act [0] [0] [0] [0] [+2,500] [2,500]
Increasing Representation on Public Lands [0] [0] [0] [0] [+2,285] [3,000]
Park Accessibility [0] [0] [0] [0] [+5,000] [5,000]
Contracting and Financial Assistance Workflow Management [0] [0] [0] [0] [+1,545] [1,545]
EXTERNAL ADMINISTRATIVE COSTS 207,287 217,633 +20,723 +2,579 +854 241,789
Employee Compensation Payments [19,945] [19,377] [+532] [0] [0] [19,909]
Unemployment Compensation Payments [18,142] [18,142] [+1,021] [0] [0] [19,163]
Centralized IT & Telecommunications Costs [17,165] [19,165] [0] [0] [0] [19,165]
Postage [2,861] [2,861] [0] [0] [0] [2,861]
Space Rental Payments [88,218] [94,458] [+11,495] [0] [0] [105,953]
Departmental Program Charges [60,956] [63,630] [+7,675] [2,579] [+854] [74,738]
Total Operation of the National Park System 2,767,028 2,923,424 +120,553 0 +145,780 3,189,757
Transfer to 400 Years of African American History Commission -3,300 -3,300 0 0 0 -3,300
Medical Services Fund 1,035 0 0 0 0 0
Transfer in for Drug Trafficking Deterrent Actions 130 0 0 0 0 0
Total Operation of the National Park System Budget Authority 2,764,893 2,920,124 +120,553 0 +145,780 3,186,457
Appropriation: CENTENNIAL CHALLENGE
CENTENNIAL CHALLENGE 15,000 15,000 0 0 0 15,000
Total Centennial Challenge 15,000 15,000 0 0 0 15,000
Appropriation: NATIONAL RECREATION AND PRESERVATION
NATURAL PROGRAMS 16,452 18,579 +629 0 0 19,208
Rivers, Trails and Conservation Assistance [10,971] [13,000] [+501] [0] [0] [13,501]
National Natural Landmarks [700] [724] [+33] [0] [0] [757]
Hydropower Recreation Assistance [898] [926] [+36] [0] [0] [962]
Chesapeake Gateways and Trails [3,009] [3,027] [+25] [0] [0] [3,052]
Federal Lands to Parks [874] [902] [+34] [0] [0] [936]
CULTURAL PROGRAMS 34,408 39,327 +860 0 +4,000 44,187
National Register Programs [17,204] [17,662] [+708] [0] [0] [18,370]
National Center for Preservation Technology & Training [2,019] [2,058] [+54] [0] [0] [2,112]
Native American Graves Protection & Repatriation Grants [2,157] [3,407] [0] [0] [0] [3,407]
Japanese American Confinement Site Grants [3,405] [4,655] [0] [0] [0] [4,655]
American Battlefield Protection Program Assistance Grants [1,198] [1,198] [0] [0] [0] [1,198]
American Indian & Native Hawaiian Art & Culture Grants [1,500] [2,750] [0] [0] [0] [2,750]
9/11 Memorial Act Grants [2,750] [4,000] [0] [0] [0] [4,000]
Oklahoma City Endowment [1,000] [0] [0] [0] [0] [0]
National Park Service FY 2024 Budget Justifications
Overview-36
NPS FY 2024 Budget at a Glance (dollar amounts in thousands)
1
2022 Actual 2023 Enacted
2024 Fixed
Costs
2024 Internal
Transfers
2024
Program
Changes
2024
Request
African-American Burial Grounds Program [0] [0] [0] [0] [+3,000] [3,000]
Grants Administration [3,175] [3,597] [+98] [0] [+1,000] [4,695]
ENVIRONMENTAL COMPLIANCE AND REVIEW 456 465 +19 0 0 484
INTERNATIONAL PARK AFFAIRS 1,950 1,990 +67 0 0 2,057
Office of International Affairs [1,274] [1,308] [+59] [0] [0] [1,367]
Southwest Border Resource Protection Program [676] [682] [+8] [0] [0] [690]
HERITAGE PARTNERSHIP PROGRAMS 27,144 29,232 +49 0 0 29,281
Commissions and Grants [26,112] [28,167] [0] [0] [0] [28,167]
Administrative Support [1,032] [1,065] [+49] [0] [0] [1,114]
STATUTORY AND CONTRACTUAL AID 3,500 2,919 0 0 -2,919 0
Total National Recreation and Preservation 83,910 92,512 +1,624 0 1,081 95,217
Appropriation: HISTORIC PRESERVATION FUND
GRANTS-IN-AID 131,300 148,900 0 0 +2,500 151,400
GRANTS-IN-AID TO STATES & TERRITORIES [57,675] [62,150] [0] [0] [0] [62,150]
GRANTS-IN-AID TO INDIAN TRIBES [16,000] [23,000] [0] [0] [0] [23,000]
TRIBAL HERITAGE GRANTS [0] [0] [0] [0] [+2,500] [2,500]
GRANTS-IN-AID TO HISTORICALLY BLACK COLLEGES & UNIVERSITIES [10,000] [11,000] [0] [0] [0] [11,000]
PAUL BRUHN HISTORIC REVITALIZATION GRANTS [10,000] [12,500] [0] [0] [0] [12,500]
COMPETITIVE GRANTS
Competitive Grants - African American Civil Rights [21,750] [24,000] [0] [0] [0] [24,000]
Competitive Grants - History of Equal Rights [4,625] [5,000] [0] [0] [0] [5,000]
Competitive Grants - Underrepresented Communities [1,250] [1,250] [0] [0] [0] [1,250]
SEMIQUINCENTENNIAL PRESERVATION GRANTS [10,000] [10,000] [0] [0] [0] [10,000]
SAVE AMERICA’S TREASURES 26,500 26,500 0 0 0 26,500
HISTORIC PRESERVATION FUND PROJECTS 15,272 29,115 0 0 -29,115 0
Total Historic Preservation Fund 173,072 204,515 0 0 -26,615 177,900
Appropriation: CONSTRUCTION
LINE-ITEM CONSTRUCTION 136,700 126,700 0 0 +2,000 128,700
Line Item Construction Projects [132,700] [120,700] [0] [0] [0] [120,700]
Abandoned Mineral Lands Projects [0] [2,000] [0] [0] [+2,000] [4,000]
Demolition and Disposal Projects [4,000] [4,000] [0] [0] [0] [4,000]
SPECIAL PROGRAMS 21,502 45,949 +13 0 +30,956 76,918
Emergencies and Unscheduled Projects [3,848] [3,848] [0] [0] [+7,000] [10,848]
Housing Improvement Program [2,933] [7,886] [+13] [0] [+7,000] [14,899]
Dam Safety and Security Program [1,247] [1,247] [0] [0] [0] [1,247]
Equipment Replacement Program [13,474] [32,968] [0] [0] [+16,956] [49,924]
CONSTRUCTION PLANNING 15,183 15,183 0 0 0 15,183
CONSTRUCTION PROGRAM MANAGEMENT & OPERATIONS 39,921 34,891 +2,268 0 0 37,159
Construction Program Management [2,838] [2,902] [+88] [0] [0] [2,990]
Denver Service Center Operations [17,322] [14,719] [+1,439] [0] [0] [16,158]
National Park Service FY 2024 Budget Justifications
Overview-37
NPS FY 2024 Budget at a Glance (dollar amounts in thousands)
1
2022 Actual 2023 Enacted
2024 Fixed
Costs
2024 Internal
Transfers
2024
Program
Changes
2024
Request
Harpers Ferry Center Operations [10,447] [10,736] [+461] [0] [0] [11,197]
Regional Facility Project Support [9,314] [6,534] [+280] [0] [0] [6,814]
MANAGEMENT PLANNING 12,678 17,080 +456 0 +11,129 28,665
Unit Management Plans [7,427] [9,572] [+244] [0] [+11,129] [20,945]
Special Resource Studies [1,486] [1,529] [+64] [0] [0] [1,593]
Environmental Impact Planning and Compliance [3,765] [5,979] [+148] [0] [0] [6,127]
Total Construction 225,984 239,803 +2,737 0 +44,085 286,625
Supplemental P.L. 117-43 229,472 0 0 0 0 0
Supplemental HR 2617 0 1,500,000 0 0 -1,500,000 0
Total Construction Budget Authority 455,456 1,739,803 +2,737 0 -1,455,915 286,625
Total, Current Appropriations 3,264,994 3,475,254 +124,914 0 +164,331 3,764,499
Total, Current Appropriations - Pre-Transfers & Inc. Balance Cancellations 3,264,994 3,475,254 +124,914 0 +164,331 3,764,499
Total, Budget Authority 3,492,331 4,971,954 +124,914 0 -1,335,669 3,761,199
NOTE: Bracketed numbers reflect total funding for that program or initiative. The table only includes line items that have proposed changes; therefore, bracketed numbers may not add to Subactivity
totals except for in the Program Changes column. Additionally, if a “base” has multiple changes across Subactivities, the total shown in brackets reflects all changes.
National Park Service FY 2024 Budget Justifications
Overview-38
Discretionary Appropriations
Fiscal Year 2024
(Dollars in Thousands)
APPROPRIATION/ACTIVITIES/SUBACTIVITIES/Program Components
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed
Costs
Changes
FY 2024
Transfers
FY 2024
Program
Changes
FY 2024
Request
Total
Change from
FY 2023
OPERATION OF THE NATIONAL PARK SYSTEM
PARK MANAGEMENT
RESOURCE STEWARDSHIP
Natural Resource Stewardship 232,999 272,329 +10,073 -16,187 +80,100 346,315 +73,986
Cultural Resources Stewardship 119,879 135,727 +5,019 -1,630 +12,348 151,464 +15,737
Everglades Restoration and Research 11,452 11,661 +197 0 0 11,858 +197
SUBTOTAL RESOURCE STEWARDSHIP 364,330 419,717 +15,289 -17,817 +92,448 509,637 +89,920
VISITOR SERVICES
Interpretation and Education 249,058 292,601 +10,821 -24,729 +9,314 288,007 -4,594
Commercial Services 11,152 15,886 +587 -4,282 +66 12,257 -3,629
SUBTOTAL VISITOR SERVICES 260,210 308,487 +11,408 -29,011 +9,380 300,264 -8,223
PARK PROTECTION
Law Enforcement and Protection 370,478 387,285 +14,322 +1,000 +10,579 413,186 +25,901
Health and Safety 37,279 42,111 +1,557 -2,764 +3,647 44,551 +2,440
SUBTOTAL PARK PROTECTION 407,757 429,396 +15,879 -1,764 +14,226 457,737 +28,341
FACILITY OPERATIONS & MAINTENANCE
Facility Operations 363,923 448,183 +16,574 -68,526 +2,805 399,036 -49,147
Facility Maintenance 550,867 490,494 +18,139 +71,838 +3,510 583,981 +93,487
SUBTOTAL FACILITY OPERATIONS & MAINTENANCE 914,790 938,677 +34,713 3,312 +6,315 983,017 +44,340
PARK SUPPORT
Management, Policy and Development 173,422 207,083 +7,658 -17,024 +12,582 210,299 +3,216
Administrative Support 439,232 402,431 +14,883 +59,725 +9,975 487,014 +84,583
SUBTOTAL PARK SUPPORT 612,654 609,514 +22,541 42,701 +22,557 697,313 +87,799
SUBTOTAL PARK MANAGEMENT 2,559,741 2,705,791 +99,830 -2,579 +144,926 2,947,968 +242,177
EXTERNAL ADMINISTRATIVE COSTS
Employee Compensation Payments 19,945 19,377 +532 0 0 19,909 +532
Unemployment Compensation Payments 18,142 18,142 +1,021 0 0 19,163 +1,021
Centralized IT & Telecommunications Costs 17,165 19,165 0 0 0 19,165 0
Postage 2,861 2,861 0 0 0 2,861 0
Space Rental 88,218 94,458 +11,495 0 0 105,953 +11,495
Departmental Program Charges 60,956 63,630 +7,675 +2,579 +854 74,738 +11,108
SUBTOTAL EXTERNAL ADMINISTRATIVE COSTS 207,287 217,633 +20,723 2,579 854 241,789 +24,156
SUBTOTAL ONPS APPROPRIATION (Current Appropriations) 2,767,028 2,923,424 +120,553 0 +145,780 3,189,757 +266,333
National Park Service FY 2024 Budget Justifications
Overview-39
APPROPRIATION/ACTIVITIES/SUBACTIVITIES/Program Components
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed
Costs
Changes
FY 2024
Transfers
FY 2024
Program
Changes
FY 2024
Request
Total
Change from
FY 2023
Transfer to Semiquincentennal Commission 0 0 0 0 0 0 0
Transfer to 400 Year of African American History Commission -3,300 -3,300 0 0 0 -3,300 0
Medical Services Fund 1,035 0 0 0 0 0 0
Transfer in for Drug Trafficking Deterrent Actions 130 0 0 0 0 0 0
SUBTOTAL ONPS APPROPRIATION - Budget Account Listing (BAL) 2,764,893 2,920,124 +120,553 0 +145,780 3,186,457 +266,333
SUBTOTAL ONPS (Total Budget Authority) 2,764,893 2,920,124 +120,553 0 +145,780 3,186,457 +266,333
CENTENNIAL CHALLENGE
CENTENNIAL CHALLENGE 15,000 15,000 0 0 0 15,000 0
SUBTOTAL CENTENNIAL CHALLENGE APPROPRIATION (Current
Appropriations) 15,000 15,000 0 0 0 15,000 0
SUBTOTAL CC APPROPRIATION - Budget Account Listing (BAL) 15,000 15,000 0 0 0 15,000 0
SUBTOTAL CC (Total Budget Authority) 15,000 15,000 0 0 0 15,000 0
NATIONAL RECREATION AND PRESERVATION
NATURAL PROGRAMS
Rivers, Trails and Conservation Assistance 10,971 13,000 +501 0 0 13,501 +501
National Natural Landmarks 700 724 +33 0 0 757 +33
Hydropower Recreation Assistance 898 926 +36 0 0 962 +36
Chesapeake Gateways and Trails 3,009 3,027 +25 0 0 3,052 +25
Federal Lands to Parks 874 902 +34 0 0 936 +34
SUBTOTAL NATURAL PROGRAMS 16,452 18,579 +629 0 0 19,208 +629
CULTURAL PROGRAMS
National Register Programs 17,204 17,662 +708 0 0 18,370 +708
National Center for Preservation Technology & Training 2,019 2,058 +54 0 0 2,112 +54
Native American Graves Protection & Repatriation Grants 2,157 3,407 0 0 0 3,407 0
Japanese American Confinement Site Grants 3,405 4,655 0 0 0 4,655 0
American Battlefield Protection Program Assistance Grants 1,198 1,198 0 0 0 1,198 0
American Indian & Native Hawaiian Art & Culture Grants 1,500 2,750 0 0 0 2,750 0
9/11 Memorial Act Grants 2,750 4,000 0 0 0 4,000 0
Oklahoma City Endowment 1,000 0 0 0 0 0 0
African American Burial Grounds Program 0 0 0 0 +3,000 3,000 +3,000
Grants Administration 3,175 3,597 +98 0 +1,000 4,695 +1,098
SUBTOTAL CULTURAL PROGRAMS 34,408 39,327 +860 0 +4,000 44,187 +4,860
ENVIRONMENTAL COMPLIANCE AND REVIEW 456 465 +19 0 0 484 +19
SUBTOTAL ENVIRONMENTAL COMPLIANCE AND REVIEW 456 465 +19 0 0 484 +19
INTERNATIONAL PARK AFFAIRS
Office of International Affairs 1,274 1,308 +59 0 0 1,367 +59
Southwest Border Resource Protection Program 676 682 +8 0 0 690 +8
SUBTOTAL INTERNATIONAL PARK AFFAIRS 1,950 1,990 +67 0 0 2,057 +67
HERITAGE PARTNERSHIP PROGRAMS
National Park Service FY 2024 Budget Justifications
Overview-40
APPROPRIATION/ACTIVITIES/SUBACTIVITIES/Program Components
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed
Costs
Changes
FY 2024
Transfers
FY 2024
Program
Changes
FY 2024
Request
Total
Change from
FY 2023
Commissions and Grants 26,112 28,167 0 0 0 28,167 0
Administrative Support 1,032 1,065 +49 0 0 1,114 +49
SUBTOTAL HERITAGE PARTNERSHIP PROGRAMS 27,144 29,232 +49 0 0 29,281 +49
STATUTORY AND CONTRACTUAL AID 3,500 2,919 0 0 -2,919 0 -2,919
SUBTOTAL STATUTORY AND CONTRACTUAL AID 3,500 2,919 0 0 -2,919 0 -2,919
SUBTOTAL NATIONAL RECREATION & PRESERVATION
APPROPRIATION (Current Appropriations) 83,910 92,512 +1,624 0 +1,081 95,217 +2,705
SUBTOTAL NR&P - Budget Account Listing (BAL) 83,910 92,512 +1,624 0 +1,081 95,217 +2,705
SUBTOTAL NR&P (Total Budget Authority) 83,910 92,512 +1,624 0 +1,081 95,217 +2,705
HISTORIC PRESERVATION FUND
GRANTS-IN-AID
GRANTS-IN-AID TO STATES & TERRITORIES 57,675 62,150 0 0 0 62,150 0
GRANTS-IN-AID TO INDIAN TRIBES 16,000 23,000 0 0 0 23,000 0
TRIBAL HERITAGE GRANTS [640]0 [920]0 0 0 +2,500 2,500 +2,500
GRANTS-IN-AID TO HISTORICALLY BLACK COLLEGES & UNIVERSITIES 10,000 11,000 0 0 0 11,000 0
PAUL BRUHN HISTORIC REVITALIZATION GRANTS 10,000 12,500 0 0 0 12,500 0
COMPETITIVE GRANTS
African American Civil Rights 21,750 24,000 0 0 0 24,000 0
History of Equal Rights 4,625 5,000 0 0 0 5,000 0
Underrepresented Communities 1,250 1,250 0 0 0 1,250 0
SEMIQUINCENTENNIAL PRESERVATION GRANTS 10,000 10,000 0 0 0 10,000 0
SUBTOTAL GRANTS-IN-AID 131,300 148,900 0 0 +2,500 151,400 +2,500
SAVE AMERICA’S TREASURES 26,500 26,500 0 0 0 26,500 0
SUBTOTAL SAVE AMERICA’S TREASURES 26,500 26,500 0 0 0 26,500 0
HISTORIC PRESERVATION FUND PROJECTS 15,272 29,115 0 0 -29,115 0 -29,115
SUBTOTAL HISTORIC PRESERVATION FUND PROJECTS 15,272 29,115 0 0 -29,115 0 -29,115
SUBTOTAL HISTORIC PRESERVATION FUND APPROPRIATION (Current
Appropriations) 173,072 204,515 0 0 -26,615 177,900 -26,615
SUBTOTAL HPF - Budget Account Listing (BAL) 173,072 204,515 0 0 -26,615 177,900 -26,615
SUBTOTAL HPF (Total Budget Authority) 173,072 204,515 0 0 -26,615 177,900 -26,615
CONSTRUCTION
LINE ITEM CONSTRUCTION
Line Item Construction Projects 132,700 120,700 0 0 0 120,700 0
Abandoned Mineral Lands Projects 0 2,000 0 0 +2,000 4,000 +2,000
Demolition and Disposal Projects 4,000 4,000 0 0 0 4,000 0
SUBTOTAL LINE ITEM CONSTRUCTION 136,700 126,700 0 0 +2,000 128,700 +2,000
SPECIAL PROGRAMS
EMERGENCIES & UNSCHEDULED PROJECTS 3,848 3,848 0 0 +7,000 10,848 +7,000
HOUSING IMPROVEMENT PROGRAM 2,933 7,886 +13 0 +7,000 14,899 +7,013
National Park Service FY 2024 Budget Justifications
Overview-41
APPROPRIATION/ACTIVITIES/SUBACTIVITIES/Program Components
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed
Costs
Changes
FY 2024
Transfers
FY 2024
Program
Changes
FY 2024
Request
Total
Change from
FY 2023
DAM SAFETY & SECURITY PROGRAM 1,247 1,247 0 0 0 1,247 0
EQUIPMENT REPLACEMENT PROGRAM 13,474 32,968 0 0 +16,956 49,924 +16,956
SUBTOTAL SPECIAL PROGRAMS 21,502 45,949 +13 0 +30,956 76,918 +30,969
CONSTRUCTION PLANNING 15,183 15,183 0 0 0 15,183 0
SUBTOTAL CONSTRUCTION PLANNING 15,183 15,183 0 0 0 15,183 0
CONSTRUCTION PROGRAM MGMT & OPERATIONS
Construction Program Management 2,838 2,902 +88 0 0 2,990 +88
Denver Service Center Operations 17,322 14,719 +1,439 0 0 16,158 +1,439
Harpers Ferry Center Operations 10,447 10,736 +461 0 0 11,197 +461
Regional Facility Project Support 9,314 6,534 +280 0 0 6,814 +280
SUBTOTAL CONSTRUCTION PROGRAM MGMT & OPERATIONS 39,921 34,891 +2,268 0 0 37,159 +2,268
MANAGEMENT PLANNING
Unit Management Plans 7,427 9,572 +244 0 +11,129 20,945 +11,373
Special Resources Studies 1,486 1,529 +64 0 0 1,593 +64
Environmental Impact Planning and Compliance 3,765 5,979 +148 0 0 6,127 +148
SUBTOTAL MANAGEMENT PLANNING 12,678 17,080 +456 0 11,129 28,665 +11,585
SUBTOTAL CONSTRUCTION APPROPRIATION (Current
Appropriations) 225,984 239,803 +2,737 0 +44,085 286,625 +46,822
Supplemental P.L. 117-43 229,472 0 0 0 0 0 0
Supplemental HR 2617 0 1,500,000 0 0 -1,500,000 0 -1,500,000
SUBTOTAL CONSTRUCTION - (Total Current Appropriations) 455,456 1,739,803 +2,737 0 -1,455,915 286,625 -1,453,178
SUBTOTAL CONSTRUCTION (Total Budget Authority) 455,456 1,739,803 +2,737 0 -1,455,915 286,625 -1,453,178
TOTAL CURRENT APPROPRIATIONS 3,264,994 3,475,254 +124,914 0 +164,331 3,764,499 +289,245
TOTAL CURRENT APPROPRIATIONS - Pre Transfers & Inc. Balance
Cancellations 3,264,994 3,475,254 +124,914 0 +164,331 3,764,499 +289,245
TOTAL DISCRETIONARY BUDGET AUTHORITY 3,492,331 4,971,954 +124,914 0 -1,335,669 3,761,199 -1,210,755
National Park Service FY 2024 Budget Justifications
Overview-42
Mandatory Appropriations
Fiscal Year 2024
(Dollars in Thousands)
APPROPRIATION/ACTIVITIES/SUBACTIVITIES/Program Components
FY 2022
Actual
1,2
FY 2023
Estimate
3,4,5
FY 2024
Estimate
6,7,8
Total Change
from FY 2023
MANDATORY APPROPRIATIONS
RECREATIONAL FEE PERMANENT APPROPRIATION
Recreational Fee Program 345,532 350,500 355,494 +4,994
Deed Restricted Parks Fee Program 3,099 8,000 10,000 +2,000
[Subtotal, Recreation Fee Programs] [348,631] [358,500] [365,494] [+6,994]
Transportation Systems Fund 91 212 217 +5
Pymt-Tax Losses on Land Acquired for GRTE NP 16 16 17 +1
SUBTOTAL RECREATIONAL FEE PERMANENT APPROPRIATION 348,738 358,728 365,728 +7,000
OTHER PERMANENT APPROPRIATIONS
Contribution for Annuity Benefits for USPP 42,101 39,674 39,549 -125
Park Concessions Franchise Fees 143,200 131,632 140,153 +8,521
Concessions Improvement Accounts 9,802 9,800 9,800 0
[Subtotal, Concessions Fees and Accounts] [153,002] [141,432] [149,953] [+8,521]
Park Building Lease and Maintenance Fund 10,833 11,645 12,515 +870
Filming/Recording Special Use Fee Program 175 1,200 1,200 0
Operation & Maintenance of Quarters 24,039 24,640 25,253 +613
Delaware Water Gap, Route 209 Operations 5 25 25 0
SUBTOTAL OTHER PERMANENT APPROPRIATIONS 230,155 218,616 228,495 +9,879
MISCELLANEOUS TRUST FUNDS
Donations (General) 96,931 52,000 52,000 0
Preservation, Birthplace of Abraham Lincoln 3 3 3 0
SUBTOTAL MISCELLANEOUS TRUST FUNDS 96,934 52,003 52,003 0
LAND ACQUISITION AND STATE ASSISTANCE (GOMESA)
Land Acquisition and State Assistance (GOMESA) 84,098 117,875 117,875 0
SUBTOTAL LAND ACQUISITION AND STATE ASSISTANCE (GOMESA) 84,098 117,875 117,875 0
FEDERAL LAND ACQUISITION (GAOA)
EMERGENCIES, HARDSHIP, RELOCATION 2,358 3,368 5,000 +1,632
INHOLDINGS, DONATIONS, & EXCHANGES 6,601 7,000 11,000 +4,000
PROJECTS 55,445 65,925 61,825 -4,100
RECREATIONAL ACCESS 13,673 14,500 12,000 -2,500
ACQUISITION MANAGEMENT 13,673 14,500 14,500 0
SUBTOTAL FEDERAL LAND ACQUISITION (GAOA) 91,750 105,293 104,325 -968
STATE CONSERVATION GRANTS (GAOA)
FORMULA STATE CONSERVATION GRANTS 196,144 200,456 157,197 -43,259
COMPETITIVE STATE CONSERVATION GRANTS 103,730 124,145 135,000 +10,855
National Park Service FY 2024 Budget Justifications
Overview-43
APPROPRIATION/ACTIVITIES/SUBACTIVITIES/Program Components
FY 2022
Actual
1,2
FY 2023
Estimate
3,4,5
FY 2024
Estimate
6,7,8
Total Change
from FY 2023
STATE CONSERVATION GRANTS ADMINISTRATION (NPS) 11,316 11,083 13,347 +2,264
STATE CONSERVATION GRANTS ADMINISTRATION (States) 0 0 0 0
SUBTOTAL STATE CONSERVATION GRANTS (GAOA) 311,190 335,684 305,544 -30,140
AMERICAN BATTLEFIELD PROTECTION PROGRAM (GAOA)
AMERICAN BATTLEFIELD PROTECTION PROGRAM ACQUISITION GRANTS 16,408 17,400 17,400 0
ABPP MODERNIZATION GRANTS 943 1,000 1,000 0
ABPP BATTLEFIELD RESTORATION GRANTS 943 1,000 1,000 0
ABPP GRANTS ADMIN 566 600 600 0
SUBTOTAL AMERICAN BATTLEFIELD PROTECTION PROGRAM (GAOA) 18,860 20,000 20,000 0
SUBTOTAL LAND ACQUISITION AND STATE ASSISTANCE (GAOA) 421,800 460,977 429,869 -31,108
OPERATION OF THE NATIONAL PARK SYSTEM
Inflation Reduction Act - NPS Employees 500,000 0 0 0
Inflation Reduction Act - Deferred Maintenance 200,000 0 0 0
Inflation Reduction Act - National Parks and Public Lands Conservation and Resilience 0 0 0 0
Inflation Reduction Act - National Parks and Public Lands Conservation and Ecosystem Restoration 0 0 0 0
Inflation Reduction Act - DOI Environmental Reviews 0 0 0 0
SUBTOTAL ONPS INFLATION REDUCTION ACT 700,000 0 0 0
VISITOR EXPERIENCE IMPROVEMENTS FUND
Visitor Experience Improvements Fund 0 12,259 6,323 -5,936
SUBTOTAL VISITOR EXPERIENCE IMPROVEMENTS FUND 0 12,259 6,323 -5,936
SUBTOTAL MANDATORY AUTHORITY 1,881,725 1,220,458 1,200,293 -20,165
1
FY 2022 Actual column does not include these sequestered Receipt amounts: Recreational Fee Program’s $2,166, GRTE $1, Park Concessions Franchise Fees’ $393, Park Building Lease &
Maintenance Fund’s $26, Operation & Maintenance of Quarters’ $54, or OCS State Conservation Grants’ $5,083. Also not included are: Federal Land Acquisition (GAOA) - Emergencies, Hardship,
Relocation’s $143, Inholdings, Donations & Exchanges’ $399, Projects’ $3,351, Recreational Access’ $827, Acquisition Management’s $827; State Conservation Grants (GAOA) - Formula State
Conservation Grants’ $11,856, Competitive State Conservation Grants’ $6,270, State Conservation Grant Administration’s $684; American Battlefield Protection Program (GAOA) - American
Battlefield Protection Program Acquisition Grants’ $992, ABPP Modernization Grants’ $57, ABPP Battlefield Restoration Grants’ $57, ABPP Grant Admin’s $34.
2
FY 2022 Actual column includes pop up of funds that were sequestered in FY 2021, but became available in FY 2022: Recreational Fee Program’s $2,166, GRTE $1, Park Concessions Franchise
Fees’ $393, Park Building Lease & Maintenance Fund’s $26, Operation & Maintenance of Quarters’ $54.
3
FY 2023 Estimate column does not include these sequestered Receipt amounts: Recreational Fee Program’s $2,166, GRTE $1, Park Concessions Franchise Fees’ $393, Park Building Lease &
Maintenance Fund’s $26, Operation & Maintenance of Quarters’ $54, OCS State Conservation Grants’ $7,125, or Visitor Experience Improvements Fund $741. Also not included are: Federal Land
Acquisition (GAOA) - Emergencies, Hardship, Relocation’s $195, Inholdings, Donations & Exchanges’ $399, Projects’ $3,781, Recreational Access’ $827, Acquisition Management’s $827; State
Conservation Grants (GAOA) - Formula State Conservation Grants’ $11,400, Competitive State Conservation Grants’ $7,125, State Conservation Grant Administration’s $629; American Battlefield
Protection Program (GAOA) - American Battlefield Protection Program Acquisition Grants’ $992, ABPP Modernization Grants’ $57, ABPP Battlefield Restoration Grants’ $57, ABPP Grant
Admin’s $34.
4
FY 2023 Estimate column includes pop up of funds that were sequestered in FY 2022, but became available in FY 2023: Recreational Fee Program’s $2,166, GRTE $1, Park Concessions Franchise
Fees’ $393, Park Building Lease & Maintenance Fund’s $26, Operation & Maintenance of Quarters’ $54. Also included are: Federal Land Acquisition (GAOA) - Emergencies, Hardship, Relocation’s
$142, Inholdings, Donations & Exchanges’ $399, Projects’ $3,351, Recreational Access’ $827, Acquisition Management’s $827; State Conservation Grants (GAOA) - Formula State Conservation
Grants’ $11,856, Competitive State Conservation Grants’ $6,270, State Conservation Grant Administration’s $684; American Battlefield Protection Program (GAOA) - American Battlefield
Protection Program Acquisition Grants’ $992, ABPP Modernization Grants’ $57, ABPP Battlefield Restoration Grants’ $57, ABPP Grant Admin’s $34.
National Park Service FY 2024 Budget Justifications
Overview-44
5
FY 2023 Estimate column includes an estimated transfer of $13,000 from Park Concessions Franchise Fees to Visitor Experience Improvements Fund.
6
FY 2024 Estimate column does not include these estimated sequestered Receipt amounts: Recreational Fee Program’s $2,172, GRTE $1, Park Concessions Franchise Fees’ $399, Park Building
Lease & Maintenance Fund’s $29, Operation & Maintenance of Quarters’ $57, OCS State Conservation Grants’ $7,125, or Visitor Experience Improvement Fund’s $337. Also not included are:
Federal Land Acquisition (GAOA) - Emergencies, Hardship, Relocation’s $290, Inholdings, Donations & Exchanges’ $641, Projects’ $3,507, Recreational Access’ $676, Acquisition Management’s
$827; State Conservation Grants (GAOA) - Formula State Conservation Grants’ $8,814, Competitive State Conservation Grants’ $7,727, State Conservation Grant Administration’s $769; American
Battlefield Protection Program (GAOA) - American Battlefield Protection Program Acquisition Grants’ $992, ABPP Modernization Grants’ $57, ABPP Battlefield Restoration Grants’ $57, ABPP
Grant Admin’s $34.
7
FY 2024 Estimate column includes pop up of funds that were sequestered in FY 2023, but became available in FY 2024: Recreational Fee Program’s $2,166, GRTE $1, Park Concessions Franchise
Fees’ $393, Park Building Lease & Maintenance Fund’s $26, Operation & Maintenance of Quarters’ $54, Visitor Experience Improvements Fund $741. Also included are: Federal Land Acquisition
(GAOA) - Emergencies, Hardship, Relocation’s $198, Inholdings, Donations & Exchanges’ $399, Projects’ $3,808, Recreational Access’ $827, Acquisition Management’s $827; State Conservation
Grants (GAOA) - Formula State Conservation Grants’ $11,372, Competitive State Conservation Grants’ $7,177, State Conservation Grant Administration’s $625; American Battlefield Protection
Program (GAOA) - American Battlefield Protection Program Acquisition Grants’ $992, ABPP Modernization Grants’ $57, ABPP Battlefield Restoration Grants’ $57, ABPP Grant Admin’s $34.
8
FY 2024 Estimate column includes an estimated transfer of $5,919 from Park Concessions Franchise Fees to Visitor Experience Improvements Fund.
9
FY 2023 Estimate column does not include transfers of $95,000 for National Parks and Public Lands Conservation and Resilience, $95,000 for National Parks and Public Lands Conservation and
Ecosystem Restoration, or $5,000 for DOI Environmental Reviews from other appropriations for Inflation Reduction Act funding.
National Park Service FY 2024 Budget Justifications
Overview-45
Park and Program Table
Fiscal Year 2024
(Dollars in Thousands)
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
PARK BASE UNITS
Parks
Abraham Lincoln Birthplace NHP 14 14 1,461 1,548 76 200 1,824
Acadia NP 65 153 9,006 9,461 489 178 10,128
Adams NHP 19 19 2,692 2,808 119 79 3,006
African Burial Grounds NM 4 4 1,398 1,459 35 25 1,519
Agate Fossil Beds NM 6 6 992 1,068 48 25 1,141
Allegheny Portage Railroad NHS 15 15 2,243 2,349 96 25 2,470
Amache NHS 0 0 0 505 0 0 505
Amistad NRA 32 33 4,517 4,731 213 78 5,022
Andersonville NHS 13 15 1,710 1,806 77 76 1,959
Andrew Johnson NHS 9 11 1,081 1,161 56 25 1,242
Antietam NB 25 30 3,898 4,082 215 110 4,407
Apostle Islands NL 26 37 3,246 3,410 191 108 3,709
Appalachian NST 8 10 1,948 2,023 89 83 2,195
Appomattox Court House NHP 19 19 2,004 2,108 99 76 2,283
Arches NP 12 34 2,245 2,365 108 76 2,549
Arkansas Post NMem 8 8 953 1,029 48 76 1,153
Assateague Island NS 31 64 5,867 6,069 234 213 6,516
Aztec Ruins NM 16 18 1,410 1,499 81 76 1,656
Badlands NP 30 52 4,647 4,800 219 238 5,257
Bandelier NM 28 49 3,597 4,072 193 135 4,400
Bent’s Old Fort NHS 12 13 1,361 1,449 68 76 1,593
Bering Land Bridge NPres 0 0 1,378 1,375 0 25 1,400
Big Bend NP 66 90 7,877 8,235 413 176 8,824
Big Cypress NPres 49 73 7,492 7,810 367 334 8,511
Big Hole NB 5 6 661 725 22 25 772
Big South Fork National River & Recreation Area 43 66 4,956 5,207 271 188 5,666
Big Thicket NPres 21 31 2,865 2,995 146 112 3,253
Bighorn Canyon NRA 30 35 4,010 4,328 189 128 4,645
Birmingham Civil Rights NM 3 3 295 946 13 645 1,604
Biscayne NP 28 37 4,608 4,789 249 163 5,201
Black Canyon of the Gunnison NP 15 20 2,069 2,175 107 76 2,358
National Park Service FY 2024 Budget Justifications
Overview-46
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
Blackstone River Valley NHP 12 12 1,798 1,877 79 25 1,981
Blackwell School NHS 0 0 0 0 0 265 265
Blue Ridge Parkway 120 161 17,874 18,729 889 171 19,789
Bluestone NSR 0 0 87 87 6 25 118
Booker T Washington NM 8 8 1,059 1,282 54 25 1,361
Boston African American NHS 6 6 882 957 47 25 1,029
Boston Harbor Islands NRA 16 18 1,346 1,431 68 130 1,629
Boston NHP 70 77 10,354 10,798 484 176 11,458
Brown v. Board of Education NHP 9 9 1,518 1,608 55 665 2,328
Bryce Canyon NP 25 57 3,788 3,966 183 381 4,530
Buffalo NR 51 72 6,486 6,803 343 143 7,289
Cabrillo NM 12 21 1,875 1,970 87 76 2,133
Camp Nelson NM 6 8 739 1,251 38 25 1,314
Canaveral NS 24 40 3,539 3,708 178 95 3,981
Cane River Creole NHP 8 9 1,240 1,322 47 25 1,394
Canyonlands NP 57 108 6,959 7,286 357 199 7,842
Cape Cod NS 63 81 8,413 8,796 453 604 9,853
Cape Hatteras Group - Cape Hatteras NS, Fort Raleigh NHS, Wright Brothers
NMem 69 110 10,484 10,861 456 133 11,450
Cape Lookout NS 20 38 2,763 2,897 147 143 3,187
Capitol Reef NP 22 33 2,690 2,880 151 97 3,128
Capulin Volcano NM 7 10 802 873 40 76 989
Carl Sandburg Home NHS 10 11 1,376 1,464 69 76 1,609
Carlsbad Caverns NP 50 56 6,234 6,481 283 126 6,890
Casa Grande Ruins NM & Hohokam Pima NM 7 9 932 1,009 52 25 1,086
Castillo de San Marcos NM & Fort Matanzas NM 15 45 2,298 2,428 114 76 2,618
Catoctin Mountain Park 24 28 3,704 4,256 190 87 4,533
Cedar Breaks NM 5 8 794 862 41 76 979
Cedar Creek and Belle Grove NHP 7 7 950 1,020 47 25 1,092
César E. Chávez NM 0 0 507 562 14 240 816
Chaco Culture NHP 12 19 2,232 2,347 115 25 2,487
Chamizal NMem 19 19 2,659 2,791 122 25 2,938
Channel Islands NP 51 56 7,988 8,314 383 680 9,377
Charles Pinckney NHS 4 4 606 673 35 25 733
Charles Young Buffalo Soldiers NM 6 6 942 1,007 39 25 1,071
Chattahoochee River NRA 24 30 3,836 3,993 185 102 4,280
Chesapeake & Ohio Canal NHP 61 67 10,127 10,907 495 105 11,507
Chickamauga & Chattanooga NMP 25 27 3,716 3,889 171 25 4,085
Chickasaw NRA 32 38 4,309 4,516 203 76 4,795
National Park Service FY 2024 Budget Justifications
Overview-47
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
Christiansted NHS, Buck Island Reef NM, & Salt River Bay NHP & Ecological
Preserve 15 17 2,847 2,968 97 150 3,215
City of Rocks NRes 0 0 456 454 1 25 480
Colonial NHP 55 61 7,443 7,884 376 226 8,486
Colorado NM 17 37 2,095 2,209 113 76 2,398
Coltsville NHP 0 0 188 188 4 365 557
Congaree NP 14 16 1,829 1,934 96 303 2,333
Cowpens NB 8 9 963 1,035 45 25 1,105
Crater Lake NP 40 75 5,688 5,949 284 371 6,604
Craters of the Moon NM&Pres 15 26 1,747 1,843 74 120 2,037
Cumberland Gap NHP 23 31 3,782 3,949 170 79 4,198
Cumberland Island NS 24 28 3,120 3,263 155 76 3,494
Curecanti NRA 39 45 4,746 4,958 245 265 5,468
Cuyahoga Valley NP 92 114 11,889 12,299 637 139 13,075
Dayton Aviation NHP 19 19 2,175 2,289 110 25 2,424
De Soto NMem 7 7 785 857 41 25 923
Death Valley NP 67 97 9,735 10,559 452 317 11,328
Delaware Water Gap NRA 77 98 10,761 11,367 567 113 12,047
Denali NP&Pres 106 154 15,924 16,603 797 1,070 18,470
Devils Postpile NM 4 5 674 735 32 76 843
Devils Tower NM 10 17 1,510 1,600 68 76 1,744
Dinosaur NM 32 45 4,113 4,310 203 132 4,645
Dry Tortugas NP 13 20 2,274 2,386 113 76 2,575
Ebey’s Landing NHR 0 2 363 414 10 25 449
Edgar Allan Poe NHS 0 0 446 446 28 25 499
Effigy Mounds NM 13 13 1,322 1,415 71 88 1,574
Eisenhower NHS 7 7 1,223 1,314 61 25 1,400
El Malpais NM 18 22 2,088 2,195 112 91 2,398
El Morro NM 7 8 1,006 1,084 53 25 1,162
Eleanor Roosevelt NHS 5 5 957 1,040 60 25 1,125
Eugene O’Neill NHS 3 4 703 774 34 76 884
Everglades NP 131 219 18,378 19,211 928 453 20,592
Fire Island NS 43 50 5,510 5,764 312 134 6,210
First Ladies NHS 7 7 1,031 1,099 37 25 1,161
First State NHP 7 7 1,030 1,104 58 25 1,187
Flagstaff Area Parks - Sunset Crater Volcano NM, Walnut Canyon NM, Wupatki
NM 28 47 4,100 4,302 191 83 4,576
Flight 93 NMem 13 14 1,731 1,832 84 25 1,941
Florissant Fossil Beds NM 9 11 1,092 1,176 60 76 1,312
National Park Service FY 2024 Budget Justifications
Overview-48
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
Fort Caroline NMem & Timucuan Ecological & Historic Preserve 24 24 2,981 3,114 147 90 3,351
Fort Davis NHS 11 14 1,465 1,560 68 25 1,653
Fort Donelson NB 13 14 1,642 1,736 80 25 1,841
Fort Frederica NM 6 6 953 1,030 49 25 1,104
Fort Laramie NHS 15 16 1,822 1,921 89 25 2,035
Fort Larned NHS 11 12 1,188 1,274 68 25 1,367
Fort McHenry NM & Historic Shrine 23 26 2,783 2,919 133 25 3,077
Fort Monroe NM 4 4 1,296 1,360 27 25 1,412
Fort Necessity NB 15 16 1,771 1,873 88 76 2,037
Fort Point NHS 1 1 561 620 18 25 663
Fort Pulaski NM 9 23 1,499 1,587 64 76 1,727
Fort Scott NHS 12 14 1,492 1,586 73 25 1,684
Fort Smith NHS 11 12 1,183 1,326 62 525 1,913
Fort Stanwix NM 14 14 1,727 1,828 89 25 1,942
Fort Sumter and Fort Moultrie NHP 21 22 2,264 2,368 112 25 2,505
Fort Union NM 12 14 1,341 1,426 66 25 1,517
Fort Union Trading Post NHS 9 9 926 1,004 54 25 1,083
Fort Vancouver NHS 19 23 2,165 2,281 111 25 2,417
Fossil Butte NM 7 9 818 881 37 76 994
Frederick Law Olmsted NHS 27 28 1,959 2,138 98 91 2,327
Fredericksburg & Spotsylvania NMP 39 41 4,989 5,245 280 336 5,861
Freedom Riders NM 1 1 498 553 13 25 591
Friendship Hill NHS 6 8 619 684 33 25 742
Gates of the Arctic NP&Pres 34 46 3,411 3,622 160 331 4,113
Gateway NRA 208 239 27,577 28,813 1,331 189 30,333
Gateway Arch NP 86 134 10,998 11,374 569 25 11,968
Gauley River NRA 2 2 919 996 52 25 1,073
George Rogers Clark NHP 9 9 1,007 1,088 54 25 1,167
George Washington Birthplace NM 16 16 1,859 1,953 84 25 2,062
George Washington Carver NM 13 13 1,600 1,696 76 25 1,797
George Washington Memorial Parkway 84 94 14,576 15,162 641 348 16,151
Gettysburg NMP 53 60 7,586 7,927 392 76 8,395
Gila Cliff Dwellings NM 4 5 415 779 20 25 824
Glacier Bay NP&Pres 32 73 5,544 5,954 287 112 6,353
Glacier NP 125 271 15,502 16,226 836 628 17,690
Glen Canyon NRA 98 141 13,149 13,706 669 453 14,828
Golden Gate NRA 168 266 26,159 27,417 1,464 313 29,194
Golden Spike NHP 11 12 1,196 1,511 58 25 1,594
Governor’s Island NM 2 2 1,591 1,642 56 25 1,723
National Park Service FY 2024 Budget Justifications
Overview-49
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
Grand Canyon NP 151 390 23,523 24,753 1,183 144 26,080
Grand Canyon Parashant NM 12 12 1,726 1,826 86 83 1,995
Grand Portage NM 9 9 1,458 1,614 58 76 1,748
Grand Teton NP 94 218 13,741 14,396 687 266 15,349
Grant-Kohrs Ranch NHS 16 17 1,647 1,753 89 110 1,952
Great Basin NP 22 37 2,957 3,099 154 121 3,374
Great Egg Harbor Scenic & Recreational River 0 0 302 302 6 25 333
Great Sand Dunes NP&Pres 18 26 2,819 2,946 137 109 3,192
Great Smoky Mountains NP 159 265 21,164 22,124 1,090 628 23,842
Guadalupe Mountains NP 23 24 3,205 3,347 143 79 3,569
Guilford Courthouse NMP 8 8 1,240 1,316 51 25 1,392
Gulf Islands NS 49 75 7,806 8,127 354 325 8,806
Hagerman Fossil Beds NM 4 5 1,004 1,074 39 25 1,138
Haleakala NP 39 87 6,044 6,388 289 282 6,959
Hampton NHS 7 7 1,328 1,413 67 25 1,505
Harpers Ferry NHP 47 50 7,286 7,523 357 76 7,956
Harriet Tubman NHP 2 2 636 685 24 25 734
Harriet Tubman Underground Railroad NHP 2 2 623 703 54 25 782
Harry S Truman NHS 13 14 1,398 1,553 81 25 1,659
Hawaii Volcanoes NP 61 119 8,639 9,028 435 313 9,776
Herbert Hoover NHS 11 13 1,513 1,608 73 76 1,757
Home of Franklin D Roosevelt NHS 27 30 4,052 4,232 224 104 4,560
Homestead NM of America 14 14 1,389 1,481 77 76 1,634
Honouliuli NHS 1 1 357 409 13 25 447
Hopewell Culture NHP 14 15 1,464 1,684 77 76 1,837
Hopewell Furnace NHS 11 11 1,569 1,660 74 25 1,759
Horseshoe Bend NMP 8 9 889 1,154 50 25 1,229
Hot Springs NP 40 44 4,954 6,001 254 76 6,331
Hovenweep NM 3 8 607 670 32 25 727
Independence NHP 175 180 26,164 27,260 1,133 25 28,418
Indiana Dunes NP 75 115 10,031 10,392 525 574 11,491
Isle Royale NP 34 46 4,795 5,021 247 93 5,361
James A Garfield NHS 8 9 841 917 48 25 990
Jean Lafitte NHP & Pres 42 43 6,010 6,238 270 142 6,650
Jewel Cave NM 11 17 1,317 1,410 77 110 1,597
Jimmy Carter NHS 17 18 2,286 2,388 95 76 2,559
John D Rockefeller Jr Memorial Parkway 0 0 602 602 41 25 668
John Day Fossil Beds NM 13 14 1,779 1,877 84 76 2,037
John F Kennedy NHS 0 0 572 570 24 25 619
National Park Service FY 2024 Budget Justifications
Overview-50
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
John Muir NHS 14 15 1,115 1,202 65 25 1,292
Johnstown Flood NMem 9 9 870 937 41 25 1,003
Joshua Tree NP 43 111 6,878 7,161 333 440 7,934
Kalaupapa NHP 33 40 5,084 5,268 236 182 5,686
Kaloko-Honokohau NHP 16 23 2,116 2,324 86 135 2,545
Katahdin Woods and Waters NM 7 8 1,182 1,250 56 76 1,382
Katmai NP&Pres, Aniakchak NM&Pres & Alagnak WR 25 40 4,806 5,149 215 215 5,579
Kenai Fjords NP 30 36 4,409 4,606 233 443 5,282
Kennesaw Mountain NBP 15 19 2,030 2,141 97 25 2,263
Keweenaw NHP 13 15 1,879 1,980 84 256 2,320
Kings Mountain NMP 11 12 1,197 1,274 59 76 1,409
Klondike Gold Rush NHP 26 40 3,473 3,627 171 76 3,874
Klondike Gold Rush - Seattle Unit NHP 6 6 811 1,083 41 25 1,149
Knife River Indian Village NHS 9 9 978 1,579 49 76 1,704
Lake Clark NP&Pres 22 27 3,800 3,959 183 107 4,249
Lake Mead NRA 101 186 20,042 20,858 824 521 22,203
Lake Meredith NRA & Alibates Flint Quarry NM 26 34 3,484 3,640 178 76 3,894
Lake Roosevelt NRA 40 52 6,526 6,817 286 151 7,254
Lassen Volcanic NP 35 59 5,551 5,777 233 218 6,228
Lava Beds NM & Tule Lake NM 18 32 2,532 2,888 137 140 3,165
Lewis & Clark NHP 15 20 1,838 1,940 87 97 2,124
Lincoln Boyhood NMem 9 9 1,168 1,283 64 25 1,372
Lincoln Home NHS 27 29 3,102 3,230 157 25 3,412
Little Bighorn Battlefield NM 10 13 1,380 1,467 61 76 1,604
Little River Canyon NPres 14 16 1,503 1,598 81 76 1,755
Little Rock Central High School NHS 9 9 1,070 1,645 51 25 1,721
Longfellow House - Washington’s Headquarters NHS 0 0 1,346 1,338 71 25 1,434
Lowell NHP 60 63 9,044 9,437 423 303 10,163
Lyndon B Johnson NHP 26 27 4,215 4,379 156 76 4,611
Maggie L Walker NHS 5 6 698 1,042 42 25 1,109
Mammoth Cave NP 52 107 7,185 7,523 358 226 8,107
Manassas NBP 26 29 3,530 3,780 193 206 4,179
Manhattan Project NHP 4 7 1,049 1,264 43 25 1,332
Manhattan Sites 20 20 4,836 5,083 101 25 5,209
Manzanar NHS 11 13 1,443 1,538 67 25 1,630
Marsh-Billings-Rockefeller NHP 14 15 2,252 2,365 122 76 2,563
Martin Luther King, Jr NHP 25 25 4,652 5,584 165 25 5,774
Martin Van Buren NHS 11 11 1,398 1,488 65 25 1,578
Medgar & Myrlie Evers Home NM 1 1 182 1,126 10 240 1,376
National Park Service FY 2024 Budget Justifications
Overview-51
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
Mesa Verde NP 50 94 6,975 7,308 345 139 7,792
Mill Springs Battlefield NM 6 6 874 932 31 25 988
Minidoka NHS 3 4 497 774 28 25 827
Minute Man NHP 25 29 3,364 3,508 182 143 3,833
Minuteman Missile NHS 8 8 769 876 40 25 941
Mississippi NRRA 19 22 2,177 2,697 119 191 3,007
Missouri NRR 9 11 1,269 1,342 63 83 1,488
Mojave NPres & Castle Mountains NM 34 42 6,023 6,253 280 163 6,696
Monocacy NB 10 12 1,729 1,870 75 276 2,221
Montezuma Castle NM & Tuzigoot NM 10 22 1,756 1,852 66 76 1,994
Moores Creek NB 5 6 733 803 34 25 862
Morristown NHP 24 24 2,924 3,067 161 76 3,304
Mount Rainier NP 84 178 13,055 13,624 674 407 14,705
Mount Rushmore NMem 34 49 4,510 4,709 230 76 5,015
Muir Woods NM 6 10 531 599 47 25 671
Natchez NHP 14 14 2,702 2,806 90 25 2,921
Natchez Trace NST 0 0 84 205 0 25 230
Natchez Trace Parkway, Brices Cross Roads NBS, Tupelo NB 94 103 12,590 13,122 579 109 13,810
National Capital Parks-East 98 99 17,991 19,046 663 139 19,848
National Mall & Memorial Parks 216 224 38,510 40,126 1,529 266 41,921
National Park of American Samoa 12 16 1,480 1,562 63 201 1,826
National Park Service Liaison to the White House 60 67 10,254 10,663 455 190 11,308
National Parks of New York Harbor (Hqtrs) 6 6 926 1,009 56 25 1,090
Natural Bridges NM 5 9 579 643 29 25 697
New Bedford Whaling NHP 8 9 1,037 1,115 60 25 1,200
New Orleans Jazz NHP 5 5 1,426 1,511 51 25 1,587
New Philadelphia NHS 0 0 0 0 0 295 295
New River Gorge NP&Pres 72 85 8,216 8,600 421 156 9,177
Nez Perce NHP 19 20 2,693 3,111 122 94 3,327
Nicodemus NHS 3 3 810 872 23 25 920
Ninety Six NHS 6 6 518 578 29 25 632
Niobrara NSR 5 5 1,102 1,176 35 76 1,287
North Cascades NP, Lake Chelan NRA, Ross Lake NRA 46 104 7,484 7,783 350 530 8,663
Obed WSR 11 11 1,174 1,261 75 84 1,420
Ocmulgee Mounds NHP 11 13 1,450 2,052 77 76 2,205
Olympic NP 98 197 13,572 14,265 741 350 15,356
Oregon Caves NM & Pres 14 16 1,882 1,983 91 83 2,157
Organ Pipe Cactus NM 33 37 4,877 5,073 232 171 5,476
Ozark NSR 59 75 7,245 7,597 384 173 8,154
National Park Service FY 2024 Budget Justifications
Overview-52
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
Padre Island NS 48 63 6,309 6,562 301 453 7,316
Palo Alto Battlefield NHS 13 13 1,175 1,254 69 76 1,399
Paterson Great Falls NHP 7 7 1,121 1,198 53 25 1,276
Pea Ridge NMP 10 11 1,366 1,517 73 376 1,966
Pearl Harbor NMem 32 35 4,896 5,078 205 25 5,308
Pecos NHP 19 21 2,533 2,661 135 76 2,872
Perry’s Victory & International Peace Memorial 10 14 1,240 1,323 59 25 1,407
Petersburg NB 26 26 4,002 4,179 179 76 4,434
Petrified Forest NP 36 55 4,071 4,267 218 121 4,606
Petroglyph NM 13 16 1,889 2,001 90 25 2,116
Pictured Rocks NL 19 34 2,856 2,980 132 107 3,219
Pinnacles NP 22 35 3,923 4,079 171 165 4,415
Pipe Spring NM 11 12 1,398 1,490 67 76 1,633
Pipestone NM 11 12 1,210 1,415 59 76 1,550
Point Reyes NS 47 80 8,343 8,726 429 484 9,639
Port Chicago Naval Magazine NMem 1 1 326 386 21 201 608
Potomac Heritage NST 0 0 472 499 4 25 528
Prince William Forest Park 27 31 3,819 3,995 201 76 4,272
Pullman NHP 7 7 1,120 1,525 46 25 1,596
Pu’uhonua O Honaunau NHP 11 22 2,087 2,199 104 135 2,438
Puukohola Heiau NHS 10 14 1,313 1,397 66 25 1,488
Rainbow Bridge NM 0 0 160 160 9 25 194
Reconstruction Era NHP 9 9 678 1,479 30 25 1,534
Redwood NP 75 103 9,601 10,271 500 453 11,224
Richmond NBP 28 28 3,463 3,638 188 80 3,906
Rio Grande WSR 0 0 225 225 15 25 265
River Raisin NBP 7 7 883 956 44 25 1,025
Rock Creek Park 48 48 9,804 10,172 384 150 10,706
Rocky Mountain NP 91 237 14,159 14,809 723 497 16,029
Roger Williams NMem 5 5 749 815 35 25 875
Ronald Reagan Boyhood Home NHS 0 0 373 373 0 25 398
Rosie the Riveter WWII Home Front NHP 10 10 1,399 1,494 76 25 1,595
Russell Cave NM 4 4 430 492 26 25 543
Sagamore Hill NHS 14 14 1,711 1,806 82 76 1,964
Saguaro NP 31 74 4,093 4,579 227 238 5,044
Saint Croix Island IHS 2 2 262 315 14 25 354
Saint Croix NSR & Lower Saint Croix NSR 34 37 4,207 4,406 236 146 4,788
Saint-Gaudens NHP 10 10 1,403 1,485 42 250 1,777
Salem Maritime NHS 19 20 2,799 2,928 117 139 3,184
National Park Service FY 2024 Budget Justifications
Overview-53
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
Salinas Pueblo Missions NM 12 14 1,533 1,627 70 25 1,722
San Antonio Missions NHP 32 36 4,254 4,966 207 25 5,198
San Francisco Maritime NHP 55 61 8,109 8,513 457 25 8,995
San Juan Island NHP 7 13 1,110 1,191 56 76 1,323
San Juan NHS 27 88 3,755 3,929 186 25 4,140
Sand Creek Massacre NHS 5 5 918 1,128 30 25 1,183
Santa Monica Mountains NRA 53 71 8,970 9,294 404 328 10,026
Saratoga NHP 18 21 2,745 2,870 137 78 3,085
Saugus Iron Works NHS 5 5 982 1,057 58 76 1,191
Scotts Bluff NM 13 13 1,066 1,145 60 25 1,230
Sequoia NP & Kings Canyon NP 134 266 17,876 18,670 846 453 19,969
Shenandoah NP 84 186 13,379 13,976 621 414 15,011
Shiloh NMP 26 30 3,054 3,194 164 76 3,434
Sitka NHP 16 19 2,356 2,468 108 25 2,601
Sleeping Bear Dunes NL 38 93 4,661 4,895 272 150 5,317
Southeast Arizona Group 23 23 3,881 4,034 159 127 4,320
Southern Arizona Group (Hqtrs) 13 15 1,875 1,979 123 81 2,183
Southern Four Corners Group 34 39 4,315 4,474 183 76 4,733
Springfield Armory NHS 12 13 1,602 1,701 82 25 1,808
Statue of Liberty NM & Ellis Island 93 94 24,833 25,466 686 25 26,177
Ste. Genevieve NHP 7 8 1,245 1,512 41 25 1,578
Steamtown NHS 44 44 6,137 6,412 284 25 6,721
Stones River NB 13 13 1,403 1,493 76 76 1,645
Stonewall NM 2 2 229 280 12 25 317
Tallgrass Prairie NPres 9 11 1,152 1,299 54 76 1,429
Thaddeus Kosciuszko NMem 0 0 188 188 12 25 225
Theodore Roosevelt Inaugural NHS 0 0 316 316 0 25 341
Theodore Roosevelt NP & International Peace Garden 28 41 3,293 3,491 171 142 3,804
Thomas Edison NHP 20 21 3,180 3,328 162 25 3,515
Thomas Stone NHS 2 2 693 760 39 25 824
Timpanogos Cave NM 13 22 1,225 1,311 68 114 1,493
Tonto NM 7 9 958 1,038 33 25 1,096
Tule Springs Fossil Beds NM 4 4 776 840 37 25 902
Tumacacori NHP 11 15 1,433 1,522 74 76 1,672
Tuskegee Airmen NHS 6 6 1,024 1,274 30 25 1,329
Tuskegee Institute NHS 8 8 1,100 1,361 36 25 1,422
Ulysses S Grant NHS 12 12 1,368 1,458 64 25 1,547
Upper Delaware Scenic & Recreational River & Middle Delaware NSR 24 25 3,693 3,844 177 116 4,137
Valles Caldera NPres 28 34 5,101 5,257 193 269 5,719
National Park Service FY 2024 Budget Justifications
Overview-54
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
Valley Forge NHP 51 52 6,983 7,278 346 95 7,719
Vanderbilt Mansion NHS 17 18 1,179 1,266 63 25 1,354
Vicksburg NMP 26 27 3,720 3,870 168 76 4,114
Virgin Islands Coral Reef NM 0 0 510 510 30 25 565
Virgin Islands NP 33 37 5,421 5,615 223 354 6,192
Voyageurs NP 36 52 4,533 4,734 245 209 5,188
Waco Mammoth NM 2 2 403 458 14 76 548
War in the Pacific NHP 12 14 1,720 1,808 62 76 1,946
Washita Battlefield NHS 7 7 838 909 42 76 1,027
Weir Farm NHS 8 9 1,436 1,520 68 25 1,613
West. Arctic Parklands - Noatak NPres, Cape Krusenstern NM, Kobuk Valley NP 21 22 2,780 2,956 185 90 3,231
Whiskeytown NRA 31 65 4,594 4,789 229 101 5,119
White Sands NP 15 27 1,942 2,046 99 76 2,221
Whitman Mission NHS 6 6 889 966 50 25 1,041
William Howard Taft NHS 9 9 899 969 45 25 1,039
William Jefferson Clinton Birthplace Home NHS 5 5 774 878 31 25 934
Wilson’s Creek NB 24 26 3,526 3,674 157 237 4,068
Wind Cave NP 24 56 2,837 3,149 157 183 3,489
Wolf Trap NP 40 40 4,592 4,890 224 225 5,339
Women’s Rights NHP 14 14 1,707 1,797 70 25 1,892
Wrangell-Saint Elias NP&Pres 38 50 6,505 6,779 318 113 7,210
Yellowstone NP 286 519 38,349 39,884 2,038 453 42,375
Yosemite NP 208 562 31,352 32,680 1,489 453 34,622
Yucca House NM 0 0 120 120 8 25 153
Yukon-Charley Rivers NPres 0 0 1,975 1,975 92 25 2,092
Zion NP 68 164 8,692 9,115 426 560 10,101
Subtotal, Park Units 9,820 14,416 1,429,259 1,511,154 68,675 45,086 1,624,915
National Trails System
[Appalachian NST] [8] [10] [1,948] [2,023] [89] [83] [2,195]
[Natchez Trace NST] [0] [0] [84] [205] [0] [25] [230]
[Potomac Heritage NST] [0] [0] [472] [499] [4] [25] [528]
Ala Kahakai NHT 4 9 621 661 34 275 970
Butterfield Overland NHT 0 0 0 205 0 25 230
California NHT 0 0 417 440 7 25 472
Captain John Smith Chesapeake NHT 4 4 879 921 35 25 981
Chilkoot NHT 0 0 0 205 0 25 230
El Camino Real de los Tejas NHT 0 0 264 287 10 25 322
El Camino Real de Tierra Adentro NHT 0 0 355 378 12 25 415
Ice Age NST 4 5 989 1,036 40 25 1,101
National Park Service FY 2024 Budget Justifications
Overview-55
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
Juan Bautista de Anza NHT 3 3 623 663 30 25 718
Lewis & Clark NHT 16 16 2,390 2,488 115 25 2,628
Mormon Pioneer NHT 0 0 308 331 14 25 370
New England NST 0 0 278 301 0 25 326
North Country NST 5 5 1,355 1,404 42 25 1,471
Old Spanish NHT 0 0 308 331 3 25 359
Oregon NHT 0 0 529 552 26 25 603
Overmountain Victory NHT 0 0 393 416 14 25 455
Pony Express NHT 0 0 316 339 7 25 371
Santa Fe NHT 17 17 803 915 31 25 971
Selma to Montgomery NHT 10 10 2,243 2,637 84 25 2,746
Star Spangled Banner NHT 0 0 219 242 11 25 278
Trail of Tears NHT 0 0 573 596 27 25 648
Washington Rochambeau Revolutionary Route NHT 1 1 341 371 9 25 405
National Trail System Program 0 2 408 413 6 0 419
Subtotal, National Trail System 64 71 14,612 16,132 557 800 17,489
[Subtotal, National Trail System with Park Units] [71] [81] [17,116] [18,859] [650] [933] [20,442]
Partnership Wild & Scenic Rivers
[Great Egg Harbor Scenic & Recreational River] [0] [0] [302] [302] [6] [25] [333]
Eightmile WSR 0 0 300 300 0 25 325
Farmington (West Branch) WSR 0 0 300 300 0 25 325
Housatonic River WSR 0 0 0 200 0 25 225
Lamprey WSR 0 0 300 300 0 25 325
Lower Delaware WSR 0 0 300 300 0 25 325
Lower Farmington & Salmon Brook WSR 0 0 300 300 0 25 325
Maurice WSR 0 0 300 300 0 25 325
Missisquoi and Trout Rivers WSR 0 0 300 300 0 25 325
Musconetcong WSR 0 0 300 300 0 25 325
Nashua WSR 0 0 300 300 0 25 325
Sudbury, Assabet, Concord WSR 0 0 300 300 0 25 325
Taunton WSR 0 0 300 300 0 25 325
Wekiva WSR 0 0 300 300 0 25 325
Westfield WSR 0 0 300 300 0 25 325
White Clay Creek WSR 0 0 300 300 0 25 325
Wood-Pawcatuck Watershed WSR 0 0 300 300 0 25 325
York River WSR 0 0 0 200 0 25 225
Wild & Scenic River Program 0 2 100 104 6 0 110
Subtotal, Partnership Wild & Scenic Rivers 0 2 4,600 5,004 6 425 5,435
[Subtotal, Partnership Wild & Scenic Rivers with Park Units] [0] [2] [4,902] [5,306] [12] [450] [5,768]
National Park Service FY 2024 Budget Justifications
Overview-56
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
Affiliated Areas
American Memorial Park 10 11 1,680 1,727 89 0 1,816
Gloria Dei (Old Swedes’) Church NHS 0 0 36 36 2 0 38
Ice Age National Scientific Reserve 0 0 739 739 0 0 739
Lower Eastside Tenement Museum 0 0 249 249 0 0 249
Oklahoma City NMem 7 7 855 886 53 0 939
Pinelands NR 0 0 301 301 0 0 301
Roosevelt Campobello International Park 0 0 1,691 1,691 0 119 1,810
Thomas Cole NHS 0 0 158 158 0 0 158
Subtotal, Affiliated Areas 18 18 5,709 5,787 144 119 6,050
Other Field Offices & Partner Organizations
400 Years of African American History Commission 0 0 3,300 3,300 0 0 3,300
Accokeek Foundation 0 0 749 749 0 0 749
Alice Ferguson Foundation 0 0 195 195 0 0 195
Anchorage Interagency Visitor Center 5 5 739 762 37 0 799
Beringia 1 1 674 674 18 0 692
Chesapeake Bay Office 2 7 509 524 24 500 1,048
Erie Canalway NHA Commission 0 0 281 289 4 0 293
Fairbanks Interagency Visitor Center 4 4 723 751 47 0 798
Johnstown Area Heritage Associate Museum 0 0 44 44 0 0 44
Lower Mississippi Delta Technical Assistance 0 0 230 230 0 0 230
Maine Acadian Culture Comm Technical Assistance 0 0 99 99 1 0 100
Masau Trail 0 0 34 34 2 0 36
National Capital Area Performing Arts Program 0 0 2,227 2,227 0 0 2,227
National Park Foundation 0 0 5,000 10,000 0 0 10,000
Route 66 National Historic Highway 0 0 302 302 5 0 307
Subtotal, Other Field Offices 13 18 15,106 20,180 138 500 20,818
United States Park Police Operations
United States Park Police Operations 0 429 92,249 95,012 4,954 5,365 105,331
Subtotal, USPP Operations - Washington D.C. 0 429 92,249 95,012 4,954 5,365 105,331
Total, Park Base 9,914 14,954 1,561,535 1,653,269 74,474 52,295 1,780,038
Central Offices
Washington Office 0 360 83,464 94,541 874 31,470 126,885
Departmental Unified Regions 0 1,221 141,513 148,436 7,297 5,525 161,258
Total, Central Offices 0 1,581 224,977 242,977 8,171 36,995 288,143
Program/Support Offices
Park Administrative Support Functions
Accounting Operations Center 0 113 19,564 20,202 1,125 0 21,327
Park Concession Program 0 15 4,759 4,850 158 0 5,008
National Park Service FY 2024 Budget Justifications
Overview-57
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
Human Resources Operation Center 0 60 9,188 9,476 459 0 9,935
Information Technology Programs 0 93 52,526 62,060 1,068 9,386 72,514
Major Acquisition Buying Offices 0 224 26,898 27,646 1,656 0 29,302
Servicing Human Resources Office 0 237 29,001 30,125 1,831 0 31,956
Learning and Development Program 0 55 15,193 15,584 510 0 16,094
Subtotal, Park Administrative Support Functions 0 797 157,129 169,943 6,807 9,386 186,136
Park Natural Resource Support Functions
Air Quality Program 0 25 8,172 8,335 267 0 8,602
Biological Resource Management Program 0 48 9,365 9,488 495 2,000 11,983
Geologic Resource Center 0 18 4,405 4,506 194 2,500 7,200
Cooperative Landscape Conservation 0 8 1,452 1,506 95 1,500 3,101
Inventory and Monitoring Program 0 255 46,214 52,654 2,441 3,650 58,745
Natural Sounds Program 0 19 3,648 3,749 176 0 3,925
Resource Damage Assessment & Restoration 0 19 1,424 1,473 80 0 1,553
Social Science Program 0 8 1,532 5,076 83 0 5,159
Everglades Restoration and Research:
South Florida Comprehensive Ecosystem Restoration Plan 0 24 5,070 5,219 154 0 5,373
South Florida Critical Ecosystem Studies Initiative 0 9 4,014 4,068 27 0 4,095
South Florida Task Force Support 0 3 2,368 2,374 16 0 2,390
Water Resources Program 0 51 13,270 13,557 496 1,500 15,553
Subtotal, Park Natural Resource Support Functions 0 487 100,934 112,005 4,524 11,150 127,679
Park Cultural Resource Support Functions
Field Resource Centers:
Midwest Archeological Center 0 22 1,439 1,500 99 0 1,599
National Capital Museum Resource Center 0 7 692 711 42 0 753
Southeast Archeological Center 0 17 1,094 1,120 61 0 1,181
Western Archeological Center 0 10 1,334 1,372 63 0 1,435
National Networks
African American Civil Rights Network 0 0 5,375 5,384 0 0 5,384
National Underground Railroad to Freedom Network 0 0 2,500 2,505 1 0 2,506
Reconstruction Era National Historic Network 0 4 475 627 28 0 655
Japanese American World War II History Network 0 0 0 0 0 250 250
World War II Heritage Cities Network 0 0 475 627 0 0 627
Cultural Resources Project Support 0 17 3,198 3,198 0 0 3,198
Subtotal, Park Cultural Resource Support Functions 0 77 16,582 17,044 294 250 17,588
Park Facility Maintenance Support Functions
D.C. Water & Sewer Program 0 0 12,313 12,313 0 0 12,313
Land Use Planning 0 0 150 150 0 0 150
Facility Management Program Support:
National Park Service FY 2024 Budget Justifications
Overview-58
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
Enterprise Facility Management Software System 0 11 7,180 7,280 71 0 7,351
Asset Management Program 0 20 9,128 9,232 129 0 9,361
Maintenance Project Planning 0 0 12,292 12,292 556 0 12,848
Subtotal, Park Facility Maintenance Support Functions 0 31 41,063 41,267 756 0 42,023
Park Interpretation & Education Support Functions
Informational Publications 0 20 3,477 3,514 177 625 4,316
Interpretation and Education Programs 0 6 1,996 4,458 72 31,000 35,530
Subtotal, Park Interpretation & Education Support Functions 0 26 5,473 7,972 249 31,625 39,846
Park Visitor Protection Support Functions
Public Health Program 0 3 3,525 3,747 36 1,375 5,158
Special Agents (Criminal Investigators) 0 39 7,632 7,888 415 1,850 10,153
Fire and Aviation Management Program 0 47 1,733 1,770 80 0 1,850
SW Border Radio Communications Program 0 0 582 582 0 0 582
Federal Law Enforcement Training Center 0 17 5,193 7,484 175 0 7,659
Office of Public Trust - Body-Worn Cameras Program 0 5 4,100 4,100 60 0 4,160
United States Park Police Headquarters 0 91 26,256 28,407 1,152 0 29,559
Subtotal, Park Visitor Protection Support Functions 0 202 49,021 53,978 1,918 3,225 59,121
Park Partnership Support Functions
Volunteers In Parks Program 0 2 6,927 7,711 23 0 7,734
Youth Partnership Programs 0 7 784 809 35 0 844
Subtotal, Park Partnership Support Functions 0 9 7,711 8,520 58 0 8,578
Total, Program/Support Offices 0 1,629 377,913 410,729 14,606 55,636 480,971
PROJECT FUNDING
Natural Resources Project Funds
Natural Resources 0 0 16,316 17,816 0 0 17,816
SW Border Resource Restoration Program 0 0 971 971 0 0 971
Subtotal, Natural Resources Project Funds 0 0 17,287 18,787 0 0 18,787
Cultural Resources Project Funds
Cultural Resources 0 0 23,985 23,985 0 0 23,985
Subtotal, Cultural Resources Project Funds 0 0 23,985 23,985 0 0 23,985
Facility Maintenance Project Funds
Cyclic Maintenance 0 0 188,184 188,184 0 0 188,184
Emergency Management and Damage Program 0 0 2,712 2,712 0 0 2,712
Environmental Management Program 0 0 6,113 6,113 0 0 6,113
Repair/Rehabilitation Projects 0 0 135,980 135,980 0 0 135,980
Subtotal, Facility Maintenance Project Funds 0 0 332,989 332,989 0 0 332,989
Interpretation & Education Project Funds
Interpretation & Education Program 0 0 1,848 3,848 0 0 3,848
Subtotal, Interpretation & Education Project Funds 0 0 1,848 3,848 0 0 3,848
National Park Service FY 2024 Budget Justifications
Overview-59
Operation of the National Park System Organizations
FY 2022
Park Base
FTE
FY 2022
Total FTE
FY 2022
Actual
FY 2023
Enacted
FY 2024
Fixed Costs
& Internal
Transfers
FY 2024
Program
Changes
FY 2024
Request
Recreation & Partnership Project Funds
Challenge Cost Share Program 0 0 386 386 0 0 386
Connecting National Trails to Park Program 0 0 925 925 0 0 925
Recreational Access Program 0 0 3,350 3,350 0 0 3,350
Youth Partnership Program 0 0 14,546 14,546 0 0 14,546
Subtotal, Recreation & Partnership Project Funds 0 0 19,207 19,207 0 0 19,207
Total, Projects 0 0 395,316 398,816 0 0 398,816
Total, Park Management 0 0 2,559,741 2,705,791 97,251 144,926 2,947,968
External Administrative Costs 0 0 207,287 217,633 23,302 854 241,789
Total, Operation of the National Park System 0 0 2,767,028 2,923,424 120,553 145,780 3,189,757
1
Represents Full-Time Equivalents (FTE) funded from park base operating dollars.
2
Total FTE shown for parks are by organization, irrespective of funding source. For example, some temporary positions in parks are funded from construction, recreation fees, etc.
3
The National Trails System includes three units that are designated as park units. They are listed under the National Trails System in brackets to show the total Trails budget level.
4
The NPS uses these totals when responding to inquiries as to the amount of funding directly available for “park base operations.” Items which follow this total also support park operations, but are
not directly managed at the park level.
5
The Final amounts reflect presentation adjustments or shifts of funds within reprogramming guidelines. Amounts may vary from previously listed levels.
6
The Roosevelt Campobello International Park Commission Budget Request will be submitted to House and Senate Appropriation Committees under separate cover.
7
The United States Park Police Operations includes support for New York area parks, San Francisco area parks, and Washington D.C. area parks.
8
The current number of NPS park units is 424. Not all units are individually listed as some are primarily operated in conjunction with another unit. For these occurrences the units have been
consolidated and are presented as one. The following consolidations are incorporated:
Unit: George Washington Memorial Parkway
Units Included: Arlington House, The Robert E. Lee Memorial; Clara Barton NHS; George Washington Memorial Parkway; Lyndon B. Johnson Memorial Grove on the Potomac; Theodore
Roosevelt Island NMem
Unit: Manhattan Sites
Units Included: Castle Clinton NM; Federal Hall NMem; General Grant NMem; Hamiltion Grange NMem; Saint Paul’s Church NHS; Theodore Roosevelt Birthplace NHS
Unit: National Capital Parks - East
Units Included: Carter G. Woodson Home NHS; Fort Washington Park; Frederick Douglass NHS; Greenbelt Park; Mary McLeod Bethune Council House NHS; Piscataway Park
Unit: National Mall & Memorial Parks
Units Included: Belmont-Paul Women’s Equality NM; Constitution Gardens; Ford’s Theatre; Franklin D. Roosevelt Memorial; Korean War Veterans Memorial; Lincoln Memorial; Martin
Luther King, Jr. Memorial; Pennsylvania Avenue NHS; Thomas Jefferson Memorial; Vietnam Veterans Memorial; World War I Memorial; World War II Memorial; Washington Monument
Unit: Southeast Arizona Group
Units Included: Chiricahua NM; Coronado NMem; Fort Bowie NHS
Unit: Southern Four Corners Group
Units Included: Canyon de Chelly NM; Hubbell Trading Post NHS; Navajo NM
National Park Service FY 2024 Budget Justifications
Overview-60
Statement of Receipts Collected and Reported
(Dollars in Thousands)
1
These funds are deposited by NPS concessioners in private bank accounts as a condition of an applicable concession contract
made before the 1998 Concessions Act, and are available only for expenditure by the concessioner, with park approval, for
required capital improvements which directly support the facilities and services provided by the concessioner. These are not
receipts for the U.S. Government and are added here only to match an OMB configuration.
Account
Number Receipt Account Title
FY 2022
Actual
($000s)
FY 2023
Projected
($000s)
FY 2024
Projected
($000s)
5110.1 Recreational Fee Program 345,532 350,500 355,500
5110.1 Deed-Restricted Parks Fee Program 3,099 8,000 10,000
5164.1 Transportation Systems Fund 91 212 217
5666.1
Payment for Tax Losses on Land Acquired for Grand Teton
NP 16 16 17
Subtotal, Recreation Fee Receipt Account 348,738 358,728 365,734
14X1034 Contribution for Annuity Benefits for USPP 42,101 39,674 39,549
5431.1 Park Concessions Franchise Fees 143,200 144,632 146,078
5163.1 Rental Payments, Park Buildings Lease and Maint. Fund 10,833 11,645 12,518
5247 Filming and Photography Special Use Fee Program 175 1,200 1,200
5049.1 Rents and Charges for Quarters 24,039 24,640 25,256
5076.1 Delaware Water Gap Rt. 209, Commercial Operation Fees 5 25 25
5169.1 Concessions Improvement Accounts
1
9,802 9,800 9,800
Subtotal, Other Permanent Appropriations 230,155 231,616 234,426
8037.1 Donations to National Park Service 96,080 51,000 51,000
8037.2 Earnings on Investments, Donations to NPS 851 1,000 1,000
8052.2
Earnings on Investments, Preservation, Birthplace of
Abraham Lincoln 3 3 3
Subtotal, Miscellaneous Trust Funds 96,934 52,003 52,003
5762.1 Fees, National Park Medical Services Fund 1,088 2,000 2,000
5762.3 Donations, National Park Medical Services Fund 1 1 1
Subtotal, NPS Medical Services 1,089 2,001 2,001
TOTAL, RECEIPTS REPORTED BY NPS TO
SPECIAL ACCOUNTS 676,916 644,348 654,164
2419.1 Fees and Other Charges for Program Admin. Services 21 21 21
2229
Sale of Timber, Wildlife and Other Natural Land Products,
Not Elsewhere Classified 3 3 3
TOTAL, RECEIPTS REPORTED BY NPS TO THE
GENERAL FUND 24 24 24
GRAND TOTAL, RECEIPTS REPORTED BY NPS 676,940 644,372 654,188
National Park Service FY 2024 Budget Justifications
Overview-61
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justification
ONPS-1
Appropriation: Operation of the National Park System
Mission Overview
The Operation of the National Park System appropriation provides the operating funding for our Nation’s
national parks, trails, partnership wild and scenic rivers, affiliated areas, partner organizations, central
offices, and program offices. The parks preserve and commemorate natural and cultural resources that are
woven into our national heritage. This appropriation contributes to several important mission areas of the
Department of the Interior and the National Park Service, including conserving natural and cultural
resources to effectively manage resources for the enjoyment of all; expanding outdoor recreation to
support the link between recreation experiences, natural landscapes, and visitor satisfaction; protecting
people through the preparedness of NPS law enforcement; and maintaining and operating NPS assets.
Appropriation Overview
The Operation of the National Park System (ONPS) appropriation is composed of two budget activities:
Park Management
The Park Management activity covers the management and operation of park areas and servicewide
programs. It is structured in line with the functional activities the NPS undertakes to fulfill its mission,
including actively managing and promoting conservation practices and providing opportunities for
recreation on our Nation’s public lands. For information about funding by park and program please refer
to the ONPS-Summaries section. The five functional activities included in the budget are:
Resource Stewardship encompasses resource management operations that provide for the
protection and conservation of unique natural, cultural, and historical features of the National
Park System.
Visitor Services includes educational and interpretive programs to enhance the visitor’s
experience. It also supports efficient management of commercial services for the benefit of
visitors and the protection of resources.
Park Protection includes law enforcement programs, the United States Park Police, and public
health operations, which provide for the protection of park resources, visitors, and staff.
Facility Operations and Maintenance encompasses the operations and maintenance of
buildings, other facilities, lands, and the protection of other government investments.
Park Support covers the management, supervision, and administrative operations for park areas,
servicewide programs, and partnerships.
External Administrative Costs
The External Administrative Costs activity funds costs that are largely determined by organizations
outside the NPS and for which funding requirements are less flexible. The requirements for these costs
are mandated in accordance with applicable laws. To promote efficient performance, these costs are
managed centrally. The categories funded from this activity support all activities and programs of the
NPS.
National Park Service FY 2024 Budget Justification
ONPS-2
Summary of Requirements for Operation of the National Park System
(Dollars in Thousands)
Budget Activity/Subactivity
FY 2022
Actual
FY 2022
Actual
FTE
FY 2023
Enacted
FY 2023
Enacted
FTE
FY 2024
Request
Fixed
Costs
(+/-)
FY 2024
Request
Internal
Transfers
(+/-)
FY 2024
Request
Program
Changes
(+/-)
FY 2024
Request
Program
Changes
(+/-) FTE
FY 2024
Request
FY 2024
Request
FTE
FY 2024
Request
Total
Change
from FY
2023 (+/-)
Park Management
Resource Stewardship 364,330 2,117 419,717 2,292 +15,289 -17,817 +92,448 +398 509,637 2,690 +89,920
Visitor Services 260,210 2,320 308,487 2,406 +11,408 -29,011 +9,380 +53 300,264 2,459 -8,223
Park Protection 407,757 2,331 429,396 2,406 +15,879 -1,764 +14,226 +73 457,737 2,479 +28,341
Facility Operations and Maintenance 914,790 4,111 938,677 4,221 +34,713 +3,312 +6,315 +55 983,017 4,276 +44,340
Park Support 612,654 3,065 609,514 3,135 +22,541 +42,701 +22,557 +54 697,313 3,189 +87,799
Subtotal, Park Management 2,559,741 13,944 2,705,791 14,460 +99,830 -2,579 +144,926 +633 2,947,968 15,093 +242,177
External Administrative Costs 207,287 0 217,633 0 +20,723 +2,579 +854 0 241,789 0 +24,156
TOTAL, OPERATION OF THE NATIONAL
PARK SYSTEM 2,767,028 13,944 2,923,424 14,460 +120,553 0 +145,780 +633 3,189,757 15,093 +266,333
Transfer to 400 Years of African American
History Commission -3,300 0 -3,300 0 0 0 0 0 -3,300 0 0
Medical Services Fund 1,035 0 0 0 0 0 0 0 0 0 0
Transfer in for Drug Trafficking Deterrent
Actions 130 0 0 0 0 0 0 0 0 0 0
TOTAL, ONPS - Budget Account Listing
(BAL) 2,764,893 13,944 2,920,124 14,460 +120,553 0 +145,780 +633 3,186,457 15,093 +266,333
1
Funding totals do not include supplemental funding
2
FTE reports Current Direct FTE only
National Park Service FY 2024 Budget Justifications
ONPS-3
Fixed Costs and Related Changes
Operation of the National Park System
Fixed Cost Element
2023
Enacted
Total or
Change
2023
Enacted
to 2024
Request
Change Description
Change in Number of Paid Days -6,688 +7,260
This column reflects changes in pay associated with
the change in the number of paid days between 2023
and 2024. 2024 has one day more than 2023.
Pay Raise +69,523 +91,513
The President’s Budget for 2024 includes one quarter
of the 4.6% pay raise for 2023 and three quarters of a
planned 5.2% pay raise for 2024.
Employer Share of Federal Employee
Retirement System (FERS) 0 +1,057
This column reflects no budgeted increase to the
employer contribution to the Federal Employee
Retirement System and a 0.6% increase to the
employer contribution for the Law Enforcement
Federal Employees Retirement System.
Departmental Working Capital Fund
(WCF) +2,674 +7,675
The change reflects the final 2024 Central Bill
approved by the Working Capital Fund Consortium.
Workers’ Compensation Payments -568 +532
The amounts reflect final chargeback costs of
compensating injured employees and dependents of
employees who suffer accidental deaths while on
duty. Costs for 2024 will reimburse the Department
of Labor, Federal Employees Compensation Fund,
pursuant to 5 U.S.C. 8147(b) as amended by Public
Law 94-273.
Unemployment Compensation Payments 0 +1,021
The amounts reflect projected changes in the costs of
unemployment compensation claims to be paid to the
Department of Labor, Federal Employees
Compensation Account, in the Unemployment Trust
Fund, pursuant to Public Law 96-499.
Rental Payments +4,240 -365
The amounts reflect changes in the costs payable to
General Services Administration (GSA) and others
for office and non-office space as estimated by GSA,
as well as the rental costs of other currently occupied
space. These costs include building security. Costs of
mandatory office relocations, i.e. relocations in cases
where due to external events there is no alternative
but to vacate the currently occupied space, are also
included.
Baseline Adjustments for O&M
Increases 0 +11,860
In accordance with space maximization efforts across
the Federal Government, this adjustment captures the
associated increase to baseline operations and
maintenance requirements resulting from movement
out of GSA or direct-leased (commercial) space and
into Bureau-owned space. While the GSA portion of
fixed costs will go down as a result of these moves,
Bureaus often encounter an increase to baseline
O&M costs not otherwise captured in fixed costs.
This category of funding properly adjusts the
baseline fixed cost amount to maintain steady-state
funding for these requirements.
Account Total Fixed Cost +120,553
National Park Service FY 2024 Budget Justifications
ONPS-4
Internal Realignments and Non-Policy/Program
Changes (Net-Zero)
FY 2024
(+/-) Description
Budget Realignment to Reflect 2022 Actual
Obligations
1
Park Management/Resource Stewardship -17,817
Internal adjustment to redistribute the variance in
enacted funding amounts and actual charges in FY
2022 by ONPS Subactivity
Park Management/Visitor Services -29,011
Internal adjustment to redistribute the variance in
enacted funding amounts and actual charges in FY
2022 by ONPS Subactivity
Park Management/Park Protection +700
Internal adjustment to redistribute the variance in
enacted funding amounts and actual charges in FY
2022 by ONPS Subactivity
Park Management/Facility Operations and
Maintenance +3,312
Internal adjustment to redistribute the variance in
enacted funding amounts and actual charges in FY
2022 by ONPS Subactivity
Park Management/Park Support +42,816
Internal adjustment to redistribute the variance in
enacted funding amounts and actual charges in FY
2022 by ONPS Subactivity
Net Account Total, Budget Realignment 0
Internal Transfers to Reconcile Funding Need with
Funding Source
Park Management/Park Protection/Law Enforcement
and Protection -2,464
Amounts reflect the adjustment of charges between
Working Capital Fund Direct Bill and Working
Capital Fund Central Bill.
Park Management/Park Support/Administrative
Support -115
Amounts reflect the adjustment of charges between
Working Capital Fund Direct Bill and Working
Capital Fund Central Bill.
External Administrative Costs/Departmental Program
Charges +2,579
Amounts reflect the adjustment of charges between
Working Capital Fund Direct Bill and Working
Capital Fund Central Bill.
Net Account Total, Internal Transfers 0
1
Please see Exhibit C: Budget Realignment for additional information.
National Park Service FY 2024 Budget Justifications
ONPS-5
OPERATION OF THE NATIONAL PARK SYSTEM
Appropriation Language
For expenses necessary for the management, operation, and maintenance of areas and facilities
administered by the National Park Service and for the general administration of the National Park Service,
[$2,923,424,000]$3,189,757,000, to remain available until September 30, 2025, of which
[$11,661,000]$11,858,000 shall be for planning and interagency coordination in support of Everglades
restoration [and], $135,980,000 shall be for maintenance, repair, or rehabilitation projects for constructed
assets [and] $188,184,000 shall be for cyclic maintenance projects for constructed assets and cultural
resources [and], $10,000,000 shall be for uses authorized by section 101122 of title 54, United States
Code [shall remain available until September 30, 2024], and not to exceed $15,000 may be for official
reception and representation expenses: Provided, That funds appropriated under this heading in this Act
are available for the purposes of section 5 of Public Law 95–348: Provided further, That notwithstanding
section 9 of the 400 Years of African-American History Commission Act (36 U.S.C. note prec. 101;
Public Law 115–102), $3,300,000 of the funds provided under this heading shall be made available for
the purposes specified by that Act: Provided further, That sections (7)(b) and (8) of that Act shall be
amended by striking “July 1, [2023]2024” and inserting “July 1, [2024]2025”.
In addition, for purposes described in section 2404 of Public Law 116–9, an amount equal to the amount
deposited in this fiscal year into the National Park Medical Services Fund established pursuant to such
section of such Act, to remain available until expended, shall be derived from such Fund. (Department of
the Interior, Environment, and Related Agencies Appropriations Act, 2023.)
Justification of Major Proposed Language Changes
The phrase “to remain available until September 30, 2025” was inserted to request that the full Operation
of the National Park System appropriation be available for two years. Two-year funding availability will
allow the NPS to mitigate the impact of continuing resolutions. Multi-year funding is consistent with the
period of availability of the operating funds at other Interior land management bureaus and similar
agencies. This change enhances consistency across the Department of the Interior.
The phrase “and not to exceed $15,000 for official reception and representation expenses” was added to
enable NPS to use up to $15,000 of appropriated amounts for courtesy and social responsibilities
associated with official duties, primarily for outreach, engagement, and consultation with Tribal partners
to honor traditions. This request would provide NPS similar authority provided to other agencies to
extend hospitality to official visitors without bureau employees bearing expenses from their own personal
funds.
Appropriations Language Citations
1. For expenses necessary for the management, operation, and maintenance of areas and
facilities administered by the National Park Service
Division A of subtitle I of title 54, United States Code, creates the National Park Service (NPS),
defines the National Park System, and provides authorities related thereto, including authority for
management, operation, and maintenance of areas and facilities administered by the NPS.
Other parts of the United States Code provide authorities related to certain subjects, as follows:
National Park Service FY 2024 Budget Justifications
ONPS-6
5 U.S.C. 5901(a), Uniform allowance for employees of the National Park Service.
54 U.S.C. 1019, Concessions and Commercial Use authorizations.
16 U.S.C. 21 – 450ss-3, 459 to 460a-11, and 460m –460-kkk, Specific national park areas or
categories of National Park areas.
16 U.S.C. 6801 note, Recreation fees and fee collection and use.
54 U.S.C. 102303-102304, 320101-320104, 320106: Acquisition, operation and management of
historic and archeological sites, buildings, and properties.
16 U.S.C. 1131-1136: National Wilderness Preservation System.
16 U.S.C. 1241-1249: National Scenic and National Historic Trails.
16 U.S.C. 1281(c): National Wild and Scenic Rivers System components.
54 U.S.C. 102701 Authorizes the law enforcement activities of the U.S. Park Police.
54 U.S.C. 101122 Authorizes appropriations to the National Park Foundation
2. and for the general administration of the National Park Service, $3,189,757,000 which shall
remain available until September 30, 2025,
54 U.S.C. 100101, 100301-100302, which creates the National Park Service, authorizes this
provision, which is included because of the desire of Congress to collect the agency’s general
administrative expenses in one appropriation. Language also makes appropriation available for
two years.
3. of which $11,858,000 shall be for planning and interagency coordination in support of
Everglades restoration,
16 U.S.C. 410r-5 to 410r-8, the Everglades National Park Protection and Expansion Act of 1989,
as amended, authorizes activities to restore Everglades National Park, and appropriations for this
purpose. The following citation includes the length of availability for Everglades restoration
funding; the NPS proposes the availability of funding for these funds to remain available for two
years, consistent with past appropriations.
4. $135,980,000 shall be for maintenance, repair, or rehabilitation projects for constructed
assets, $188,184,000 shall be for cyclic maintenance projects for constructed assets and
cultural resources,
54 U.S.C. 100101, 100301-100302, which creates the National Park Service, authorizes this
provision. The NPS proposes the availability of funding for these funds to remain available for
two years, consistent with past appropriations.
5. and $10,000,000 shall be for uses authorized by section 101122 of title 54, United States
Code.
54 U.S.C. 101122 authorizes appropriations to the National Park Foundation, for use to match
contributions made to the Foundation.
6. and not to exceed $15,000 for official reception and representation expenses
National Park Service FY 2024 Budget Justifications
ONPS-7
The NPS proposes new language to enable NPS to use up to $15,000 of appropriated amounts for
courtesy and social responsibilities associated with official duties, primarily for outreach,
engagement, and consultation with Tribal partners to honor traditions. This request would provide
NPS similar authority provided to other agencies to extend hospitality to official visitors without
bureau employees bearing expenses from their own personal funds.
7. That notwithstanding section 9 of the 400 Years of African-American History Commission
Act (36 U.S.C. note prec. 101; Public Law 115–102), $3,300,000 of the funds provided under
this heading shall be made available for the purposes specified by that Act
This provision directs the NPS to transfer $3,300,000 of funding to the 400 Years of African-
American History Commission. The Commission is a Federally appointed committee, operating
independently as established by the Secretary of the Interior and administered by the National
Park Service.
The Commission was established in the 400 Years of African-American History Commission Act
to coordinate the 400th anniversary of the arrival of the first enslaved Africans in the English
colonies. The Commission’s purpose is to plan, develop, and carry out programs and activities
throughout the United States that recognize and highlight the resilience and cultural contributions
of Africans and African Americans over 400 years; acknowledge the impact that slavery and laws
that enforced racial discrimination had on the United States; encourage civic, patriotic, historical,
educational, artistic, religious, and economic organizations to organize and take part in
anniversary activities; assist States, localities, and nonprofit organizations to further the
commemoration; and coordinate public scholarly research about the arrival of Africans and their
contributions to the United States.
8. for purposes described in section 2404 of Public Law 116-9, an amount equal to the amount
deposited in this fiscal year into the National Park Medical Services Fund established
pursuant to such section of such Act, to remain available until expended, shall be derived
from such Fund.
This provision allows the NPS to utilize funds collected in the National Park Medical Services
Fund, as authorized by section 2404 of the John D. Dingell, Jr. Conservation, Management, and
Recreation Act (P.L. 116-9), for the purposes of executing that section.
National Park Service FY 2024 Budget Justifications
ONPS-8
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
ONPS-9
Justification of Program and Performance
Activity: Park Management
Subactivity: Resource Stewardship
Resource
Stewardship ($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)*
Program
Changes
(+/-)
2024
Request
Change
from 2023
Enacted
(+/-)
Natural Resource
Stewardship 232,999 272,329 +10,073 -16,187 +80,100 346,315 +73,986
Cultural Resource
Stewardship 119,879 135,727 +5,019 -1,630 +12,348 151,464 +15,737
Everglades
Restoration and
Research 11,452 11,661 +197 +0 +0 11,858 +197
Total
Requirements 364,330 419,717 +15,289 -17,817 +92,448 509,637 +89,920
Total FTE
Requirements 2,117 2,292 0 0 +398 2,690 +398
*Internal Transfers column reflects adjusted amounts by budget subactivity and program component based on an analysis of
actual charges in the NPS accounting system for FY 2022. In order to more transparently represent amounts requested in FY
2024, the budget presentation incorporates these amounts in the Internal Transfers column, reflecting a programmatic base
funding realignment.
Summary of FY 2024 Program Changes for Resource Stewardship
Program Changes ($000) FTE
Conservation Initiative – Youth Corps Programs +31,000 +10
Conservation Initiative – Natural Resource Capacity at Parks +28,500 +228
Conservation Initiative – Climate Change and Natural Resources Management
Team +11,500 +92
Conservation Initiative – Cultural Resources Assessment Team +3,720 +24
Conservation Initiative – Inventory and Monitoring Program +3,100 +15
Conservation Initiative – Research Learning Centers +3,000 +6
Conservation Initiative – Cooperative Ecosystem Studies Units +2,000 +7
Racial Justice and Equity for Underserved Communities Initiative – Tribal Co-
Stewardship +7,075 +0
Racial Justice and Equity for Underserved Communities Initiative – Alaska
Subsistence Management +1,000 +5
Racial Justice and Equity for Underserved Communities Initiative – Japanese
American WWII History National Networks +250 +1
New and Critical Responsibilities +740 +5
Supporting Park Capacity +563 +5
TOTAL Program Changes +92,448 +398
Mission Overview
The Resource Stewardship subactivity supports the NPS mission by protecting, conserving, and restoring
natural and cultural resources, and providing the knowledge and information necessary to ensure their
National Park Service FY 2024 Budget Justifications
ONPS-10
proper management. Public lands are the perfect place to find peace and solitude and observe some of
America’s most iconic species and landscapes. Conservation stewardship of these treasures is a key
component of the NPS mission. Implementing programs and projects to support land, water, and wildlife
conservation, the NPS is a leader in protecting and managing America’s resources for current and future
generations to enjoy.
Subactivity Overview
As a steward of the nation’s natural and cultural heritage, a primary responsibility of the NPS is to
conserve and protect park resources and values. The NPS inventories, evaluates, documents, conserves,
protects, monitors, maintains, and interprets the natural and cultural resources at 424 park units, 25 trails
and 66 wild and scenic rivers. National Park Service stewardship helps to sustain resources and allows for
their continued appreciation, understanding, and enjoyment. The resource stewardship subactivity
consists of the following areas of responsibility:
Natural Resource Stewardship
Supports parks by providing park and resource managers with knowledge gained through
systematic and critical investigations, responsive technical assistance, continuing education for
park personnel, and cost-effective research programs that address complex landscape-level
management issues. Partners include the United States Geological Survey, other Federal and State
agencies, and Cooperative Ecosystem Studies Unit-affiliated academic institutions around the
country.
Helps understand, conserve, and protect the natural resources in the National Park System
through active management, research, and stewardship projects. This work enhances visitor
experiences while conserving iconic resources including geologic features and wildlife, detecting
and managing invasive plants and animals, restoring disturbed ecosystems, and conducting
tactical and other studies to address natural resource operational needs.
Assesses the vulnerability of park resources and infrastructure to the effects and potential effects
of climate change. This work improves resource resiliency and develops adaptation strategies to
protect resources and assets from the threat of a changing climate. Seeks to develop climate
change monitoring information in collaboration with parks, other Department of the Interior
bureaus, other agencies, and partners.
Conducts systematic inventories of natural resources and monitoring of park resource conditions
to inform park management decisions through the organization of 32 ecosystem-based multi-park
Inventory and Monitoring (I&M) Networks.
Contributes to the conservation and restoration of scenery, wildlife, vegetation, air and water
quality, marine resources, geologic and paleontological resources, night skies and natural sounds
resulting in healthy intact ecosystems that deliver the best visitor experience.
Cultural Resource Stewardship
Identifies, documents, preserves, protects, and commemorates the sites, landscapes, buildings,
people, events, and objects that define the nation’s diverse heritage. Maintains knowledge and
inventories of these resources to facilitate appropriate and cost-effective preservation and
protection, as well as access to resources.
National Park Service FY 2024 Budget Justifications
ONPS-11
Provides secure and environmentally stable facilities for museum collections to ensure long-term
preservation and accessibility of the collections for research, public use, enjoyment, and increased
understanding.
Conducts applied research aimed at preserving cultural resources. Provides detailed, systematic
data about resources and their preservation and protection needs. Guides the application of
specific methods and techniques for preservation maintenance.
Operates seven cultural resource centers which provide research, project supervision, technical
assistance, information management, and Geographic Information Systems expertise.
Oversees NPS compliance with the Native American Graves Protection and Repatriation Act and
assists all NPS sites with related activities, providing technical advice, guidance, and training.
Everglades Restoration and Research
Implements conservation projects essential to the conservation and restoration of the natural
ecological systems affecting Big Cypress NPres, Biscayne NP, Everglades NP, and Dry Tortugas
NP. Projects include feasibility studies, pilot projects, and restoration projects.
Under the leadership of the Department’s Office of Everglades Restoration Initiatives, supports
NPS efforts on restoration projects and programs, the activities of the South Florida Ecosystem
Restoration Task Force, and supports efforts associated with the Invasive Exotic Species Strategic
Action Framework.
National Park Service FY 2024 Budget Justifications
ONPS-12
Subactivity: Resource Stewardship
Program Component: Natural Resource Stewardship
FY 2024 Program Activities
The following are examples of planned FY 2024 Natural Resource Stewardship activities:
Protect High Elevation and Subalpine Forest from Ungulates at Hawaii Volcanoes National Park
Prevent Extinction of a Critically Endangered Butterfly at Biscayne National Park
Prevent Fossil Loss at Tule Springs Fossil Beds National Monument
Restore Prairie and Oak Savanna for Pollinators and T&E Species at Ice Age National Scenic
Trail
Restore grasslands and reintroduce endangered plant species in Chesapeake and Ohio Canal
National Historical Park
Restore Watershed at Fort Bowie National Historic Site
Investigate Impacts of Sea Level Rise on Sea Turtle Nest Management at Padre Island National
Seashore
Respond to Stony Coral Tissue Loss Disease at Four Caribbean Parks
Analyze, Protect, and Reintroduce Sentry Milk-Vetch at Grand Canyon National Park
Investigate Impact of Changing Ecosystems on Caribou Herds in Alaska
Restore Native Freshwater Mussel Beds in Cuyahoga Valley National Park
Determine Whitebark Pine Health and Develop Recovery Actions in Yellowstone National Park
Survey and Implement Recovery Actions for Threatened Mexican Spotted Owl in Valles Caldera
National Preserve
Complete Meadow Restoration, Revegetation, and Invasive Treatments in Yosemite National
Park
Justification of FY 2024 Program Changes
The FY 2024 budget request for Natural Resource Stewardship is $346,315,000 and 1,842 FTE, a
program change of +$80,100,000 and +363 FTE compared to FY 2023 Enacted.
Conservation Initiative – Youth Corps Programs (+$31,000,000 / +10 FTE) Funding will support
mobilizing the next generation of conservation and resilience workers, maximizing the creation of
accessible training opportunities and providing a pathway to well-paying jobs. The NPS administers a
wide variety of internship and other youth programs with partnerships dedicated to hiring youth.
Programs include the American Sign Language Conservation Corps, the Ancestral Lands Conservation
Corps, Historically Black Colleges and Universities Internship Program, the Latino Heritage Internship
Program, the Scientists in Parks program, and the Veteran Fire Corps.
With this investment, the NPS intends to expand and enhance its youth corps programs by increasing
individual parks’ capacity to host conservation teams and projects to improve grassroots capacity; engage
a multi-media team to highlight the importance of the work and attract diverse recruits; establish long-
term apprenticeship programs to create a pathway to good, union jobs critical to NPS work in trades such
as carpentry, brick and stone masonry, electrical, plumbing, building retrofitting, renewable energy
technology; establish a living wage requirement for the program; and expand program administration to
streamline financial assistance and increase the program’s ability to operationalize performance data.
National Park Service FY 2024 Budget Justifications
ONPS-13
Conservation Initiative – Natural Resource Capacity at Parks (+$28,500,000 / +228 FTE) – Funding
will increase natural resource stewardship capacity servicewide. This investment renews the NPS
commitment to a core competency and mission-essential task while supporting key administration efforts
related to climate change, conservation, and natural sciences. The NPS proposes targeted natural resource
capacity increases at a substantial number of parks, which represent the majority of the NPS’s natural
resources holdings and responsibilities. These parks will also provide support to smaller parks with
natural resources workloads. This investment provides park superintendents capacity to address climate
change consequences and specific threats to the natural resources in their area of operations. For example,
this funding would allow for the park-level recruitment of natural resource staff including but not limited
to natural resource protection specialists, biologists, hydrologists, wildlife veterinarians, ecologists,
environmental engineers, natural resource technicians, geologists, botanists, and physical scientists.
The increase also proposes additional capacity at the regional level to coordinate collaborative
conservation. It increases NPS’s investment in its responsibilities to the Chesapeake Bay Program
regional partnership with a $0.5 million increase, and it requests $1 million to reinforce the NPS’s
responsibilities managing the Colorado River basin.
Conservation Initiative – Climate Change and Natural Resources Management Team (+$11,500,000
/ +92 FTE) Funding will increase support for the National Park Service’s spectrum of servicewide
natural resource management programs. For example, an increase to the geologic resources division will
assess risk to park visitors, staff and infrastructure from major geologic hazards arising from climate
change such as rockfall; landslides; flooding and debris flows (especially post- fire); permafrost;
hurricanes; and earthquakes. An investment in the cooperative landscape conservation program will
support science and actions that identify, implement, and advance landscape- and seascape-scale
collaborative conservation. And an increase to the water resources division will help identify, support and
secure sustainable water sources to support park operations and visitor use.
Conservation Initiative – Inventory and Monitoring Program (+$3,100,000 / +15 FTE) This
funding increase will support additional capacity across the Inventory and Monitoring program. This
program is a system-wide inventory and monitoring effort designed to address the natural resource
inventory and monitoring needs in ~300 parks by conducting natural resource inventories and monitoring
the condition or “health” of key vital sign parameters. These best available science-based metrics and raw
empirical data provide park managers, planners, and interpreters with a broad-based understanding of the
status and trends in the condition of park natural resources and provide a critical basis for making and
assessing the results of management decisions. The network is open-source and research is utilized by
other agencies, partners, scientists, academics, and citizens alike and is a key tool for communicating with
the public on the efficacy of resource protection efforts.
Conservation Initiative – Research Learning Centers (+$3,000,000 / +6 FTE) Funding will allow
the NPS to provide dedicated support to the NPS system of Regional Learning Centers (RLC), whose
purpose is to bring science and research collaboration to the forefront of the Service. The RLCs promote
research in parks and make the findings of research available and understandable to the widest possible
audience.
National Park Service FY 2024 Budget Justifications
ONPS-14
Conservation Initiative – Cooperative Ecosystem Studies Units (+$2,000,000 / +7 FTE) –This
funding will increase the NPS commitment to Cooperative Ecosystem Studies Units (CESUs). A CESU is
an interdisciplinary partnership of Federal agencies, Tribes, academic institutions (including minority
serving institutions), State and local governments, nongovernmental conservation organizations, and other
partners working together within a broad bio-geographic area to support informed public trust resource
stewardship. Through its membership in this national network of CESUs, the NPS collaborates with other
Federal agencies and many non-Federal partners to generate cost-effective and high-quality scientific and
scholarly information. CESUs attract expert researchers to conduct studies in parks, providing usable
knowledge for resource managers, responsive technical assistance to parks, and continuing education for
park personnel. The staff associated with this increase would work with multiple parks and programs to
identify research, technical assistance, and education needs, assist in securing funding for park-based
projects, help parks connect with specialized expertise available through the CESU network, and
contribute scholarly expertise to lead or contribute to projects at the park, region, and servicewide levels.
Racial Justice and Equity for Undeserved Communities Initiative – Alaska Subsistence
Management (+$1,000,000 / +5 FTE) This funding supports the management of subsistence hunting,
trapping, and fishing on NPS lands and waters in Alaska. Title VIII of the Alaska National Interest Lands
Conservation Act (ANILCA) establishes that subsistence uses of fish and wildlife shall be given priority
over other uses of these resources for rural Alaska residents (native and non-native). This “rural
preference” allows local rural residents to engage in subsistence hunting, fishing, and trapping on Federal
public lands. Nowhere else in the United States is there a Federally mandated program to manage
traditional subsistence harvests of fish and wildlife on Federal lands, including national parks,
monuments, and preserves. ANILCA mandates that NPS recognize the significance of traditional Alaska
Native and non-Native subsistence uses as a cultural value of the people in and around most national park
lands in Alaska that preserves a vital piece of America’s heritage. It also recognizes the importance of
maintaining unimpaired ecosystems and natural and healthy populations of fish and wildlife as a
foundation for providing opportunities for traditional subsistence activities and other uses for future
generations. The NPS has facilitated the program in the past through funded projects like harvest studies
conducted cooperatively with local Tribes and other rural communities and research on fish and wildlife
populations. Dedicated program staff will ensure the consistent resourcing and focus the program
deserves.
National Park Service FY 2024 Budget Justifications
ONPS-15
Program Overview
The NPS manages natural resources in the National Park System to meet its statutory responsibility to
conserve resources unimpaired for future generations. National parks conserve natural resources, play
unique roles amid changing environmental conditions as places for scientific research and baselines for
understanding, and serve as venues to communicate and collaborate with partners and the public. Active
conservation management efforts to align resource stewardship in the environment include identifying
and mitigating stressors that threaten resource resilience (e.g. invasive species, air and water quality
impacts, extreme events such as storms and flooding, etc.), conducting inventory and monitoring
activities to identify changes in and/or stressors to park resources, restoring disturbed land and resources
to build long-term adaptive capacity, restoring habitats and connectivity, and developing partnerships
with private landowners, other Federal and State agencies, Tribes, and NGOs to address issues at the
landscape scale. These activities are largely conducted at the park level, utilizing park personnel and
contractor or cooperator support. Centralized or team-based subject-matter specialists also provide park
managers with cost-effective scientific support, specialized expertise, and technical assistance on a wide
range of air, sound, water, geologic, and biological resource management needs, including science-based
decision-making support and problem resolution.
The NPS is using the National Park Service Natural Resource Stewardship and Science Framework to
organize and communicate broad goals for resource management, priorities for natural resource
stewardship and science in the National Park System, and useful actions and activities that can be
implemented to achieve these goals. The framework identifies four areas that guide NPS natural resource
stewardship actions and investments: 1) addressing immediate site-specific challenges that occur at the
park level, 2) managing amid continuous change, 3) working collaboratively with partners and
stakeholders, including Tribes, and 4) enhancing stewardship and science access and engagement. In
addition, park managers and natural resource subject matter experts collaborate to prepare the park’s
Resource Stewardship Strategy (RSS), a science and scholarship-based plan that fosters an integrated
natural and cultural resource approach for aligning resource stewardship actions and investments in
coordinated and prioritized ways, while addressing potential impacts to park ecosystems including
invasive species, environmental change, and water quality and quantity to achieve resource values
identified in park foundation documents and related management plans. As a resource stewardship
strategy is completed, it supersedes the park’s resource management plan (RMP). The RSS is updated
routinely as resource conditions change, new information is collected, stewardship activities are
completed, or stewardship goals are achieved.
Natural resource activities and programs include the following:
Air Resource Management and Research
Established in response to amendments to the 1977 Clean Air Act to protect clean air, especially in
national parks and wilderness areas, the NPS maintains an extensive air monitoring network. The NPS, in
cooperation with State and Federal partners, maintains a network of over 150 fine particle samplers, 53 of
which monitor visibility in parks. The NPS also operates a network of more than 53 ambient air quality
monitoring sites to determine other key air quality performance indicators, namely ozone and deposition
of mercury, sulfur, nitrate and ammonia. Air quality monitoring is conducted in cooperation with other
Federal and State agencies as part of national networks. States actively consult with the NPS when
developing air quality management plans that might affect parks, especially Class I areas.
National Park Service FY 2024 Budget Justifications
ONPS-16
The NPS reviews permit applications for new and modified sources of air pollution, actively works with
applicants, and assists States during the permitting process to reduce levels of air pollution from these
sources and mitigate potential adverse effects on park resources.
The NPS has statutory responsibilities under the Clean Air Act (P.L. 88-206) to protect important scenic
resources and other air quality related values in parks from impairment due to air pollution. Air quality
applied research provides an understanding of the effects of air pollution on the condition of park
resources and ecosystems, and air quality related values integral to visitor experience and enjoyment of
parks not available through the USGS or other Federal agencies. A significant portion of this effort is the
acquisition of research information in national parks, and information on the composition of particulates
in the air that cause visibility impairment. Combined with research on the transport and transformation of
air pollutants, these data help identify the sources of the pollutants that may affect visibility in parks and,
in cooperation with other agencies, can point to mitigation strategies that improve air quality in parks.
Learn more about the results of air quality management at: Air Resource Management (nps.gov)
Biological Resources Management
The NPS manages an extensive range of activities to conserve, restore, preserve and manage biological
resources, native species and their habitats, and contribute to the overall health of the park and landscape-
level ecosystem. The NPS works closely with States on the identification and conservation of critical
migration corridors that intersect parks and State priority areas.
Invasive Plant Management Teams (IPMTs) serve more than 287 parks over a broad geographic area and
work to detect, identify, develop, conduct, and evaluate invasive species management projects.
The Wildlife Health Team provides professional veterinary consultation and technical assistance to parks.
Among the priority wildlife diseases receiving ongoing surveillance and management are Chronic
Wasting Disease, Plague, Rabies, vector-borne disease and tick-borne disease, bighorn sheep pneumonia
and hemorrhagic diseases of cervids, Hantavirus from deer mice exposure, Lyme Disease and Relapsing
Fever from tick exposure, and White Nose Syndrome.
The Wildlife Conservation Team provides science-based expertise and leadership to parks and NPS in
addressing complex wildlife conservation issues, restoration of species, marine and terrestrial migrations,
and strategic law and policy education and interpretation to parks and managers throughout the System.
Learn more about aspects of biological resource management at: Biological Resources Division
(nps.gov)
Cooperative Landscape Conservation
The National Park Service’s approach to climate change, science, adaptation, and communication is
through the Cooperative Landscape Conservation (CLC) program. The NPS leverages its resources and
expertise with that of other Federal agencies, States, Tribes, and others to focus on problems of concern to
the nation’s varied ecosystems. National parks contain some of the Nation’s most treasured landscapes
and historical sites, many of which are particularly vulnerable to changes in the environment. The NPS
develops and applies science to understand risks to park resources from environmental hazards, identifies
specific factors that affect park resources and park investments, and develops approaches to protect
resources and make them more resilient. The NPS provides support to park managers servicewide in
National Park Service FY 2024 Budget Justifications
ONPS-17
developing vulnerability assessments and adaptation strategies, and collaborates with other bureaus,
agencies, and partners to develop and share scientific information. In serving park visitors, the NPS
develops interpretive products and provides first-hand learning opportunities about environmental impacts
and how the NPS is responding to protect park resources and the Nation’s heritage.
Learn more about cooperative landscape conservation at: Climate Change (nps.gov)
At a Glance…
NPS Water Supply Sources
Water, in adequate quantity and quality, is essential for NPS ecosystems and operations including supplies for
visitors and staff, firefighting activities, restoration efforts, stock watering, and concession operations. Oak Spring in
the Chisos Basin of Big Bend National Park is the sole water source for a busy hub of visitor infrastructure and
services within the park. An analysis by NPS scientists found that the flow from the spring directly correlates with
rainfall in the basin and thus is vulnerable to potential future declines in precipitation. Such information is essential
for park managers to develop actions that ensure adequate water supply, yet very few parks have information to
understand the vulnerability to climate change of water supply sources. Analyzing parks’ water security through
climate change vulnerability assessments is a continuing priority in FY 2024.
Resource Damage Assessment and Restoration
The NPS provides technical support and guidance to parks in assessing injuries to park resources and
seeking damages for restoration pursuant to the System Unit Resource Protection Act (54 U.S.C.
100721), the Oil Pollution Act of 1990 (OPA) (104 Stat. 484), the Clean Water Act (CWA) (86 Stat. 816)
as amended by OPA, and the Comprehensive Environmental Response, Compensation and Liability Act
(CERCLA) (94 Stat. 2767). This support includes responses to oil and hazardous materials incidents
affecting parks, together with incidents involving human-caused injury to park resources (natural and
cultural), property, and visitor use. Costs and damages are recovered through negotiated settlements with
responsible parties. Cost recovery provides a means to achieve restoration of injured park resources rather
than requesting additional appropriated funds.
This NPS activity also has responsibility to coordinate NPS efforts within the DOI for the protection of
the Nation’s natural, cultural, and historic resources resulting from any manmade disaster or incident of
national emergency in full partnership with other Federal, State, local, and Tribal governments.
Learn more at: Resource Damage and Assessment (nps.gov)
National Park Service FY 2024 Budget Justifications
ONPS-18
Geologic Resources
Geological features and processes are key influences on the health of park watersheds, landscapes, and
marine resources, as well as the NPS’s ability to sustain biological communities on the lands and waters it
manages. Subject matter specialists provide park managers with scientific information and technical
support in areas including disturbed land restoration; mitigation of geologic hazards (e.g., rockfalls,
landslides, debris flows); geologic resource inventory and monitoring; management and protection of
paleontological resources, cave and karst systems, soil resources, and coastal shorelines; and planning that
integrates the use of information on park geologic features and processes in park decision making.
At a Glance…
Geologic Hazards and the Unstable Slopes Management Program
Rockfall damage to Zion National Park Road
Natural active geological processes like rockfalls and landslides are a danger to life and property. In 2022 alone,
four park visitors lost their lives due to rockfalls. In recent years, vital roads and facilities at Zion, Denali, Hawaii
Volcanoes, and Yellowstone National Parks have sustained major damage from such geological events. Many other
parks are also at risk for active geologic hazards. The NPS developed the Unstable Slopes Management Program
(USMP) in collaboration with other agencies and the Federal Highways Administration to proactively identify,
prioritize, and address these hazards. USMP provides a simple analytical field tool used at many NPS units to assess
and prioritize potential slope hazards so parks can focus limited resources to mitigate top priority hazardous slopes.
The NPS also protects park natural resources from adverse impacts associated with past, present, and
future energy and mineral development in and adjacent to parks. NPS areas contain a substantial number
of current non-Federal oil, gas, and mineral activity, including 364 oil and gas operations in 12 park units;
1,102 mining claims in 15 park units; and 10 mining and other mineral operations in four park units.
Conversely, abandoned mining and oil and gas exploration and production sites represent a substantial
portion of the disturbed lands requiring restoration in parks. Abandoned Mineral Land (AML) features are
remnants of a time when reclamation of mined areas was not required by Federal or State laws and
regulations. Many of these sites have serious public safety issues and resource impacts, yet many are also
valuable natural and historic properties due to their cultural values and the critical wildlife habitat they
provide. There are over 39,000 features
2
in 133 parks, of which approximately 3,800 mine features and
150 orphaned oil and gas wells require action.
2
Individual elements of an AML site, such as vertical shafts, adits, open stopes, and open pits; structures such as headframes,
mills, wellheads, and storage facilities; landform modifications such as access roads and drainage diversions; and piles of ore,
waste rock, soil stockpiles, and tailings.
National Park Service FY 2024 Budget Justifications
ONPS-19
The NPS is also actively engaged in cave research in response to Title II of P.L. 101-578, which
established the Cave Research Institute, and P.L.105-325, the National Cave and Karst Research Institute
Act of 1998, through partnerships with the State of New Mexico, New Mexico Institute of Mining and
Technology (NMT), City of Carlsbad, New Mexico, and the National Cave and Karst Research Institute.
Learn more about the geologic resource activities at: Geologic Resource Division (nps.gov)
Inventory and Monitoring (I&M)
The NPS administers a park system-wide inventory and monitoring effort designed to assess the natural
resource inventory and monitoring needs in ~300 parks by conducting basic natural resource inventories
and monitoring the conditions of key ecosystem parameters. These data provide park managers, planners,
and interpreters with the baseline and current status and trends of park natural resources, which serves as
the evidence basis for making management decisions, assessing results of management decisions,
collaborating with other agencies and partners, and communicating the importance of conserving park
natural systems and native species to the public.
I&M leverages its resources through partnerships as part of a strategy to maximize the availability, use,
and relevance of science-based information. I&M integrates, collaborates, and works across disciplines
and scales with NPS natural resource stewardship activities (e.g., climate, air quality, water resources)
and other agencies to compile, analyze, and report natural resource information. This approach supports
the NPS strategy to provide cost-efficient information of optimal use to park managers while meeting data
quality standards. I&M consists of 32 networks that provide expertise and natural resource condition
information to support the management of natural resources in parks. I&M science also routinely provides
the basis for park natural resource condition assessments, integration with resource stewardship strategy
development, and other park planning and management efforts.
Parks must determine appropriate levels and types of visitor use and permitted activities such as fishing,
river use, backcountry use, and hunting. Parks must also evaluate, plan, and design the appropriate type,
location, and level of activities that can be conducted without impairing resources. This often results in
the development of a management or operations plan that utilizes an environmental assessment to
evaluate alternatives and needed mitigation. These plans rely heavily on integrating information from
various sources, of which NPS I&M is critical.
Learn more about the NPS Inventory and Monitoring Program at: Inventory and Monitoring (nps.gov)
National Park Service FY 2024 Budget Justifications
ONPS-20
Inventory and Monitoring Networks Map
Natural Sounds
Natural sounds, sometimes referred to as the “acoustic environment” or “soundscape” of a national park,
are the aggregate of all sounds that occur, together with the physical capacity for transmitting natural
sounds. As an intrinsic physical element of the environment, noise can affect both park resources and
visitor experience. Although noise is one of the more pervasive sources of pollution, it is still considered
an emerging issue for NPS and therefore, it often is not well addressed in most parks. Responding to 49
U.S.C. 40128, Overflights of National Parks, which requires NPS and the FAA to reduce noise from low
flying air tours over national parks to protect park resources and values, as well as the visitor experience,
the NPS initiated sustained efforts to provide a consistent approach to managing acoustic environments
(or soundscapes). The NPS performs acoustic monitoring, data collection and analysis, and development
of ambient acoustic baseline information and planning assistance along with source specific monitoring
and recommendations for mitigation of measurable impacts from noise. An integral element of this effort
is working with the Federal Aviation Administration (FAA) and the Department of Transportation to
implement the National Parks Air Tour Management Act (NPATMA). The NPS continues to work to
manage air tours over national parks to protect park resources and values under the statute. The NPS and
the FAA are working closely together to complete Air Tour Management Plans (ATMPs) for all parks in
which they are required by December 2024.
The NPS has completed acoustic monitoring at 1,007 sites in 132 parks. While the principal focus of the
activity remains on park overflights, parks are also beginning to address a range of other notable noise
sources, including park operations, oil and gas development within and adjacent to park boundaries, and
motorized recreation, which requires specialized technical assistance to accurately measure and analyze
park soundscapes to industry standards. In addition, the NPS has developed various models and other
tools to help train park staff and build internal capacity for measuring ambient baseline sounds levels and
source-specific noise. The NPS continues to work with partners to advance understanding of the role that
natural sounds play in overall ecosystem health and visitor enjoyment.
Learn more about natural sounds activities at: Natural Sounds (nps.gov)
National Park Service FY 2024 Budget Justifications
ONPS-21
Research Learning Centers
Research Learning Centers (RLCs) provide an infrastructure for researchers to conduct research and
exchange information for their networks of parks. They support and facilitate research by government and
nongovernment scientists that informs the stewardship of parks and their protected resources. The 19
RLCs are listed in the table below.
Research Learning Center Host Benefitting
Parks
Appalachian Highlands Science Learning Center Great Smoky Mountains NP 4
Atlantic Research Center Cape Cod NS 8
Continental Divide Research Learning Center Rocky Mountain NP 3
Crater Lake Science and Learning Center Crater Lake NP 1
Crown of the Continent Research Learning Center Glacier NP 3
Desert Research Learning Center Saguaro NP 11
Great Lakes Research and Education Center Indiana Dunes NP 14
Gulf Islands Research and Education Center Gulf Islands NS 1
Jemez Mountains Research Learning Center Valles Caldera NPres 2
Murie Science and Learning Center Denali NP&Pres 17
North Coast and Cascades Research Learning Center Olympic NP 8
Ocean Alaska Science and Learning Center Kenai Fjords NP 11
Old-Growth Bottomland Forest Research and Education
Center Congaree NP 22
Pacific Coast Science and Learning Center Point Reyes NS 8
Schoodic Education and Research Center Acadia NP 11
Southern California Research Learning Center Santa Monica Mountains NRA 3
Tule Springs Expedition Research Learning Center
Tule Springs Fossil Beds NM 1
Urban Ecology Research Learning Alliance National Capital Area 16
Yosemite Research Learning Center Yosemite NP 1
TOTAL 19 145
Learn more about the RLCs at: Research Learning Centers (nps.gov)
Social Science Program
The social science program conducts and promotes state-of-the-art social science related to the mission of
the NPS and delivers critical knowledge to park managers and the public. The program provides research
and technical assistance to park and program managers and to non-Federal researchers. Activities include
Socioeconomic Monitoring which provide rigorous and nationally representative results of visitor
demographics, trip characteristics, and attitudes regarding the visitor experience in parks; the Visitor
Spending Effects which estimates the impacts park visitors have on local, regional, and national
economies in terms of their contribution to sales, income, and jobs; and the collection, analysis, and
publication of official NPS visitation statistics. NPS uses this information to improve visitor services,
enhance civic engagement, protect natural and cultural resources, and manage parks more effectively.
Learn more about social science activities at: Social Science (nps.gov)
Water Resources
The NPS protects and manages fresh and marine waters in parks, including aquatic biota and vegetation.
It also works to restore water quantity (levels and flows) and quality to desired conditions, including
applicable Clean Water Act standards; and to ensure that water and water rights are available to meet
National Park Service FY 2024 Budget Justifications
ONPS-22
visitor and administrative needs. The program provides park managers assistance to ensure the consistent
application of laws and regulations throughout the National Park System and develop technical
information so that management decision-making is based on science. Aquatic resource professionals
address park management needs, including water resources planning, identification and prioritization of
protection and restoration projects, development of water-related scientific information, aquatic resource
restoration projects, and participation in legal or administrative processes.
The NPS works closely with States on the application of the Clean Water Act to protect water quality in
parks and conducts water quality monitoring on selected water bodies. The NPS participates in State
water rights administrative and court processes and seeks to negotiate resolution of issues with the States
and other parties. The NPS also works to assess, protect, and restore upland, coastal, and marine
watershed conditions; floodplain, stream, wetland, and riparian resources; groundwater resources; wild
and scenic rivers; and freshwater and marine fisheries, and manages, disseminates, and archives relevant
hydrologic data. The NPS ensures protection of infrastructure and ecosystem function through programs
developed to evaluate development that impacts floodplains and wetlands. The NPS is also engaged in
efforts to prevent the spread and introduction of aquatic invasive species, working with other Federal
agencies, State partners, Tribes, and multi-stakeholder groups. For example, NPS units in the western
U.S. began developing programs to address the threat of quagga and zebra mussels in 2007. As of FY
2022, there are 10 western parks with quagga and zebra mussel management or prevention programs.
Beginning in FY 2023, for the first time, Quagga/Zebra Mussel (QZM) funds will support an invasive
mussel management program east of the Mississippi River, at Voyageurs National Park.
The NPS manages 88 ocean, coastal and Great Lakes parks that attract over 95 million recreational visits
and generate over $6 billion in visitor spending for local economies. NPS responds more effectively and
efficiently to changing ocean and coastal conditions by working with other DOI bureaus, the National
Oceanographic and Atmospheric Administration (NOAA), and academic partners. The NPS provides
technical expertise and guidance to park managers in addressing priorities like aquatic invasive species,
cooperative fisheries management with States, harmful algal blooms, ocean acidification, habitat
mapping, marine debris, shoreline management, and water level changes and restoration.
Learn more about water resource stewardship activities at: Water Resources Division (nps.gov)
National Park Service FY 2024 Budget Justifications
ONPS-23
At a Glance…
Aquatic Resource Restoration
NPS Director Sams participates in wetland
restoration work at Delaware Water Gap National
Recreation Area
The NPS manages over 20 million acres of wetlands, including salt and freshwater marshes, swamps, peatlands,
mudflats, and intertidal zones. These highly productive and biologically diverse systems enhance water quality,
control erosion, maintain stream flows, sequester carbon, and harbor at least 35 percent of threatened and
endangered species. Approximately 2.2. million acres of NPS aquatic resources require restoration. The NPS has
established wetland protection policies and procedures, is acquiring baseline wetland inventory data, and is actively
restoring degraded and lost wetlands. Since 2000, program staff have provided restoration assistance to more than
90 NPS units. Restoring physical and biological integrity of degraded aquatic ecosystems enhances visitor
experiences and bolsters aquatic resource resilience to the adverse impacts of climate change.
Natural Resource Projects
The Natural Resources Projects program provides a dedicated servicewide fund source to complete the
National Park System’s highest priority natural resource projects. While individual park units receive
operational funds for the stewardship of natural resources, discrete resource stewardship projects focused
on specific challenges and situations are generally beyond the funding capabilities of individual units. A
servicewide program is an efficient approach that simultaneously allows NPS leadership to address long-
standing park needs, react effectively to emerging threats, and implement bureau, Department and
Administration priorities servicewide.
All NPS units and programs are eligible to submit proposals for funding consideration. Submissions are
centrally administered through the NPS’s project management information system (PMIS) to ensure
application to high priority issues and facilitate effective internal controls and financial risk management.
Annually, senior leaders in the Directorate of Natural Resources Stewardship and Science (NRSS) and
servicewide through the Natural Resource Advisory Group (NRAG) are impaneled to evaluate, prioritize,
and select projects for funding.
National Park Service FY 2024 Budget Justifications
ONPS-24
Annually, projects are submitted for a wide range of natural resource subjects including but not limited to
invasive species prevention/mitigation; the management of and study of impacts to at-risk species; the
restoration of plants, animals, streams, wetlands and ecosystems, tactical biological studies, field-testing
of novel stewardship techniques , scientific or management methodology refinement, climate change
vulnerability assessments, scenario and adaptation planning, and addressing highest priority
environmental challenges. The panel evaluates projects based upon four criteria: 1) significance of the
resource, 2) urgency and severity of threat, 3) expected results upon completion and 4) cost effectiveness.
Additionally, project funds may be set aside to address specific issues, typically these are rapidly
emerging threats to resources; recent examples include invasive mussels and white nose syndrome.
Projects that directly address the park unit resource stewardship strategy, and/or park, regional, bureau,
departmental or administration priorities are given advantage, all other criteria being equal.
Great Lakes Restoration Initiative
In 2009, the Great Lakes Restoration Initiative (GLRI) was established to restore and protect the Great
Lakes region. Led by the U.S. Environmental Protection Agency (EPA), the GLRI invests in the region’s
environmental and public health through a coordinated interagency process, now guided by Action Plan
III (2020-2024). The program focuses on five major restoration areas: cleaning up toxics and areas of
concern; combating invasive species; improving nearshore health, in part by reducing phosphorus runoff;
restoring wetlands, other habitats and at-risk species; and integrated solutions to cross-cutting issues.
GLRI funds are distributed by the EPA and are meant to fund Great Lakes activities of Federal agencies,
States, Tribes, and partners. The NPS received approximately $7.8 million in FY 2022 to implement
initiative projects and has received approximately $4.5 million annually in the past decade. In addition,
the NPS works with other Federal agencies to identify priorities and potential future collaborative
projects.
Learn more about the Great Lakes Restoration Initiative, visit http://glri.us
National Trails System
The National Trails System (NTS) is a nationwide network of national scenic trails, national historic
trails, and national recreation trails. Of the 32 congressionally designated national scenic and historic
trails, NPS administers or co-administers 25 trails. In 2022 and 2023, the National Trails System grew to
include two new national historic trails through the congressional designations of the Chilkoot NHT and
Butterfield Overland NHT.
A hiker on Chilkoot NHT in Alaska
National Park Service FY 2024 Budget Justifications
ONPS-25
The network of national scenic and historic trails within the system, at over 55,000 miles, is larger than
the interstate highway system and connects more than 6,000 thousand communities with access to the
outdoors. More than 80 million Americans live within 5 miles of a national trail and NTS trails serve
millions of visitors each year, and the NPS continues to strive to increase equitable access to national
trails. Many communities have adopted “trail town” affinity programs to support their local economic
strategies and their greening, access, or health goals.
The NPS provides interagency coordination, policy development, partnership training, financial
assistance, technical assistance, research, communications, networking, mapping, and reporting for the
benefit of the National Trails System. Interagency coordination with the Bureau of Land Management
(BLM) and U.S. Forest Service (USFS) is an essential part of these efforts since many of the national
trails cross lands administered by these other agencies. Executive Order 13195 and a 2017 Memorandum
of Understanding signed by the NPS, Bureau of Land Management, U.S. Forest Service, U.S. Fish and
Wildlife Service, Bureau of Reclamation, Federal Highway Administration, and the U.S. Army Corps of
Engineers strengthen this interagency collaboration and sharing of resources.
All national scenic and national historic trails are cooperatively managed by design and demonstrate
successful collaboration with partner organizations. Partnerships are integral for the National Trails
System, and the NPS works with a wide array of State, Tribal, and local governments, private
landowners, nonprofit organizations, and other partners to leverage resources, maintain, and sustain the
system. Over the last decade NTS partners have generated an average of more than 1 million hours of
volunteer and public service support annually. Cooperative management partners generally contribute
more funds and in-kind resources to NTS management each year than appropriated Federal funds.
Recent national trail projects include providing youth engagement experiences to encourage the next
generation of environmental stewards along the New England NST and Arizona NST; improving the
visitor experience along the Pacific Crest NST; providing safety training for volunteers working along the
North County NST and Ice Age NST; providing opportunities for youth and community engagement
focused on cultural history along the Juan Bautista de Anza NHT, Ala Kahakai NHT, Star-Spangled
Banner NHT, Washington-Rochambeau Revolutionary Route NHT, and the Freedom Trail NRT;
providing healthy recreation opportunities along the Erie and Ohio Canal Towpath NRT; developing
interpretive resources along the Trail of Tears NHT and Continental Divide NST and Pacific Northwest
NST; developing programing to engage Tribal youth along the Captain John Smith Chesapeake NHT; and
supporting interagency and partner training and research at the national level to support the National
Trails System.
Learn more about the National Trails System at: National Trails System (nps.gov)
Components of the National Trails System
Administered by the NPS
Ala Kahakai NHT
Appalachian NST
Butterfield Overland NHT
California NHT
Captain John Smith Chesapeake NHT
Chilkoot NHT
El Camino Real de los Tejas NHT
Ice Age NST
Juan Bautista de Anza NHT
Lewis & Clark NHT
National Park Service FY 2024 Budget Justifications
ONPS-26
Mormon Pioneer NHT
Natchez Trace NST
New England NST
North Country NST
Oregon NHT
Overmountain Victory NHT
Pony Express NHT
Potomac Heritage NST
Santa Fe NHT
Selma to Montgomery NHT
Star-Spangled Banner NHT
Trail of Tears NHT
Washington-Rochambeau Revolutionary Route
NHT
Administered by Other Agencies
Arizona NST (USFS)
Continental Divide NST (USFS)
Florida NST (USFS)
Iditarod NHT (BLM)
Nez Perce (Nee-Me-Poo) NHT (USFS)
Pacific Crest NST (USFS)
Pacific Northwest NST (USFS)
Co-Administered by NPS and BLM
Old Spanish NHT
El Camino Real de Tierra Adentro NHT
National Recreation Trails
National recreation trails are a category of the National Trails System designated by either the Secretary
of the Interior or the Secretary of Agriculture. National recreation trails provide close-to-home outdoor
recreation opportunities and access on Federal, State, Tribal, and other local lands near communities
across the nation. Combined, these trails create a network of over 1,300 existing land and water-based
trails in all 50 States, including the District of Columbia and Puerto Rico. They provide the opportunity to
connect people to the outdoors, improve access for healthy outdoor activities, and increase conservation
efforts within State and municipal parks and various Federal lands. The NPS works with Federal, State,
Tribal, and local partners to provide resources and technical expertise to promote the development and
recognition of these trails in partnership with American Trails. In June 2022, the Secretary of the Interior
designated nine new national recreation trails in seven states, adding nearly 600 miles to the National
Trails System.
Learn more about the National Recreation Trails at: www.americantrails.org and at: National Trails
System (nps.gov)
National Wild and Scenic Rivers System:
The National Wild and Scenic Rivers System was created by Congress in 1968 (P.L. 90-542; 16 U.S.C.
1271 et seq.) to protect certain rivers with outstanding natural, cultural, and recreational values in a free-
flowing condition for the enjoyment of present and future generations. The Wild and Scenic Rivers Act is
notable for safeguarding the special character of these rivers, while also recognizing the potential for their
appropriate use and development. It encourages coordinated river management that crosses political
boundaries and promotes public engagement in developing goals for river protection and implementing
conservation actions. Rivers may be designated by Congress or, if certain requirements are met, by the
Secretary of the Interior. Designated river segments need not include the entire river and may include
tributaries.
National Park Service FY 2024 Budget Justifications
ONPS-27
Kayakers on the recently-designated York Wild and Scenic River
There are 228 rivers that comprise the National Wild and Scenic Rivers System. The NPS has
responsibilities for 66 of these, including rivers that are units of the National Park System or located
within or adjacent to park boundaries, rivers administered by NPS through legislatively established
partnerships, and rivers that are managed by States or Tribes. The Wild and Scenic Rivers Act requires
the NPS to prepare Comprehensive River Management Plans and establish boundaries and river
classifications. The NPS Unit Management Plan program supports this planning function.
Partnership Wild and Scenic Rivers are a unique collaborative management model within the system.
These 18 partnership rivers are managed by locally driven, cooperative planning between local, State, and
regional stakeholders and the NPS. Nationally designated river protection, supported by limited Federal
funding and technical assistance, leverages substantial additional State, local, and private funding. To
date, locally based river management councils or committees have been formed on each partnership river
specifically for this purpose.
The National Wild and Scenic Rivers System evaluates and approves Federally assisted water resource
projects that impact over 4,000 miles of designated rivers. Together, the NPS and its partners work to
satisfy other requirements under the Wild and Scenic Rivers Act, including to protect and enhance a
river’s free-flow, water quality, and other values which led to a river’s designation as part of the National
Wild and Scenic River System. New rivers may be added to the system through various mechanisms,
including congressionally authorized studies.
National Park Service FY 2024 Budget Justifications
ONPS-28
National Wild and Scenic Rivers System
Learn more about the National Wild and Scenic Rivers System at: National Wild and Scenic River
System (rivers.gov) and: Wild & Scenic Rivers (nps.gov)
National Park System Rivers
Alagnak (AK)
Alatna (AK)
Aniakchak (AK)
Bluestone (WV)
Cache la Poudre (CO)
Charley (AK)
Chilikadrotna (AK)
Delaware (middle) (NJ & PA)
Delaware (upper) (NY & PA)
Flathead (MT)
Great Egg Harbor (NJ)
John (AK)
Kern (CA)
Kings (CA)
Klamath (CA)
Kobuk (AK)
Koyukuk (North Fork) (AK)
Merced (CA)
Missouri (NE & SD)
Mulchatna (AK)
Niobrara (NE)
Noatak (AK)
Obed (TN)
Rio Grande (TX)
River Styx (OR)
Salmon (AK)
St. Croix (MN & WI)
Snake Headwaters (WY)
Surprise Canyon Creek (CA)
Tinayguk (AK)
Tlikakila (AK)
Tuolumne (CA)
Virgin (UT)
Partnership Wild and Scenic Rivers
Delaware (Lower) (NJ & PA)
Eightmile (CT)
Farmington (West Branch) (CT)
Great Egg Harbor (NJ)
Housatonic (CT)
Lamprey (NH)
Lower Farmington & Salmon Brook (CT)
Maurice (NJ)
Musconetcong (NJ)
Nashua, Squannacook, & Nissitissit (MA & NH)
Sudbury, Assabet, & Concord (MA)
Taunton (MA)
Upper Missisquoi & Trout (VT)
Wekiva (FL)
Westfield (MA)
White Clay Creek (DE & PA)
Wood-Pawcatuck Watershed (CT & RI)
York (ME)
Rivers Managed by States and/or Tribes
American (Lower) (CA)
Allagash Wilderness Waterway (ME)
Big and Little Darby Creeks (OH)
Cossatot (AR)
Eel (CA and Tribal administration)
Klamath (CA, OR and Tribal administration)
Little Beaver (OH)
Little Miami (OH)
Loxahatchee (FL)
Lumber (NC)
Middle Fork Vermillion (IL)
New (NC)
St. Croix (Lower) (MN, WI)
Smith (CA)
Trinity (CA and Tribal administration)
Wolf (WI and Tribal administration)
National Park Service FY 2024 Budget Justifications
ONPS-29
Subactivity: Resource Stewardship
Program Component: Cultural Resource Stewardship
FY 2024 Program Activities
The following are examples of planned FY 2024 Cultural Resource Stewardship activities:
Continue to inventory archeological sites on NPS lands to ensure their appropriate preservation
and protection. In FY 2024, an estimated 1,000 sites are expected to be newly inventoried, with
54 percent of over 85,000 total inventoried sites in good condition.
Continue to inventory cultural landscapes on NPS lands to ensure their appropriate preservation
and protection. In FY 2024, an estimated 30 cultural landscapes are expected to be inventoried,
including capturing of GIS data. Of the total of 957 already inventoried as of the end of FY 2022,
47 percent are in good condition.
Maintain 62 percent of historic structures in good condition in FY 2024.
Catalog an estimated 1.0 million museum objects, ending FY 2024 with an estimated 138.4
million cataloged objects.
Review and update scope of collection statements; remove items that are not museum objects or
outside the scope.
Continue providing access to museum objects and park stories through online exhibits on public
websites.
Oversee the preparation of 90-100 Historic Resource Studies, Special History Studies, and
Administrative Histories for parks and national programs.
Oversee the preparation of 45-55 National Register of Historic Places documentation for parks.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Cultural Resource Stewardship is $151,464,000 and 812 FTE, a program
change of +$12,348,000 and +35 FTE from FY 2023 Enacted.
Racial Justice and Equity for Underserved Communities Initiative – Tribal Co-Stewardship
(+$7,075,000 / +0 FTE) – This increase would establish a funding stream dedicated to expanding Tribal
co-stewardship, in support of Secretarial Order 3403, Fulfilling the Trust Responsibility to Indian Tribes
in the Stewardship of Federal Lands and Waters and recently-issued NPS policy. Funds would largely be
deployed via annual funding agreements between parks and Tribes. Funds would support both recurring
operational work, similar to the longstanding annual funding agreement between the Grand Portage Band
of Lake Superior Chippewa and Grand Portage NM for a variety of facilities operations, and non-
recurring project work, similar to the recent funding agreement between member Tribes of Kawerak, Inc.
and Bering Land Bridge National Preserve to complete work on several maintenance projects over three
years. Parks working toward expanding co-stewardship opportunities in the future include Badlands
National Park, Grand Canyon National Park, Big Horn Canyon National Recreation Area, Bandelier
National Monument, and Canyon de Chelly National Monument, among others.
Racial Justice and Equity for Underserved Communities Initiative – Japanese American WWII
History National Networks (+$250,000 / +1 FTE) – Funding would support implementation of the
Japanese American World War II History Network authorized in the FY23 Omnibus appropriations bill.
The new network will coordinate partners nationwide on research and education efforts relating to
National Park Service FY 2024 Budget Justifications
ONPS-30
Japanese American World War II history and Japanese American experiences during the war, including
relocation centers and confinement sites.
Conservation Initiative – Cultural Resources Climate Assessment Team (+$3,720,000 / +24 FTE)
Funding would create an interdisciplinary climate assessment and adaptation team to design and conduct
inventory and monitoring of cultural resources impacted by climate change. Preservation specialists, like
engineers and architects, will bring the knowledge needed to assess climate impacts on park structures,
and archeologists and anthropologists will help assess threats to sites and the connections of indigenous
and associated communities. These positions will bring expertise needed to help parks make sound
decisions about adaptation and resiliency. With this funding the team will develop a baseline inventory
and scalable methodology to identify typologies for materials, evaluate and monitor conditions and
trends, develop risk-exposure scenarios to evaluate the impacts of climate change on cultural resources,
and identify resilient, cost-effective, and long-term treatment and adaptation strategies. For example, in
FY 2024, the team will build an inventory system to assess and track climate impacts on cultural
resources using baseline data sets developed by preservation specialists to monitor original and repair
materials at Dry Tortugas National Monument’s Fort Jefferson and to analyze material performance under
predicted and actual environmental conditions.
New and Critical Responsibilities (+$740,000 / +5 FTE) - The budget proposes $8.2 million and 52
FTE spread across multiple ONPS budget subactivities for new and additional responsibilities at parks
and central offices. In FY 2024, funding will support the management of newly added lands, facilities,
visitor centers, and interpretive offerings at Denali NP and Preserve, Birmingham Civil Rights NM/
Freedom Riders NM, Medgar and Myrlie Evers NM, and others, as well as park protection increases at
Fort Smith NHS and Joshua Tree NP. Specific funding also supports new spending for community
outreach with Tribal communities at Bryce Canyon NP, North Cascades NP, Lake Chelan NRA, and Ross
Lake NRA. Additional details on this request can be found in the Budget Overview section.
Supporting Park Capacity (+$563,000 / +5 FTE)The budget proposes $17.3 million and 125 FTE
funding spread across multiple ONPS budget subactivities to support basic operational capacity needs at
all parks, rivers, and trails. Funding is spread across multiple ONPS budget subactivities to strengthen all
critical functions at parks. Between FY 2011 and FY 2022, the NPS has collectively lost almost 19
percent of its ONPS-funded Full-Time Equivalent capacity. Over the same period, over 30 units and
additional authorized sites have been added to the national park system, and visitation has grown by more
than 30 million. This proposed increase will provide park additional funds for basic operations to better
serve visitors and resources and ease planning for urgent and emerging needs.
Program Overview
The NPS engages in preservation and protection activities as a steward of the Nation’s archeological
resources, cultural landscapes, ethnographic resources, history, historic and prehistoric structures, and
museum collections. The NPS also conducts associated applied research, which provides the foundation
of cultural resource stewardship by providing detailed, systematic data for planning, management, and
interpretation to enable cultural resource managers to preserve and protect cultural resources. Parks
conduct most cultural resource management actions, with regional and servicewide offices and centers
providing essential support in areas such as policy development, training, and major preservation work.
National Park Service FY 2024 Budget Justifications
ONPS-31
Cultural resources contained within the National Park System are extensive and varied, and include
cultural landscapes such as the National Mall, historic structures such as Independence Hall, and myriad
archeological sites. Many parks also have associated museum collections, such as the original objects
from the night President Lincoln was killed on display at Ford’s Theatre National Historic Site. Cultural
resources tell the story of the Nation and its people, from the ancient sites of Aztec National Monument to
the modern ones of Tuskegee Airmen National Historic Site, the battlefields of Gettysburg National
Military Park, and the historic immigration gateways of Ellis Island. Overall, the National Park system
contains over 26,000 historic and prehistoric structures, 4,200 statues, monuments, and memorials, more
than 85,000 archeological sites, more than 950 cultural landscapes, and more than 189 million museum
objects and archival documents. Proactive resource management is essential. This includes, but is not
limited to, monitoring the condition of cultural resources, regular and ongoing maintenance to slow
deterioration and repair damage, proper archival and collections storage conditions and policies for
resource use, and preventing and responding to resource threats from weather events and fires, air
pollution, improper use, and vandalism and looting. Parks also strive to identify and document the
relationships between traditionally associated peoples and resources to provide culturally sensitive
management and interpretation of resources. Parks conduct education and interpretation programs in
cultural heritage to convey the significance of the resources and their meanings to a broad and diverse
constituency. NPS-managed cultural resources are described below.
Archeological Resources
Sites and artifacts provide unique and irreplaceable information that connects modern communities with
the cultural heritage of the United States. These resources are extremely vulnerable to threats including
climate change and other natural processes, development, excessive visitor use, vandalism, and looting.
Park resource managers monitor site conditions, facilitate research, and implement preservation strategies
to maintain the integrity and improve the condition of archeological resources and make information
gathered through applied research available to resource managers, research professionals and the public.
Archeological information and research are used in public programs such as ranger events and exhibits
that interpret archeological artifacts, park and program websites, and educational opportunities.
Cultural Landscapes
Cultural landscapes are geographic areas associated with a historic event, activity, or person, or which
exhibits other cultural or aesthetic values. Cultural landscapes managed by NPS include battlefields and
cemeteries such as Gettysburg National Military Park and National Cemetery, urban landscapes such as
the National Mall, and places such as the Jamestown Island Area at Colonial National Historical Park, the
site of the first permanent English settlement in North America, and Manzanar National Historic Site, a
camp where Japanese Americans were incarcerated during World War II.
Parks manage cultural landscapes through research, planning, and stewardship, with the goal of defining
the values and associations that make the landscape historically significant, identifying the type and
degree of change that can occur while maintaining the historic character of the landscape, and planning
for an undertaking the long-term preservation of the landscape through preservation maintenance and
treatments and other resource protection activities.
National Park Service FY 2024 Budget Justifications
ONPS-32
Ethnographic Resources
NPS engages in ethnographic research using professional methods of cultural anthropology. Work
includes assessments, surveys, field studies, and consultations that provide for the identification,
evaluation, and interpretation of the relationships between contemporary cultural communities, including
Native Americans and other traditionally associated peoples, and ethnographically significant natural and
cultural resources in parks. This work facilitates the provision of culturally sensitive resource
management, as well as interpretive and educational materials.
Historic and Prehistoric Structures
Historic structures are constructed works including buildings and monuments, dams and canals, nautical
vessels and defensive works such as forts, temple mounds and ruins, and bridges and tunnels. The
preservation and protection of historic and prehistoric structures has two basic goals: slowing the rate at
which historic material is lost and maintaining the historic character and integrity of resources. For
historic and prehistoric structures, stewardship focuses on five major activities: 1) control of physical
work and use; 2) monitoring conditions of deterioration and structural failure; 3) protecting structures
from human and environmental threats; 4) retaining or delegating responsibility for structures; and 5)
developing the skills, knowledge, and mind-set needed to support the program.
Museum Collections
Museum collections from over 402 units of the National Park System are maintained in 328 parks, at six
NPS cultural resource centers, and at 833 non-Federal repositories. These collections include 41.9 million
archeological, 3.3 million historical, 90,000 art, 4.3 million biological, 1.4 million paleontological, 22,000
ethnological, and 96,000 geological items, plus over 85,000 linear feet of archives. Collections include
items ranging from historic furnishings in the home of John Adams and flags that flew over Fort Sumter,
to Thomas Edison’s handwritten notes on inventions. Other important museum program activities include
developing on-site and virtual exhibits, Teaching with Museum Collections lesson plans, and technical
guidance in the NPS Museum Handbook.
National Park Service FY 2024 Budget Justifications
ONPS-33
Historical Research
The Park History Program conducts historical research studies to ensure that the information presented in
parks and national programs and used in park planning activities and management is based on the most
accurate information available. This includes the development and oversight of park administrative
histories, which provides invaluable information to park managers on their park’s history, including
decisions made over time, and the salient historical issues that determined important decisions of park
management. The program also trains employees in oral history techniques, practices, and management of
resources, and manages a program to identify, prioritize, and nominate National Park Service properties
to the National Register of Historic Places in compliance with Section 110 of the National Historic
Preservation Act.
The Park History Program also manages several national research and preservation programs through
shared leadership with local, State, and Federal entities, as well as interested individuals and
organizations. These programs include the African American Civil Rights Network to recognize sites,
facilities, and programs that interpret the history of the African American civil rights movement in the
United States; the National Maritime Heritage Program that administers grants for non-NPS partners to
steward historic resources and educate the public about the nation’s maritime history; the National
Historic Lighthouse Preservation Act program to transfer surplus historic lighthouses to non-Federal
partners for preservation, public education, and recreation; and the American World War II Heritage
Cities program to recognize U.S. cities and other local jurisdictions for their historic contributions to the
domestic war effort and current preservation efforts around WWII homefront history. Through the
African American Civil Rights Network, the NPS will continue to support the Center for Civil Rights
Research at the University of South Carolina in FY 2024 with up to $3.4 million through a cooperative
agreement.
At a Glance…
“History and Hope: Interpreting the Roots of Our Climate Crisis and Inspiring Action
The “History and Hope: Interpreting the Roots of Our Climate Crisis and Inspiring Action” project supports the
ongoing servicewide response as articulated in both the NPS Climate Change Response Strategy and the National
Climate Change interpretation and Education Strategy. The “History and Hope” toolkit expands interpretation of
climate change by using history to help visitors see climate change in a new light from its human-caused origins to
its solutions. The NPS is now working to create an accessible and expanded version of the toolkit to be available to
the public. One park reports that the toolkit provides “deeper, more nuanced interpretation that sticks with the visitor
after their visit, . . . a path forward for interpreters who don’t know where to start.”
Park Native American Graves Protection and Repatriation Act Program
The Park NAGPRA program oversees NPS compliance with the Native American Graves Protection and
Repatriation Act (NAGPRA) and assists all NPS sites with related activities, providing technical advice,
guidance, and training. The law applies to the NPS as an agency that manages public land and cares for
collections containing Native American human remains, funerary objects, sacred objects, and objects of
cultural patrimony. The agency is required to return certain items to lineal descendants, Tribes, and
Native Hawaiian organizations and to plan for and manage the discovery of such items on Federal land.
National Networks
The NPS manages five national networks around important themes in American history: African
American Civil Rights, the Underground Railroad Network to Freedom, the Reconstruction Era,
National Park Service FY 2024 Budget Justifications
ONPS-34
American World War II Heritage Cities, and the Japanese American World War II History Network.
These programs coordinate preservation, research, and education efforts nationwide across large networks
of partners. Through shared leadership with local, State, and Federal entities, as well as other
stakeholders, the NPS educates the public about the history and significance of these themes; provides
technical assistance to empower communities to document, preserve, and tell their stories; and maintains
listings of historic sites, interpretive and educational programs, and facilities with verifiable connections
to the themes. Through these combined activities, these programs and their many non-NPS partners are
advancing scholarship and knowledge, making it accessible for school curricula, academic study, and
heritage tourism.
Cultural Resource Projects
Cultural Resource Project funds are used to complete the National Park System’s highest priority cultural
resource management projects. These projects are beyond the funding capabilities of the parks
themselves, and are designed to preserve, protect, and provide information about the diverse array of
NPS’s cultural resources. These funds are central to implementing bureau- and Department-level strategic
plans, and they enable the NPS to achieve a standard of excellence for the stewardship of the resources
that form the historical and cultural foundations of the Nation.
This project funding supports interdisciplinary research, documentation, stabilization, and conservation of
NPS cultural resources, and directly supports the goals of resource stewardship, relevance, and education.
Project funds support park planning needs relating to proposed development and allow parks to inventory
and evaluate cultural resources per the requirements of Section 110 of the National Historic Preservation
Act. They also provide for baseline research and treatment guidance that is critical to support the
streamlined compliance process for deferred maintenance and infrastructure projects that impact park
resources.
To be considered for this funding, projects must support NPS responsibilities under the Organic Act, the
National Historic Preservation Act, or other NPS-related legislation; address how information and
knowledge that results from these projects will be actively transferred to park managers, staff, visitors,
partners, researchers, and educators, as appropriate; and, where applicable, address how geographic
information systems (GIS) spatial data will be created in accordance with NPS GIS standards. Projects are
ranked and selected for funding according to regional and park unit priorities, whether the project
develops core baseline documentation or stabilizes cultural resources, and if the project addresses
planning and documentation needs for cultural resources, and if the project addresses requirements for
compliance with the Native American Graves Protection and Repatriation Act.
Youth Programs
The Cultural Resources Diversity Internship Program is an opportunity for undergraduate and graduate
students from traditionally underrepresented populations to explore the cultural resources and historic
preservation fields. In FY 2023, the program will engage interns at multiple sites across the country.
Internships are offered during a 12-week summer session and include projects such as preparing historical
reports on cultural resources, planning exhibits on historical topics, participating in archeological
excavations, conducting surveys of historic buildings, cataloging park and museum collections, providing
interpretive programs for youth groups, developing community outreach programs, and writing lesson
National Park Service FY 2024 Budget Justifications
ONPS-35
plans based on historical themes. Some internships confer Direct Hire Authority status to interns who
complete the program. Additional internships may be created as needed for more advanced projects.
The Historic Preservation Internship Training Program, administered in partnership with the National
Council for Preservation Education (NCPE), offers undergraduate and graduate students the opportunity
to gain practical experience in cultural resource management in National Park Service headquarters, field
offices, parks, as well as in other Federal agencies. Working under the direction of historic preservation
professionals, students undertake short-term projects to learn about and contribute to national historic
preservation programs and the Federal government’s preservation and management of historic properties.
At a Glance…
Providing Professional Experience and Connecting Youth with the Past: The Urban Archeology Corps
The Urban Archaeology Corps (UAC) is a national program that employs youth to conduct archeology on NPS
lands. The program aims to increase the diversity of the profession while creating a pipeline using direct hiring
authorities into federal service. Projects have included background research, survey, condition assessments,
excavation, collections management, and interpretation and public education. Teams typically consist of 2-10 people
for projects running 6-10 weeks. The program has employed 200 people since 2012.
In 2022, the UAC employed 26 people ages 16-34 through youth-serving nonprofit partners. At Colonial NHP, a
team conducted excavations, expanded community outreach and engagement, and conducted archeological site
condition assessments. Two UAC teams worked at five parks in the Hudson River Valley to conduct projects
including excavation, baseline documentation, and public interpretation. At Fort Frederica NM and Cumberland
Island NS, a team from the Southeast Conservation Corps assisted with survey and excavation of multiple
indigenous and historic sites, removed vegetation from mound sites, and assisted with preservation treatments at
cemeteries.
National Park Service FY 2024 Budget Justifications
ONPS-36
Subactivity Resource Stewardship
Program Component: Everglades Restoration and Research
FY 2024 Program Activities
The following are examples of planned FY 2024 Everglades Restoration and Research activities:
Continue operations and activities of the Department of the Interior’s Office of Everglades
Restoration Initiatives (OERI) in its policy coordination and management role for the
Department, and its role in working with Federal, State, local, and Tribal representatives of the
South Florida Ecosystem Restoration Task Force.
Focus data sciences efforts to assess existing long term biological and hydrologic databases, that
will allow resource managers, decision-makers, and the public to understand the trends in
Everglades NP resources as they relate to water management changes and restoration benefits.
Continue to participate in interagency planning and modeling efforts supporting the ongoing
multiple and simultaneous CERP planning projects associated with the Biscayne Bay and
Southeastern Everglades Ecosystem Restoration project, the Western Everglades Planning
Project, phases of the Central Everglades Planning Project (CEPP) including the next operational
plan, the Southern Everglades Project, and seepage management projects along the eastern
boundary of Everglades NP.
Continue implementation of the Tamiami Trail Next Steps Phase 2 project, which upon
completion will restore an additional 75 to 80 billion gallons of water a year to flow into
Everglades NP and Florida Bay.
Implement the Osceola Camp cure plan which identified the areas of the camp (located within
Northeast Shark River Slough) that would need to be elevated for CEPP to be implemented.
Continue to conduct modeling and implement monitoring to ensure that the planned, constructed
or operated projects will deliver maximum benefits to the South Florida National parks and
preserve.
Expand resilience and sustainability research efforts and resource management to address impacts
of climate change and sea level rise on the Everglades ecosystem.
Continue our targeted applied science efforts to guide restoration, operations, and natural
resources management.
Provide technical tools to support land and ecosystem managers, evaluate restoration plans, and
support detection, containment, and control of exotic invasive species.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Everglades Restoration and Research is $11,858,000 and 36 FTE. There
are no proposed program changes from FY 2023 Enacted.
Program Overview
The Everglades Restoration and Research program is a critical component of the restoration,
conservation, and protection of Federal interest lands in south Florida. Projects implemented through this
program relate directly to the restoration of the ecological systems for Everglades and Biscayne National
Parks and Big Cypress National Preserve, and indirectly for Dry Tortugas National Park. The monitoring,
targeted research, and evaluation components of this program provide technical tools and data that assist
National Park Service FY 2024 Budget Justifications
ONPS-37
the NPS in understanding the function of the present ecosystem, in evaluation of alternative plans for
restoration, and in assessment of the effects of built restoration projects on NPS resources. The program
also supports work on detection, containment and control techniques for exotic species, conducts studies
of large-scale ecosystem events, and studies the potential effects of changing weather patterns on sea-
level rise and saltwater intrusion; all of which threaten DOI resources in south Florida. The program will
focus applied science projects on data and syntheses needed to inform decisions regarding the design and
function of the current and future restoration projects, the effects of infrastructure and operations on
threatened and endangered species, the effects of large scale disturbance events (such as the effects of the
2015 seagrass die-off in Florida Bay, and the long-term impacts of Hurricane Irma in 2017), and the
effects of environmental impacts and invasive species on NPS resources.
The NPS is a major partner in the combined State and Federal effort to restore the Everglades ecosystem.
The south Florida park units are among the collaborating entities implementing major water resource
projects such as the Modified Water Deliveries and the regional Comprehensive Everglades Restoration
Plan (CERP). Restoring the Everglades is a more than $20 billion program of large-scale modifications to
the water management infrastructure of south Florida and has a targeted completion date beyond 2038.
Projects affecting NPS lands and waters occur in phases through the end of CERP implementation. The
NPS works with the U.S. Fish and Wildlife Service (FWS) and the U.S. Geological Survey (USGS) to
support CERP projects through the development of restoration performance measures, hydrology models,
water quality analysis, ecological models and quantitative evaluations of the environmental benefits of
proposed actions. Additionally, while the funding for the Everglades restoration effort to date has focused
almost exclusively on water management infrastructure and operations, in the last decade new
information provided by the research component of the Program has highlighted the need to address
exotic invasive species, land-use, and environmental and climate change issues that interact with water
management and affect NPS resources at the ecosystem scale.
Restoration components directly affecting South Florida ecosystems are in progress and nearing
completion. The Biscayne Bay coastal wetlands phase 1 project, to rehydrate coastal wetlands and reduce
damaging point-source freshwater discharge to Biscayne Bay and Biscayne National Park, is scheduled
for completion by late 2024. This project will improve freshwater wetlands ecosystems and wildlife
habitat benefiting aquatic vegetation, oysters and critical fish, crocodiles, and wading birds.
The $200 million Tamiami Trail Next Steps Project represents a new approach to collaboration between
Federal and State agencies by merging funding and expertise to achieve important regional transportation,
sustainability, and Everglades restoration goals all in one project. The Florida Department of
Transportation (FDOT) in coordination with NPS began construction of the remaining 6.7 miles of the
Tamiami Trail Next Steps Phase 2 Project in April, 2021. Phase 2 of the project is focused on raising and
reconstructing the remaining 6.7 miles of the eastern Tamiami Trail with features to further improve
water conveyance, roadway safety, and stormwater treatment. The Next Steps Phase 2 Project will
enhance the connectivity and waterflow between the marshes north and south of the Tamiami Trail while
maintaining a vital transportation link. The project will allow additional water to move south from Lake
Okeechobee, which is critical for the successful implementation of the Comprehensive Everglades
Restoration Plan. This project will allow for an additional 75 to 80 billion gallons of water a year to flow
south into the Everglades National Park and Florida Bay.
National Park Service FY 2024 Budget Justifications
ONPS-38
Phase 1 of the Tamiami Trail Next Steps Project improved water flow through the Tamiami Trail with the
construction of a one-mile bridge in 2013 and 2.3-miles of bridging completed in 2019. Everglades
National Park received a grant from the Federal Highway Administration to match a commitment from
the State of Florida. By the completion of Phase 2 in 2025, water is expected to flow more freely with
fewer impediments into Everglades National Park for the first time since the early 1900s.
Construction of several other restoration components of the Central Everglades Planning Project (CEPP),
a critical element of CERP that is anticipated to bring improvements in water quantity and quality,
directly benefiting the Everglades National Park, will be initiated in FY 2024. These components are
critical to decrease reliance on S333s structures and for water to flow freely into a march (Water
Conservation Area 3B), under the Tamiami Trail Next Steps bridges, and then into Everglades National
Park. The CEPP operational plan will also be worked on in FY 2024 to decide how to operate these
structures and other CEPP components.
Office of Everglades Restoration Initiatives (OERI)
Funding in FY 2024 will also sustain the continued operations and activities of the Department of the
Interior’s Office of Everglades Restoration Initiatives (OERI). Since 1995, the OERI has provided senior
executive level leadership in support of the congressionally mandated responsibilities of the Department
and the Secretary in the restoration of America’s Everglades. OERI will provide support necessary to
fulfill the Secretary’s role and responsibilities as chair of the intergovernmental South Florida Ecosystem
Restoration Task Force (Task Force). The OERI, under the leadership of the Secretary of the Interior, will
continue its role as the south Florida liaison for the Office of the Secretary in coordinating all
departmental and bureau-level Everglades restoration activities, projects and programs.
In FY 2024, the OERI leadership and staff will continue to work directly with the Federal, State, local
government, and Tribal representatives on the Task Force and administer, manage, and support the
priorities, activities, meetings, and the required Congressional reporting responsibilities of the Task Force,
its Working Group, the Science Coordination Group, and any designated advisory bodies.
Congressionally mandated reporting documents produced by the OERI will include the South Florida
Ecosystem Restoration Strategy and Biennial Report, the annual Integrated Financial Plan, the Plan for
Coordinating Science, and the annual Cross-cut Budget.
In the Water Resources Development Act of 2020, section 504, Congress directed the Task Force to
develop a priority list of invasive species that significantly impact the structure and function of ecological
communities, native species, or habitats within the South Florida Ecosystem. The Task Force member
agencies are also directed to manage these species through coordination and collaboration. Congress
directs the Task Force to develop innovative strategies and tools; guide applied research; facilitate
improved management; and prevent future introductions of nonnative species. Funding will directly
support specialized staff expertise in invasive exotic plants and animals and OERI will be responsible for
managing and guiding the Task Force’s efforts in implementing the Invasive Exotic Species Strategic
Action Framework.
Critical Ecosystems Studies Initiative (CESI)
The Critical Ecosystems Studies Initiative will remain one of the primary sources providing targeted
scientific information for use in restoration decision-making and guiding NPS land management
responsibilities in south Florida. CESI-funded applied science has contributed to the basic body of
National Park Service FY 2024 Budget Justifications
ONPS-39
knowledge about the Everglades ecosystem: how it functioned naturally before large-scale drainage in the
first part of the 20th century, how it has been altered and is currently functioning, and what the
requirements are for restoration of the ecosystem. CESI funded research continues to be utilized directly
in planning for CERP and other water management projects and processes by directly addressing land
managers and restoration planner questions.
The close coordination among the bureaus receiving research and development funding for Everglades
restoration significantly increases efficiency, both financially and in terms of the timeliness of science
project results. Since many of the projects selected via the requests for proposals have three- to four-year
durations, CESI funding is available for a limited number of new projects each year. As restoration
projects are implemented, CESI funding is contributing to monitoring the effects of these projects on NPS
resources. During the life of the program, the emphasis on funding of projects has shifted from basic
research and modeling to emphasizing restoration project assessment and monitoring. Given new
developments in the following fields: threatened and endangered species, invasive species introduction
and expansion, climate change, sea-level rise and saltwater intrusion, funding for the applied research
component of CESI remains essential to ensure the existence of a sound scientific foundation for the
design and operation of CERP projects as well as for the other natural resource management actions in
south Florida.
Comprehensive Everglades Restoration Plan (CERP)
The NPS program for the Comprehensive Everglades Restoration Plan involves staff participation on
interagency teams responsible for planning, proposing, and evaluating alternatives, and monitoring
ecological impacts of CERP restoration projects affecting NPS/DOI lands and resources. Some of these
projects take place on or are adjacent to NPS lands, and others, although located on lands belonging to the
State, affect the upstream watershed and water deliveries to NPS units. Projects vary from reservoir
construction, to stormwater treatment area construction, to levee construction/removal, to seepage
management projects, to projects that modify the operation of existing water management infrastructure.
Staff participation involves bringing the NPS perspective and mission critical goals into the interagency
planning process, performing modeling and analyses and reporting of technical information for use in
planning and design, and providing scientific and technical briefings to NPS and DOI leadership. The
NPS program for the CERP also supports employees who participate in the programmatic aspects of the
CERP, particularly its system-wide restoration coordination and verification program (RECOVER), as
well as staff who participate in ongoing water quality compliance and technical review for the Everglades.
National Park Service FY 2024 Budget Justifications
ONPS-40
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
ONPS-41
Activity: Park Management
Subactivity: Visitor Services
Visitor Services
($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)*
Program
Changes
(+/-)
2024
Request
Change from
2023
Enacted (+/-)
Interpretation and
Education 249,058 292,601 +10,821 -24,729 +9,314 288,007 -4,594
Commercial
Services 11,152 15,886 +587 -4,282 +66 12,257 -3,629
Total
Requirements 260,210 308,487 +11,408 -29,011 +9,380 300,264 -8,223
Total FTE
Requirements 2,320 2,406 0 0 +53 2,459 +53
*Internal Transfer column reflects adjusted amounts by budget subactivity and program component based on an analysis of actual
charges in the NPS accounting system for FY 2022. In order to more transparently represent amounts requested in FY 2024, the
budget presentation incorporates these amounts in the Internal Transfers column, reflecting a programmatic base funding
realignment.
Summary of FY 2024 Program Changes for Visitor Services
Program Changes ($000) FTE
Visitor Services on the Digital Platform
+3,000 +5
Semiquincentennial Commemoration (America 250)
+2,000 +11
New and Critical Responsibilities
+2,085 +17
Supporting Park Capacity
+1,280 +12
Unigrid Brochure Printing
+625 +3
Racial Justice and Equity for Underserved Communities Initiative – Increasing
Representation on Public Lands
+390 +5
TOTAL Program Changes
+9,380 +53
Mission Overview
The Visitor Services subactivity is central to the National Park Service mission, as it ensures meaningful
experiences for park visitors through greater understanding and access to America’s natural, cultural,
historical and recreational treasures. These experiences are facilitated through formal and informal
experiential and educational platforms, leading to greater protection, appreciation, and enjoyment. Youth
programs inspire future generations while providing workforce and skill building opportunities for
teenagers and young adults interested in cultural, natural, and recreational resource protection.
Millions of visitors access Interior’s public lands seeking inspiration and recreation, helping to grow the
booming outdoor recreation industry. Visitors also come to learn and share the stories of our natural and
cultural history. Visitor Services facilitate connecting to the great outdoors at NPS public recreation areas
across the country and continues to expand access for the benefit of all.
Subactivity Overview
The National Park Service Centennial Act (P.L. 114-289) states that “the Secretary shall ensure that
management of System units and related areas is enhanced by the availability and use of a broad
program of the highest quality interpretation and education.” National park areas have long been an
inspiration for hundreds of millions of Americans and people from around the world. The NPS provides
National Park Service FY 2024 Budget Justifications
ONPS-42
an array of opportunities, activities and services that promote enjoyment, health, lifelong learning,
stewardship and workforce development. The goal of the NPS is to foster an understanding and
appreciation of these places of natural beauty and cultural and historical significance.
Interpretation and Education
Fosters experiences that engender meaning with audiences and draw connections to the breadth of
America’s natural, cultural, historical and recreational resources. Employs a variety of
interpretation approaches that foster dialogue, promote learning and convey the complexity of
natural and human history and recreational opportunities associated with place. Ensures
responsible use of facilities and promotes safety for staff, visitors and volunteers.
Contributes to America’s educational system, ensuring that parks are places of experiential
formal and informal lifelong learning. Builds local and national level partnerships with non-
governmental organizations (NGOs), school and community-based education programs that use
traditional and web-based educational tools.
Provides exceptional visitor services from the first spark of interest to a well-informed visit to
long-lasting memories. Informs visitors and volunteers of safety regulations and precautions, and
available programs and services. Provides web-based access to resources via traditional websites
and emerging social media channels. Delivers civic engagement opportunities for service learning
and volunteerism to accomplish mission critical science, conservation, educational, and
recreational work in units of the National Park System.
Commercial Services
Manages concession contracts, commercial use authorizations, and leases for the benefit of
visitors and the protection of resources.
Ensures an adequate return to the government through the collection of concessions franchise fees
and the recovery of costs associated with commercial use authorizations.
Provides for necessary and appropriate accommodations and services for park visitors through the
provision of quality visitor facilities and services at reasonable costs.
National Park Service FY 2024 Budget Justifications
ONPS-43
Subactivity: Visitor Services
Program Component: Interpretation and Education
FY 2024 Program Activities
The following are examples of planned FY 2024 Interpretation and Education activities:
Execute $3.8 million in Interpretation and Education projects servicewide, including those
centered on telling the story of historically marginalized groups.
Establish 12 urban outreach and community engagement coordinators across the NPS to lead
efforts in building strategic community relationships, increasing engagement with historically
excluded communities, and building more inclusive park connections with urban communities.
Provide continued guidance and support for multifaceted/hybrid distance learning, as well as
build a strategic long-term approach to evolving education programming to better meet the needs
of teachers, students, and families.
Enhance and highlight interpretive recreation opportunities introducing more Americans to
camping, fishing, and other NPS recreation activities.
Continue to build exceptional visitor service standards and measurable vital signs to better assess
and manage changing visitation throughout the system.
Continue effort to digitize Junior Ranger activities to provide progressively wider access and
modern tools for reaching a growing audience of multigenerational families and young people.
Develop an innovative, inclusive and data-driven approach to modern visitor experiences and
infrastructure that includes onsite, digital, and media engagement.
Help launch the implementation of the American Semiquincentennial Commemoration.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Interpretation and Education is $288,007,000 and 2,383 FTE, a program
change of +$9,314,000 and +52 FTE from FY 2023 Enacted.
Visitor Services on the Digital Platform (+$3,000,000 / +5 FTE) – Funding would support continued
development of new and improved digital tools for visitors as part of ongoing work to improve the
customer experience. In FY 2022, the Office of Management and Budget designated the NPS as a High
Impact Service Provider (HISP) under Executive Order 14058 – Transforming Federal Customer
Experience and Service Delivery to Rebuild Trust in Government. Funding will support improving the
visitor digital experience as one of two designated services. The effort will interlink visitor experiences,
NPS business services, and NPS data such as geographic information, maps, and park statistics. New
tools would facilitate trip planning, convey up-to-date information about park conditions, organize digital
copies of park passes, and provide engaging, short-form content and interpretation. Tools would connect
park information to rec.gov services and establish application programming interfaces to help other travel
systems access and use NPS data. NPS will prioritize investments that reduce congestion and wait times
from high visitation to improve customer experience. Funding will support preliminary scoping efforts in
the inaugural year and will support development of applications, systems, and content. When completed
and released to the public, visitor use, and feedback will provide parks with better information about
visitation trends and visitor expectations.
National Park Service FY 2024 Budget Justifications
ONPS-44
Semiquincentennial Commemoration (America 250) (+$2,000,000 / +11 FTE) The proposed
funding supports visitor services related to America 250th, the commemoration of the semiquincentennial
year of the United States of America. In FY 2024, the NPS will use these funds to develop servicewide
diverse programming (unigrid brochures, etc.) that will be distributed to all parks throughout the
commemorative period, as well as begin hiring additional temporary staff and related visitor service needs
at parks expected to be directly impacted by increased visitation around the 250
th
.
New and Critical Responsibilities (+$2,085,000 / +17 FTE) – The budget proposes $8.2 million and 52
FTE spread across multiple ONPS budget subactivities for new and additional responsibilities at parks
and central offices. In FY 2024, funding will support the management of newly added lands, facilities,
visitor centers, and interpretive offerings at Denali NP and Preserve, Birmingham Civil Rights NM/
Freedom Riders NM, Medgar and Myrlie Evers NM, and others, as well as park protection increases at
Fort Smith NHS and Joshua Tree NP. Specific funding also supports new spending for community
outreach with Tribal communities at Bryce Canyon NP, North Cascades NP, Lake Chelan NRA, and Ross
Lake NRA Additional details on this request can be found in the Budget Overview section.
Supporting Park Capacity (+$1,280,000 / +12 FTE) – The budget proposes $17.3 million and 125 FTE
funding spread across multiple ONPS budget subactivities to support basic operational capacity needs at
all parks, rivers, and trails. Funding is spread across multiple ONPS budget subactivities to strengthen all
critical functions at parks. Between FY 2011 and FY 2022, the NPS has collectively lost almost 19
percent of its ONPS-funded Full-Time Equivalent capacity. Over the same period, over 30 units and
additional authorized sites have been added to the national park system, and visitation has grown by more
than 30 million. This proposed increase will provide park additional funds for basic operations to better
serve visitors and resources and ease planning for urgent and emerging needs.
Unigrid Brochure Printing (+$625,000 / +3 FTE) – Additional funding would support increased
printing costs for brochures and other printed park informational materials. Unigrid brochures provide
visitors with essential park information, orientation, and warnings about critical health and safety
concerns. As interpretation platforms, they describe global phenomena and serve as vehicles for parks and
culturally diverse park partners to share sensitive stories with honesty and candor. Parks report that even
in the digital age demand for paper copies has grown with increased visitation, as well as requests from
schools, Chambers of Commerce, park partners, school systems, and teachers who make the brochures
part of their classroom curricula. Per-unit pricing of the brochures had remained stable over the past 13
years, hovering around 7 cents each. However, the Government Publishing Office (GPO) recently issued
a major modification of the Unigrid print contract, which reflects new paper costs amounting to 10.4 cents
per brochure.
Racial Justice and Equity for Undeserved Communities Initiative – Increasing Representation on
Public Lands (+$390,000 / +5 FTE) – The budget proposes $3.0 million and 5 FTE across multiple
ONPS budget subactivities to support the Increasing Representation in our Public Lands initiative. Funds
will support the initial operations at two new park units established by the Biden-Harris administration:
New Philadelphia NHS and the Blackwell School NHS, as well as the expansion site in Summerton, SC
for Brown v. Board of Education NHP. An additional $1.8 million is proposed for potential new park
designations that preserve important places and tell the stories of those that have been historically
underrepresented and underserved to more rapidly initiate unit start up.
National Park Service FY 2024 Budget Justifications
ONPS-45
Program Overview
The purpose of interpretation and education programming is to advance the NPS mission by providing
memorable interpretive, educational, and recreational experiences that will (1) help the public create and
understand the meaning and relevance of park resources and stories, and (2) inspire stewardship actions to
protect and enhance those resources and stories. Park-based Interpretation and Education programs
engaged approximately 85 million people in personal services in 2022. This is still significantly lower
than the more than 150 million people reached in a typical year, due to the impacts of the COVID-19
pandemic but was an increase of 15 million people from 2021. While many visitor experiences were
shifted to social media and other digital platforms, the NPS expects to continue increasing its in-person
engagement.
Interpretation and Engagement: Interpretation and visitor engagement inspires and connects visitors of
all ages to America’s natural and cultural heritage. Through facilitating engagement and enjoyment of
NPS sites, visitors learn and are moved toward stewardship and conservation for this and future
generations. Programs educate the public on the diversity of cultures and stories that shaped the heritage
of each park and surrounding communities. Interpretation elevates multiple points of view regarding the
history of the park, including previously excluded and untold stories with the goal of being equitable and
inclusive in the programs and media presented.
Parks use a staff of trained professional rangers to present a wide variety of formal and informal
audience-centered programs delivered in-person, as well as through various technological means using a
variety of interpretive tools and techniques. These include participatory dialogues, guided tours and talks,
special events, Junior Ranger programs, theme-based programs, curriculum-based field trips, community
engagement and informal interpretation provided by rangers, guides and volunteers. Wayside and interior
exhibits, on-site and digital information and orientation tools and publications, self-guided trails and
tours, and interactive web-based programs are also available.
Volunteer Programs: The National Park Service works hand-in-hand with communities to engage
people of all ages and backgrounds in meaningful and mutually beneficial volunteer opportunities.
Growth in volunteerism with public lands reflects the interest of the public to experience and protect
national parks. Volunteers come from all ages and backgrounds to share their time and talents in support
of mission operations. Through short-term volunteer events and longer-term recurring opportunities, these
active engagement stewardship efforts connect people to public lands and build community.
The NPS creates stewardship opportunities through the following programs:
Volunteers-In-Parks Program (VIP): The VIP program is authorized by the Volunteers-In-The-
Parks Act of 1969. It provides a means through which the NPS can accept and utilize voluntary
help and services from the public. Volunteers work side-by-side with NPS employees in nearly
every discipline and unit and are a valuable human resource that strengthens the service we
provide to the public and supports mission operations. In 2022, the NPS mobilized 123,581
volunteers at nearly 400 national park sites, programs, and offices. Volunteers provided over 3.6
million hours estimated to be worth an average hourly rate of $28.54, a total value to the NPS of
almost $110 million.
Trails & Rails Program (TRP): The TRP is an innovative partnership between the NPS,
Amtrak, and the Department of Recreation, Park and Tourism Sciences at Texas A&M
National Park Service FY 2024 Budget Justifications
ONPS-46
University. Since 2000, the program provides rail passengers with educational opportunities
which foster an appreciation and greater understanding of the natural and cultural heritage, sites
and the geography of the areas through which the trains travel. In 2022, TRP programs
coordinated 186 volunteers in 616 interpretation programs. These volunteers engaged 83,211 rail
passengers and contributed 21225 hours: a total value to the NPS of approximately $ 569,421.
Community Volunteer Ambassadors (CVA): This unique public-private partnership program
utilizes a young adult service corps who are strategically engaged in the active citizenry efforts of
parks and programs to increase community volunteerism. Through this program, parks and
programs build capacity for volunteer engagement in their local communities and create new
opportunities to engage the public through volunteer service. In 2022, 173 CVAs mobilized
25,195 volunteers, who served 335,707 hours. These volunteer projects include interpretation and
education services to public audiences, resource stewardship and habitat management, and
National Day of Service events such as National Public Lands Day and the Martin Luther King,
Jr. Day of Service.
Volunteer.gov: Launched in 2002, Volunteer.gov has served as the primary means of recruiting
volunteers for public lands, and the National Park Service manages this shared-service online
volunteer recruitment and management platform, working in partnership with other federal
agencies. Together, the agencies and bureaus using Volunteer.gov manage over 450,000
volunteers who contribute more than 10 million hours of volunteer service annually, for an
annual value of $285 million. Over 1,700 volunteer opportunities were made available to the
public through Volunteer.gov in 2022, and new functionality is being added to the platform to
help federal volunteer managers operate their volunteer programs more efficiently.
Education Programs: The National Park Service hosted more than 1.1 million students at park
units in 2022. National Parks are where K-12 student’s history and science curricula can come
alive. They are able to see where history actually happened and how nature is science in motion.
The NPS also facilitated virtual distance learning programs for 12,000 students and 600 teacher
engagement programs.
Teacher-Ranger-Teacher Program: The Teacher-Ranger-Teacher program is the leading
program of the National Park Service’s servicewide education efforts. Teacher-Ranger-Teacher
provides K-12 educators with a professional development opportunity during the summer months
to research and learn in an NPS unit. Following their summer NPS experience, Teacher-Ranger-
Teacher participants return to classrooms with increased knowledge of natural resources, wildlife,
geography, geology, and the historical and cultural resources preserved and interpreted at the
parks. In the summer of 2022, the NPS hosted 52 Teacher-Ranger-Teachers in 47 park units.
Since its inception in 2007, the program has directly impacted more than 250,000 K-12 students
across the country by training their teachers to use science and heritage resources available
through the NPS. Over 1,900 teachers have participated in the program, contributing more than
1,200 new lesson plans since 2012.
National Unigrid Brochure Program: Unigrid brochures developed, produced, and maintained by
Harpers Ferry Center for Media Services are distributed to parks servicewide. They are used to orient
visitors to parks and supply visitors with accurate, interpretive, and logistical information. The brochures
serve as a tool to provide the official expression of the park and its resources, the responsible use of those
resources, and the critical information necessary to keep visitors safe. In FY 2022, the National Unigrid
National Park Service FY 2024 Budget Justifications
ONPS-47
Brochure Program worked with nearly 400 parks and NPS program offices. Over 11 million brochures
were printed. COVID-19 issues systemwide adversely affected quantity, which usually runs between 22 –
24 million copies annually. Using soy-based inks, the program produces brochures that are
environmentally friendly and cost effective, each brochure costs 12 cents per printed copy. The program
made significant gains in programmatic accessibility, converting Unigrids to Braille, increasing the total
number of Braille brochures to 100% of the inventory of NPS park Unigrids. The program also continues
to expand accessibility by using Unigrid materials in mobile applications, as well as online publication of
content that is compliant with Section 508 of the Rehabilitation Act of 1973.
At a Glance…
NPS Unigrid Brochure Program
For almost as long as there have been national parks, there have been visitor brochures. As the National Park System
grew, so did the need for publications. They came in a wide variety of formats, fonts, and folding methods that made
it increasingly difficult to keep up with demand. In 1985, the Unigrid program received one of the first Presidential
Design Awards from the National Endowment for the Arts, which noted, “The program fulfills the primary objective
of a design system, reducing routine decisions so that effort can be concentrated on quality. The implementation of
the program demonstrates sensitivity to the wide variety of subject matter and attention to the finest detail. It is an
example to others and has already achieved international recognition.
Read more about the history of the Unigrid program here: A Brief History of the Unigrid (nps.gov)
Junior Ranger Program: The Junior Ranger Program is the premiere NPS program for engaging young
people in discovering the significance of park sites and introducing them to the story of America’s natural
and cultural history. Junior Ranger programs are designed to provide participants with the flexibility to
discover and interact with a park at their own pace, alongside family, and within the limits of their visit.
Each park maintains a program that reflects the individual identity and significance of that place. Today,
there are over 400 Junior Ranger programs with individual badges or patches to earn in NPS sites across
the Nation. In 2022, over 1.6 million youth engaged with the Junior Ranger program.
Every Kid Outdoors (EKO) is an interagency program between the National Park Service (NPS),
Bureau of Land Management, U.S. Fish and Wildlife Service, Bureau of Reclamation, U.S. Army Corps
of Engineers, National Oceanic and Atmospheric Administration, and U.S. Forest Service providing free
entrance to 4
th
graders and their families. The Every Kid Outdoors Act (P.L. 116-9) formalized the
National Park Service FY 2024 Budget Justifications
ONPS-48
program for seven years beginning September 1, 2019. In addition, some State park systems honor the
pass. In FY 2022, 111,210 passes were redeemed by students and their families. During the lifetime of the
EKO program over a million passes have been redeemed. The program also encourages the agencies to
offer related school programs to fourth graders.
National Park Service Recreational Fishing and Junior Ranger Angler: The National Park Service’s
vast rivers, lakes, streams, and oceans provide exceptional opportunities for fishing and fishing-related
activities in 213 park sites across the United States. In FY 2022, the Recreational Fishing and Junior
Ranger Angler program has invested in a diverse set of partnerships to expand the program’s reach into a
broad cross-section of the population. The NPS partnered with the National Park Trust (NPT) to extend
fishing experiences to 400 Title I students and 200 college students from Historically Black Colleges and
Universities. NPT partnered with Our Military Kids (OMK) and Tragedy Assistance Program for
Survivors (TAPS) to provide 14 fishing outings in national parks for military and gold star families,
reaching 350 individuals representing more than 100 families. The NPS partnered with Blue Star Families
to reach 100+ military families in four metropolitan areas through recreational fishing clinics and outdoor
activities. Environment for the Americas hosted 21 interns at 19 park units providing hundreds of
education programs and promoting in park fishing access.
Youth Programs:
The National Park Service Youth and Young Adult Programs encompass a full range of youth-oriented
developmental programs and projects conducted in national park units. Through public-private
partnerships with nonprofit youth serving organizations, the NPS Youth Programs provide employment,
volunteer service and engagement opportunities for teenagers and young adults. Under the umbrella of the
21
st
Century Conservation Service Corps (21
st
CSC) the NPS engages 16-30-year-old Americans,
including low-income and disadvantaged individuals and veterans in compensated positions to participate
in natural and cultural conservation work projects that maintain park resources. Youth employment is a
cost-effective method to preserve resources while providing the participants with developmental job
skills, training, and education.
The NPS collaborates with education partners and youth organizations to create a pathway to employment
with a focus on diversifying the NPS workforce. At least 10,000 youth each year are involved in a multi-
year progression of experiences from engagement and education programs to internship and volunteer
opportunities to employment. Partners include organizations such as service and conservation corps,
community-based environmental and heritage organizations, and educational institutions. Youth programs
also serve to provide recreational opportunities and an expansion of career choices to participants.
The NPS is firmly committed to providing high quality youth employment opportunities. These
opportunities will provide skills development, clear performance goal and objectives, safe working
environments that are accommodating and inclusive, direct links to potential NPS career opportunities, a
living wage or stipend, and experiences and products that have clear positive value to the public and our
nation’s natural and cultural resources.
In FY 2022, there were 4,292 participant hires through youth serving partner organizations and 367
participants in youth conservation corps programs. The NPS YMCA partner program provides outdoor
recreation, education, volunteer service and employment opportunities to youth. In FY 2022 the program
had 16,449 participants including 4,316 children from economically disadvantaged backgrounds and 200
National Park Service FY 2024 Budget Justifications
ONPS-49
children from active-duty military families. In recent years, NPS Youth Programs have designed major
national programs that support DOI priorities in the areas of creating a next generation of conservation
stewards, restoring trust with local communities, supporting infrastructure needs, and employing veterans.
The Park Planning, Facilities and Lands (PPFL) Build Up Internship Program will provide
career pathways into the National Park Service (NPS) for students with competitive and highly
specialized skillsets in technical fields. The program gives them an opportunity to learn from and
contribute to a wide array of activities that make up PPFLs operations and aims to engage the
next generation of skilled technical professionals at NPS. The Build Up internship will include
high-achieving, highly motivated undergraduate and graduate students with a background in
technical specialties. Specialties include but are not limited to: Architecture, Community
planning, Engineering, Geographic Information Systems (GIS), Land resources, Planning, Social
sciences, Survey or cartographic services, and Web design and development.
The American Sign Language Conservation Corps Program: The program provides
opportunities to young adults who are deaf and/or hard of hearing. This demographic sector has
unemployment rates as high as 80 percent. The participants work on 21 CSC projects focused on
the deferred maintenance needs of the NPS. The NPS has developed projects with three service
conservation corps and other partnerships with educational institutions across the nation that
serve the deaf and hard of hearing community.
The NPS Historically Black Colleges and Universities Internship Program (HBCUI): The
NPS HBCUI Program provides 39 internship opportunities to undergraduate and graduate
students in natural and cultural resource conservation. 31 HBCU institutions were represented in
the FY 2022 program year. This program also received considerable philanthropic support to
match the Federal investment.
The Traditional Trades Advancement Program (TTAP): TTAP provides opportunities to
veterans under 35 years of age and non-veteran young adults in the historic preservation
vocational trades of carpentry and brick masonry. The participants work on 26-week project work
assignments that assist with the restoration and preservation of historic structures in the NPS. The
goal of this program is to place the participants in NPS maintenance positions or on the path to
obtaining a good, union job.
The Indian Youth Service Corps: Established through the John D. Dingell, Jr. Conservation,
Management, and Recreation Act (P.L. 116-9), this program enrolls participants between the ages
of 16 and 30, and veterans aged 35 or younger, a majority of whom are Indian. The program
supports Indian Tribes through agreements between Tribes and a conservation corps to carry out
appropriate conservation projects on eligible service land. The Indian Youth Service Corps
Program (IYSC) Guidelines were finalized in 2022. In FY 2022 the NPS supported the IYSC
Traditional Trades Advancement Program, the Navajo Capacity Builders Service Corps Program,
the Native Voices Project in the Grand Canyon which involved 11 Grand Canyon Affiliated
Tribes, and the Ahta Heritage Youth Development Program at Wrangell-St. Elias National Park
in collaborative partnership with the Ahtna Alaska Native Corporation. The NPS also supported
Native American youth development projects in regions, involved 25 Tribal Nations, two Alaska
Tribal Nations and one Alaska Native Corporation, and provided employment opportunities for
290 youth and young adults. The National Park Foundation raised $1 million in support of the
IYSC.
National Park Service FY 2024 Budget Justifications
ONPS-50
The Latino Heritage Internship Program (LHIP): The NPS LHIP provides 33 internship
opportunities to undergraduate and graduate students in natural and cultural resource conservation
at 33 NPS sites and program offices The Latino Heritage Internship Program (LHIP) connects
Latino early career professionals to national parks across the country and to diverse career
development experiences via internships. These experiences range from archiving historical
documents and supporting visitor services to conducting research projects and creating
communications messages about national parks and their activities.
National Park Service FY 2024 Budget Justifications
ONPS-51
Subactivity: Visitor Services
Program Component: Commercial Services
FY 2024 Program Activities
The following are examples of planned FY 2024 Commercial Services activities:
Proactively manage concession contracting, including analyzing leasehold surrender interest,
component maintenance reserves and appropriate return to the Federal government associated
with applicable new contracts.
Consider opportunities for new services and facilities updates where appropriate as to ensure
relevance of offerings for visitors.
Improve criteria and processes to assess concessioner performance in meeting contract
requirements and achieving customer satisfaction.
Award new commercial services contracts as authorized under the Visitor Experience
Improvements Authority contained in the National Park Service Centennial Act (P.L. 114-289),
which allows the NPS to enter into other commercial visitor services arrangements such as
management contracts, a model more common in the private sector hospitality industry.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Commercial Services is $12,257,000 and 76 FTE, a program change of
+$66,000 and +1 FTE from FY 2023 Enacted.
Supporting Park Capacity (+$66,000 / +1 FTE) – The budget proposes $17.3 million and 125 FTE
funding spread across multiple ONPS budget subactivities to support basic operational capacity needs at
all parks, rivers, and trails. Funding is spread across multiple ONPS budget subactivities to strengthen all
critical functions at parks. Between FY 2011 and FY 2022, the NPS has collectively lost almost 19
percent of its ONPS-funded Full-Time Equivalent capacity. Over the same period, over 30 units and
additional authorized sites have been added to the national park system, and visitation has grown by more
than 30 million. This proposed increase will provide park additional funds for basic operations to better
serve visitors and resources and ease planning for urgent and emerging needs.
Program Overview
Visitor services are provided to visitors to national parks via a range of private-public partnerships such as
concession contracts and commercial use authorizations, known collectively as commercial services.
Some parks manage only one or two concessions contracts that provide for basic visitor services such as
food service or convenience items, while other parks oversee dozens of contracts providing for a wide
range of services, such as accommodations, food and beverage restaurant operations, retail stores, marina
operations, guided services and more. Concessions contracts vary widely, from a boat house operation
that rents kayaks and equipment to the iconic park lodges that host tens of thousands of visitors a year.
The NPS Commercial Services Program oversees these services and regulates organizations and
businesses that use park resources for compensation, monetary gain, or benefit through concession
contracts, commercial use authorizations, and leases in order to ensure visitors receive fair value for the
goods or services provided and the Federal government receives a fair return from concessioners.
Oversight of park facilities leases is also provided through the Commercial Services Program.
National Park Service FY 2024 Budget Justifications
ONPS-52
Commercial services in national parks have a long history—the Yellowstone Park Act of 1872 gave the
Secretary of the Interior the authority to grant leases, privileges, and permits to private citizens and
corporations for operating commercial services on public lands. By 1916, concession operations existed
in many national park areas. In 1965, the Concessions Policy Act, P.L. 89-249, established greater
safeguards and controls on concessions operations and limited concession operations to those that are
necessary and appropriate for public use and visitor enjoyment while consistent to the highest practicable
degree in the preservation and conservation park areas and resources. The National Parks Omnibus
Management Act of 1998, P.L. 105-391 (54 U.S.C. §101911 – 101938, “the Concessions Law”)
established additional management requirements, emphasizing increased competition for concession
contracts, reducing the number of concessioners eligible to receive a preferential right of contract
renewal, replacing sound value possessory interest with leasehold surrender interest, and permitting
franchise fees to be returned to the NPS.
The NPS manages almost 500 concession contracts, 6,500 commercial use authorizations (CUAs), and
more than 175 leases with private sector operators to provide commercial visitor services. NPS has
awarded more than 900 contracts since the Concessions Law was enacted, using standard contract
language based on private sector practices. These contracts enhance visitor experiences and set the
framework for consistent oversight of commercial visitor services. As required by the Concessions Law,
NPS uses external consultants to aid in the development of new prospectus documents for these contracts,
and a legislatively mandated evaluation and selection process.
Regulations and policies are in place to guide agency operations to manage park concessions responsibly
and make rational, well-informed decisions. NPS also provides guidelines to all concessioners on
maintaining facilities and providing services that are safe, sanitary, attractive, and demonstrate sound
management. Presently, there are more than 5,000 NPS assets assigned to concessioners, and NPS
requires condition assessments and environmental management audits for NPS concession-managed
facilities and operations. These audits and assessments are conducted by contracted experts and aid NPS
in determining environmental conditions as well as cyclic, preventative, and component renewal
maintenance requirements and necessary capital investments, allowing for improvement of facility
conditions and operations. Additionally, the NPS requires both periodic and annual evaluations of each
concession operation to guarantee adherence to contract requirements and established standards.
National Park Service FY 2024 Budget Justifications
ONPS-53
At a Glance…
Commercial Services Management at Yosemite National Park
First protected in 1864, Yosemite National Park is best known for its waterfalls, but within its nearly 1,200 square
miles, you can find deep valleys, grand meadows, ancient giant sequoias, a vast wilderness area, and much more.
Yosemite National Park includes some of the most iconic viewsheds in the United States. The park’s popularity and
year-round operations make it one of most visited national parks in the system with an average of over 4.0 million
visitors per year.
Wawona Hotel, a National Historic Landmark, is a
Victorian-era historic hotel located four miles from
Yosemite’s southern entrance.
Commercial services provided throughout the park include lodging (upscale hotel rooms, standard motel rooms,
rustic and tent cabins), food and beverage, retail, fuel, interpretive tours, mountaineering services, skiing, horse and
mule tours, photography and art sales, and equipment rentals.
National Park Service FY 2024 Budget Justifications
ONPS-54
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
ONPS-55
Activity: Park Management
Subactivity: Park Protection
Park Protection
($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)*
Program
Changes
(+/-)
2024
Request
Change
from 2023
(+/-)
Law Enforcement
and Protection 370,478 387,285 +14,322 +1,000 +10,579 413,186 +25,901
Health and Safety 37,279 42,111 +1,557 -2,764 +3,647 44,511 +2,440
Total
Requirements 407,757 429,396 +15,879 -1,764 +14,226 457,737 +28,341
Total FTE
Requirements 2,331 2,406 0 0 +73 2,479 +73
*Internal Transfer column reflects adjusted amounts by budget subactivity and program component based on an analysis of actual
charges in the NPS accounting system for FY 2022. In order to more transparently represent amounts requested in FY 2024, the
budget presentation incorporates these amounts in the Internal Transfers column, reflecting a programmatic base funding
realignment. This column also includes a transfer out of $2.5 million from the Law Enforcement and Protection program
component to fund an increase in the Working Capital Fund (WCF) Central Bill for DOI’s Incident Management, Analysis and
Reporting System (IMARS). These amounts were previously billed to NPS via the WCF Direct Bill.
Summary of FY 2024 Program Changes for Park Protection
Program Changes ($000) FTE
United States Park Police Capacity
+5,365 +24
Conservation Initiative – Natural Disaster Response Capacity
+2,000 +13
Supporting Park Capacity
+1,950 +17
Special Agents (Criminal Investigators)
+1,850 +9
New and Critical Responsibilities
+1,781 +10
Conservation Initiative – Public Health Protection
+1,000 0
Law Enforcement Psychological Screening Contract
+280 0
TOTAL Program Changes
+14,226 +73
Mission Overview
The Park Protection Subactivity supports the NPS mission by contributing to the protection and
preservation of natural and cultural resources and ensuring visitors can safely enjoy and experience the
national parks.
Subactivity Overview
Park Protection plays a key role in serving the public interest through professional law enforcement,
physical security, and emergency services that combine the best of the traditional Ranger and the modern
public safety professional. These efforts include the preparation, response, and support of recovery efforts
from public health emergencies, natural disasters, and other impactful events.
National Park Service FY 2024 Budget Justifications
ONPS-56
Subactivity: Park Protection
Program Component: Law Enforcement and Protection
FY 2024 Program Activities
The following are examples of planned FY 2024 Law Enforcement and Protection activities:
Continue to provide law enforcement and public safety resource protection services across parks
that welcome millions of visitors annually.
Continue to provide specialized United States Park Police (USPP) protection for national icons
and the millions of visitors to NPS sites in San Francisco, New York, and Washington, D.C.
Deter crimes, such as drug cultivation and trafficking, which cause degradation in wilderness and
other areas, threatening endangered species, archeological sites, historical sites, and other unique
and precious park resources.
Ensure a safe environment for persons exercising their First Amendment rights and celebrating
events of national significance.
Contribute to border security, counter-drug operations, and emergency services.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the Law Enforcement and Protection program is $413,186,000 and 2,240
FTE, a program change of +$10,579,000 and +57 FTE from FY 2023 Enacted.
United States Park Police Capacity (+$5,365,000 / +24 FTE) – Funding will support additional recruit
classes and civilian support staff for the U.S. Park Police (USPP). Funding will help provide the
necessary capacity for ensuring the protection of the millions of annual visitors of the metropolitan areas
they safeguard. Funding would provide for salary and benefits for newly initiated officers along with the
required equipment and communication tools.
Special Agents (Criminal Investigators) (+$1,850,000 / +9 FTE) – Increased funding would support
additional specialized and highly skilled criminal investigators. Agents are stationed across the national
park system and conduct complex, sensitive, and long-term criminal investigations, working closely with
Law Enforcement (LE) rangers in the parks. Examples of typical cases include crimes of violence, major
resource violations, drug cultivation, and major property crimes. There are currently 60-70 cases at any
given time that are beyond the staffing capacity of the program, which currently funds 25 agents. As
capacity in the Special Agent program has declined, workload has fallen back to park LE rangers who
don’t have specialized training. This funding would ensure there is sufficient expertise in the Special
Agent program to address specialized criminal investigations and return capacity to park LE programs
currently attempting to cover some of this complex workload.
Supporting Park Capacity (+$1,607,000 / +15 FTE) – The budget proposes $17.3 million and 125 FTE
funding spread across multiple ONPS budget subactivities to support basic operational capacity needs at
all parks, rivers, and trails. Funding is spread across multiple ONPS budget subactivities to strengthen all
critical functions at parks. Between FY 2011 and FY 2022, the NPS has collectively lost almost 19
percent of its ONPS-funded Full-Time Equivalent capacity. Over the same period, over 30 units and
additional authorized sites have been added to the national park system, and visitation has grown by more
than 30 million. This proposed increase will provide park additional funds for basic operations to better
serve visitors and resources and ease planning for urgent and emerging needs.
National Park Service FY 2024 Budget Justifications
ONPS-57
New and Critical Responsibilities (+$1,477,000 / +9 FTE) – The budget proposes $8.2 million and 52
FTE spread across multiple ONPS budget subactivities for new and additional responsibilities at parks
and central offices. In FY 2024, funding will support the management of newly added lands, facilities,
visitor centers, and interpretive offerings at Denali NP and Preserve, Birmingham Civil Rights NM/
Freedom Riders NM, Medgar and Myrlie Evers NM, and others, as well as park protection increases at
Fort Smith NHS and Joshua Tree NP. Specific funding also supports new spending for community
outreach with Tribal communities at Bryce Canyon NP, North Cascades NP, Lake Chelan NRA, and Ross
Lake NRA. Additional details on this request can be found in the Budget Overview section.
Law Enforcement Psychological Screening Contract (+$280,000 / +0 FTE) – Funding would support
a psychological screening contract for NPS law enforcement. Psychological testing is required for all
newly hired law enforcement officers and is a best practice for hiring in public safety positions.
Additional funding would allow for the NPS to become compliant with Department policy and is
consistent with President Biden’s Executive Order 14074 – Advancing Effective, Accountable Policing
and Criminal Justice Practices to Enhance Public Trust and Public Safety. Covering this contract from
within funds available would further reduce law enforcement capacity.
Program Overview
The NPS is required to enforce all pertinent Federal laws and regulations within all park units. This is an
integral component in keeping our natural and cultural resources unimpaired for future generations,
providing the public the opportunity to enjoy the national park units in a safe manner, and providing
employees a safe place of employment.
NPS law enforcement personnel perform a variety of functions, including protecting and preserving
resources, park lands and areas with special protection designations, such as wilderness areas and Icon
status; ensuring the safety of visitors and providing search and rescue and emergency medical services;
managing large-scale incidents and developing emergencies, including structural fires and natural
disasters, such as hurricanes; and providing a level of on-the-ground customer service that has long been
the tradition of the National Park Service.
The NPS focuses on enforcement of Federal laws and regulations and the reduction of crimes in our
national parks through a number of means, including employing community-oriented policing methods,
proactive patrols, agent participation in interagency task forces, and by increasing the use of science and
technology to target crime. Drug production, trafficking, and use on parklands are combated by focusing
resources on counter-drug operations and promoting drug education and other community outreach
programs. These proactive approaches, along with training and information gathering, enhance visitor and
employee safety, resource protection, and homeland security.
Law Enforcement Operations
Park law enforcement rangers provide critical services to ensure visitor and employee safety and security,
protection of park resources, prevention of drug operations and other illegal activities in park areas, and
apprehension of criminal violators. The United States Park Police (USPP) supports these efforts and
provides law enforcement services to designated National Park Service sites in the metropolitan areas of
Washington, D.C., New York City, and San Francisco. The USPP has primary law enforcement jurisdiction
on approximately 135,000 acres of NPS land, patrolling areas with tens of millions of annual visitors, is
National Park Service FY 2024 Budget Justifications
ONPS-58
responsible for traffic control on all NPS lands within its jurisdiction, and patrols five major parkways
that serve as principal evacuation routes from Washington, D.C.
Border Security
Law enforcement efforts are critical throughout the NPS, and enhanced physical security is required at
parks located on the international borders. The NPS utilizes law enforcement park rangers and special
agents, and collaborates with other Federal, State, and local law enforcement authorities and organizations
to assist in providing security and protection of park resources and ensuring visitor safety on park lands
adjacent to international borders. Ongoing efforts at these parks include the following:
Ranger patrols and surveillance of roads, trails, and backcountry areas.
Short and long-term counter-smuggling and drug cultivation investigations and operations.
Cooperation and coordination with the Department of Homeland Security, Customs and Border
Protection, and other Federal, State, and local agencies involved with border security.
Counter-Drug Operations
The National Park Service works diligently to ensure that all pertinent Federal laws and regulations are
enforced within park units. This includes funding for national parks located along international borders to
address problems such as drug trafficking that can threaten park lands and visitors. These efforts are an
integral component in keeping our natural and cultural resources unimpaired for future generations,
providing the public the opportunity to enjoy parks in a safe manner, and providing employees a safe
place of employment. Through the utilization of law enforcement rangers and special agents, in
collaboration with Federal, State, and local authorities, the NPS is actively engaged in visitor and resource
protection efforts that include:
Short and long-term counter-smuggling and drug cultivation investigations and operations
Ranger patrols and surveillance of roads, trails, and backcountry areas
Cooperation and coordination with the Department of Homeland Security’s Customs and Border
Protection, and other Federal, State, and local agencies involved with border security
Additionally, the NPS, in concert with the U.S. Forest Service, the Drug Enforcement Administration,
and other Federal, State, and local partners, actively combats illegal drug operations in park areas.
Through these efforts, the NPS supports Federal drug control priorities by reducing domestic drug
production and availability.
Emergency Services
The NPS provides emergency management, search and rescue capabilities throughout all fifty States and
territories, and medical oversight and credentialing of emergency medical providers that render aid to
thousands of visitors and employees. Emergency services are provided by park personnel who are
engaged in various lifesaving and emergency management disciplines critical to ensuring the safety of
visitors and staff. The NPS also provides medical services and currently collects fees for these services at
ten units. Funds are deposited into the National Park Medical Services fund as offsetting collections and
are made available each year by a provision in the annual appropriations act. Additionally, the NPS
supports Federal, Tribal, State, and local responses to natural disasters and emergencies, providing
services within and beyond the boundaries of the NPS. Operational responsibilities also include
emergency medical services, lifeguard activities, and search and rescue operations under the National
National Park Service FY 2024 Budget Justifications
ONPS-59
Response Framework. Finally, the NPS provides incident management operations, which include large
scale emergency management planning efforts for a variety of special activities.
Resource and Environmental Protection
The NPS actively manages natural and cultural resources in the National Park System to meet its statutory
responsibility to preserve these resources unimpaired for future generations. Law enforcement personnel,
including USPP, protect park resources through investigations, remote surveillance, improved security,
prosecution of suspects, and increased interagency cooperation. The NPS provides prevention and
investigation efforts directed towards environmental crimes impacting resources, including USPP aviation
support in detection efforts, and utilization of preventative educational programs for both park visitors
and neighbors to combat the negative effects of human habitation. Preventive measures focus on
educating visitors, particularly offenders, about the effects of inappropriate or illegal behavior on
irreplaceable resources. Similarly, educating NPS employees about the impact of their work habits on the
quality of resources provides effective preventive protection and helps employees recognize illegal
activities.
National Icon Protection
The USPP and other law enforcement rangers work to protect each of the park units, and enhanced
physical security is required at national Icon parks such as the Statue of Liberty, Mount Rushmore,
Independence Hall and the Liberty Bell, the Washington Monument, and the Lincoln and Jefferson
Memorials, to address intrusions, vulnerabilities, and potential terrorist threats.
Since the terrorist attacks of September 11, 2001, the NPS has maintained a proactive anti-terrorism
stance in providing protection and police services at national Icon parks. For example, the USPP provides
security on the National Mall through a variety of measures, including visitor screening at the Washington
Monument, deployment of permanent perimeter vehicle barriers, and anti-terrorism training for USPP
officers, other NPS employees, and concessionaires.
Wilderness Protection
Wilderness areas serve as a critical anchor for habitat conservation, clean air, and water repositories. Over
50 percent of the National Park System acreage is congressionally designated wilderness, and thus must
be accordingly protected and managed. Parks maintain wilderness character by patrolling wilderness
areas; enforcing regulations; educating visitors on the importance of wilderness and wilderness
protection; monitoring human impacts; conducting restoration projects; and employing condition
monitoring techniques and research to ensure consistent wilderness resource protection and conservation.
Policy and protection efforts consistent with the 1964 Wilderness Act are implemented to ensure these
areas are sufficiently protected and held to the standard of care intended by Congress.
Illegal Trade and Poaching
Natural and cultural resources are often threatened by human impacts and uses. Illegal activities such as
poaching and illegal trade operations cause harm to and, in some cases, destruction of the resources for
which the parks were established. Illegal trade operations, involving wildlife and plant parts taken from
national park areas are significant. Wildlife and plants are taken illegally for different reasons, often for
personal consumption or for the sale of wildlife body parts in local or international markets. The illegal
killing and/or removal of wildlife from the parks, including several federally listed threatened or
National Park Service FY 2024 Budget Justifications
ONPS-60
endangered species, is suspected to be a factor in the decline of numerous species of wildlife and could
cause the local extinction of many more if not properly addressed.
Archeological and Paleontological Crimes
The NPS annually experiences hundreds of documented violations where archeological or paleontological
resources are damaged or destroyed. Damage occurs at a variety of sites, including archeological sites,
which include burials, tools, pottery, and baskets associated with historic and prehistoric subsistence and
village sites, ceremonial sites, and shipwrecks and associated artifacts. The Archeological Resource
Protection Act (ARPA), the Antiquities Act, and the Native American Graves Protection and Repatriation
Act (NAGPRA) provide a statutory basis for the protection of archeological sites and cultural resources in
parks. Regular monitoring and law enforcement activities reduce and deter looting and devastation of the
resources. Protection efforts at parks for ARPA activities have resulted in criminal prosecutions as well as
increased site protection throughout the NPS. The NPS plans to continue these investigative efforts and
will continue to support the training of investigative, resource protection, and archeological staff.
National Park Service FY 2024 Budget Justifications
ONPS-61
Subactivity: Park Protection
Program Component: Health and Safety
FY 2024 Program Activities
The following are examples of planned FY 2024 Health and Safety activities:
Provide search and rescue, natural disaster, and critical incident and emergency response services.
Reduce the incidence of preventable injuries and ensure a safe environment for park visitors;
maintain a safe and productive workforce through risk management, training, and safe work
practices.
Improve and promote positive public health at parks by addressing issues such as food safety,
water and wastewater treatment, and prevention, detection, and containment of zoonotic, vector-
borne, and communicable diseases.
Continue to ensure all NPS buildings meet fire and life safety codes and have appropriate fire
protection systems.
Ensure employees that respond to structure fires and other all-hazard incidents are properly
trained, equipped, and certified.
Collaborate with the Center for Disease Control and State health departments to better define
disease transmission hazards in National Park System sites.
Justification of FY 2023 Program Changes
The FY 2024 budget request for Health and Safety is $44,551,000 and 239 FTE, a program change of
+$3,647,000 and +16 FTE from FY 2023 Enacted.
Conservation Initiative – Natural Disaster Response Capacity (+$2,000,000 / +13 FTE) – Funding
will support the Service’s recurring efforts to keep itself equipped to protect life and property through the
coordinated utilization of a cadre of NPS employees that provides for a reserve of trained, qualified, and
disciplined incident response personnel for use in emergency situations that frequently occur across NPS
lands. Establishing a small cadre of regionally based emergency planners, team managers, and training
support specialists will allow the Service to better prepare for, respond to, and recover from complex
multi-jurisdictional incidents such as hurricanes, floods, fires, earthquakes, and eruptions. Funding would
provide for incident planning, required training, maintenance of incident personnel qualifications, and
logistical support for the Service’s approximately 20,000 staff and existing Incident Management Teams,
serving as a force multiplier, significantly increasing servicewide capacity for timely and cost-effective
incident response.
Conservation Initiative – Public Health Protection (+$1,000,000 / 0 FTE) – Funding will enhance the
organizational capacity of the Public Health (OPH) program, allow for mission essential inspection travel,
and ensure a strong public health presence to better address, prevent, and manage environmental health
risks, disease threats and rapidly emerging public health issues related to climate change, in support of
Executive Order 13994 – Ensuring a Data-Driven Response to High-Consequence Public Health Threats.
OPH will lead in the expansion of promising practices, technology and tools, and partnerships that
promote parks as a health resource to the American public, with a focus on underserved communities in
support of Executive Order 13985 – Advancing Racial Equity and Support for Underserved
Communities. OPH will also lead an effort to plan, conduct, evaluate, and establish a framework and
approach to provide for implementation of science-informed health promotion and protection practices
National Park Service FY 2024 Budget Justifications
ONPS-62
servicewide. OPH is supporting these efforts through the White House Strategy on Hunger, Nutrition, and
Health.
New and Critical Responsibilities (+$473,000 / +1 FTE) – The budget proposes $8.2 million and 52
FTE spread across multiple ONPS budget subactivities for new and additional responsibilities at parks
and central offices. In FY 2024, funding will support the management of newly added lands, facilities,
visitor centers, and interpretive offerings at Denali NP and Preserve, Birmingham Civil Rights NM/
Freedom Riders NM, Medgar and Myrlie Evers NM, and others, as well as park protection increases at
Fort Smith NHS and Joshua Tree NP. Specific funding also supports new spending for community
outreach with Tribal communities at Bryce Canyon NP, North Cascades NP, Lake Chelan NRA, and Ross
Lake NRA. Additional details on this request can be found in the Budget Overview section.
Supporting Park Capacity (+$174,000 / +2 FTE)The budget proposes $17.3 million and 125 FTE
funding spread across multiple ONPS budget subactivities to support basic operational capacity needs at
all parks, rivers, and trails. Funding is spread across multiple ONPS budget subactivities to strengthen all
critical functions at parks. Between FY 2011 and FY 2022, the NPS has collectively lost almost 19
percent of its ONPS-funded Full-Time Equivalent capacity. Over the same period, over 30 units and
additional authorized sites have been added to the national park system, and visitation has grown by more
than 30 million. This proposed increase will provide park additional funds for basic operations to better
serve visitors and resources and ease planning for urgent and emerging needs.
Program Overview
The NPS implements strategies to provide a safe and accident-free recreational and working environment
for NPS visitors and employees. Servicewide efforts address visitor safety, search and rescue, critical
incident response services, public health, occupational health and safety, aviation support activities, and
structural fire prevention.
Critical Incident Response
NPS emergency service operations are critical to protecting and responding to visitors, employees, and
resources in distress throughout the system. Emergency services are provided by park personnel who are
engaged in various lifesaving and emergency management disciplines. Operations include emergency
medical services, search and rescue, lifeguard services, and incident management. Structural and wildland
fire operations are provided, including prevention efforts and suppression activities. Aviation support is
critical to furthering these efforts, as mission activities support search and rescue, law enforcement,
backcountry patrol, wildland fire management, and natural resource management. These services are also
often utilized beyond the boundaries of the NPS to assist in local and national disasters and emergencies.
Public Health
The NPS promotes visitor and public health through NPS staff in parks and support by officers from the
US Public Health Service (PHS), the uniformed service of the Department of Health and Human Services.
The PHS has an almost century long tradition of service with the NPS. PHS officers serve as advisors and
consultants on health-related issues associated with food, drinking water, wastewater, vector-borne and
infectious diseases, emergency response, and backcountry operations. NPS staff and PHS officers also
respond to public health emergencies such as the Coronavirus pandemic, and natural disasters such as
Hurricanes Sandy and Katrina, and are involved in numerous ongoing health promotion and protection
National Park Service FY 2024 Budget Justifications
ONPS-63
projects. The NPS also collaborates and partners with local, state, and other Federal health jurisdictions
and public health protection activities and surveillance efforts have helped detect disease outbreaks, led to
timely implementation of disease control measures, and decreased transmission.
Risk Management
Visitor and employee safety is paramount for the NPS and thus, many risk management practices are
instituted to provide effective visitor and occupational safety, and health and employee wellness efforts.
NPS objectives include identification and management of risks to the visiting public, mitigation of
operational risks to enhance mission effectiveness, the reduction of human error-related accidents,
formulation of and compliance with safety and occupational health standards, and education and
advocacy for a fit and healthy workforce.
National Park Service FY 2024 Budget Justifications
ONPS-64
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
ONPS-65
Activity: Park Management
Subactivity: Facility Operations & Maintenance
Facility
Operations &
Maintenance
($000)
2022
Actual
2023
Enacted
Fixed Costs
(+/-)
Internal
Transfers
(+/-)*
Program
Changes
(+/-)
2024
Request
Change from
2023
Enacted (+/-)
Facility
Operations 363,923 448,183 +16,574 -68,526 +2,805 399,036 -49,147
Facility
Maintenance 550,867 490,494 +18,139 +71,838 +3,510 583,981 +93,487
Total
Requirements 914,790 938,677 +34,713 +3,312 +6,315 983,017 +44,340
Total FTE
Requirements 4,111 4,221 0 0 +55 4,276 +55
*Internal Transfer column reflects adjusted amounts by budget subactivity and program component based on an analysis of actual
charges in the NPS accounting system for FY 2022. In order to more transparently represent amounts requested in FY 2024, the
budget presentation incorporates these amounts in the Internal Transfers column, reflecting a programmatic base funding
realignment.
Summary of FY 2024 Program Changes for Facility Operations and Maintenance
Program Changes ($000) FTE
Supporting Park Capacity
+3,896 +36
New and Critical Responsibilities
+1,094 +11
Conservation Initiative - Management and Policy Support for Climate Change
Decision Making
+1,000 +8
Racial Justice and Equity for Underserved Communities Initiative - Increasing
Representation on our Public Lands
+325 +0
TOTAL Program Changes +6,315 +55
Mission Overview
The Facility Operations and Maintenance subactivity supports the National Park Service (NPS) mission
by contributing to the protection and maintenance of natural and cultural resources, the knowledge and
planning to manage those resources appropriately, and the modernization and renewal of employee and
visitor facilities and infrastructure. The NPS is guardian of a world-renowned network of parks,
monuments, and other special places with natural beauty, historical, or cultural significance. The bureau
ensures that this vast system of land, waters, and assets remain accessible for all.
Subactivity Overview
Facility Operations and Maintenance play key roles in fulfillment of the NPS mission, ensuring continued
protection, preservation, serviceability, and use of park facilities and infrastructure and natural and
cultural resources. The NPS maintains a diverse range of recreational, public use, historic and support
facilities in dispersed locations and varied circumstances. These sites span time from prehistoric ruins into
the 21
st
century and represent diverse cultures. All park units come with myriad resources, facilities, and
features — including many that are unique to specific sites. Each site must be properly maintained to
achieve management objectives and to protect government, partner and donated investments.
National Park Service FY 2024 Budget Justifications
ONPS-66
Subactivity: Facility Operations & Maintenance
Program Component: Facility Operations
FY 2024 Program Activities
The following are examples of planned FY 2024 Facility Operations activities:
Perform maintenance of landscapes and trails (e.g., mowing, trimming, weeding, planting).
Perform custodial and janitorial functions on in-use park facilities, including public restrooms.
Prevent asset deterioration by performing pest management.
Asset weatherization and seasonal activation and deactivation.
Removing litter and debris to keep parks clean, promote responsible environmental stewardship,
and mitigate hazards.
Justification of FY 2024 Programmatic Changes
The FY 2024 budget request for the Facility Operations program is $399,036,000 and 2,424 FTE, a
program change of +$2,805,000 and +22 FTE from FY 2023 Enacted.
Supporting Park Capacity (+$1,860,000 / +17 FTE) – The budget proposes $17.3 million and 125 FTE
funding spread across multiple ONPS budget subactivities to support basic operational capacity needs at
all parks, rivers, and trails. Funding is spread across multiple ONPS budget subactivities to strengthen all
critical functions at parks. Between FY 2011 and FY 2022, the NPS has collectively lost almost 19
percent of its ONPS-funded Full-Time Equivalent capacity. Over the same period, over 30 units and
additional authorized sites have been added to the national park system, and visitation has grown by more
than 30 million. This proposed increase will provide park additional funds for basic operations to better
serve visitors and resources and ease planning for urgent and emerging needs.
New and Critical Responsibilities (+$640,000 / +5 FTE) - The budget proposes $8.2 million and 52
FTE spread across multiple ONPS budget subactivities for new and additional responsibilities at parks
and central offices. In FY 2024, funding will support the management of newly added lands, facilities,
visitor centers, and interpretive offerings at Denali NP and Preserve, Birmingham Civil Rights NM/
Freedom Riders NM, Medgar and Myrlie Evers NM, and others, as well as park protection increases at
Fort Smith NHS and Joshua Tree NP. Specific funding also supports new spending for community
outreach with Tribal communities at Bryce Canyon NP, North Cascades NP, Lake Chelan NRA, and Ross
Lake NRA. Additional details on this request can be found in the Budget Overview section.
Racial Justice and Equity for Underserved Communities Initiative - Increasing Representation on
our Public Lands (+$305,000 / +0 FTE) - The budget proposes $3.0 million and 5 FTE across multiple
ONPS budget subactivities to support the Increasing Representation in our Public Lands initiative. Funds
will support the initial operations at two new park units established by the Biden-Harris administration:
New Philadelphia NHS and the Blackwell School NHS, as well as the expansion site in Summerton, SC
for Brown v. Board of Education NHP. An additional $1.8 million is proposed for potential new park
designations that preserve important places and tell the stories of those that have been historically
underrepresented and underserved to more rapidly initiate unit start up.
National Park Service FY 2024 Budget Justifications
ONPS-67
Program Overview
Facility Operations activities support nearly all aspects of resource protection and visitor services,
ensuring buildings, roads, trails, picnic areas, campgrounds, and other infrastructure are available for use
by visitors and park personnel. The reliability of facility components is essential to efficient park
operations, recreational access, visitor satisfaction, and health and safety. The Facility Operations
function encompasses day-to-day activities that allow for the continued use of facilities and are conducted
with employee and visitor safety as the primary goal. These activities in a park are separate from, but
work in concert with the Facility Maintenance regimen, which is used to directly extend the life of the
resource and provide long-range development and protection of facilities. The Facilities Operations
function incorporates the planning, organizing, directing, and controlling of the day-to-day work
activities. The two functions collaborate to ensure an efficient, effective, and comprehensive maintenance
program.
Many parks operate much as a municipality might, performing waste removal, water and wastewater
processing, landscape maintenance, and shared-space servicing. The mixture of these activities varies,
depending on the park unit needs and the time of the year. Parks must consider the type, size, and scope
of the required operational activities, and take into account seasonal fluctuations in those requirements.
Facility Operations funds also support central program management, such as core offices and staff for
facilities program administration, oversight, planning, and reporting. It also provides staff for key safety
and compliance activities, such as accessibility. Federal laws and regulations require that all Federal
buildings, facilities, programs, activities, and services are accessible to and usable by persons with
disabilities. The NPS is committed to ensuring visitors with disabilities have access to the full range of
opportunities and experiences available in the national parks, while maintaining consistency with other
legal mandates for conservation and protection of resources. A national program provides support to
parks to improve accessibility servicewide. During FY 2024, accessibility program support will focus on
improving workforce competency around accessibility through staff and volunteer training.
National Park Service FY 2024 Budget Justifications
ONPS-68
Subactivity: Facility Operations & Maintenance
Program Component: Facility Maintenance
FY 2024 Program Activities
The following are examples of FY 2024 Facility Maintenance activities:
Perform all aspects of asset management on over 75,000 assets including trails, campgrounds,
utilities, historic structures, landscapes, housing, visitor centers, and other facilities that support
the National Park Service mission.
Direct project funding to the highest-priority facility maintenance and repair needs in the National
Park Service to address the full complement of activities of a successful and effective facility
lifecycle management program.
Justification of FY 2024 Programmatic Changes
The FY 2024 budget request for the Facility Maintenance program is $583,981,000 and 1,852 FTE, a
program change of +$3,510,000 and +33 FTE from FY 2023 Enacted.
Supporting Park Capacity (+$2,036,000 / +19 FTE) – The budget proposes $17.3 million and 125 FTE
funding spread across multiple ONPS budget subactivities to support basic operational capacity needs at
all parks, rivers, and trails. Funding is spread across multiple ONPS budget subactivities to strengthen all
critical functions at parks. Between FY 2011 and FY 2022, the NPS has collectively lost almost 19
percent of its ONPS-funded Full-Time Equivalent capacity. Over the same period, over 30 units and
additional authorized sites have been added to the national park system, and visitation has grown by more
than 30 million. This proposed increase will provide park additional funds for basic operations to better
serve visitors and resources and ease planning for urgent and emerging needs.
Conservation Initiative - Climate Change and Natural Resources Management Team (+$1,000,000 /
+8 FTE) – Funding will build capacity for expertise in sustainable asset management, leveraging
vulnerability assessments to develop strategies and standards for asset conservation and adaption to the
effects of climate change and extreme weather events, as well as managing and cleaning up contaminated
sites. Capacity in these fields will help the NPS develop risk assessments, documentation protocols, and
monitoring processes to support adaptation and protection of natural resources and other assets.
New and Critical Responsibilities (+$454,000 / +6 FTE) - The budget proposes $8.2 million and 52
FTE spread across multiple ONPS budget subactivities for new and additional responsibilities at parks
and central offices. In FY 2024, funding will support the management of newly added lands, facilities,
visitor centers, and interpretive offerings at Denali NP and Preserve, Birmingham Civil Rights NM/
Freedom Riders NM, Medgar and Myrlie Evers NM, and others, as well as park protection increases at
Fort Smith NHS and Joshua Tree NP. Specific funding also supports new spending for community
outreach with Tribal communities at Bryce Canyon NP, North Cascades NP, Lake Chelan NRA, and Ross
Lake NRA. Additional details on this request can be found in the Budget Overview section.
Racial Justice and Equity for Underserved Communities Initiative - Increasing Representation on
our Public Lands (+$20,000 / +0 FTE) - The budget proposes $3.0 million and 5 FTE across multiple
ONPS budget subactivities to support the Increasing Representation in our Public Lands initiative. Funds
will support the initial operations at two new park units established by the Biden-Harris administration:
National Park Service FY 2024 Budget Justifications
ONPS-69
New Philadelphia NHS and the Blackwell School NHS, as well as the expansion site in Summerton, SC
for Brown v. Board of Education NHP. An additional $1.8 million is proposed for potential new park
designations that preserve important places and tell the stories of those that have been historically
underrepresented and underserved to more rapidly initiate unit start up.
Program Overview
Facility Maintenance activities support park operations by protecting natural and cultural resources and
by ensuring visitor safety and satisfaction through maintenance of cultural resources, facilities, and
infrastructure. While parks perform basic Facility Maintenance function activities, many of the activities
under this function are larger than basic operational budgets can handle, fluctuate in need from year to
year, or are specialized in nature. These larger or specialized requirements are often coordinated at the
regional or national level, easing the specialized skills and oversight requirements at the parks. The NPS
effectively accomplishes Facility Maintenance activities by assessing facility conditions, prioritizing
work, and planning investments to ensure the most efficient use of limited resources. Early detection of
potential problems prevents loss of assets and ensures that facilities are maintained at a level necessary to
support the NPS mission. Facility Maintenance funding addresses routine and unplanned maintenance
activities, complementing the day-to-day custodial work handled by the Facility Operations subactivity.
Routine maintenance that should occur on regular or recurring schedules is commonly referred to as
cyclic maintenance. It includes preventive maintenance; normal repairs; replacement of parts and
structural components; periodic inspection, adjustment, lubrication, and cleaning (non-janitorial) of
equipment; painting; resurfacing; and other activities that ensure continuing service of assets. Routine
maintenance, when performed at scheduled intervals, reduces repair costs, increases equipment reliability,
and extends asset lifecycles. Routine or scheduled maintenance performed at the scheduled intervals on
capital assets such as buildings, roads, and fixed equipment helps them reach their originally anticipated
service life.
Repair/Rehabilitation projects address documented maintenance needs that could not be performed on
schedule and have resulted in deteriorating facilities in need of repair and/or renewal, and support
lifecycle investments to replace major components and systems of assets, or demolish and replace
facilities, at the end of their useful life.
Facility Management Program Support
The following programs provide administrative functions and oversight are provided through Facility
Maintenance funding.
1. Asset Management ProgramThe purpose of the NPS Asset Management Program (AMP) is to
provide for lifecycle management of the bureau’s facility portfolio. The AMP is focused on three primary
objectives: knowing the inventory of constructed assets, understanding their condition and using that
information to make wise investment decisions in compliance with Executive Order 13327 – the 2016
Real Property Acts (the Federal Property Management Reform Act and the Federal Assets Sale and
Transfer Act), and the Department of the Interior Asset Management Plan.
2. Enterprise Facility Management Software System –Parks use the Enterprise Facility Management
Software System (eFMSS) to support the Asset Management Program by tracking the comprehensive
asset inventory, asset status, and work order management. In addition to the centralized database for work
National Park Service FY 2024 Budget Justifications
ONPS-70
order and asset tracking, the eFMSS includes over a dozen component applications to facilitate inventory
reporting, project planning, work cost estimation, and data analysis. It also interfaces with accounting and
financial systems. Parks and programs use this data to identify, track, prioritize, and manage facility
maintenance needs. The broad scope includes work planning and programming, health and safety issue
identification, legally mandated compliance, and long-range planning.
3. Maintenance Project Planning – This funds project planning, which includes project scoping and site
assessments, identifying project needs, developing project scopes, and conducting project cost validation
processes. It may also be used for project management activities, which includes architecture-engineering
(A&E) firm management, construction oversight, and inspection. Beginning with the enactment of the FY
2022 budget, this funding also provides for facility condition assessments to gather important lifecycle
inventory and deficiency data on critical infrastructure, facilities, and equipment at the asset level, data
that is critical to building a project and executing maintenance on a facility.
Project and Major Maintenance Programs
The following are major project funds that are components of the Facility Maintenance subactivity.
Major Maintenance Funding History ($000)
Major Facility Maintenance Project Fund Sources
FY 2022
Actual
FY 2023
Enacted
FY 2024
Request
Repair and Rehabilitation $135,980 $135,980 $135,980
Cyclic Maintenance $188,184 $188,184 $188,184
1. Repair and Rehabilitation Program – Repair and Rehabilitation is part of the servicewide asset
management strategy that directs project funds to parks’ highest priority mission critical assets.
The program provides funding for prioritized projects that focus on maintenance, recapitalization,
alteration, replacement and divestiture activities. Repair and rehabilitation projects address large-
scale, complex repair needs that arise on an infrequent or non-recurring basis where preventative
maintenance is no longer sufficient to improve the condition of the facility or infrastructure. The
projects are designed to restore or improve the condition of a facility or a component, thereby
returning the facility to a cyclic schedule.
At a Glance…
Repair and Rehabilitation – Little Lost Man Creek at Redwood National Park
Projects like this one at Redwood National Park, to replace a 42-year old vehicle bridge over Little Lost Man Creek
are funded through the Repair and Rehabilitation program. The bridge is the only visitor access to hiking and biking
trails, as well as a service vehicle road for park staff. The bridge now meets current code requirements and provides
safe access to popular areas of the park for visitors and staff.
National Park Service FY 2024 Budget Justifications
ONPS-71
Typical large-scale projects may include campground and trail renewal, wastewater and water
line replacement, or housing renewal. These projects also incorporate the Department of the
Interior (DOI) commitment to sustainable construction practices, Architectural Barriers Act
Accessibility Standards (ABAAS) and, the DOI’s Energy Management Program.
Repair and rehabilitation typically funds projects with costs less than two million dollars; projects
above this threshold are normally funded through the Line Item Construction or Legacy
Restoration Fund program, and maintenance projects with a direct visitor connection may also be
funded through recreation fee receipts. Many NPS transportation projects are funded through the
Highway Trust Fund, reauthorized under the Infrastructure Investment and Job Act, P.L. 117-58.
At A Glance…
Discretionary Funding for Major Maintenance
The National Parks and Public Land Legacy Restoration Fund (LRF) was established by the Great American
Outdoors Act (P.L. 116-152). Among the LRF’s primary benefits is its ability to fund large projects that would
otherwise take several years to accomplish via the NPS’s existing discretionary fund sources. Shifting this burden
away from discretionary fund sources allows programs like Repair and Rehabilitation to continue addressing smaller
or more immediate needs in a wide range of parks. Below are some examples of projects that will be accomplished
through the Repair and Rehabilitation program in FY 2024. The Repair and Rehabilitation funds between 200-500
projects per year. The projects here only represent a small portion of the total work planned by NPS parks and
regions that will be accomplished by this fund source.
Park State Project
Glacier Bay National Park & Preserve AK Rehabilitate Interiors of Visitor Use Cabins
Sitka National Historical Park AK Repair Kassdaaheen River Pedestrian Bridge
Casa Grande Ruins National Monument AZ Replace Domestic Water System Components
Yellowstone National Park WY Rehabilitate Historic Norris Campground Ranger Station
Colorado National Monument CO Restore Historic Headwalls along Rock Rim Drive
Lyndon B. Johnson National Historical
Park TX
Rehabilitate Ranch Water System to Enable Fire
Suppression
Pictured Rocks National Lakeshore MI Rehabilitate Day Use Trails at Munising Falls
Harry S. Truman National Historic Site MO Repair Truman Farm Home Foundation
Catoctin Mountain Park MD
Rehabilitate Historic Park Headquarters Facility at Camp
Peniel
Manassas National Battlefield Park VA Stabilize and Repoint Historic Chinn House Elements
Valley Forge National Historical Park PA Rehabilitate Stirling Quarters for Visitor Use
Weir Farm National Historic Site CT Rehabilitate Visitor Trails at Weir Farm
New River Gorge National Park and
Preserve WV Rehabilitate Buildings at Headquarters Complex
North Cascades National Park WA Replace South Fork Bridge Creek Trail Bridge
Hawaii Volcanoes National Park HI
Replace Failing Pond Liner in Water Catchment
Reservoir
Blue Ridge Parkway NC Rehabilitate Linn Cove Visitor Center
Mammoth Cave National Park KY Rehabilitate Cave Lift Stations
National Park Service FY 2024 Budget Justifications
ONPS-72
2. Cyclic Maintenance – The Cyclic Maintenance Program is a central element of NPS efforts to
curtail the growth of the maintenance backlog and promote asset lifecycle management. This
program provides funding for prioritized projects that focus on addressing maintenance and
recapitalization activities. Cyclic Maintenance projects are routine in nature and help to ensure
that assets and resources can meet their intended design lives and continue to perform efficiently.
Examples of common cyclic maintenance projects include road sealing, painting and roofing of
buildings, brush removal from trails, sign repair and replacement, landscaping, repair of dock and
marine facilities, and upgrades to electrical and security systems.
Cyclic maintenance for cultural resources can include projects such as re-pointing masonry walls
of historic and prehistoric structures, pruning historic plant material, stabilizing eroding
archeological sites, and preventive conservation of museum objects. Artifact preservation and
restoration gives visitors a physical connection to history and enriches a location’s interpretation
experience.
At a Glance…
Cyclic Maintenance – Trail Clearing at Point Reyes National Seashore
Projects like this one at Point Reyes National Seashore, to perform cyclic trail brushing, tree clearing, and draining
clearing, are funded through the Cyclic Maintenance Program. This operation involved brushing and clearing 60
miles of trail, and 698 drainage devices. The trail is now safely accessible for public recreational opportunities.
3. Environmental Management Program (EMP) – is a collection of NPS programs that provide
oversight and maintain goals for the sustainable operation of the national parks. This includes
goals for contaminated site cleanup, hazardous waste management, environmental compliance
and environmental management systems. To achieve these goals, the EMP ensures compliance
with the Agency Strategic Prioritization Framework and the exercise of the President’s delegated
cleanup and enforcement authorities under the Comprehensive Environmental Response,
Compensation, and Liability Act (CERCLA) —often referred to as the Superfund statute.
EMP activities include the support of goals of the NPS Green Parks Plan (GPP). The GPP Third
Edition, released in 2023, defines the NPS’s five sustainability goals: Be Climate Friendly and
Climate Ready; Be Energy Smart and Water Wise; Buy Green and Reduce, Reuse, Recycle;
Green Our Rides; and Foster a Sustainability Ethic. In the field, the EMP provides funding for
National Park Service FY 2024 Budget Justifications
ONPS-73
guidance and training to facilitate contaminated site cleanup and to ensure compliance with
environmental regulations and Executive Orders, as well as facilitating the unit-level execution of
EMP management objectives.
The EMP provides assistance and advice to NPS units, regions, programs, and interagency
partners. EMP develops execution strategies for environmental and sustainability issues, as well
as projects and programs based on best practices garnered from experience and research. The
EMP includes subject matter experts and program managers related to environmental
operations—including regulatory compliance, legacy pollution cleanup, hazardous waste
management, pollution prevention, and environmental assessments. The EMP provides funding
for assessments, guidance and training to ensure compliance with environmental regulations and
Executive Orders, implementation of the Green Parks Plan, as well as facilitating the unit-level
execution of EMP management objectives.
The NPS has over 500 Legacy Pollution contaminated sites in its inventory and estimates. While
EMP’s efforts have been highly successful, leading and performing essential activities to restore
critical NPS lands impacted by contamination caused by external parties, most of the
contaminated sites remain without cleanup progress. In FY 2022, 33 sites received a total of $3.6
million of EMP cleanup funds. EMP’s goal is to have completed Title 1 studies by FY 2029 that
will define the actual dollar amount needed to complete cleanup actions at all NPS Legacy
Pollution sites, using CERCLA authorities.
In addition, as part of ongoing management of agency practices and procedures, EMP provided
guidance and funding for 94 internal environmental compliance audits across the NPS in FY
2022. NPS-wide audits cost, on average, approximately $1.3 million per year and reveal
approximately 1,400 compliance findings per year. The EMP is the primary fund source for the
findings’ resolution. The annual cost of Environmental Compliance is a combination of the audit
costs and the costs to resolve findings.
National Park Service FY 2024 Budget Justifications
ONPS-74
At A Glance…
Environmental Cleanup and Reuse
Quarry Firing Range Alder Camp Road Firing Range
The former Quarry Firing Range (Site) is located within the Hawai’i Volcanoes National Park. EMP funds were
used to compete the Title 1 Decision Document. This document estimated that the cost of the cleanup of Site legacy
pollution to be $1.1 million. This cleanup action will protect Site workers and recreational users, ecological
receptors including plants, soil invertebrates, birds, mammals, and several protected wildlife species: the Hawaiian
hoary bat (ope’ape’a), endangered Hawaiian goose (nēnē), Hawaiian short-eared owl (pueo), and Hawaiian hawk
(ʻio).
The Alder Camp Road Firing Range (Site) is located in Redwood National and State Parks in Northern California.
EMP funds were used to compete the Title 1 Decision Document. This document estimated the cost of the cleanup
of legacy pollution to be $2 million. The cleanup action will protect Site workers and recreational users and foster
the re-introduction of the endangered California Condor.
4. Emergency Management and Damage Program – During a typical operating year, parks
sustain damage to resources due to severe storms, floods, fires, hurricanes, earthquakes, and other
emergencies. The NPS strives to ensure that facilities and infrastructure are repaired quickly to
provide for safe, uninterrupted visitor use of facilities. This function is separate from the longer-
term repairs or critical systems failure projects, which are more commonly funded by the
Construction Appropriation’s Emergency and Unscheduled Projects subactivity.
National Park Service FY 2024 Budget Justifications
ONPS-75
Activity: Park Management
Subactivity: Park Support
Park Support ($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)*
Program
Changes
(+/-)
2024
Request
Change
from
2023
Enacted
(+/-)
Management, Policy
and Development 173,422 207,083 +7,658 -17,024 +12,582 210,299 +3,216
Administrative Support 439,232 402,431 +14,883 +59,725 +9,975 487,014 +84,583
Total Requirements 612,654 609,514 +22,541 +42,701 +22,557 697,313 +87,799
Total FTE
Requirements 3,065 3,135 0 0 +54 3,189 +54
*Internal Transfer column reflects adjusted amounts by budget subactivity and program component based on an analysis of actual
charges in the NPS accounting system for FY 2022. In order to more transparently represent amounts requested in FY 2024, the
budget presentation incorporates these amounts in the Internal Transfers column, reflecting a programmatic base funding
realignment. This column also includes a transfer out of $115,000 million from the Administrative Support program component
to fund an increase in the Working Capital Fund (WCF) Central Bill for Administrative Record Compilation conducted by the
DOI Solicitor. These amounts were previously billed to NPS via the WCF Direct Bill.
Summary of FY 2024 Program Changes for Park Support
Program Changes ($000) FTE
Centralized Information Technology Costs
+6,386 0
Racial Justice and Equity for Underserved Communities Initiative – Park
Accessibility
+5,000 +5
Supporting Park Capacity
+2,530 +22
Racial Justice and Equity for Underserved Communities Initiative – Implement
the NATIVE Act
+2,500 +13
New and Critical Responsibilities
+2,311 +9
Racial Justice and Equity for Underserved Communities Initiative – Increasing
Representation on Our Public Lands
+2,285 +3
Contracting and Financial Assistance
+1,545 +2
TOTAL Program Changes
+22,557 +54
Mission Overview
The Park Support subactivity contributes to the mission of the National Park Service by supporting all
other functions, enabling the Service to protect, conserve, and restore natural and cultural resources;
ensuring the Service possesses sound knowledge to inform the proper management of these resources;
collaborating with partners to achieve a wide variety of goals; and providing for the public enjoyment and
visitor experience of parks.
Subactivity Overview
The Park Support subactivity within Park Management includes administering, managing, and supporting
the operations of park units throughout the United States. In addition, Park Support encompasses several
National Park Service FY 2024 Budget Justifications
ONPS-76
internal administrative programs, such as personnel, finance, procurement, data processing and
communications, and other services that provide necessary support functions. The management and
administrative functions funded in the ONPS appropriation also provide management and administrative
support to programs supported by other NPS appropriations.
Management, Policy and Development Program
The programs within the Management, Policy and Development functions establish operating guidelines
and objectives, coordinate with other public and private organizations, efficiently manage staff and funds,
and ensure compliance with statutes, Departmental directives, and regulations affecting the operation of
the national park system. Efficiency and effectiveness are enhanced by coordinating park operations
between various units and programs throughout the System, as well as setting policy and ensuring
necessary compliance with legislation and regulations. The function also includes funding for the park
superintendents who are responsible for managing the individual units of the national park system.
Administrative Support Program
The programs encompassed in Administrative Support are vitally important to running a more efficient
and effective national park system. The programs provide support functions required for complex
operations in a dispersed organization, including financial and budget administration; personnel
recruitment, staffing, and employee relations; formal contracting and small purchases; property
management; management of information technology; and other related activities.
National Park Service FY 2024 Budget Justifications
ONPS-77
Subactivity: Park Support
Program Component: Management, Policy, and Development
FY 2024 Program Activities
The following are examples of planned FY 2024 Management, Policy, and Development activities:
Provide consistent policy guidance and oversight to the 424 parks, 66 National Wild and Scenic
Rivers, 25 National Scenic and Historic Trails and the several other programs falling under the
NPS’s purview.
Provide competency-based learning opportunities in all career fields to engage employees in
continuous learning for professional organizational effectiveness.
Ensure achievable and sustainable partnerships by providing servicewide policy guidance and
oversight of donation and fundraising activities, reviewing fundraising feasibility studies, plans
and agreements, and developing and conducting training to increase the Service’s capacity to
foster partnerships and philanthropic stewardship.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Management, Policy and Development is $210,299,000 and 888 FTE, a
program change of +$12,582,000 and +36 FTE from FY 2023 Enacted.
Racial Justice and Equity for Underserved Communities Initiative – Park Accessibility for Visitors
and Employees program (+$5,000,000 / +5 FTE) – Funding would allow the NPS to implement a
“network” model of providing support to parks to improve accessibility. Members of this network will
come from different parts of the Service and the disability community and will inform and direct national
level coordination, policy, guidance, and oversight. This funding request would provide technical
assistance and training from both internal resources as well as directly from disability organizations for
parks to develop their own capacity around all types of accessibility for visitors and employees. The
network approach would be program-driven, placing the impetus for inclusion at the forefront of every
program initiative, project, and decision made in the NPS. Projects include facility access, supporting
compliance with section 508, accessible programming, recreational experiences, and technology that
meets the needs of visitors with a broad range of abilities in every format. By forming this all-inclusive
network, the NPS will continue to build a culture that puts accessibility on equal footing with other
important facility and programmatic accomplishments, complying with existing Federal laws, and
ensuring equal opportunity for all demographics.
Racial Justice and Equity for Underserved Communities Initiative – Implement the NATIVE Act
(+$2,500,000 / +13 FTE) - The NPS proposes to increase park and regional office capacity to support
implementation of the Native American Tourism & Improving Visitor Experience (NATIVE) Act (P.L.
114-221). The NATIVE Act promotes a more inclusive national travel and tourism strategy and has the
potential to deliver significant benefits for Tribes, including jobs creation, elevated living standards and
expanded economic opportunities. This increase provides dedicated funding for direct park and regional
collaborative work to implement the Act. For parks, this work includes working with local Tribes to
identify and build on existing tourism activities and develop long-range tourism capabilities. Parks will
establish plans to improve travel and tourism data collection and analysis, increase the usability of public
information, support tourism infrastructure to include Native communities, develop visitor portals that
National Park Service FY 2024 Budget Justifications
ONPS-78
showcase Native culture, and improve access to transportation programs for Native community tourism
and trade.
Racial Justice and Equity for Underserved Communities Initiative – Increasing Representation on
our Public Lands (+$2,195,000 / +2 FTE) – The budget proposes $3.0 million and 5 FTE across
multiple ONPS budget subactivities to support the Increasing Representation in our Public Lands
initiative. Funds will support the initial operations at two new park units established by the Biden-Harris
administration: New Philadelphia NHS and the Blackwell School NHS, as well as the expansion site in
Summerton, SC for Brown v. Board of Education NHP. An additional $1.8 million is proposed for
potential new park designations that preserve important places and tell the stories of those that have been
historically underrepresented and underserved to more rapidly initiate unit start up.
New and Critical Responsibilities (+$2,027,000 / +8 FTE) – The budget proposes $8.2 million and 52
FTE spread across multiple ONPS budget subactivities for new and additional responsibilities at parks
and central offices. In FY 2024, funding will support the management of newly added lands, facilities,
visitor centers, and interpretive offerings at Denali NP and Preserve, Birmingham Civil Rights NM/
Freedom Riders NM, Medgar and Myrlie Evers NM, and others, as well as park protection increases at
Fort Smith NHS and Joshua Tree NP. Specific funding also supports new spending for community
outreach with Tribal communities at Bryce Canyon NP, North Cascades NP, Lake Chelan NRA, and Ross
Lake NRA. Additional details on this request can be found in the Budget Overview section.
Supporting Park Capacity (+$860,000 / +8 FTE)The budget proposes $17.3 million and 125 FTE
funding spread across multiple ONPS budget subactivities to support basic operational capacity needs at
all parks, rivers, and trails. Funding is spread across multiple ONPS budget subactivities to strengthen all
critical functions at parks. Between FY 2011 and FY 2022, the NPS has collectively lost almost 19
percent of its ONPS-funded Full-Time Equivalent capacity. Over the same period, over 30 units and
additional authorized sites have been added to the national park system, and visitation has grown by more
than 30 million. This proposed increase will provide park additional funds for basic operations to better
serve visitors and resources and ease planning for urgent and emerging needs.
Program Overview
The programs within the Management, Policy, and Development function administer and provide
oversight to park units throughout the United States, as well as the numerous other programs under the
purview of the NPS. The programs establish operating guidelines and objectives, coordinate with other
public and private organizations, efficiently manage staff and funds, and ensure compliance with laws,
Departmental directives, and regulations affecting the operation of the park, river, and trail systems.
Efficiency and effectiveness are enhanced by coordinating operations between various units and programs
throughout the System. The function also includes the funding for park superintendents who are
responsible for managing the individual units.
Management of the National Park Service
The scope of the Service’s responsibilities extends beyond management of the park, river, and trail
systems; senior management at central offices also provide coordinated oversight and guidance to
programs such as the National Register of Historic Places, Federal Lands to Parks, National Heritage
Areas, and numerous grant programs.
National Park Service FY 2024 Budget Justifications
ONPS-79
Legislative and Congressional Affairs
The legislative program of the National Park Service responds to the individual legislative needs of park
units, develops legislation that provides servicewide authorities, and monitors all legislative and
congressional matters that impact the NPS.
Servicewide Learning and Development
The servicewide program provides competency-based learning opportunities in all career fields and
engages employees in continuous learning for professional organizational effectiveness. These programs
are delivered to employees using traditional classroom-based and blended instruction, instructional
webinars, and computer-based programs, originating from three training centers. Providing distance
delivery of programs reduces travel costs for participating employees. Major initiatives include the NPS
Fundamentals Program, the New Supervisor Development Program, the New Division Chief Leadership
Development Program, the New Superintendents Academy, the Generating Organizational Advancement
and Leadership Program, and the Career Academy. The programs maintain partnerships with a variety of
partners to assist with several of these initiatives; program support is also provided through an agreement
with the U.S. Fish and Wildlife Service’s National Conservation Training Center.
Policy
The Office of Policy guides the Service through analysis, review, and communication of servicewide
policies such as Executive Orders, Directors Orders, and Management Policies. The regions, parks, and
programs form management decisions based on NPS policies.
Communications and Public Affairs
The NPS delivers information to explain its policies and stewardship responsibilities and to highlight the
opportunities parks and community programs make available to all Americans. Park, program, regional,
and national communications activities include writing and issuing news releases, answering questions
from the media, producing multimedia and digital communications, creating and maintaining websites,
reaching people through social media, fulfilling Freedom of Information Act requests, and celebrating and
commemorating important American events.
Partnerships
The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and
outdoor recreation throughout this country and the world. By working collaboratively to identify and
achieve mutual goals, the capacity to serve the public is increased. NPS partners include other
governmental entities at the Federal, Tribal, State, local and international levels, nonprofit organizations,
business, academic institutions, and individuals. The NPS collaborates with 70 cooperating associations
and 215 friends groups. The NPS also monitors ongoing Urban Park (UPARR) requirements.
Park Management
Park managers provide on-the-ground leadership and direction at each park unit, ensuring that the mission
of the NPS and the individual units are carried out efficiently and effectively. Park management requires
the successful integration of diverse programs such as natural and cultural resources management, visitor
and resource protection, interpretation, commercial services, partnership management, and administration
into a cohesive organization that successfully protects and preserves the resource while providing for
visitor enjoyment and education.
National Park Service FY 2024 Budget Justifications
ONPS-80
Subactivity: Park Support
Program Component: Administrative Support
FY 2024 Program Activities
The following are examples of planned FY 2024 Administrative Support activities:
Provide the budget formulation and execution, accounting services, property and space
management, and business management tools to support the operation of the NPS.
Use best business practices to provide the NPS community and the public with usable
information, cost-effective technology, and services that are customer driven, results-oriented,
secure, and universally accessible.
Continue to work with DOI to consolidate servers, data centers, and help desk functions.
Continue to provide training to all employees and supervisors to support a respectful, inclusive,
safe and engaged work environment.
Continue the development, refinement, successful operation, and promotion of the new NPS
mobile app.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Administrative Support is $487,014,000 and 2,301 FTE, a program
change of +$9,975,000 and +18 FTE from FY 2023 Enacted.
Centralized Information Technology Costs (+$6,386,000 / +0 FTE) – In FY 2024, funding will be
directed to charges billed to the NPS to operate servicewide IT systems including centralized software
license purchase and portions of the financial and property systems, per latest cost estimates. Additional
funding will preclude these costs from being billed to park and program budgets which erodes operational
capacity. The increase also includes $386,000 to invest in IT modernization, IT workforce, and critical IT
infrastructure needs. This funding will support key Department and Bureau-specific cybersecurity
requirements and priorities such as Zero-Trust implementation, Federal Information Security
Modernization Act (FISMA) compliance, and effective oversight.
Supporting Park Capacity (+$1,670,000 / +14 FTE) – The budget proposes $17.3 million and 125 FTE
funding spread across multiple ONPS budget subactivities to support basic operational capacity needs at
all parks, rivers, and trails. Funding is spread across multiple ONPS budget subactivities to strengthen all
critical functions at parks. Between FY 2011 and FY 2022, the NPS has collectively lost almost 19
percent of its ONPS-funded Full-Time Equivalent capacity. Over the same period, over 30 units and
additional authorized sites have been added to the national park system, and visitation has grown by more
than 30 million. This proposed increase will provide park additional funds for basic operations to better
serve visitors and resources and ease planning for urgent and emerging needs.
Contracting and Financial Assistance (+$1,545,000 / +2 FTE) ‒ In FY 2024, funding will support NPS
implementation of Executive Order 13985 – Advancing Racial Equity for Underserved Communities, by
identifying and addressing systematic barriers that unintentionally limit the ability of vendors from
underserved communities to fully participate in procurement and financial assistance programs. The FTE
supported by this funding would directly engage with members of underserved communities through
industry days and other means to coordinate, communicate, and train potential vendors about upcoming
National Park Service FY 2024 Budget Justifications
ONPS-81
economic opportunities. This increase would also support development of an online small business
outreach portal where small businesses can directly access forecasted contracting and financial assistance
opportunities and can directly contact NPS small business specialists and financial assistance liaisons for
support.
New and Critical Responsibilities (+$284,000 / +1 FTE) – The budget proposes $8.2 million and 52
FTE spread across multiple ONPS budget subactivities for new and additional responsibilities at parks
and central offices. In FY 2024, funding will support the management of newly added lands, facilities,
visitor centers, and interpretive offerings at Denali NP and Preserve, Birmingham Civil Rights NM/
Freedom Riders NM, Medgar and Myrlie Evers NM, and others, as well as park protection increases at
Fort Smith NHS and Joshua Tree NP. Specific funding also supports new spending for community
outreach with Tribal communities at Bryce Canyon NP, North Cascades NP, Lake Chelan NRA, and Ross
Lake NRA. Additional details on this request can be found in the Budget Overview section.
Racial Justice and Equity for Underserved Communities Initiative – Increasing Representation on
our Public Lands (+$90,000 / +1 FTE) The budget proposes $3.0 million and 5 FTE across multiple
ONPS budget subactivities to support the Increasing Representation in our Public Lands initiative. Funds
will support the initial operations at two new park units established by the Biden-Harris administration:
New Philadelphia NHS and the Blackwell School NHS, as well as the expansion site in Summerton, SC
for Brown v. Board of Education NHP. An additional $1.8 million is proposed for potential new park
designations that preserve important places and tell the stories of those that have been historically
underrepresented and underserved to more rapidly initiate unit start up.
Program Overview
The programs encompassed in Administrative Support are important to running an efficient and effective
national park system. The programs provide support functions required for complex operations in a
dispersed organization, including financial and budget administration; personnel recruitment, staffing, and
employee relations; formal contracting and small purchases; property management; management of
information technology; and other related activities.
Budget, Financial Management, and Strategic Planning
The budget and financial management function of the NPS provides for the budget formulation, budget
execution, accounting, property, space management, and business tools to manage the finances of the
National Park Service. In addition to the preparation of the annual budget, monitoring of financial plans
and expenditures, ensuring fiscal accountability and proper use of financial resources, and financial
administrative services and reporting, the function supports programmatic risk assessment and internal
control reviews and analysis of financial and operational needs and performance at the park, region, and
servicewide levels through management accountability and strategic planning efforts and the Business
Plan Internship program. Also supported are the management of leased facilities, motor vehicles, and
central supply property management.
Information Resources
The Information Resources Management program ensures NPS meets the Administration goals for
improving the effectiveness of the existing technology infrastructure and moving new services to
enterprise cloud initiatives. In addition to the enterprise cloud initiatives, Information Resources is
participating in the Department’s category management, and tackling cybersecurity by aggressively
National Park Service FY 2024 Budget Justifications
ONPS-82
heightening the importance of continuous secure management and monitoring of the cyber environment.
Additional efforts include reducing the number of data centers, consolidating administrative systems and
streamlining electronic records management to ultimately improve service to the public and NPS partners.
The National Park Service website, www.nps.gov, receives about 490 million page views and 90 million
users annually.
Acquisition and Financial Assistance
The NPS manages its acquisition program through regionally-consolidated Major Acquisition Buying
Offices, or MABOs, and a major construction acquisition program at the Denver Service Center. The
acquisition program is principally responsible for acquiring goods and services utilizing a range of
contracting methodologies from full and open competition to set asides associated with the Small
Business Administration. In conducting program reviews of the acquisition function, the NPS has
determined that there are opportunities to improve the efficiency and effectiveness of operations through
increase standardization of business practices, strategic contracting and through equitable workload
adjustments. In FY 2023, the NPS is analyzing its organizational structure for the acquisition program and
conducting stakeholder engagement with the support of a contracted consultant. Beginning in FY 2024,
the NPS plans to adjust the reporting structure for all procurement and contracting staff from the regional
consolidation model to report to a single consolidated organization. There are no plans to reduce staffing
or physically relocate existing staff as part of this effort.
In addition, the NPS is evaluating the financial assistance program, which is similarly consolidated at the
regional level, with some staff reporting to the MABOs. The financial assistance program is principally
responsible for executing a wide range of cooperative agreement with States, Tribes, local governments
and non-profit organizations. In addition, the NPS financial assistance program provides policy oversight
of the NPS grant programs to ensure grants are awarded in accordance with relevant statues federal
financial assistance. Due to a steady increase in the use of cooperative agreements and a growing focus on
agreements that are increasingly competitive and complex, the NPS has determined that there are
significant efficiencies to be gained for both the NPS and its business partners by moving to a
consolidated organizational structure. In FY 2023, the NPS is analyzing its organizational structure for
financial assistance program and conducting stakeholder engagement with the support of a contracted
consultant. Beginning in FY 2024, the NPS plans to adjust the reporting structure for all financial
assistance staff to report to a single consolidated organization. There are no plans to reduce staffing or
physically relocate existing staff as part of this effort.
Workforce and Inclusion
Critical workforce issues such as creating a culturally diverse and inclusive workforce, recruitment,
staffing, work/life initiatives, employee relations, retention, employee development, equal opportunity,
and succession planning have an impact on every NPS park, program and employee. The NPS continues
to implement a plan designed to improve employee engagement and satisfaction by transforming the
delivery of human resources services and focusing on building the organization’s capacity to better serve
its customers by growing the vitality, productivity, and professionalism of its Human Resources
community; and developing more effective servicewide Learning and Development programs targeted at
growing both future leaders and technical experts.
National Park Service FY 2024 Budget Justifications
ONPS-83
The NPS continues to refine the regionally-consolidated and shared service support model for human
resources functions to improve service delivery and overall efficiency. A consolidated human resource
model supports equitable workloads, standardization of human resources practices and functions, more
effective oversight, and the opportunity for efficiencies through specialization. In FY 2023, the NPS is
analyzing its organizational structure for human resources functions and conducting stakeholder
engagement with the support of a contracted consultant. Beginning in FY 2024, the NPS plans to adjust
the reporting structure for all human resources staff to report to a single consolidated organization. There
are no plans to reduce staffing or physically relocate existing staff as part of this effort.
Beginning in autumn 2021, the NPS worked to address workplace environment, organizational culture,
and workforce diversity, equity, inclusion, and accessibility (DEIA) shortfalls in its strategic planning
process. Bolstered by ongoing work to enhance DEIA efforts across the federal enterprise in response to
EO 14035 on Diversity, Equity, Inclusion, and Accessibility in the Federal Workforce, the NPS has
incorporated data and information from the Federal Employee Viewpoint Survey (FEVS) and research by
subject matter experts to identify areas for improvement within NPS. This resulted in the Respectful,
Inclusive, Safe, and Engaged (RISE) NPS initiative, a robust vision for cultural change and a commitment
from NPS leadership to address the policies, procedures, informal practices, and support mechanisms that
directly contribute to the work environment and culture of the organization. RISE represents a broad,
action-based response to employee concerns in a host of areas, including topics like onboarding, housing,
pay and recognition, employee communication, work-life balance, DEIA, training opportunities, and
more.
National Park Service FY 2024 Budget Justifications
ONPS-84
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
ONPS-85
Activity: External Administrative Costs
External Administrative
Costs ($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)*
Program
Changes
(+/-)
2024
Request
Change
from
2023
(+/-)
Employee Compensation
Payments
19,945 19,377 +532 0 0 19,909 +532
Unemployment Compensation
Payments
18,142 18,142 +1,021 0 0 19,163 +1,021
Centralized IT &
Telecommunications Costs
17,165 19,165 0 0 0 19,165 0
Postage 2,861 2,861 0 0 0 2,861 0
Space Rental 88,218 94,458 +11,495 0 0 105,953 +11,495
Departmental Program
Charges
60,956 63,630 +7,675 +2,579 +854 74,738 +11,108
Total Requirements
207,287 217,633 +20,723 +2,579 +854 241,789 +24,156
Total FTE Requirements
0 0 0 0 0 0 0
*This component includes $2.6 million of transfers from the Park Management Activity to fund an increase in the Working
Capital Fund (WCF) Central Bill for DOI’s Incident Management, Analysis and Reporting System (IMARS), and for
Administrative Record Compilation conducted by the DOI Solicitor. These amounts were previously billed to NPS via the WCF
Direct Bill.
Activity Overview
The External Administrative Costs activity includes funding support necessary to provide and maintain
services that represent key administrative support functions where costs are largely determined by
organizations outside the National Park Service and funding requirements are less flexible. The
requirements for these services are mandated in accordance with applicable laws. To ensure the efficient
performance of the National Park Service, these costs are most effectively managed on a centralized
basis.
FY 2024 Program Overview, Fixed Costs, Transfers, and Program Changes
Employee Compensation Payments (+$532,000 / +0 FTE)
Funding allows for financial compensation to NPS employees in the event of a job-related injury. The
NPS makes payments to the Employees’ Compensation Fund at the Employment Standards
Administration, within the Department of Labor, for compensation claims awarded to NPS employees
during the previous fiscal year.
Unemployment Compensation Payments: (+$1,021,000 / +0 FTE)
Funding provides unemployment compensation to qualifying former personnel as prescribed under the
Omnibus Reconciliation Act of 1980. The law requires all unemployment benefits be paid to former
Federal employees, based on Federal service performed after December 31, 1980 to be reimbursed to the
Federal Employees’ Compensation account of the unemployment trust fund by each Federal agency. The
Department distributes the total cost among its bureaus, based on total separations. The level of
separations total for the NPS is the highest for the Department because of a large number of seasonal
staff.
National Park Service FY 2024 Budget Justifications
ONPS-86
Centralized IT & Telecommunications Costs: (+$0 / +0 FTE)
Funding provides for charges billed to the NPS to operate servicewide IT systems including centralized
software license purchase and portions of the financial and property systems. Another major IT
component is the NPS Website. Consolidated billings create efficiencies in bill payment and provide
better coordination throughout NPS. Funding also provides servicewide data network service, Internet
service, and telephone service through the Federal Telecommunication System (FTS) network and
commercial telephone service. The costs of these services are dictated by rates established by
Government Services Administration (GSA) and the telecommunications companies. Funding supports
critical mission related activities in every park. The program is vital to ensuring that the NPS maintains
the ability to effectively communicate with external partners and manage the hundreds of millions of
annual visitors to the NPS website.
Postage: (+$0 / +0 FTE)
Funding supports servicewide postage costs. Postage metering is managed through a central contract,
which provides services nationwide.
Space Rental: (+$11,495,000 / +0 FTE)
Funding provides for the office space and related services leased through the GSA and other private
owners by the National Park Service. In addition to general office space, GSA leases may include storage,
food service, conference, and training spaces; light industrial facilities; and parking space where
necessary. Rental space includes Federally owned buildings operated by GSA, and buildings owned by
the private sector, some of which the GSA leases and makes available for use by Federal agents.
The standard level user charges paid by NPS are determined by GSA and are billed on a quarterly basis.
GSA Space changes include rate increases which are considered a fixed cost.
Departmental Program Charges: (+$11,108,000 / +0 FTE)
Funding provides the NPS contribution to the costs of Department-wide programs and activities
conducted on behalf of its bureaus, such as the departmental invasive species program, news services,
mailroom and library, shared services, and the Interior Business Center. This includes costs associated
with the support of the Federal Personnel Payroll System (FPPS). It also provides funding for cross-
bureau information technology planning; infrastructure and communications improvements; and security.
The NPS has identified $854,000 within the program to invest in IT modernization, IT workforce, and
critical IT infrastructure needs. This funding will support key Department and Bureau-specific
cybersecurity requirements and priorities such as Zero-Trust implementation, FISMA compliance, and
effective oversight.
This component also includes $2.6 million of transfers from the Park Management Activity to fund an
increase in the Working Capital Fund (WCF) Central Bill for DOI’s Incident Management, Analysis and
Reporting System (IMARS), and for Administrative Record Compilation conducted by the DOI Solicitor.
These amounts were previously billed to NPS via the WCF Direct Bill.
National Park Service FY 2024 Budget Justifications
CC-1
Appropriation: Centennial Challenge
Appropriation Overview
The Centennial Challenge program provides dedicated Federal funding to match non-Federal donations
targeted at signature National Park Service projects and programs that enhance visitor services, reduce
deferred maintenance, and improve natural and cultural resource protection in parks across the system.
All Centennial Challenge funds require at least a 1:1 match, derived from non-Federal sources in the form
of cash, assets, or a pledge of donation guaranteed by an irrevocable letter of credit. Projects are
administered under existing NPS partnership authorities. The non-Federal funds contributed to match
Centennial Challenge Federal funds are reflected in the NPS Miscellaneous Trust Funds-Donations
permanent appropriation.
National Park Service FY 2024 Budget Justifications
CC-2
Summary of Requirements for Centennial Challenge
(Dollars in Thousands)
Budget Activity/Subactivity
FY 2022
Actual
FY 2022
Actual
FTE
FY 2023
Enacted
FY 2023
Enacted
FTE
FY 2024
Request
Fixed
Costs
(+/-)
FY 2024
Request
Internal
Transfers
(+/-)
FY 2024
Request
Program
Changes
(+/-)
FY 2024
Request
Program
Changes
(+/-) FTE
FY 2024
Request
FY 2024
Request
FTE
FY 2024
Request
Total
Change
from FY
2023 (+/-)
Centennial Challenge
Centennial Challenge 15,000 12 15,000 12 0 0 0 0 15,000 12 0
TOTAL, CENTENNIAL CHALLENGE 15,000 12 15,000 12 0 0 0 0 15,000 12 0
National Park Service FY 2024 Budget Justifications
CC-3
CENTENNIAL CHALLENGE
Appropriation Language
For expenses necessary to carry out the provisions of section 101701 of title 54, United States Code,
relating to challenge cost share agreements, $15,000,000, to remain available until expended, for
Centennial Challenge projects and programs: Provided, That not less than 50 percent of the total cost of
each project or program shall be derived from non-Federal sources in the form of donated cash, assets, or
a pledge of donation guaranteed by an irrevocable letter of credit. (Department of the Interior,
Environment, and Related Agencies Appropriations Act, 2023.)
Justification of Major Proposed Language Changes
No language changes are proposed.
Authorizing Statutes
54 U.S.C. 101701 allows the Secretary to enter into challenge cost-share agreements with any State or
local government, public or private agency, organization, institution, corporation, individual, or other
entity for the purpose of sharing costs or services in carrying out authorized functions and responsibilities
of the Secretary with respect to any System unit or System program, any affiliated area, or any designated
national scenic trail or national historic trail.
54 U.S.C. 101101, allows the Secretary, in the administration of the Service, to accept money that may be
donated for the purposes of the System.
National Park Service FY 2024 Budget Justifications
CC-4
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
CC-5
Justification of Program and Performance
Activity: Centennial Challenge
Centennial Challenge
($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change
from 2023
Enacted
(+/-)
Centennial Challenge 15,000 15,000 +0 +0 +0 15,000 +0
Total Requirements 15,000 15,000 +0 +0 +0 15,000 +0
Total FTE Requirements
12 12 +0 +0 +0 12 +0
FY 2024 Program Activities
The following are examples of planned FY 2024 Centennial Challenge activities:
Leverage at least $15 million in non-Federal donations with $15 million in Federal funding to
support projects and programs that address deferred maintenance and repairs, enhance outdoor
recreation and education for underserved youth, improve the visitor experience, and incorporate
the nation’s diverse history and stories into the NPS’s programming.
For example, at Acadia National Park, leverage $5 million in donations from Friends of Acadia to
fund construction of new seasonal employee housing. These units will meet a critical need for
housing for seasonal employees, which is a primary factor in a prospective employee’s decision
to accept a job at the park, and a contributing factor to a 29 percent decrease in seasonal staffing
levels since 2016.
Mission Overview
The National Park Service Centennial Act, enacted in the 100
th
anniversary year of the establishment of
NPS, created the Centennial Challenge Fund to further the mission of NPS and enhance the visitor
experience in park units. The Act authorizes State or local governments, public or private agencies,
organizations, institutions, corporations, and individuals to partner with the NPS in its mission to preserve
the natural and cultural resources and values of the National Park System for the enjoyment, education,
and inspiration of this and future generations.
The Centennial Challenge Fund enables the NPS to engage in partnership projects that will repair and
modernize NPS infrastructure, expand recreational opportunities and access to the public, and develop
new and improved educational and interpretive programs for visitors. All Federal funds for the project
must be matched at a minimum of 1:1 from a non-Federal source. Preference is given to projects that
demonstrate a greater than 1:1 match or address deferred maintenance and repair needs.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Centennial Challenge is $15,000,000 and 12 FTE. There are no proposed
program changes compared to FY 2023 Enacted.
National Park Service FY 2024 Budget Justifications
CC-6
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
NRP-1
Appropriation: National Recreation and Preservation
Mission Overview
The programs within the National Recreation and Preservation (NR&P) account contribute to the ability
of all levels of government and non-governmental interests to take prompt and coordinated action to
conserve, develop, and utilize natural and cultural resources for the benefit and enjoyment of all. The NPS
provides technical and financial assistance to entities outside of the National Park System to conserve
resources and enhance recreation opportunities throughout this country and the world.
Appropriation Overview
The NR&P account covers a broad range of activities relating to outdoor recreation planning; preservation
of resources; and environmental compliance. These programs provide a central point at the Federal level
for recreation and conservation planning; the coordination of Federal and State policies, procedures, and
guidelines; and the administration of technical and financial assistance to Federal, State, and local
governments and private organizations. Support is provided to the National Historic Preservation Program
to develop a national inventory of historic properties, set standards for historic preservation, and provide
technical and financial preservation assistance. Staff resources are also provided to coordinate
international assistance programs. This appropriation is composed of the following six budget activities:
Natural Programs
Natural Programs activities include: support of river and trail opportunities through State and local
technical assistance and Chesapeake Bay Gateway and Water Trails grants; creation of river conservation
and recreational opportunities that are compatible with continuing and future operations of hydropower
facilities, fulfillment of NPS responsibilities under the Federal Power Act, and protection of park
resources through the Hydropower Recreation Assistance Program; management of the National Natural
Landmark programs; and NPS facilitation of the transfer of surplus Federal real property to local
governments for recreation uses.
Cultural Programs
Within the Cultural Programs activity, the NPS manages the National Register of Historic Places; reviews
and certifies applications for Federal Tax Credits for Historic Preservation as a reimbursable activity;
conducts cultural resources management planning through the National Historic Landmarks program, the
Historic American Buildings Survey, the Historic American Engineering Record, and the Historic
American Landscapes Survey programs; advances the application of science and technology in historic
preservation and provides information distribution and skills training in the preservation and conservation
of the Nation’s significant historic and cultural resources through the National Center for Preservation
Technology and Training; supports the fulfillment of responsibilities under the Native American Graves
Protection and Repatriation Act (including through the NAGPRA grant program); coordinates Federal
archeology programs; and administers multiple financial assistance programs.
Environmental Compliance and Review
This activity includes the staff resources to review and comment on environmental impact statements,
Federal licensing, permit applications, and other actions within NPS jurisdictions.
National Park Service FY 2024 Budget Justifications
NRP-2
International Park Affairs
The International Park Affairs activity coordinates international assistance programs and the exchange
and support functions that complement the Service’s domestic role.
Heritage Partnership Programs
Financial and technical assistance is provided through this activity to congressionally designated heritage
partnership programs, including national heritage areas, national heritage corridors, national historic
districts, and other designations. These are managed by non-Federal organizations to promote the
conservation of natural, historic, scenic, and cultural resources.
Statutory and Contractual Aid
This activity provides funding to partners to operate, manage, interpret, and preserve resources at
associated areas.
National Park Service FY 2024 Budget Justifications
NRP-3
Summary of Requirements for National Recreation and Preservation
(Dollars in Thousands)
Budget Activity/Subactivity
FY 2022
Actual
FY 2022
Actual
FTE
FY 2023
Enacted
FY 2023
Enacted
FTE
FY 2024
Request
Fixed
Costs
(+/-)
FY 2024
Request
Internal
Transfers
(+/-)
FY 2024
Request
Program
Changes
(+/-)
FY 2024
Request
Program
Changes
(+/-) FTE
FY 2024
Request
FY 2024
Request
FTE
FY 2024
Request
Total
Change
from FY
2023 (+/-)
Natural Programs 16,452 80 18,579 85 +629 0 0 0 19,208 85 +629
Cultural Programs 34,408 102 39,327 104 +860 0 +4,000 +4 44,187 108 +4,860
Environmental Compliance & Review 456 3 465 3 +19 0 0 0 484 3 +19
International Park Affairs 1,950 8 1,990 8 +67 0 0 0 2,057 8 +67
Heritage Partnership Programs 27,144 5 29,232 5 +49 0 0 0 29,281 5 +49
Statutory and Contractual Aid 3,500 0 2,919 0 0 0 -2,919 0 0 0 -2,919
TOTAL, NATIONAL RECREATION AND
PRESERVATION 83,910 198 92,512 205 +1,624 0 +1,081 +4 95,217 209 +2,705
1
FTE reports Current Direct FTE only
National Park Service FY 2024 Budget Justifications
NRP-4
Fixed Costs and Related Changes
National Recreation and Preservation
Fixed Cost Element
2023
Enacted
Total or
Change
2023
Enacted to
2024
Request
Change Description
Change in Number of Paid Days -114 +119
This column reflects changes in pay associated with
the change in the number of paid days between
2023 and 2024. 2024 has one day more than 2023.
Pay Raise +1,181 +1,505
The President’s Budget for 2024 includes one
quarter of the 4.6% pay raise for 2023 and three
quarters of a planned 5.2% pay raise for 2024.
Account Total Fixed Cost +1,624
National Park Service FY 2024 Budget Justifications
NRP-5
NATIONAL RECREATION AND PRESERVATION
Appropriation Language
For expenses necessary to carry out recreation programs, natural programs, cultural programs, heritage
partnership programs, environmental compliance and review, international park affairs, and grant
administration, not otherwise provided for, [$92,512,000]$95,217,000, to remain available until
September 30, [2024, of which $2,919,000 shall be for projects specified for Statutory and Contractual
Aid in the table titled “Interior and Environment Incorporation of Community Project Funding
Items/Congressionally Directed Spending Items“ included for this division in the explanatory statement
described in section 4 (in the matter preceding division A of this consolidated Act)] 2025. (Department of
the Interior, Environment, and Related Agencies Appropriations Act, 2023.)
Justification of Major Proposed Language Changes
Language specific to Congressionally Directed Spending is removed as it is not applicable to the FY 2024
budget request, and subject to the determination of Congress.
Appropriations Language Citations
1. For expenses necessary to carry out natural programs,
54 U.S.C. 200103(e) authorizes the Secretary of the Interior to provide technical assistance and
advice to and cooperate with States, political subdivisions, and private interests, including
nonprofit organizations, with respect to outdoor recreation.
16 USC 1241 to 1251, National Trails System Act, sets prerequisites for inclusion of trails in the
National Scenic and National Historic Trails system, prescribes procedures for designation of
trails and administration of the system, and establishes a number of specific trails, while 16 USC
1271 to 1287, Wild and Scenic Rivers Act, as amended, establishes the Wild and Scenic Rivers
system, prescribes how the system will be administered, designates specific rivers for inclusion,
and prohibits the FERC from licensing dams or other project works directly affecting a river so
designated.
Public Law 105-312, as amended by Sec. 110 of Public Law 116-118, authorizes the program to
provide technical and financial assistance in cooperation with other Federal, State, local and
private partners to identify, conserve, restore and interpret natural, recreational, historical and
cultural resources within the Chesapeake Bay watershed, as well as establish a network of
Gateway sites and Watertrails. It also establishes the Chesapeake Bay Gateways Grants
Assistance Program.
40 USC 484(k)(2) to (3), Federal Property and Administrative Services Act, as amended,
authorizes disposal of Federal surplus real property for use as public park or recreation areas, and
requires determination and enforcement of compliance with terms of disposal.
2. cultural programs,
Chapter 3125 of title 54, United States Code, Archeological and National Historic Preservation
Act of 1974, establishes a program for preservation of historical and archeological data which
National Park Service FY 2024 Budget Justifications
NRP-6
might otherwise be lost or destroyed as a result of a Federal or Federally-assisted or licensed
project, activity, or program, and authorizes appropriation of specific amounts for this purpose.
Division A of subtitle III of title 54, United States Code, National Historic Preservation Act,
provides for assistance to non-Federal entities for the preservation of their cultural heritage,
establishes the National Register of Historic Places and regulations for State Historic Preservation
Districts, and provides for assistance to Indian Tribes in preserving their historic properties.
Chapter 3201 of title 54, United States Code, Historic Sites Act, declares it national policy to
protect historic sites, buildings, and objects; establishes various national historic sites, national
battlefield sites, national heritage corridors, national heritage areas, and national heritage
partnerships; authorizes appropriation of funds for this purpose; and provides specific authority
for the Secretary to acquire property and to restore, reconstruct, rehabilitate, preserve, and
maintain historic and prehistoric sites, buildings, objects, and properties of national historical or
archaeological significance. It also establishes competitive grants for operation, security, and
maintenance of certain memorials to victims of the terrorist attacks of September 11, 2001.
3. heritage partnerships programs,
Heritage partnership programs are individually designated under the following laws:
Public Law 103-449, Title IV Cane River National Heritage Area and Commission.
Public Law 98-398 Illinois and Michigan Canal National Heritage Corridor Act of 1984, as
amended by Public Law 104-333 (Div. I, Title IX, Sec. 902), Public Law 105-355 (Title V, Sec.
502), and Public Law 109-338 Title IV.
Public Law 99-647 Blackstone River Valley National Heritage Corridor Act of 1986, as amended
by Public Law 101-441, Public Law 102-154 (Title I), Public Law 104-208 (Div. A, Title I, Sec.
101d), Public Law 104-333 (Div. I, Title IX, Sec. 901), Public Law 105-355 (Title V, Sec. 501),
Public Law 106-113 (Div. B, Sec. 1000(a)(3)), Public Law 106-176 (Title I, Sec. 121) and Public
Law 109-338 Title VII.
Public Law 100-692 Delaware and Lehigh Navigation Canal National Heritage Corridor Act of
1988, as amended by Public Law 105-355 (Title IV).
Public Law 103-449 (Title I) Quinebaug and Shetucket Rivers Valley National Heritage Corridor
Act of 1994, as amended by Public Law 106-149 Quinebaug and Shetucket Rivers Valley
National Heritage Corridor Reauthorization Act of 1999.
Public Law 104-333 Omnibus Parks and Public Lands Management Act of 1996 included the
Shenandoah Valley Battlefields National Historic District and Commission Act of 1996 (Div. I,
Title VI, Sec. 606), the Hudson River Valley National Heritage Area Act of 1996 (Div. II, Title
IX), the National Coal Heritage Area Act of 1996 (Div. II, Title I), the Ohio & Erie Canal
National Heritage Corridor Act of 1996 (Div. II, Title VIII), the South Carolina National
Heritage Corridor Act of 1996 (Div. II, Title VI), and the Steel Industry American Heritage Area
Act of 1996 (Div. II, Title IV). It also designated America’s Agricultural Heritage Partnership
National Park Service FY 2024 Budget Justifications
NRP-7
(Div. II, Title VII), Augusta Canal National Heritage Area (Div. II, Title III), Essex National
Heritage Area (Div. II, Title V), and Tennessee Civil War Heritage Area (Div. II, Title II). The
Steel Industry American Heritage Area Act of 1996 was later amended by Public Law 106-113
(Appendix C, Title I, Sec. 116).
Public Law 105-355 (Title I) Automobile National Heritage Area Act.
Public Law 106-278 (Title I) Lackawanna Valley National Heritage Area Act of 2000.
Public Law 106-278 (Title II) Schuylkill River Valley National Heritage Area Act.
Public Law 106-291 (Title I, Sec. 157) Wheeling National Heritage Area Act of 2000.
Public Law 106-319 Yuma Crossing National Heritage Area Act of 2000.
Public Law 106-554 (Div. B, Title VIII) Erie Canalway National Heritage Corridor Act.
Public Law 108-108 (Title I, Sec. 140) Blue Ridge National Heritage Area Act of 2003.
Public Law 108-447 Consolidated Appropriations Act, 2005 (Div. J) authorizes three heritage
areas: National Aviation Heritage Area (Title V), Oil Region National Heritage Area (Title VI),
and Mississippi Gulf Coast National Heritage Area (Title VII).
Public Law 109-338 (Title II) authorizes 10 heritage areas: Arabia Mountain National Heritage
Area, GA; Atchafalaya National Heritage Area, LA; Champlain Valley National Heritage
Partnership, NY/VT; Crossroads of the American Revolution National Heritage Area, NJ;
Freedom’s Frontier National Heritage Area, KS/MO; Great Basin National Heritage Route,
UT/NV; Gullah/Geechee Cultural Heritage Corridor, NC/SC; Mormon Pioneer National Heritage
Area, UT; Northern Rio Grande National Heritage Area, NM; Upper Housatonic Valley National
Heritage Area, MA/CT.
Public Law 110-229 Consolidated Natural Resources Act of 2008 Title IV designates the
following as National Heritage Area sites: Journey through Hallowed Ground National Heritage
Area (Subtitle A), Niagara Falls National Heritage Area (Subtitle B), and Abraham Lincoln
National Heritage Area (Subtitle C).
Public Law 111-11 Omnibus Public Land Management Act of 2009 Title VIII, Subtitle A
designates as a National Heritage Area Site: Sangre de Cristo National Heritage Area, CO (Sec.
8001); Cache la Poudre River National Heritage Area, CO (Sec. 8002); South Park National
Heritage Area, CO (Sec. 8003); Northern Plains National Heritage Area, ND (Sec. 8004);
Baltimore National Heritage Area, MD (Sec. 8005); Freedom’s Way National Heritage Area, MA
& NH (Sec. 8006); Mississippi Hills National Heritage Area, MS (Sec. 8007); Mississippi Delta
National Heritage Area, MS (Sec. 8008); Muscle Shoals National Heritage Area, AL (Sec. 8009);
and Kenai Mountains-Turnagain Arm National Heritage Area, AK (Sec. 8010).
Public Law 116-9 John D. Dingell, Jr. Conservation, Management, and Recreation Act Title VI,
Section 6001, establishes Appalachian Forest National Heritage Area, Maritime Washington
National Heritage Area, Mountains to Sound Greenway National Heritage Area, Sacramento-San
National Park Service FY 2024 Budget Justifications
NRP-8
Joaquin Delta National Heritage Area, Santa Cruz Valley National Heritage Area, and
Susquehanna National Heritage Area.
Public Law 117-339, the National Heritage Area Act, establishes a National Heritage Area
System composed of each National Heritage Area, National Heritage Corridor, National Heritage
Canalway, Cultural Heritage Corridor, National Heritage Route, and National Heritage
Partnership designated by Congress. It also authorizes Alabama Black Belt National Heritage
Area, Bronzeville-Black Metropolis National Heritage Area, Downeast Maine National Heritage
Area, Northern Neck National Heritage Area, St. Croix National Heritage Area, Southern
Campaign of the Revolution National Heritage Corridor, and Southern Maryland National
Heritage Area.
4. environmental compliance,
16 USC 797(e) and 803(a), Federal Power Act, requires that the recommendations of agencies
with administration over relevant resources be considered in licensing power generation projects
and requires licenses to include conditions for protection of wildlife habitat.
42 USC 4321 to 4347, National Environmental Policy Act, requires agencies to monitor,
evaluate, and control their activities so as to protect and enhance the quality of the environment
and requires that a detailed Statement be prepared for any major Federal action significantly
affecting the quality of the human environment, while 49 USC 303, Department of Transportation
Act of 1966, requires review of proposed Department of Transportation projects which could
have an adverse impact on public park and recreation areas and historic sites.
16 USC 1278, Wild and Scenic Rivers Act, requires agencies to notify Interior of any proceeding,
study, or other activity which affects or may affect wild and scenic rivers under its jurisdiction,
and 16 USC 3505, Coastal Barrier Resources Act, permits expenditures for the purpose of
studying management, protection, and enhancement of fish and wildlife resources and habitats.
5. international park affairs,
54 U.S.C. 302908, 54 U.S.C. 307101, and 54 U.S.C. 300101, National Historic Preservation Act,
authorizes the administration of a grant program in certain areas outside the United States,
cooperation with other nations and international organizations in connection with the World
Heritage Convention, and declares it Federal policy “in cooperation with other nations [to]
provide leadership in the preservation of the prehistoric and historic resources of the international
community of nations…”.
16 U.S.C. 1537 authorizes the Secretary to encourage or cooperate in certain ways with other
nations in the conservation of fish or wildlife and plants, refers to United States commitment to
the worldwide protection of endangered or threatened species, and requires cooperation with
other nations to implement the Convention on Nature Protection and Wildlife Preservation in the
Western Hemisphere.
22 U.S.C. 2151q and 2452(b)(11) authorizes agencies to preserve biological diversity and to
assist countries in protecting and maintaining wildlife habitats and developing sound conservation
National Park Service FY 2024 Budget Justifications
NRP-9
programs. It also directs international aid agencies to cooperate and support the relevant efforts of
the NPS.
6. and grant administration, not otherwise provided for,
Division A of subtitle III of title 54, U.S.C., the National Historic Preservation Act, prescribes
responsibilities for administration of the historic preservation program, and 25 USC 3001 to
3013, Native American Graves Protection and Repatriation Act of 1990, provides for the
inventory, protection, management, and repatriation of human remains and cultural items.
Chapter 3081 of title 54, U.S.C., American Battlefield Protection Act of 1996, as amended by
Public Law 111-11, establishes the American Battlefield Protection Program to assist citizens,
public and private institutions, and governments in planning, interpreting, and protecting sites
where historic battles were fought, while Public Law 113-291 notes that any site where a battle
was fought on American soil is eligible under this program.
Public Law 109-441 authorized the Japanese American Confinement Site (JACS) Grants
program, which preserves Japanese American World War II confinement sites through
partnerships with local preservation groups and are used to encourage and support the research,
interpretation, and preservation of these sites. Public Law 117-328 established the Norman Y.
Mineta Japanese American Confinement Education Grants under the JACS program to provide
grants to educate the public on the historical importance of Japanese American confinement
during World War II.
Public Law 117-328 established the African American Burial Grounds Preservation Program to
support partners through grants, cooperative agreements, and memoranda of understanding to
identify, research, document, interpret, and preserve African American burial grounds.
National Park Service FY 2024 Budget Justifications
NRP-10
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
NRP-11
Justification of Program and Performance
Activity: Natural Programs
Natural Programs
($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change from
2023 Enacted
(+/-)
Rivers, Trails and
Conservation
Assistance 10,971 13,000 +501 0 0 13,501 +501
National Natural
Landmarks 700 724 +33 0 0 757 +33
Hydropower
Recreation
Assistance 898 926 +36 0 0 962 +36
Chesapeake
Gateways and Trails 3,009 3,027 +25 0 0 3,052 +25
Federal Lands to
Parks 874 902 +34 0 0 936 +34
Total
Requirements 16,452 18,579 +629 0 0 19,208 +629
Total FTE
Requirements 80 85 0 0 0 85 0
Mission Overview
Natural Programs support the NPS mission by providing technical assistance to local communities,
organizations, and other local and State governments, to preserve and protect resources and maintain a
nationwide system of parks, open space, rivers, and trails and to provide educational, recreational, and
conservation benefits for the American people.
Activity Overview
Natural Programs include:
Rivers, Trails, and Conservation Assistance – The Rivers, Trails and Conservation Assistance
Program (RTCA) helps communities and land managers with local conservation and outdoor
recreation efforts around the country. The National Park Service team works with local
knowledge experts to develop or restore parks, trails, rivers and conservation areas, evolve
resiliency strategies to a changing climate, recover from natural disasters, and create new and
sustainable outdoor recreation opportunities. The NPS collaborates to leverage public and private
resources to create successful close-to-home community-led projects. RTCA works with public
land managers in addressing recreation and visitor access, equity, health, accessibility, and
environmental justice goals. Through these projects, the National Park Service has collaborated
with more than 20,000 partners to create 1.3 million acres of parks, build 40,200 miles of trails,
and conserve 22,400 miles of rivers in all 50 States and Territories including Puerto Rico and the
U.S. Virgin Islands.
National Park Service FY 2024 Budget Justifications
NRP-12
National Natural Landmarks – The National Natural Landmarks Program recognizes and
encourages the conservation of sites that best illustrate the Nation’s biological and geological
heritage. The designation of National Natural Landmarks allows the NPS to partner with public
and private landowners to support conservation of nationally significant natural resources. As of
late 2022, 602 sites within the United States, American Samoa, Guam, Puerto Rico, and the U.S.
Virgin Islands have been designated, providing recognition and encouraging protection of
approximately 9 million acres.
Hydropower Recreation Assistance – The Hydropower Assistance program provides technical
assistance to participants involved in the Federal Energy Regulatory Commission (FERC)
hydropower licensing proceedings to help others engage more effectively and ensure projects
provide enhanced outdoor recreation opportunities and a quality environmental setting. Since
2002, the NPS has worked on FERC hydropower licensing proceedings to protect, improve and
create access to outdoor recreation on over 20,000 river miles and over 1,700 miles of trails, and
contributed to the conservation of over 81,000 acres of parks and open space. In addition, staff
prioritize support to projects that involve National Park Service units and related areas including
National Wild & Scenic Rivers, National Trails, and other nationally designated areas managed
by the NPS.
Chesapeake Bay Gateways and Trails – This program provides technical and financial
assistance to State, community, and non-profit organizations in the Chesapeake Bay watershed.
NPS collaborates with partners to provide better access to the Chesapeake and rivers, to conserve
important landscapes and resources, to engage youth in meaningful work and placed-based
education, to improve recreational opportunities, and to interpret the natural and cultural
resources of the Chesapeake region.
Federal Lands to Parks –The Federal Lands to Parks Program (FLP) conserves natural and
cultural resources and supports a nationwide system of parks, open space, rivers, and trails to
provide close to home recreational and conservation benefits through the transfer of surplus
Federal lands. Since 1949, over 1,624 properties have been transferred to State and local
governments for parks and recreation in 50 States, Puerto Rico, the Virgin Islands, and Guam.
National Park Service FY 2024 Budget Justifications
NRP-13
Activity: Natural Programs
Program Component: Rivers, Trails, and Conservation Assistance
FY 2024 Program Activities
The following are examples of planned FY 2024 Rivers, Trails, and Conservation Assistance activities:
Provide technical assistance and collaborate with more than 250 projects in over 800
communities.
Leverage public and private resources for community-led projects across America.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the Rivers, Trails, and Conservation Assistance program is $13,501,000
and 69 FTE. There are no proposed program changes from FY 2023 Enacted.
Program Overview
Since 1988, the National Park Service has helped communities realize their visions for outdoor recreation
and conservation through the Rivers, Trails and Conservation Assistance (RTCA) program. RTCA
planners help local leaders, partners, and national park staff engage broad community participation,
explore strategies, and leverage funding. Through these projects, the National Park Service has
collaborated with more than 14,000 partners to create over 1.1 million acres of parks, build 38,400 miles
of trails, and conserve 22,200 miles of rivers in all 50 States and Territories including Puerto Rico and the
U.S. Virgin Islands. Today, more than 60 million people live within one mile of an outdoor recreation
opportunity that was created or improved by NPS through the RTCA program.
Project applications come from and are guided by the goals of the administration and the needs of local
leaders. Working in partnership, RTCA planners engage community members in planning and
implementation. While the RTCA does not provide financial assistance, it will assist communities in
developing strategies to leverage public and private resources. The RTCA program also provides
technical assistance to individual national parks and other State and Federal land managers.
For more information about the Rivers, Trails, and Conservation Assistance program, visit:
www.nps.gov/rtca
National Park Service FY 2024 Budget Justifications
NRP-14
Activity: Natural Programs
Program Component: National Natural Landmarks
FY 2024 Program Activities
The following are examples of planned FY 2024 National Natural Landmarks activities:
Support conservation efforts of site managers and organizations (including private landowners)
who oversee sites designated as National Natural Landmarks.
Facilitate the evaluation of sites for potential NNL designation.
Engage in and facilitate partnerships among landmark sites and with other recognized and
protected areas to promote connected conservation.
Partner with landmark sites to connect the public to their diverse natural heritage by highlighting
and communicating stories about NNL site resources, including targeted engagement with the
roughly 70 sites that will be marking the 50
th
anniversary of their NNL designation in 2024.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the National Natural Landmarks program is $757,000 and 4 FTE. There
are no proposed program changes from FY 2023 Enacted.
Program Overview
For over 60 years, the National Park Service has been collaborating with partners to extend the benefits of
natural and cultural resource conservation to local communities through the National Natural Landmarks
(NNL) program. NNL designation formally recognizes a site as possessing outstanding biological and/or
geological features, providing an important example of our Nation’s natural heritage. Landmarks are
owned by a variety of public and private land stewards, and participation in the program is voluntary.
To date, 602 natural areas, encompassing approximately nine million acres in both rural and urban
settings, have received the distinction as a national natural landmark. The NPS works alongside
landowners, managers, and other partners to encourage and support the conservation of these nationally
significant sites.
The Cleveland-Lloyd Dinosaur Quarry in Utah has provided more than 10,000
fossilized bones from at least 60 animals from the Jurassic Period. This
predator trap is unduplicated among other classic dinosaur beds around the
world.
National Park Service FY 2024 Budget Justifications
NRP-15
Program staff engage with owners and managers at designated sites to understand management
challenges, ascertain condition of landmark resources and provide or broker technical assistance;
participate in environmental review and planning to minimize impacts to landmark sites; utilize various
communication tools and outlets to raise awareness of these nationally significant areas; seek
opportunities to engage landmark sites in connected conservation efforts; and coordinate the
identification, evaluation and designation of new landmark sites.
Find more information about the National Natural Landmarks program at: www.nps.gov/nnlandmarks
National Park Service FY 2024 Budget Justifications
NRP-16
Activity: Natural Programs
Program Component: Hydropower Recreation Assistance
FY 2024 Program Activities
The following are examples of planned FY 2024 Hydropower Recreation Assistance activities:
Representing the NPS in hydropower proceedings, making recommendations for studies,
providing technical assistance, and developing recommendations for conservation and recreation
enhancements.
Enable Federal Energy Regulatory Commission (FERC) to recover program costs from the
licensees back to the U.S. Treasury.
Participating in priority projects to ensure recreation and conservation interests are considered in
relicensing, as well as in proposals to develop new hydropower, on existing lock and dams and
free-flowing rivers.
Responding to requests for assistance from parks and related NPS management areas impacted by
the FERC hydropower proceedings.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the Hydropower Recreation Assistance program is $962,000 and 4 FTE.
There are no proposed program changes from FY 2023 Enacted.
Program Overview
The Hydropower Recreation Assistance program promotes and enhances recreation opportunities across
the Nation by assisting hydropower producers, recreation organizations, local communities, and
stakeholders in planning for and providing sustainable recreation access and services for the public. The
program also improves natural resource conservation and recreation in hydropower projects by making
recommendations to modify hydropower facility operations to better protect the local ecosystem and
enhance recreation opportunities. Since 2002, the NPS has worked on FERC hydropower licensing
proceedings to protect, improve and create access to outdoor recreation on over 2,025 river miles and over
1,700 miles of trails, and contributed to the conservation of over 81,000 acres of parks and open space.
In addition, staff prioritize support to projects that involve NPS parks and other nationally designated
areas to ensure project impacts do not adversely affect areas where NPS has management responsibilities.
Importantly, there are 45 dams within the National Park System with a capacity of more than 6,500
Megawatts of energy. This is equivalent to powering approximately 6.6 million homes. Hydropower
assistance work continues at projects affecting several parks, including Paterson Great Falls NHP, Lowell
NHP, Ross Lake NRA, Lake Roosevelt NRA, Blackstone River Valley NHP, Blue Ridge Parkway,
Horseshoe Bend NMP, Lewis and Clark NHT, Missouri National Recreational River, Voyagers NP, Saint
Croix NSR, and the Appalachian NST.
Funding has supported recreation and conservation improvement projects including recreation facilities
and access points, shoreline protection, flows for recreation, and interpretation and education materials.
The Hydropower Recreation Assistance program creates opportunities for river conservation and
enhancement of water-based recreation that are fully compatible with continuing and future operations of
hydropower facilities. The program supports sustainable hydropower facilities that provide clean
National Park Service FY 2024 Budget Justifications
NRP-17
renewable energy. Program resources are allocated based on the pending hydropower relicensing and staff
workload and opportunities for significant contributions by the NPS. Program costs are reported to the
Department of the Interior and forwarded to the FERC to recover costs from licensees.
Find more information online about the Hydropower Recreation Assistance program at:
www.nps.gov/hydro
At a Glance…
New Accessible Boat Launch and Guide for the New York State Canalway National Water Trail
In 2022, the Erie Boulevard Hydropower (EBH) company sponsored development of the 2nd edition of the New
York State Canalway Water Trail Guide, as well as construction of a physically accessible canoe and kayak launch.
The NPS Hydropower Assistance Program supported these efforts through participation in negotiations for a
settlement agreement for the new hydropower license issued, as well as facilitation of the connection between the
EBH company and the Village of Medina. The new guide and accessible launch are enhancing access to and
improving visitor experiences on the New York State Canalway System, a National Historic Landmark District and
a National Water Trail.
National Park Service FY 2024 Budget Justifications
NRP-18
Activity: Natural Programs
Program Component: Chesapeake Bay Gateways and Trails
FY 2024 Program Activities
The following are examples of planned FY 2024 Chesapeake Bay Gateways and Trails activities:
Coordinate and facilitate the Chesapeake Bay Gateways and Watertrails Network, a system of
programmatic partners and partner and public parks, historic sites and other places providing the
chance to enjoy, learn about and help conserve the Chesapeake Bay and its watershed.
Provide technical and financial assistance that leverages State, community, nonprofit, and private
sector partner funding to identify, conserve, restore, and interpret natural, recreational, historical,
and cultural resources within the Chesapeake Bay Watershed.
Manage the annual competitive Chesapeake Gateways Network Grant offering in accordance
with the Chesapeake Bay Initiative Act of 1998, to aid State and local governments and
communities, nonprofit organizations, and the private sector in identifying, conserving, restoring,
and interpreting key resources within the Chesapeake Bay Watershed.
Facilitate and help create new equitable public water access sites managed by others for
recreation including boating, fishing, and paddle sports.
Continue to co-convene the Chesapeake Conservation Partnership as a network of Federal, State,
and local government agencies, Tribal partners, NGOs, recreationists, anglers, and hunters to
collaboratively promote public access and large landscape conservation.
Continue collaboration on existing partner visitor contact stations in Pennsylvania, Maryland, and
Virginia, assisting with exhibits, programming, and signage.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Chesapeake Bay Gateways and Trails is $3,052,000 and 4 FTE. There
are no proposed program changes from FY 2023 Enacted.
Program Overview
The Chesapeake Bay Gateways and Trails program, authorized in 1998, provides technical and financial
assistance to Federal, State and local agencies, nonprofit organizations, and the private sector to provide
equitable access to the Chesapeake and its rivers, to conserve important landscapes and resources, to
engage youth in meaningful work and placed-based education, to improve recreational opportunities, and
to interpret the natural and cultural resources of the Chesapeake region.
The Chesapeake region is home to many important cultural and historic sites, including those related to
Indigenous peoples, free and enslaved Blacks, working family farms, and active watermen and women
whose culture and livelihoods depend on a healthy waterways. Over 18 million people live in the 41
million-acre Chesapeake Bay watershed and tens of millions more people visit and explore the
Chesapeake region each year. The Chesapeake Gateways and Trails program annually offers technical
and financial assistance to support partners and communities with visitor service amenities, interpretive
media, youth employment, programs and signage, training, conservation, and public water access projects
linked to over 300 Chesapeake Gateways sites, parks, refuges, land and water trails, historic sites, and
communities and throughout the Chesapeake Bay watershed. The program is a key element of an overall
National Park Service FY 2024 Budget Justifications
NRP-19
Chesapeake Bay watershed restoration effort in partnership with Maryland, Virginia, Pennsylvania,
Delaware, New York, West Virginia, and the District of Columbia.
Executive Order (EO)13508, Chesapeake Bay Protection and Restoration, signed May 2009, directs
Federal agencies and partners to recommend and implement a strategy for restoring and protecting the
Chesapeake Bay. The strategy, developed in 2010, sets key goals and outcomes for implementation,
including protecting two million additional acres and expanding public access to the Bay and tributaries
by 300 new access sites by 2025. The NPS has been tasked with fostering interjurisdictional collaboration
to achieve these goals, which were subsequently adopted in the 2014 Chesapeake Bay Watershed
Agreement signed by the governors of six States, the District of Columbia, and the Federal government.
A management strategy and work plan adopted under the Watershed Agreement guides assistance for
Chesapeake conservation, including collaborative resource documentation and protection and capacity
building.
The Chesapeake Bay Gateways and Trails program supports DOI’s implementation of key EO and
Watershed Agreement outcomes. The NPS Chesapeake Gateways program serves as the lead organization
facilitating, managing, and tracking four of the ten goals and associated workgroups of the Watershed
agreement: Land Conservation, Public Access, Stewardship/Diversity, and Education. Projects provide
new economic and recreational assets, universal accessibility, and access for traditionally underserved
communities at key locations along local, State, and national water trails through simple soft launch
facilities, fishing piers, boardwalks, and ramps for nonmotorized and motorized boating. Assistance with
interpretive media, signage, programming, and staff training at strategic locations enables partners and
communities to offer high quality visitor experiences that build public awareness and support for the
Chesapeake’s cultural and natural heritage.
National Park Service FY 2024 Budget Justifications
NRP-20
Activity: Natural Programs
Program Component: Federal Lands to Parks
FY 2024 Program Activities
The following are examples of planned FY 2024 Federal Lands to Parks activities:
Continue assisting Federal agencies to reduce the inventory of unneeded/surplus Federal property
by transferring real estate to States and communities for public parks and recreation.
Assist State and local agencies to meet community needs while assuring park and recreation
accountability and compliance for transferred properties.
Complete web and data systems, establish and implement a system to digitize and electronically
store and records improving accountability, transparency, efficiency, and outreach to help the
public find where FLP-protected parks are, and encourage citizens to care for and champion their
local parks.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the Federal Lands to Parks program is $936,000 and 4 FTE. There are no
proposed program changes from FY 2023 Enacted.
Program Overview
In partnership with State and local governments, the Federal Lands to Parks (FLP) program contributes to
community revitalization by providing new and expanded State and community parks; increasing close-
to-home recreation opportunities increasingly recognized as important to improving people’s health and
wellness; and protecting open space and important natural and cultural resources. In addition to benefiting
communities, the FLP program helps the Federal government save money by reducing its unneeded
inventory of Federal land and facilities.
The NPS partners with the U.S. General Services Administration (GSA) to transfer surplus Federal real
estate for public parks and recreation areas, transforming them into local community assets while
reducing the Federal inventory of unneeded real estate. Similarly, the NPS continues to work with the
Department of Defense (DoD), States, and communities to convert military bases closed and realigned
under Base Realignment and Closure Acts (BRAC) into park and recreation areas.
FLP works to ensure that transferred properties have continued public recreation access and use, resource
protection, and compliance with deeds, as required by 40 U.S.C. § 550(b and e), formerly the Federal
Property and Administration Services Act of 1949. While surplus Federal property available for transfer
for new public parks will be reduced due to the Federal Assets Sale and Transfer Act (FASTA; Public
Law 114-287), FLP staff is responsible for overseeing perpetual recreational use requirements on nearly
1,300 active properties, exceeding 137,000 acres. FLP helps communities prevent or resolve compliance
issues, such as installation of commercial cell towers, park closures, pipelines and mining proposals, road
projects, and more. FLP staff works with communities to better meet changing land use and recreational
needs through program guidance, and if necessary, land exchanges, easements, ownership changes, third-
party use agreements, change to another Federal public benefit use program, or reversion to the Federal
government for reuse for private or commercial uses.
Learn more about the Federal Lands to Parks program at: www.nps.gov/flp
National Park Service FY 2024 Budget Justifications
NRP-21
Activity: Cultural Programs
Cultural Programs
($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change
from 2023
Enacted
(+/-)
National Register
Programs 17,204 17,662 +708 0 0 18,370 0
National Center for
Preservation
Technology & Training 2,019 2,058 +54 0 0 2,112 0
Native American Graves
Protection &
Repatriation Grants 2,157 3,407 0 0 0 3,407 0
Japanese American
Confinement Site Grants 3,405 4,655 0 0 0 4,655 0
American Battlefield
Protection Program
Assistance Grants 1,198 1,198 0 0 0 1,198 0
American Indian &
Native Hawaiian Art &
Culture Grants 1,500 2,750 0 0 0 2,750 0
9/11 Memorial Act
Grants 2,750 4,000 0 0 0 4,000 0
Oklahoma City
Memorial Endowment
Fund 1,000 0 0 0 0 0 0
African American
Burial Grounds
Preservation Program 0 0 0 0 +3,000 3,000 +3,000
Grants Administration 3,175 3,597 +98 0 +1,000 4,695 +1,098
Total Requirements 34,408 39,327 +860 0 +4,000 44,187 +4,860
Total FTE Requirements
102 104 0 0 +4 108 +4
Summary of FY 2024 Program Changes for Cultural Programs
Program Changes ($000) FTE
Racial Justice and Equity for Underserved Communities Initiative – African
American Burial Grounds Program +3,000 0
Racial Justice and Equity for Underserved Communities Initiative – Grants
Administration +1,000 +4
TOTAL Program Changes +4,000 +4
Mission Overview
The Cultural Programs activity of the National Recreation and Preservation (NR&P) account supports the
NPS mission by contributing to the conservation of cultural resources through formal partnership
programs.
National Park Service FY 2024 Budget Justifications
NRP-22
Activity Overview
NPS Cultural Programs support the preservation of the Nation’s cultural heritage and the integration of
preservation values in public and private decisions. The program components of this activity are:
National Register Programs – Assists communities in preserving significant historic and
archeological properties through formal designation and technical assistance. Federal designation
qualifies historic properties for Federal financial assistance and regulatory protection.
National Center for Preservation Technology and Training – Supports a national program of
research, information distribution, and skills training in the preservation and conservation of the
Nation’s significant historic structures and landscapes, archeological properties, and material
culture and advances the application of science and technology in historic preservation.
Native American Graves Protection and Repatriation Act (NAGPRA) Grants – Assists
Indian Tribes and Native Hawaiian organizations (NHOs) in requesting and repatriating ancestral
remains and other cultural items. In addition, assists museums in fulfilling their responsibilities to
consult with Indian Tribes and NHOs.
Japanese American Confinement Sites Grants – Assists communities, States, local
governments, non-profit institutions, educational institutions, and Tribal groups with the
preservation and interpretation of Japanese American World War II confinement sites; supports
nonprofit organizations working to educate the public on the historical importance of Japanese
American confinement during World War II.
American Battlefield Protection Program Assistance Grants – Promotes the preservation of
sites associated with historic battles fought on American soil during the armed conflicts that
shaped the growth and development of the United States.
American Indian and Native Hawaiian Art and Culture Grants – Supports Native culture and
arts development.
9/11 Memorial Act Grants – Provides competitive grants for the continued operation, security,
and maintenance of the on-site memorials of the events and victims of September 11, 2001.
African American Burial Grounds Preservation ProgramProvides grants for identification,
research, documentation, interpretation, and preservation of African American burial grounds.
Grants Administration – Administers multiple grant programs funded within this Activity and
from the Historic Preservation Fund. Is responsible for ensuring that grantees comply with all
requirements and successfully complete funded projects. These administrative activities span the
life of each grant, which may last up to five years past the date of award.
National Park Service FY 2024 Budget Justifications
NRP-23
Activity: Cultural Programs
Program Component: National Register Programs
FY 2024 Program Activities
The following are examples of planned FY 2024 National Register Program activities:
Preserve prehistoric and historic properties and cultural traditions in partnership with States,
Tribes, local governments, and preservation organizations, and continue efforts to digitize and
preserve National Register records, increasing public access and reducing risks of resource
damage and loss.
Conduct approximately 1,300 new National Register actions, including review and processing of
new listings, determinations of eligibility, acceptance of multiple cover documents, additional
documentation, and requests for boundary changes, removals, and moved properties.
Justification of FY 2024 Program Changes
The FY 2024 budget request for National Register Programs is $18,370,000 and 83 FTE. There are no
proposed program changes from FY 2023 Enacted.
Program Overview
National Register Programs encourage the preservation of cultural resources by all levels of government
and the private sector. A wide range of technical assistance is offered, including:
National Register of Historic Places
The National Register of Historic Places is the Nation’s official inventory of historic places that have
been determined to be worthy of preservation. It recognizes buildings, structures, sites, objects, and
districts that are significant in American history, architecture, archeology, engineering, and culture at the
National, State, and local levels. The program provides guidance on the identification, evaluation, and
registration of historic properties to State and Federal agencies, Tribes, local governments, and the public.
It serves as a planning tool for Federal, State, and local governments to encourage the preservation of
eligible properties and encourage private preservation efforts through Federal preservation incentives
such as the Federal Historic Preservation Tax Incentives Program. The records of the National Register
are publicly available.
Find more information online at: www.nps.gov/subjects/nationalregister/index.htm
National Historic Landmarks Program
National Historic Landmarks (NHLs) are cultural properties which are among the Nation’s most
significant historic places—buildings, sites, districts, structures, and objects that possess exceptional
value or quality in illustrating the heritage of the United States in history, architecture, archeology,
engineering, and culture. Proposed NHLs are designated by the Secretary of the Interior based on the
recommendation of the National Park Service Advisory Board. Upon designation, NHLs are listed in the
National Register of Historic Places. The records of the NHL program are publicly available.
Find more information online at: www.nps.gov/nhl/
National Park Service FY 2024 Budget Justifications
NRP-24
Heritage Documentation Programs
The Heritage Documentation Programs (HDP) survey and document properties that have an important
place in the history of the Nation and in the development of American architecture, engineering, and
landscapes. These programs include the Historic American Buildings Survey (HABS), the Historic
American Engineering Record (HAER), and the Historic American Landscapes Survey (HALS).
Documentation created through the programs is archived in the national architecture and engineering
collections of the Library of Congress and is available to the public copyright fee. The programs produce
documentation of historic properties to assist with rehabilitation and interpretation, publish technical
standards and guidance, train students and practitioners in documentation techniques, field test new
recording technologies, and review and process documentation developed by other federal agencies in
compliance with the requirements of the National Historic Preservation Act.
Find more information online at: www.nps.gov/hdp/
Cultural Resources GIS Program
The Cultural Resource Geographic Information Systems program (CRGIS) fosters the use of Geographic
Information Systems (GIS) and Global Positioning System (GPS) technologies in survey, inventory,
documentation, and management of cultural resources. CRGIS manages and maintains the NPS national
cultural resource spatial data set in addition to the National Register of Historic Places spatial data set, a
National Geospatial Data Asset., available for public use and access through Geoplatform.gov. The
program provides training in the use of GIS and GPS in managing historic properties to NPS staff, State
Historic Preservation Offices, Tribal Historic Preservation Offices, and other historic preservation
organizations. CRGIS works to integrate State, Tribal, and Federal cultural resource spatial data sets,
eliminate redundancy, and create Federal agency wide cultural resource spatial data standards. The
program expands the effectiveness of resource planning, disaster response, and meeting regulatory
requirements through the use of spatial technologies.
Find more information online at: https://www.nps.gov/crgis
Archaeological Assistance Program
The Archaeological Assistance Program provides coordination, leadership, technical assistance, and
guidance to all Federal agencies with responsibility for archeological resources pursuant to the National
Historic Preservation Act of 1966 and the Archaeological and Historic Preservation Act of 1974, and also
collaborates with State, Tribal, and local agencies to ensure responsible stewardship of resources.
Find more information online at: www.nps.gov/archeology/sites/fedarch.htm
Technical Preservation Services
Technical Preservation Services (TPS) develops historic preservation standards, guidance, and other
information on the preservation and rehabilitation of historic buildings and is the NPS national program
lead for the Historic Surplus Property Program. TPS also administers, in partnership with State Historic
Preservation Offices, the Federal Historic Preservation Tax Incentives Program, which provides a 20
percent tax credit to property owners or long-term lessees who rehabilitate income-producing historic
buildings listed in the National Register of Historic Places or located in a registered historic district.
For more information online at: www.nps.gov/tps/
National Park Service FY 2024 Budget Justifications
NRP-25
National Native American Graves Protection and Repatriation Act (NAGPRA) Program
NAGPRA was enacted in 1990. The Act provides a process for museums and Federal agencies to resolve
rights to Native American cultural items—human remains, funerary objects, sacred objects, and objects of
cultural patrimony—to lineal descendants, Indian Tribes, and Native Hawaiian organizations. The
National NAGPRA program supports the responsibility of the Secretary of the Interior for the National
administration and implementation of NAGPRA.
Find more information online at: www.nps.gov/nagpra/
Cultural Resources Office of Interpretation and Education
This program inspires the stewardship of America’s special places and promotes inclusive preservation
through youth internships, as well as interpretation and education. Internship and longer-term fellowship
opportunities are meant to develop a new generation of cultural resources professionals who represent the
full diversity of the United States. The program also supports programs that encourage visitors on the
ground and online to discover public lands and provides educators with online lesson plans, training, and
technical assistance on using historic places in education.
Find more information online at: www.nps.gov/orgs/1023/index.htm
American Battlefield Protection Program
The American Battlefield Protection Program (ABPP) assists citizens, public and private institutions, and
State and local governments in planning, interpreting, and protecting sites associated with historic battles
fought on American soil during the armed conflicts that shaped the growth and development of the United
States. To this end, the program provides technical and financial assistance for preservation projects and
encourages partnerships among private organizations, Tribes, and all levels of government.
Find more information online at: www.nps.gov/orgs/2287/index.htm
National Park Service FY 2024 Budget Justifications
NRP-26
Activity: Cultural Programs
Program Component: National Center for Preservation Technology and Training
FY 2024 Program Activities
The following are examples of planned FY 2024 National Center for Preservation Technology and
Training activities:
Provide technical information, research, and best practices related to preservation technology to
preservation professionals nationwide, with a focus on park resource issues and national
assistance program needs. This will include hosting webinars and podcasts focusing on the role of
science and technology in preservation.
Add new technical briefs to communicate best practices in preservation for site managers,
homeowners, contractors, and the public.
Host workshops, symposia, and training events that address cutting-edge issues in preservation,
including climate change adaptation, disaster response, resiliency and energy efficiency, and
nondestructive evaluation technologies for cultural resource management.
Manage an authorized grants program to support partners in development of research and to
improve tools, materials, and approaches to conservation of historic buildings and landscapes,
archeological sites and objects, and museum collections.
Internally develop and collaborate with partners to develop new preservation technologies, with a
focus on responding to climate change issues, sustainability, and mitigation practices.
Work with partners to develop climate-informed cultural resource management strategies.
Rapidly gather data on enslaved and tenant farmer houses and Rosenwald Schools across the
southeastern U.S. using 3D laser scanning, photogrammetry, and oral histories to capture these
quickly vanishing structures and the stories of the people who inhabited them.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the National Center for Preservation Technology and Training is
$2,112,000 and 7 FTE. There are no proposed program changes from FY 2023 Enacted.
Program Overview
The National Center for Preservation Technology and Training (NCPTT) is a designated Federal
laboratory that undertakes research related to historic preservation and advances the application of science
and technology to preservation problems. The NCPTT also partners with universities and nonprofits,
supports applied research, through Preservation Technology and Training Grants, partners with
professional and scientific organizations, publishes technical guidance for preservation professionals, and
trains students and practitioners in the latest preservation techniques.
NCPTT serves as a clearinghouse for technical and scientific preservation information, with research and
training programs that reach preservationists throughout the U.S., an internationally recognized web
presence, and a catalog of technical reports and training videos to keeps preservationists informed about
advances in technologies and methods for evaluating historic buildings, sites, and collections.
Find more information about the National Center for Preservation Technology and Training online at:
https://www.nps.gov/subjects/ncptt/index.htm
National Park Service FY 2024 Budget Justifications
NRP-27
Activity: Cultural Programs
Program Component: National Native American Graves Protection and Repatriation Act
(NAGPRA) Grants
FY 2024 Program Activities
The following are examples of planned FY 2024 National Native American Graves Protection and
Repatriation Act activities:
The program expects to award approximately 25 grants to assist with consultation and
documentation projects leading to the repatriation of Native American ancestral remains and
other cultural items.
The program expects to award approximately 10 grants to assist with travel and transportation of
repatriated Native American cultural items.
Justification of FY 2024 Program Changes
The FY 2024 budget request for NAGPRA Grants is $3,407,000 and 0 FTE. There are no proposed
program changes from FY 2023 Enacted.
Program Overview
The Native American Graves Protection and Repatriation Act (NAGPRA) of 1990 addresses the rights of
lineal descendants, Indian Tribes, and Native Hawaiian organizations to Native American cultural items,
including human remains, funerary objects, sacred objects, and objects of cultural patrimony.
The Native American Graves Protection and Repatriation Program annually awards grants to museums,
Tribes, and Native Hawaiian organizations under the provisions of 25 U.S.C. 3008. From FY 1994 to FY
2022, the NAGPRA grant program has awarded a total of 1,091 grants totaling $56.1 million. The grants
fund museum and Tribal projects for consultation and identification, leading to NAGPRA notices and
repatriation; including costs of transfer of possession from museums and agencies to Tribes and Native
Hawaiian Organizations.
Find more information about the National NAGPRA Program online at:
www.nps.gov/subjects/nagpra/index.htm
National Park Service FY 2024 Budget Justifications
NRP-28
Activity: Cultural Programs
Program Component: Japanese American Confinement Site Grants
FY 2024 Program Activities
The following is an example of planned FY 2024 Japanese American Confinement Site Grants activities:
The program expects to award 20-25 grants to States, Tribes, local governments, and nonprofit
organizations to acquire, protect, preserve, research, interpret, and restore historic confinement
sites.
The program expects to award one grant of up to $1.25 million to nonprofit organizations to
educate the public on the historical importance of Japanese American confinement during World
War II.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Japanese American Confinement Site Grants is $4,655,000 and 0 FTE.
There are no proposed program changes from FY 2023 Enacted.
Program Overview
The Japanese American Confinement Sites (JACS) Grants program (P.L. 109-441) preserves Japanese
American World War II confinement sites through partnerships with local preservation groups. Grant
funds may be used to encourage and support the research, interpretation, and preservation of the sites
where Japanese Americans were detained during World War II. Since the first appropriation in FY 2009,
NPS has awarded 288 grants totaling more than $39 million. Public Law 117-328 established the Norman
Y. Mineta Japanese American Confinement Education Grants under the JACS program; the NPS will use
the additional funding provided in FY 2023 to provide grants for U.S.-based nonprofit organizations that
promote understanding of the Japanese American experience to engage in projects to educate the public
on the historical importance of Japanese American confinement during World War II. The NPS is
working to establish the competitive criteria and other specifications for this new funding.
Japanese American Confinement Grants are competitively awarded on the basis of applicant proposals
meeting the following selection criteria: historical significance, critical preservation need, lasting
educational impact, and feasibility and cost-effectiveness. Eligible projects must also demonstrate
commitment of a 2:1 Federal to non-Federal match.
Past grants have included a project to conduct an assessment of two original barracks moved back to a
former internment site in Montana to help guide restoration of the buildings and interpretation of the sites
history; a project to research the little-known history of Japanese American women recruited from
Japanese American World War II incarceration sites to serve in the U.S. Cadet Nurse Corps; and a project
to teach elementary and middle school students about the history of Japanese American World War II
incarceration and the Nisei soldiers who volunteered for military service while their families remained
incarcerated behind barbed wire. The wide range of funded grant projects demonstrates the importance of
sharing the lessons of Japanese American World War II incarceration history with the public and how
those lessons remain relevant today.
Find more information online about Japanese American World War II confinement site grants at:
www.nps.gov/jacs
National Park Service FY 2024 Budget Justifications
NRP-29
Activity: Cultural Programs
Program Component: American Battlefield Protection Program Assistance Grants
FY 2024 Program Activities
The following is an example of planned FY 2024 American Battlefield Protection Program (ABPP)
Assistance Grants activities:
The program expects to award approximately 12-15 grants to assist in identification, planning,
and education efforts to protect significant battlefields and historic sites associated with armed
conflicts on American soil.
Justification of FY 2024 Program Changes
The FY 2024 budget request for ABPP Assistance Grants is $1,198,000 and 0 FTE. There are no
proposed program changes from FY 2023 Enacted.
Program Overview
The goals of the American Battlefield Protection Program (ABPP) are to protect battlefields and sites
associated with armed conflicts that influenced the course of American history; to encourage and assist in
planning for the preservation, management, and interpretation of these sites; and to raise awareness of the
importance of preserving battlefields and related sites for future generations. ABPP planning grants
protect natural and cultural resources and seek to leverage Federal funding with partner resources to
sustain local preservation efforts. They do not fund land acquisition or capital improvement projects.
These grants assist in the preservation and protection of America’s significant battlefields and sites of
armed conflict through site identification and documentation, as well as planning, interpretation, and
educational projects. Projects associated with lands owned by the NPS or directly benefiting units of the
National Park System are not eligible. ABPP planning grants complement three additional grant programs
administered by the program that are funded through Land and Water Conservation Fund mandatory
appropriations. These grants provide assistance to non-Federal entities for the acquisition, interpretation,
and restoration of significant Civil War battlefields and of significant American Revolution and War of
1812 battlefields and associated historic properties that are outside the external boundaries of units of the
National Park System. More information on ABPP battlefield acquisition grants can be found in the Land
Acquisition and State Assistance section.
Find more information online at: www.nps.gov/orgs/2287/index.htm
National Park Service FY 2024 Budget Justifications
NRP-30
Activity: Cultural Programs
Program Component: American Indian & Native Hawaiian Art & Culture Grants
FY 2024 Program Activities
The following is an example of planned FY 2024 American Indian & Native Hawaiian Art & Culture
Grants activities:
The NPS expects to provide funding to the Northwest Coast arts program as outlined by the
memorandum of agreement between the Institute of American Indian Arts and the Sealaska
Heritage Institute.
The NPS will use program increases provided in FY 2022 and FY 2023 to support existing
program participants and to provide competitive opportunities for new entities to apply for
funding.
Justification of FY 2024 Program Changes
The FY 2024 budget request for American Indian and Native Hawaiian Art and Culture Grants is
$2,750,000 and 0 FTE. There are no proposed program changes from FY 2023 Enacted.
Program Overview
This program supports Native culture and arts development with congressional direction to fund the
Northwest Coast arts program through the Sealaska Heritage Institute. The Northwest Coast arts program
contributes to maintaining the cultural diversity of the Nation and the cultural survival of the region’s
indigenous populations, furthering the goals of the American Indian, Alaska Native, and Native Hawaiian
Culture and Art Development Act.
National Park Service FY 2024 Budget Justifications
NRP-31
Activity: Cultural Programs
Program Component: 9/11 Memorial Act Grants
FY 2024 Program Activities
The following is an example of planned FY 2024 9/11 Memorial Act Grants activities:
The program expects to award $4.0 million in grants to one or more of the eligible organizations.
Justification of FY 2024 Program Changes
The FY 2024 budget request for 9/11 Memorial Act Grants is $4,000,000 and 0 FTE. There are no
proposed program changes from FY 2023 Enacted.
Program Overview
The 9/11 Memorial Act Grant Program was established in FY 2020 to provide competitive grants for the
continued operation, security, and maintenance of the on-site memorials of the events and victims of
September 11, 2001. Eligible recipients must be located at the sites of the attacks, and they must be
established to commemorate the events of, and honor the victims of, the terrorist attacks on the World
Trade Center and the Pentagon on September 11, 2001. In addition, they must offer free admission to
active and retired members of the military, registered first responders to the 9/11 attacks, and family
members of victims of the attacks as well as offer free admission hours to the general public at least once
per week.
National Park Service FY 2024 Budget Justifications
NRP-32
Activity: Cultural Programs
Program Component: Oklahoma City Memorial Endowment Fund
FY 2024 Program Activities
The FY 2024 budget request does not propose funding for the Oklahoma City Memorial Endowment
Fund. The amount provided to the Endowment from FY 2022 appropriations completed the total
authorized appropriation for this purpose.
Justification of FY 2024 Program Changes
The FY 2024 budget request does not include funding for the Oklahoma City Memorial Endowment
Fund. There are no proposed program changes from FY 2023 Enacted.
Program Overview
The Oklahoma City National Memorial is an affiliated area of the NPS that honors the victims, survivors,
rescuers, and all who were affected by the Oklahoma City bombing on April 19, 1995.
National Park Service FY 2024 Budget Justifications
NRP-33
Activity: Cultural Programs
Program Component: African American Burial Grounds Preservation Program
FY 2024 Program Activities
The following is an example of planned FY 2024 African American Burial Grounds Preservation
Program activities:
Award $3.0 million of grants from the first year of funding for this newly established program.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the African American Burial Grounds Program is $3,000,000 and 0 FTE,
a program change of +$3,000,000 and 0 FTE from FY 2023 Enacted.
Racial Justice and Equity for Undeserved Communities Initiative – African American Burial
Grounds Preservation Program (+$3,000,000 / +0 FTE) – Funding would allow the NPS to implement
the United States African American Burial Grounds Preservation Program established in the Consolidated
Appropriations Act, 2023 and authorized through 2027. Under this new program, the NPS will support
identification, preservation, restoration, interpretation, research, and documentation of historic African
American burial grounds through grants, cooperative agreements, memoranda of understanding, and
technical assistance.
Program Overview
The Consolidated Appropriations Act, 2023 (P.L. 117-328) established a new grant program to support
partners in identifying, researching, documenting, interpreting, and preserving African American burial
grounds. The NPS is working to develop the program in FY 2023 and make the first grants under this
authority in FY 2024.
National Park Service FY 2024 Budget Justifications
NRP-34
Activity: Cultural Programs
Program Component: Grants Administration
FY 2024 Program Activities
The following are examples of planned FY 2024 Grants Administration activities:
Administer the Historic Preservation Fund grant programs, including providing training and
guidance on grant and program requirements and management for formula grants to States,
Tribes, and local governments, a disaster relief program, congressionally-directed project grants,
and five competitive grant programs – a total of over 1,500 active grants.
Manage over 200 active grants funded from NR&P.
Administer the Certified Local Government program for over 2,000 communities and the
Preservation Planning program for 59 State Historic Preservation Offices as they relate to
requirements of the HPF and the National Historic Preservation Act.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Grants Administration is $4,695,000 and 18 FTE, a program change of
+$1,000,000 and +4 FTE from FY 2023 Enacted.
Racial Justice and Equity for Underserved Communities Initiative – Grants Administration
(+$1,000,000 / +4 FTE) – Funding would allow the NPS to effectively manage the additional and
growing workload of grants administration associated with recent increases in grant funding, recently
established grant programs including the Japanese American Confinement Sites education grants and the
African American Burial Ground grants program, and earmarked projects funded from the NR&P and
Historic Preservation Fund accounts. NPS grants administration staff currently manage on average 100
grants per person, which is not a sustainable workload. This increase would fund an additional two to
three additional grant managers, as well as technical review staff to ensure compliance with relevant laws
and policies, particularly for earmarked projects that have generally only been through minimal review
before appropriations. This would bring the average caseload to approximately 75 per person, which will
improve the NPS ability to implement the many grant programs it administers. This increase would also
allow the NPS to conduct more technical assistance to potential applicants, thereby improving the quality
of projects funded by NPS grant programs.
Program Overview
The Grants Administration Program administers multiple grant programs within the Historic Preservation
Fund account, as well as grants funded from within this appropriation. The NPS is responsible for
ensuring that grantees comply with all requirements and that they successfully complete their proposed
projects.
National Park Service FY 2024 Budget Justifications
NRP-35
Activity: Environmental Compliance and Review
Environmental
Compliance and
Review ($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change from
2023 Enacted
(+/-)
Environmental
Compliance and
Review 456 465 +19 0 0 484 +19
Total
Requirements 456 465 +19 0 0 484 +19
Total FTE
Requirements 3 3 0 0 0 3 0
Mission Overview
The Environmental Compliance and Review activity supports the Service’s mission by contributing to the
protection, restoration, and preservation of natural and cultural resources; the provision of adequate
knowledge to properly manage these resources; and to provide for visitor enjoyment and satisfaction with
the appropriate availability, diversity, and quality of park facilities, services, and recreational
opportunities.
Activity Overview
The Environmental Compliance and Review activity provides review and comment on environmental
impact Statements, Federal licensing and permitting applications, and other actions which may impact
areas of NPS jurisdiction and expertise. This activity ensures compliance with the National
Environmental Policy Act (NEPA) and other environmental protection mandates. It also provides
comments on the effects on environmental quality resulting from proposed legislation, regulations,
guidelines, Executive Orders regarding outdoor recreation, including wild and scenic rivers, National
trails, wilderness, resource management plans and activities from other agencies, recreation complexes,
Federal surplus property or transfers, and related projects and undertakings.
FY 2023 Program Activities
The following is an example of planned FY 2024 Environmental Compliance and Review activities:
Coordinate the NPS’s review and comments on approximately 1,000 external environmental
review documents.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Environmental Compliance and Review is $484,000 and 3 FTE. There
are no proposed program changes from FY 2023 Enacted.
Program Overview
The Environmental Compliance and Review activity is the focal point for NPS external environmental
review. NPS is a major participating bureau in DOI’s Environmental Review Program since the NPS has
unique expertise associated with the review of environmental compliance documents that have the
potential to impact outdoor recreation at the Federal, State, and local levels. Because of the geographic
National Park Service FY 2024 Budget Justifications
NRP-36
breadth of these park and recreation lands and improvements, it is necessary for the Department to
transmit certain environmental documents received from other agencies and bureaus to the NPS for
review and preparation of agency comments. Typically, approximately 1,000 documents are submitted to
and reviewed by NPS each year. The program facilitates NPS review and comment on the potential
impacts of agency proposals on NPS resources and values, and helps other agencies mitigate these
impacts.
National Park Service FY 2024 Budget Justifications
NRP-37
Activity: International Park Affairs
International Park
Affairs ($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change from
2023 Enacted
(+/-)
Office of
International Affairs 1,274 1,308 +59 0 0 1,367 +59
Southwest Border
Resource Protection
Program 676 682 +8 0 0 690 +8
Total Requirements 1,950 1,990 +67 0 0 2,057 +67
Total FTE
Requirements 8 8 0 0 0 8 0
Mission Overview
The International Park Affairs activity includes the Office of International Affairs and the Southwest
Border Resource Protection Program. These programs support the NPS mission by contributing to the
conservation and protection of natural and cultural resources and associated values of the National Park
system and of key partner countries, the restoration and maintenance of the condition of these resources,
and the ability of the NPS to collaborate effectively with partners to achieve these goals.
Activity Overview
Since the designation of Yellowstone as the world’s first National Park in 1872, the United States has
been looked to for leadership and as a model in park management by other countries and the global parks
movement. The NPS has a long tradition of international engagement and has either helped create or
significantly influenced the development of park systems in nearly every country in the world.
International cooperation is directly related to the NPS mission, and is even included in the Mission
Statement, “The Park Service cooperates with partners…throughout this country and the world.” In
addition to providing other nations with technical assistance, the NPS has learned innovative park
management techniques from international cooperation activities, in such diverse fields as invasive
species management, interpretation, biodiversity prospecting, and cultural resources preservation.
Research has demonstrated that international collaboration is critical to protecting many different types of
park resources. Hundreds of migratory species, including birds, bats, butterflies, salmon, and whales
regularly move between NPS units and habitats outside the US. To ensure that these shared wildlife
species continue to return to U.S. parks, NPS staff work with counterparts in other countries to establish
and manage protected areas outside U.S. borders. Similarly, invasive species, wildfire, and air and water
pollution pay no heed to boundaries and require international collaboration for effective resource
protection.
National Park Service FY 2024 Budget Justifications
NRP-38
Activity: International Park Affairs
Program Component: Office of International Affairs
FY 2024 Program Activities
The following are examples of planned FY 2024 Office of International Affairs (OIA) activities:
OIA will coordinate official international visitor and volunteer programs, provide information and
assistance to NPS employees on international issues, and serve as NPS liaison with other Federal
agencies, particularly the State Department, on international park and heritage matters.
OIA will develop technical assistance and exchange programs with key partners, including
Australia, Canada, Mexico, Chile, Georgia, Palau, and other nations. This will include in-country
training, study tours in the United States, the development of ‘sister parks’ and other initiatives of
mutual benefit.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the Office of International Affairs is $1,367,000 and 6 FTE. There are no
proposed program changes from FY 2023 Enacted.
Program Overview
The NPS Office of International Affairs (OIA) is the NPS focal point for international activities and
serves as the primary contact for other DOI bureaus, agencies, foreign governments, and international and
private organizations on park and conservation related matters. Through OIA, NPS exchanges technical
and scientific information, shares knowledge and lessons learned, and provides technical assistance to
other nations on park and heritage resource management issues. It also assists in the implementation of
international treaty obligations that arise from legislative mandates and executive initiatives. OIA
provides guidance to NPS employees on international engagement and oversees all official international
travel requests for review and approval by NPS and DOI leadership.
World Heritage: OIA provides staff support to the Assistant Secretary for Fish and Wildlife and
Parks on the World Heritage Convention, a U.S. treaty obligation, which the National Historic
Preservation Act directs the Secretary of the Interior to lead and coordinate for the U.S.
government. The NPS manages 18 of the 24 World Heritage Sites in the U.S., including Grand
Canyon and Yellowstone National Parks, and OIA administers the Convention’s ongoing
reporting and nomination process. The World Heritage Committee routinely monitors
developments that could affect U.S. World Heritage Sites. OIA coordinates the U.S. response to
the Committee’s queries about such issues. OIA also guides and coordinates the development of
U.S. World Heritage nominations and maintains information to update the official “Tentative
List” from which nominations are selected. At the Committee’s 46
th
session in 2023, a serial
nomination of eight earthworks associated with the ancient Hopewell Culture in Ohio will be
considered for inscription on the List. A multi-country nomination of Moravian Church
Settlements, including the Moravian District, in Bethlehem, Pennsylvania (along with related
sites in Germany and the United Kingdom) will be formally submitted in 2023 for consideration
by the Committee the following year.
Technical Assistance: As part of official international agreements with partner park agencies,
OIA strengthens efforts to protect border parks with shared park resources and supports U.S.
National Park Service FY 2024 Budget Justifications
NRP-39
foreign policy objectives through technical assistance to other countries’ national park systems.
The majority of this assistance is funded with outside financial support, primarily from the U.S.
Agency for International Development, the U.S. Department of State, and the World Bank.
Long-Term Programs: OIA develops and implements cooperative international agreements to
conduct long-term programs for protected areas conservation, cultural heritage, and resource
management with key international partners. The NPS also shares management responsibility for
preservation and conservation of natural and cultural resources with park authorities in adjacent
countries, including Canada and Mexico, as well as with Russia and in the Caribbean Basin.
International Visitors and Volunteers: OIA serves as the initial NPS point of contact for
official international visitors who wish to interact directly with Service professionals to learn
about various elements of park management in the United States. On average, OIA handles more
than 300 official international visitors from as many as seventy countries each year through the
State Department’s International Visitor Leadership Program (IVLP). OIA also coordinates the
International Volunteers in Parks (IVIP) program, which places over 125 international students
and park managers in NPS units each year, providing them with hands-on training while also
supporting park projects.
Find more information online about the International Affairs Program at: International Affairs
(nps.gov)
National Park Service FY 2024 Budget Justifications
NRP-40
Activity: International Park Affairs
Program Component: Southwest Border Resource Protection Program
FY 2024 Program Activities
The following are examples of planned FY 2024 Southwest Border Resource Protection Program
activities:
Provide technical and financial assistance to parks along the international southern border to
achieve common goals with our Mexican partners, maintain cooperative relationships, mitigate
impacts on cultural and natural resources, engage new partners, communities, and visitors in
shared environmental stewardship, and increase appreciation and understanding of our shared
cultural heritage.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the Southwest Border Resource Protection Program is $690,000 and 2
FTE. There are no proposed program changes from FY 2023 Enacted.
Program Overview
The NPS manages ten parks along the 2,000-mile border shared between the United States and Mexico.
Mexico manages nine protected areas along this same international border. The national park units
include Organ Pipe Cactus NM, Big Bend NP, Amistad NRA, Palo Alto NHS, Padre Island NS, Saguaro
NP, Tumacácori NHP, Chamizal NMem, Coronado NMem, and Chiricahua NM. Some of these NPS
units, such as Organ Pipe NM, consistently experience serious resource damage due to illegal cross-
border activities traversing the parks. Other national park units within the desert Southwest have also
experienced impacts to their natural and cultural resources. Thousands of miles of unauthorized roads and
trails have been created, major ecological processes and the migration patterns of wildlife have been
disrupted, important historic sites have been vandalized, and archeological sites have been looted. The
Southwest Border Resource Protection Program, located within the Denver Regional Office, works with
park units and their Mexican counterparts, as well as educational institutions, international nonprofit
organizations, Tribes, and local, State, and Federal agencies on cross-border projects that improve
resource stewardship and achieve international cooperation along this border.
National Park Service FY 2024 Budget Justifications
NRP-41
Activity: Heritage Partnership Programs
Heritage
Partnership
Programs ($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change from
2023 Enacted
(+/-)
Commissions and
Grants 26,112 28,167 0 0 0 28,167 0
Administrative
Support 1,032 1,065 +49 0 0 1,114 +49
Total
Requirements 27,144 29,232 +49 0 0 29,281 +49
Total FTE
Requirements 5 5 0 0 0 5 0
Mission Overview
The Heritage Partnership Program (HPP) supports the conservation and stewardship of diverse natural
and cultural resources and the provision of educational and recreational benefits for the American people
through partnership programs.
Activity Overview
Heritage Partnership Programs promote the conservation of local natural, historic, scenic, and cultural
resources through national heritage areas, national heritage corridors, national historic districts, and other
designations. These authorized programs are the management responsibility of Federal commissions,
nonprofit groups, universities, State agencies or municipal authorities. They are not units of the National
Park System, and their lands are not Federally owned or managed. They are guided by management plans
approved by the Secretary of the Interior. Via this partnership strategy, these programs provide a powerful
tool for the preservation of community heritage, combining historic preservation; cultural and natural
resource conservation; local and regional preservation planning; and heritage education and tourism. In
FY 2022, these programs leveraged over $74.6 million in cash and in-kind support and benefitted from
over 326,000 volunteer hours valued at $9.7 million, greatly increasing the impact of their Federal
funding. This activity includes two program components:
Commissions and Grants – Provides funding to 60 of the 62 authorized programs
1
Administrative Support – Provides servicewide coordination, guidance, assistance, training, and
support to programs, partners, and the public
1
Southwestern Pennsylvania Heritage Preservation Commission and John H. Chafee Blackstone River Valley National Heritage
Corridor no longer receive Federal funding from this fund source. The latter continues to receive technical support from the
Heritage Partnership Program Program and coordinates closely with Blackstone River Valley NHP.
National Park Service FY 2024 Budget Justifications
NRP-42
Activity: Heritage Partnership Programs
Program Component: Commissions and Grants
FY 2024 Program Activities
The following are examples of planned FY 2024 Heritage Partnership Programs Commissions and Grants
activities:
Support recently-established national heritage areas in their legislatively mandated management
planning process.
Support mature national heritage areas, national heritage corridors, national historic districts, and
other designations through cooperative agreements, with lower-funded programs funded flat from
amounts allocated at the FY 2023 enacted level and higher-funded programs reduced to provide
funding for newly-established programs.
Heritage Partnership Program States
Date
Authorized
FY 2023
Enacted
FY 2024
Request
Cumulative
Incl. FY
2024
Abraham Lincoln NHA IL 2008 $500,000 $500,000 $4,838,205
Alabama Black Belt NHA AL 2023 n/a $150,000 $150,000
Appalachian Forest NHA* MD/WV 2019 $500,000 $500,000 $1,469,291
Arabia Mountain NHA GA 2006 $500,000 $500,000 $5,123,865
Atchafalaya NHA LA 2006 $500,000 $500,000 $5,126,865
Augusta Canal NHA GA 1996 $500,000 $500,000 $10,672,380
Baltimore NHA MD 2009 $500,000 $500,000 $4,690,205
Blue Ridge NHA NC 2003 $690,000 $589,000 $14,584,780
Bronzeville-Black Metropolis NHA IL 2023 n/a $150,000 $150,000
Cache la Poudre River NHA CO 1996 $500,000 $500,000 $4,879,205
Cane River NHA LA 1994 $591,000 $504,000 $15,378,218
Champlain Valley National Heritage
Partnership NY/VT 2006 $500,000 $500,000 $5,271,865
Crossroads of the American
Revolution NHA NJ 2006 $500,000 $500,000 $5,123,865
Delaware and Lehigh National
Heritage Corridor PA 1988 $610,000 $521,000 $19,314,559
Downeast Maine NHA ME 2023 n/a $150,000 $150,000
Erie Canalway National Heritage
Corridor NY 2000 $709,000 $605,000 $15,329,528
Essex NHA MA 1996 $628,000 $536,000 $19,985,568
Freedom’s Frontier NHA KS/MO 2006 $500,000 $500,000 $5,344,865
Freedom’s Way NHA MA/NH 2009 $500,000 $500,000 $4,390,205
Great Basin National Heritage Route NV/UT 2006 $500,000 $500,000 $4,985,865
Gullah/Geechee Cultural Heritage
Corridor
FL/GA/
NC/SC 2006 $500,000 $500,000 $4,985,865
Illinois and Michigan Canal National
Heritage Corridor IL 1984 $500,000 $500,000 $11,177,205
John H. Chafee Blackstone River
Valley National Heritage Corridor MA/RI 1986 n/a n/a $15,005,961
National Park Service FY 2024 Budget Justifications
NRP-43
Heritage Partnership Program States
Date
Authorized
FY 2023
Enacted
FY 2024
Request
Cumulative
Incl. FY
2024
Journey Through Hallowed Ground
NHA
MD/PA/
VA/WV 2008 $500,000 $500,000 $4,688,205
Kenai Mountains-Turnagain Arm
NHA
AK 2009 $500,000 $500,000 $4,690,205
Lackawanna Valley NHA PA 2000 $500,000 $500,000 $11,658,398
The Last Green Valley National
Heritage Corridor CT/MA 1994 $666,000 $568,000 $17,599,471
Maritime Washington NHA WA 2019 $500,000 $500,000 $1,469,291
Maurice D. Hinchey Hudson River
Valley NHA NY 1996 $500,000 $500,000 $14,379,756
Mississippi Delta NHA MS 2009 $500,000 $500,000 $4,540,205
Mississippi Gulf Coast NHA MS 2004 $500,000 $500,000 $6,058,978
Mississippi Hills NHA MS 2009 $500,000 $500,000 $4,540,205
Mormon Pioneer NHA UT 2006 $500,000 $500,000 $5,344,865
MotorCities NHA (Automobile) MI 1998 $500,000 $500,000 $12,119,756
Mountains to Sound Greenway NHA WA 2019 $500,000 $500,000 $1,469,291
Muscle Shoals NHA AL 2009 $500,000 $500,000 $4,540,205
National Aviation Heritage Area OH 2004 $500,000 $500,000 $6,340,978
National Coal Heritage Area WV 1996 $500,000 $500,000 $7,379,599
Niagara Falls NHA NY 2008 $500,000 $500,000 $4,976,205
Northern Neck NHA VA 2023 n/a $150,000 $150,000
Northern Plains NHA ND 2009 $500,000 $500,000 $3,930,342
Northern Rio Grande NHA NM 2006 $500,000 $500,000 $4,835,865
Ohio and Erie National Heritage
Canalway OH 1996 $640,000 $546,000 $20,197,448
Oil Region NHA PA 2004 $500,000 $500,000 $6,339,993
Rivers of Steel NHA PA 1996 $664,000 $567,000 $20,627,919
Sacramento-San Joaquin Delta NHA* CA 2019 $500,000 $500,000 $1,469,291
Sangre de Cristo NHA CO 2009 $500,000 $500,000 $4,690,205
Santa Cruz Valley NHA AZ 2019 $500,000 $500,000 $1,469,291
Schuylkill River Valley NHA PA 2000 $500,000 $500,000 $11,296,756
Shenandoah Valley Battlefields
National Historic District VA 1996 $500,000 $500,000 $11,685,284
Silos and Smokestacks NHA IA 1996 $710,000 $606,000 $17,181,107
South Carolina National Heritage
Corridor SC 1996 $663,000 $566,000 $18,218,000
South Park NHA CO 2009 $500,000 $500,000 $4,690,205
Southern Campaign of the Revolution
National Heritage Corridor NC/SC 2023 n/a $150,000 $150,000
Southern Maryland NHA MD 2023 n/a $150,000 $150,000
Southwestern Pennsylvania Heritage
Preservation Commission PA 1988 n/a n/a $2,432,000
St. Croix NHA USVI 2023 n/a $150,000 $150,000
National Park Service FY 2024 Budget Justifications
NRP-44
Heritage Partnership Program States
Date
Authorized
FY 2023
Enacted
FY 2024
Request
Cumulative
Incl. FY
2024
Susquehanna NHA* PA 2019 $500,000 $500,000 $1,469,291
Tennessee Civil War Heritage Area TN 1996 $500,000 $500,000 $9,790,559
Upper Housatonic Valley NHA CT/MA 2006 $500,000 $500,000 $4,835,865
Wheeling NHA WV 2000 $596,000 $509,000 $15,581,589
Yuma Crossing NHA AZ 2000 $500,000 $500,000 $8,132,134
Total $28,167,000 $28,167,000
*Funding in FY 2023 and FY 2024 is contingent on approval of the legislatively required management plan. If the management
plan is not approved, funding will be made available at the FY 2022 enacted level, with the remainder distributed to other areas.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Commissions and Grants is $28,167,000 and 0 FTE. There are no
proposed program changes from FY 2023 Enacted.
National Park Service FY 2024 Budget Justifications
NRP-45
Activity: Heritage Partnership Programs
Program Component: Administrative Support
FY 2024 Program Activities
The following are examples of planned FY 2024 Heritage Partnership Programs Administrative Support
activities:
Coordinate NPS headquarters, regional, and park interaction with heritage partnership programs.
Monitor use of prior-year Heritage Partnership Program funding.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Administrative Support is $1,114,000 and 5 FTE. There are no proposed
program changes from FY 2023 Enacted.
Program Overview
The NPS leverages its institutional expertise to enhance heritage partnership program management and
support the work of programs and their partners, providing technical assistance and guidance,
administrative support, information and support on budget and policies, and the coordination and
dissemination of information to partners and the public. Additionally, the NPS seeks to encourage
standards and accountability for heritage partnership programs through a variety of avenues including
research, measurement, monitoring, and evaluation; to support organizational sustainability, business
planning, and financial resource development planning; to encourage consistency and quality in heritage
partnership programs while working towards a cohesive network; and to share and promote applicable
practices in the protection of cultural and national heritage resources.
National Park Service FY 2024 Budget Justifications
NRP-46
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
NRP-47
Activity: Statutory and Contractual Aid
Statutory and
Contractual Aid
($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change from
2023 Enacted
(+/-)
Statutory and
Contractual Aid 3,500 2,919 0 0 -2,919 0 -2,919
Total
Requirements 3,500 2,919 0 0 -2,919 0 -2,919
Total FTE
Requirements 0 0 0 0 0 0 0
Summary of FY 2024 Program Changes for Heritage Partnership Programs
Program Changes ($000) FTE
Statutory and Contractual Aid -2,919 0
TOTAL Program Changes -2,919 0
Mission Overview
Statutory and Contractual Aid represents congressionally directed spending to operate, manage, interpret,
and preserve resources at associated areas.
FY 2024 Program Activities
The FY 2024 budget request does not propose funding for Historic Preservation Fund Projects.
Justification of FY 2024 Program Changes
Statutory and Contractual Aid (-$2,919,000 / -0 FTE) – The FY 2024 budget request does not propose
funding for Statutory and Contractual Aid.
National Park Service FY 2024 Budget Justifications
NRP-48
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
HPF-1
Appropriation: Historic Preservation Fund
Mission Overview
The Historic Preservation Fund (HPF) contributes to the National Park Service’s goal of protecting
significant cultural resources. Grants from the HPF to States, Tribes, local governments, and nonprofit
organizations serve as catalysts for preserving and protecting our Nation’s irreplaceable heritage without
expending tax dollars. They also leverage private and non-Federal investment while creating jobs that
expand local economies and accelerate historic preservation activities pursuant to the National Historic
Preservation Act and other relevant laws.
Appropriation Overview
The Historic Preservation Fund appropriation includes grant programs to facilitate the preservation of the
Nation’s historic and cultural resources. The appropriation is composed of two budget activities:
Grants-in-Aid
The Grants-in-Aid activity includes grants to support operations of the historic preservation offices of
States, Territories, local governments, and American Indian Tribes. These grants facilitate the
preservation of cultural heritage and compliance with Federal preservation mandates, including
conducting Section 106 review and developing National Register of Historic Places eligibility opinions as
required by the National Historic Preservation Act. Grants-in-Aid to States are formula funded to State
Historic Preservation Offices (SHPO) and must be matched by a non-Federal contribution that constitutes
at least forty percent of the cost of administering the SHPO’s projects and programs. SHPOs must
distribute at least ten percent of their grants to Certified Local Governments. Grants-in-Aid to Tribes are
formula funded to Tribal Historic Preservation Offices (THPO). The matching requirement for Grants to
Tribes is waived. This activity also includes multiple competitive grant programs including the Tribal
Heritage Grants program which awards competitive grants to support preservation and protection of the
cultural heritage of Federally-recognized Tribes, Alaska Native Villages and Corporations, and Native
Hawaiian Organizations. Other grant programs preserve historic properties at Historically Black Colleges
and Universities; revitalize rural communities through rehabilitation of historic properties; survey and
nominate to the National Register of Historic Places properties associated with underrepresented
communities; preserve historic sites that tell the stories of the struggle for African-American civil rights
and equal rights in America, and restore sites and structures that honor and interpret the founding of the
Nation.
Grants-in-Aid to Save America’s Treasures
The Grants-in-Aid to Save America’s Treasures activity provides grants to preserve nationally significant
museum collections and historic sites.
National Park Service FY 2024 Budget Justifications
HPF-2
Summary of Requirements for Historic Preservation Fund
(Dollars in Thousands)
Budget Activity/Subactivity
FY 2022
Actual
FY 2022
Actual
FTE
FY 2023
Enacted
FY 2023
Enacted
FTE
FY 2024
Request
Fixed
Costs
(+/-)
FY 2024
Request
Internal
Transfers
(+/-)
FY 2024
Request
Program
Changes
(+/-)
FY 2024
Request
Program
Changes
(+/-) FTE
FY 2024
Request
FY 2024
Request
FTE
FY 2024
Request
Total
Change
from FY
2023 (+/-)
Grants-in-Aid
Grants-in-Aid to States and Territories 57,675 0 62,150 0 0 0 0 0 62,150 0 0
Grants-in-Aid to Indian Tribes 16,000 0 23,000 0 0 0 0 0 23,000 0 0
Tribal Heritage Grants 1/ [640] [0] [920] [0] 0 0 +2,500 0 2,500 0 +2,500
Grants-in-Aid to Historically Black
Colleges & Universities 10,000 1 11,000 1 0 0 0 0 11,000 1 0
Paul Bruhn Historic Revitalization Grants 10,000 1 12,500 1 0 0 0 0 12,500 1 0
Competitive Grants
African American Civil Rights 21,750 1 24,000 1 0 0 0 0 24,000 1 0
History of Equal Rights 4,625 1 5,000 1 0 0 0 0 5,000 1 0
Underrepresented Communities 1,250 1 1,250 1 0 0 0 0 1,250 1 0
Semiquincentennial Preservation Grants 10,000 0 10,000 0 0 0 0 0 10,000 0 0
Subtotal, Grants-in-Aid 131,300 5 148,900 5 0 0 +2,500 0 151,400 5 +2,500
Save America’s Treasures 26,500 2 26,500 2 0 0 0 0 26,500 2 0
Historic Preservation Fund Projects 15,272 0 29,115 0 0 0 -29,115 0 0 0 -29,115
TOTAL, HISTORIC PRESERVATION
FUND 173,072 7 204,515 7 0 0 -26,615 0 177,900 7 -26,615
1
The Tribal Heritage Grants program has been funded through Grants-in-Aid to Indian Tribes. The 2024 budget proposes to provide this competitive grant program its own dedicated fund source,
separate from formula-funded grants to Tribal Historic Preservation Offices. Bracketed amounts shown in 2022 and 2023 are non-add and reflect the set-aside for Tribal Heritage Grants in the Grants-
in-Aid to Indian Tribes line item for those years.
National Park Service FY 2024 Budget Justifications
HPF-3
HISTORIC PRESERVATION FUND
Appropriation Language
For expenses necessary in carrying out the National Historic Preservation Act (division A of subtitle III of
title 54, United States Code), [$204,515,000]$177,900,000, to be derived from the Historic Preservation
Fund and to remain available until September 30, [2024]2025, of which $26,500,000 shall be for Save
America’s Treasures grants for preservation of nationally significant sites, structures and artifacts as
authorized by section 7303 of the Omnibus Public Land Management Act of 2009 (54 U.S.C. 3089):
Provided, That an individual Save America’s Treasures grant shall be matched by non-Federal funds:
Provided further, That individual projects shall only be eligible for one grant: Provided further, That all
projects to be funded shall be approved by the Secretary of the Interior [in consultation with]who shall
provide notification to the House and Senate Committees on Appropriations: Provided further, That of
the funds provided for the Historic Preservation Fund, $1,250,000 is for competitive grants for the survey
and nomination of properties to the National Register of Historic Places and as National Historic
Landmarks associated with communities currently under-represented, as determined by the Secretary;
[$29,000,000]$24,000,000 is for competitive grants to preserve the sites and stories of the African
American Civil Rights movement; [$11,000,000] $5,000,000 is for competitive grants to preserve sites
related to the struggle of all people to achieve equal rights in America; $11,000,000 is for grants to
Historically Black Colleges and Universities; $12,500,000 is for competitive grants for the restoration of
historic properties of national, State, and local significance listed on or eligible for inclusion on the
National Register of Historic Places, to be made without imposing the usage or direct grant restrictions of
section 101(e)(3) (54 U.S.C. 302904) of the National Historical Preservation Act; and $10,000,000 is for
a competitive grant program to honor the semiquincentennial anniversary of the United States by
restoring and preserving sites and structures listed on the National Register of Historic Places that
commemorate the founding of the nation[; and $29,115,000 is for projects specified for the Historic
Preservation Fund in the table title “Interior and Environment Incorporation of Community Project
Funding Items/Congressionally Directed Spending Items” included for this division in the explanatory
statement described in section 4 (in the matter preceding division A of this consolidated Act]: Provided
further, That such competitive grants shall be made without imposing the matching requirements in
section 302902(b)(3) of title 54, United States Code to States and Indian tribes as defined in chapter 3003
of such title, Native Hawaiian organizations, local governments, including Certified Local Governments,
and non-profit organizations. (Department of the Interior, Environment, and Related Agencies
Appropriations Act, 2023.)
Justification of Major Proposed Language Changes
The FY 2024 President’s Budget expands on language originally contained in the FY 2023 Enacted bill
by itemizing the three components of Competitive Grants for clarity and transparency. The phrase “who
shall provide notification to” is substituted for “in consultation with” in order to make the language more
consistent with other terminology used in the President’s budget request. Additionally, language specific
to Congressionally Directed Spending is removed as it is not applicable to the FY 2024 request, and
subject to the determination of Congress.
National Park Service FY 2024 Budget Justifications
HPF-4
Appropriations Language Citations
1. For expenses necessary in carrying out the National Historic Preservation Act, (division A
of subtitle III of title 54, United States Code), $177,900,000,
54 U.S.C. 300101 – 307108, the National Historic Preservation Act of 1966 (Public Law 89-665,
80 Stat. 915), establishes a variety of historic preservation programs, including the historic
preservation grant program to provide assistance to non-Federal entities for the preservation of
their cultural heritage, the National Register of Historic Places, and the designation of National
Historic Landmarks. The Act authorizes the Secretary of the Interior to carry out these programs;
the National Park Service implements these programs and responsibilities for the Secretary.
2. to be derived from the Historic Preservation Fund
In 1976, Public Law 94-422 amended the National Historic Preservation Act to establish the
Historic Preservation Fund as the funding source. 54 U.S.C. 303102, as amended by Public Law
94-422, Public Law 96-515, Public Law 100-127, Public Law 102-575, Public Law 106-208,
Public Law 109-453, and Public Law 114-289 provided the fund with $150 million in revenues
from Outer Continental Shelf receipts each fiscal year through 2023.
3. and to remain available until September 30, 2025,
The NPS proposes the availability of funding for this account to remain available for two years,
consistent with past appropriations and authority under 54 U.S.C. 303103, which allows
appropriations from the Historic Preservation Fund to be made without fiscal year limitation.
National Park Service FY 2024 Budget Justifications
HPF-5
Justification of Program and Performance
Activity: Grants-in-Aid
Grants-in-Aid ($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change
from 2023
Enacted
(+/-)
Grants-in-Aid to
States and Territories 57,675 62,150 0 0 0 62,150 0
Grants-in-Aid to
Indian Tribes 16,000 23,000 0 0 0 23,000 0
Tribal Heritage Grants [640] [920] 0 0 +2,500 2,500 +2,500
Grants-in-Aid to
Historically Black
Colleges and
Universities 10,000 11,000 0 0 0 11,000 0
Paul Bruhn Historic
Revitalization Grants 10,000 12,500 0 0 0 12,500 0
Competitive Grants
27,625 30,250 0 0 0 30,250 0
Semiquincentennial
Preservation Grants 10,000 10,000 0 0 0 10,000 0
Total Requirements 131,300 148,900 0 0 +2,500 151,400 +2,500
Total FTE
Requirements 7 7 0 0 0 7 0
Summary of FY 2024 Program Changes for Grants-in-Aid
Program Changes ($000) FTE
Racial Justice and Equity for Undeserved Communities Initiative – Tribal
Heritage Grants
+2,500 0
Total Program Changes +2,500 0
Mission Overview
The Grants-in-Aid program supports the National Park Service mission by providing preservation
benefits for the American people through partnerships with other Federal, State, Tribal, and local
governments, and nonprofit organizations.
Activity Overview
The Grants-in-Aid activity provides grants in accordance with the provisions of the National Historic
Preservation Act (54 U.S.C. 300101 et seq.), demonstrating leadership and support for the preservation of
the Nation’s cultural, historic, and prehistoric resources. Grants under this activity fall into the following
categories: 1) matching grants to States, Territories (American Samoa, Commonwealth of the Northern
Mariana Islands, Guam, Commonwealth of Puerto Rico, and U.S. Virgin Islands), the District of
Columbia, and the Freely Associated States (Federated States of Micronesia, Republic of the Marshall
Islands, and Republic of Palau), 2) formula grants to American Indian Tribes, Alaska Natives, and Native
Hawaiians for cultural heritage preservation, 3) competitive grants to American Indian Tribes, Alaska
Natives, and Native Hawaiians for cultural heritage preservation, 4) grants to Historically Black Colleges
and Universities to document and preserve historic structures, 5) Paul Bruhn Historic Revitalization
Grants to rehabilitate historic properties and foster economic development in rural communities, 6)
National Park Service FY 2024 Budget Justifications
HPF-6
competitive grants for Underrepresented Communities in the National Register of Historic Places, African
American Civil Rights, and History of Equal Rights, and 7) Semiquincentennial Preservation Grants.
National Park Service FY 2024 Budget Justifications
HPF-7
Activity: Grants-in-Aid
Subactivity: Grants-in-Aid to States and Territories
FY 2024 Program Activities
The following are examples of planned FY 2024 Grants-in-Aid to States and Territories activities:
Award 59 HPF formula grants to States, Territories, the District of Columbia and the Freely
Associated States totaling $62.2 million.
States will distribute approximately 270 subgrants to over 2,150 Certified Local Governments
and certify 25 new communities.
States will survey approximately 10.0 million acres for cultural resources and evaluate and list
approximately 1,200 sites to the National Register of Historic Places.
States will review approximately 140,000 outside Federal undertakings in FY 2023, providing
100,000 National Register eligibility opinions.
Justification of FY 2024 Program Changes
The FY 2024 request for Grants-in-Aid to States and Territories is $62,150,000 and 0 FTE. There are no
proposed program changes from FY 2023 Enacted.
Subactivity Overview
The Historic Preservation Fund (HPF) was established in 1977 as a matching grant program and is funded
by Outer Continental Shelf oil and gas lease revenues. Deposits into the Fund are authorized at $150
million per year, through FY 2023. The FY 2024 Budget request includes a general provision to extend
the authorization by one year. Use of the Fund is subject to appropriations. In this way, revenues
generated by the use of one resource support efforts to conserve other resources, in this case historic
assets. Subsequent amendments to the NHPA in 1980 created the Certified Local Government program
and in 1992 established Tribal Historic Preservation Officers.
The National Park Service administers the HPF on behalf of the Secretary of the Interior. The funds
provided as annual grants to State and Tribal Historic Preservation Officers assist in efforts to protect and
preserve historic resources. Each State Historic Preservation Officer (SHPO), appointed by the governor
for each State, manages this annual grant to perform the Federal preservation responsibilities required by
the NHPA. All States must provide a 40% match.
Funding is used by States to pay for HPF eligible preservation projects, including survey and inventory of
historic resources, National Register nominations, preservation education, architectural planning,
community preservation plans, managing preservation tax incentives, and brick and mortar repair to
buildings. SHPOs also use funds to perform reviews of Federally funded projects that potentially affect
historic resources under Section 106 of the NHPA (54 U.S.C. 306108 et seq.). A minimum of ten percent
of each State’s allocation must be subgranted to assist Certified Local Governments (CLGs). These are
local governments certified by the NPS and the State as having made a commitment to local historic
preservation. These funds are spent locally on preservation projects, with selection decisions made at the
State level. Below are recent activities funded through Historic Preservation Fund Grants-in-Aid to the
SHPOs:
National Park Service FY 2024 Budget Justifications
HPF-8
Facilitated an estimated $6.5 billion of private investment in FY 2022 in the rehabilitation of
income-producing historic properties under the Federal Historic Preservation Tax Incentives
Program; an estimated total of $122.8 billion in completed projects since the program’s inception
in 1977 through FY 2022.
Created an estimated 6,789 new low- and moderate-income housing units through the Federal
Historic Preservation Tax Incentives program in FY 2022 for an estimated total of 192,314 new
low/moderate-income units since the program’s inception in 1977.
Surveyed approximately 8.9 million acres during FY 2021, the most recent year of data available,
for cultural resources by States, with over 130,200 properties evaluated for their historical
significance and added to State inventories.
SHPOs reviewed 101,400 Federal undertakings in FY 2021, the most recent year of data
available, providing 92,300 National Register eligibility opinions.
An estimated 135,000 jobs created by Federal Historic Preservation Tax Incentives Program in
FY 2021, and over 3.0 million from the program’s inception in 1977 through 2021 (the most
recent year available).
Acted on 1,304 actions related to the National Register of Historic Places in FY 2022, including
listings, determinations of eligibility, acceptance of multiple cover documents, additional
documentation, and requests for boundary changes, removals, and moved properties. Of these,
823 properties were listed in the National Register, bringing the cumulative total to over 98,000
listings with over 1.9 million contributing resources (buildings, sites, structures, objects).
Rejections continued to be low: only one nomination was rejected, representing less than one
percent of all National Register actions.
Thirty communities in 16 States became CLGs during FY 2022, bringing the cumulative total to
2,094 CLGs throughout the Nation.
Seven Statewide historic preservation plans were submitted and approved by SHPOs and
approved by the NPS in FY 2022.
Find more information online about SHPO grants at:
https://www.nps.gov/subjects/historicpreservationfund/shpo-grants.htm
National Park Service FY 2024 Budget Justifications
HPF-9
Activity: Grants-in-Aid
Subactivity: Grants-in-Aid to Tribes
FY 2024 Program Activities
The following are examples of planned FY 2024 Grants-in-Aid to Tribes activities:
Award formula grants to an estimated 210 Tribal Historic Preservation Offices (THPOs).
Add approximately 1,100 new listings to Tribal inventories.
Survey approximately 75,000 acres for cultural resources by Tribes with over 2,500 significant
historical and archeological properties inventoried, evaluated, or designated by Tribes.
Review approximately 75,000 Federal undertakings, providing 3,500 National Register eligibility
opinions.
Justification of FY 2024 Program Changes
The FY 2024 request for Grants-in-Aid to Tribes is $23,000,000 and 0 FTE. There are no proposed
program changes from FY 2023 Enacted.
Subactivity Overview
The NHPA authorizes the Secretary of the Interior to administer grants to American Indian Tribes for
preservation of their cultural heritage. NPS awards grants to THPOs so that they may assume duties from
the SHPOs. Distribution of grants to THPOs is based on a formula that considers both the number of
eligible Tribes and the relative size of Tribal lands, with 80 percent of the funding divided equally among
THPOs, and the remainder allocated based on acreage held in trust. Eligible activities may include
development of Tribal resource management plans, historic preservation skills development, historical
and archeological surveys, oral history projects, and performing Section 106 reviews of proposed
Federally funded projects. Grants to Tribes, which do not have a matching requirement, serve to help
preserve vanishing Tribal cultural resources and heritage, allowing Tribes to participate in the national
preservation program and developing capabilities for conducting sustainable preservation programs.
Find more information online about THPO grants online at:
https://www.nps.gov/subjects/historicpreservationfund/thpo-grants.htm
National Park Service FY 2024 Budget Justifications
HPF-10
Activity: Grants-in-Aid
Subactivity: Tribal Heritage Grants
FY 2024 Program Activities
The following are examples of planned FY 2024 Tribal Heritage Grants activities:
The program will competitively award approximately 15 grants.
Justification of FY 2024 Program Changes
Racial Justice and Equity for Underserved Communities Initiative – Tribal Heritage Grants
(+$2,500,000 / +0 FTE) – Funding would provide dedicated support for competitive Tribal Heritage
Grants to Federally-recognized Tribes, Alaska Native Villages and Corporations, and Native Hawaiian
Organizations for the preservation and protection of their cultural heritage. In prior fiscal years, the NPS
used a portion of Grants-in-Aid to Tribes (an average of $500,000 annually) for this purpose. This
increase would allow the program to make more and larger-dollar grants, creating a greater opportunity to
fund physical preservation work.
Subactivity Overview
Tribal Heritage Grants support Federally-recognized Tribes, Alaska Native Villages and Corporations,
and Native Hawaiian Organizations in preserving and protecting their cultural heritage. The NPS awards
grants for projects under five basic categories: Locating and Identifying Cultural Resources, Preserving
Historic Structures, Comprehensive Preservation Planning, Oral History and Documenting Cultural
Traditions, and Education and Training for Building a Tribal Historic Preservation Program. Recent
awards from this program include a grant to the Pueblo of Zuni (NM) to prepare a historical site
assessment and mitigation plan to repair and preserve the Middle Village Kiva, a grant to the Arrostook
Band of Micmacs (ME) to conduct an oral history project documenting basket making, and a grant to the
Knik Tribe (AK) for an archeological survey and map of part of the Tribe’s ancestral lands to lay the
foundation for a future conservation easement. Grants under this program are awarded through a
competitive process and do not require a non-Federal match, though matching is considered a competitive
factor.
Find more information online about Tribal Heritage Grants online at:
https://www.nps.gov/subjects/historicpreservationfund/tribal-heritage-grants.htm
National Park Service FY 2024 Budget Justifications
HPF-11
Activity: Grants-in-Aid
Subactivity: Grants-in-Aid to Historically Black Colleges and Universities
FY 2024 Program Activities
The following are examples of planned FY 2024 Historically Black Colleges and Universities activities:
The program will competitively award approximately 20 grants.
Justification of FY 2024 Program Changes
The FY 2024 request for Grants-in-Aid to Historically Black Colleges and Universities is $11,000,000
and 1 FTE. There are no proposed program changes from FY 2023 Enacted.
Program Overview
These grants provide physical preservation assistance to buildings located on campuses of Historically
Black Colleges and Universities (HBCUs) that are listed in or eligible for the National Register. The
program also funds National Register nominations and Preservation Plans for HBCU campuses. If a site
is not listed, then a new nomination or an amendment must be created as part of the grant project. Grants
under this program are awarded through a competitive process and do not require a non-Federal match,
though matching is considered a competitive factor. Since the 1990s, the NPS has awarded more than $87
million in grants to over 85 HBCUs.
Find more information online about HBCU Grants online at:
https://www.nps.gov/subjects/historicpreservationfund/historically-black-colleges-and-universities.htm
National Park Service FY 2024 Budget Justifications
HPF-12
Activity: Grants-in-Aid
Subactivity: Paul Bruhn Historic Revitalization Grants
FY 2024 Program Activities
The following are examples of planned FY 2024 Paul Bruhn Historic Revitalization Grants activities:
The program will competitively award approximately 18 grants.
Justification of FY 2024 Program Changes
The FY 2024 request for Paul Bruhn Historic Revitalization Grants is $12,500,000 and 1 FTE. There are
no proposed program changes from FY 2023 Enacted.
Program Overview
Paul Bruhn Historic Revitalization Grants support subgrant programs that enable the rehabilitation of
historic properties and foster economic development in rural communities. Recipients of the grants
include States, Tribes, Certified Local Governments, and nonprofits, which in turn subgrant funds to
projects in rural communities in their jurisdictions. This program funds preservation projects for historic
sites, including architectural and engineering services and physical preservation through subgrants to
communities determined to be rural by the US Bureau of the Census. Eligible properties must be listed in
the National Register of Historic Places or determined eligible for listing and located within rural (non-
urban) communities with populations less than 50,000. If a site is not listed, a new nomination or
amendment must be created as part of the grant project. Grants under this program are awarded through a
competitive process and do not require a non-Federal match, though matching is considered a competitive
factor.
Find more information online about Paul Bruhn Historic Revitalization Grants online at:
https://www.nps.gov/subjects/historicpreservationfund/paul-bruhn-historic-revitalization-grants-
program.htm
National Park Service FY 2024 Budget Justifications
HPF-13
Activity: Grants-in-Aid
Subactivity: Competitive Grants
Competitive Grants
($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change
from 2023
Enacted
(+/-)
African American
Civil Rights Grants 21,750 24,000 0 0 0 24,000 0
History of Equal
Rights Grants 4,625 5,000 0 0 0 5,000 0
Underrepresented
Communities Grants 1,250 1,250 0 0 0 1,250 0
Total Requirements 27,625 30,250 0 0 0 30,250 0
Total FTE
Requirements 3 3 0 0 0 3 0
FY 2024 Program Activities
The following are examples of planned FY 2024 Competitive Grants activities:
The program will competitively award approximately 45 African American Civil Rights grants,
including at least one from funding for larger-dollar physical preservation projects.
The program will competitively award approximately 12 History of Equal Rights grants.
The program will award approximately 22 Underrepresented Communities grants.
Justification of FY 2024 Program Changes
The FY 2024 Request for Competitive Grants is $30,250,000 and 3 FTE. There are no proposed program
changes from FY 2023 Enacted.
Program Overview
Competitive grants allow for the award of grants to State, Tribal, and local governments, and nonprofits,
allowing different communities and organizations to work together on over-arching issues and
preservation needs. This program funds:
African American Civil Rights Grants
The African American Civil Rights Grant Program (Civil Rights Grants) documents, interprets, and
preserves sites and stories related to the African American struggle to gain equal rights in America from
the transatlantic slave trade forward. This competitive grant program provides grants to States, Tribes,
local governments (including Certified Local Governments), and nonprofits. Grants will fund a broad
range of planning, development, and research projects for historic sites, including survey, inventory,
documentation, interpretation, education, collections conservation, architectural services, historic
structure reports, preservation plans, and physical preservation work. The program includes a specific
funding opportunity for larger-dollar physical preservation projects. If a site is not listed in or determined
eligible for the National Register of Historic Places or as a National Historic Landmark, or is not listed for
its association with civil rights, then a new nomination or amendment must be created as part of the grant
project. Grants under this program are awarded through a competitive process and do not require non-
Federal match, though matching is considered a competitive factor.
National Park Service FY 2024 Budget Justifications
HPF-14
Find more information online about African American Civil Rights Grants online at:
https://www.nps.gov/subjects/historicpreservationfund/african-american-civil-rights.htm
History of Equal Rights Grants
The History of Equal Rights grant program preserves sites related to the struggle of all people to achieve
equal rights in America, including but not limited to issues of race, gender sexuality, class, labor, age,
location, religion, and politics. The History of Equal Rights grants are not limited to any specific group
and are intended to include the broadest possible interpretation of sites associated with efforts to achieve
equal rights. This program funds physical preservation work and pre-preservation planning activities for
sites that are listed in or determined eligible for the National Register of Historic Places or as a National
Historic Landmark. Should a site not be listed, or not listed for its association with equal rights, then a
new nomination or amendment must be created as part of the grant project. Grants under this program are
awarded through a competitive process and do not require non-Federal match, though matching is
considered a competitive factor.
Find more information online about History of Equal Rights Grants online at:
https://www.nps.gov/subjects/historicpreservationfund/history-of-equal-rights.htm
Underrepresented Communities Grants
The Underrepresented Community Grant Program works to diversify listings in the National Register of
Historic Places. Projects include surveys and inventories, and nominations of historic properties
associated with communities underrepresented in the National Register, as well as amendment of older
nominations for specific sites. Eligible applicants are limited to State Historic Preservation Offices,
Federally-recognized Tribes, Alaska Native Villages/Corporations, and Native Hawaiian Organizations,
Certified Local Governments, and non-profit organizations. Grants under this program are awarded
through a competitive process and do not require a non-Federal match, though matching is considered a
competitive factor.
Find more information online about Underrepresented Communities Grants online at:
https://www.nps.gov/subjects/historicpreservationfund/underrepresented-community-grants.htm
National Park Service FY 2024 Budget Justifications
HPF-15
Activity: Grants-in-Aid
Subactivity: Semiquincentennial Preservation Grants
FY 2024 Program Activities
The following are examples of planned FY 2024 Semiquincentennial Preservation Grants activities:
The program will competitively award approximately 18 grants.
Justification of FY 2024 Program Changes
The FY 2024 Request for Semiquincentennial Preservation Grants is $10,000,000 and 0 FTE. There are
no proposed program changes from FY 2023 Enacted.
Program Overview
The Semiquincentennial Preservation Grant program supports preservation of structures listed in the
National Register of Historic Places that commemorate the founding of the nation. The program is
inclusive of the many peoples and forces that shaped the creation of America at any point until December
31, 1800. Funds may be awarded to States, Tribes, local governments, and nonprofits. Grants under this
program are awarded through a competitive process and do not require a non-Federal match, though
matching is considered a competitive factor.
Find more information online about Semiquincentennial Preservation Grants online at:
https://www.nps.gov/subjects/historicpreservationfund/semiquincentennial.htm
National Park Service FY 2024 Budget Justifications
HPF-16
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
HPF-17
Activity: Grants-in-Aid to Save America’s Treasures
Grants-in-Aid to
Save Americas
Treasures ($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change from
2023 Enacted
(+/-)
Save Americas
Treasures Grants 26,500 26,500 0 0 0 26,500 0
Total
Requirements 26,500 26,500 0 0 0 26,500 0
Total FTE
Requirements 2 2 0 0 0 2 0
Mission Overview
The Save America’s Treasures program funds partnerships with other Federal, State, Tribal, and local
agencies, and nonprofit organizations for the preservation of nationally significant sites and collections.
FY 2024 Program Activities
The following is an example of planned FY 2024 Save America’s Treasures activities:
The program will competitively award approximately 80 grants to Nationally significant
properties and collections.
Justification of FY 2024 Program Changes
The FY 2024 Request for Save America’s Treasures Grants is $26,500,000 and 2 FTE. There are no
proposed program changes from FY 2023 Enacted.
Program Overview
The Save America’s Treasures (SAT) grant program was established in 1998 and first awarded grants in
1999 to help preserve nationally significant historic properties and collections that convey our Nations
rich heritage to future generations. These matching grants are available for preservation and/or
conservation work on nationally significant museum collections and nationally significant historic
structures and sites. The NPS works closely with the Institute of Museum and Library Services, the
National Endowment for the Arts, and the National Endowment for the Humanities to administer the
program and develop public awareness. Since 1999, this program has provided $414 million to more than
1,500 projects.
Find more information online about Save America’s Treasures Grants online at:
https://www.nps.gov/subjects/historicpreservationfund/save-americas-treasures-grants.htm
National Park Service FY 2024 Budget Justifications
HPF-18
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
HPF-19
Activity: Historic Preservation Fund Projects
Historic
Preservation Fund
Projects ($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change from
2023 Enacted
(+/-)
Historic
Preservation Fund
Projects 15,272 29,115 0 0 -29,115 0 -29,115
Total
Requirements 15,272 29,115 0 0 -29,115 0 -29,115
Total FTE
Requirements 0 0 0 0 0 0 0
Mission Overview
Historic Preservation Fund Projects are congressionally directed spending for grants made under the
authority of the Historic Preservation Fund for preservation of the Nation’s historic and cultural
resources.
FY 2024 Program Activities
The FY 2024 request does not propose funding for Historic Preservation Fund Projects.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the Historic Preservation Fund Projects is $0 and 0 FTE, a program
change of -$29,115,000 and -0 FTE from FY 2023 Enacted.
Historic Preservation Fund Projects (-$29,115,000 / 0 FTE) – The FY 2024 request does not include
funding for Historic Preservation Fund Projects.
National Park Service FY 2024 Budget Justification
HPF-20
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justification
CONST-1
Appropriation: Construction
Mission Overview
The Construction appropriation provides support to several National Park Service mission goals,
including managing park resources, providing for visitor enjoyment, and improving organizational
effectiveness.
Appropriation Overview
The Construction appropriation is composed of five budget activities. The NPS also records reimbursable
transactions within this account.
Line Item Construction
National Park Service Line Item Construction provides for modernization and renewal of high-priority
facilities, which could include construction throughout the National Park System. It also provides for
divestiture of unneeded and obsolete assets, as well as security and restoration of abandoned mineral
lands.
Special Programs
Special Programs Provide for minor, unscheduled, and emergency construction projects; for inspection,
repair, or replacement of equipment infrastructure; for housing improvement; and for dam safety and
security.
Construction Planning
The Construction Planning activity lays the groundwork for actual construction through investigations,
surveys, analysis of alternatives, and design. These activities develop required technical and contractual
documents to allow construction projects to be awarded, to allow for construction completion within
budget and on schedule. Construction Planning ensures projects are designed and provide sustainable and
maintainable assets.
Construction Program Management and Operations
Construction Program Management and Operations activities provides regional and Washington office
program management, oversight of the construction program, administration of support to park employee
housing programs, and administration of the Dam Safety Program. It also provides centralized project
management and contracting services for construction and interpretive projects. One of the key activities
is a servicewide project management control system to validate the cost and scope of each requirement
and monitor status throughout all phases of the effort.
Management Planning
This activity prepares and maintains up-to-date plans to guide management decisions on the use,
development, and administration of each park. Unit Management Plans define the desired conditions for
watersheds, landscapes, marine and biological resources, cultural resources, and opportunities for
recreational experiences. Additionally, the Special Resource Studies component conducts
Congressionally-directed studies of the various alternatives available for protection of areas that may have
potential for addition to the National Park System or other designations. Finally, the Environmental
National Park Service FY 2024 Budget Justification
CONST-2
Planning and Compliance component completes environmental impact Statements for projects within the
requirements of National Environmental Policy Act (NEPA).
Reimbursable Activities
In addition to the subactivities described above, the NPS also records the majority of transactions related
to reimbursable activities and agreements with Federal, State, and local governments and Indian Tribes
within the Construction account; some reimbursable activity is also contained within the Operation of the
National Park System account. This consists of activities which the NPS has the expertise to undertake,
ranging from providing archaeological assistance and monitoring air and water quality, to constructing
and rehabilitating facilities and providing security for high profile historical and recreational sites. For
more information on actual and estimated spending and offsetting collections related to reimbursable
agreements, see the Budget Account Schedules for Construction and Operation of the National Park
System.
National Park Service FY 2024 Budget Justification
CONST-3
Summary of Requirements for Construction
(Dollars in Thousands)
Budget Activity/Subactivity
FY 2022
Actual
FY 2022
Actual
FTE
FY 2023
Enacted
FY 2023
Enacted
FTE
FY 2024
Request
Fixed
Costs
(+/-)
FY 2024
Request
Internal
Transfers
(+/-)
FY 2024
Request
Program
Changes
(+/-)
FY 2024
Request
Program
Changes
(+/-) FTE
FY 2024
Request
FY 2024
Request
FTE
FY 2024
Request
Total
Change
from FY
2023 (+/-)
Line Item Construction
Line Item Construction Projects 132,700 4 120,700 4 0 0 0 0 120,700 4 0
Abandoned Mineral Lands Projects 0 7 2,000 7 0 0 +2,000 0 4,000 7 +2,000
Demolition and Disposal Projects 4,000 1 4,000 1 0 0 0 0 4,000 1 0
Subtotal, Line Item Construction 136,700 12 126,700 12 0 0 +2,000 0 128,700 12 +2,000
Special Programs
Emergency & Unscheduled Projects 3,848 0 3,848 0 0 0 +7,000 0 10,848 0 +7,000
Housing Improvement Program 2,933 2 7,886 7 +13 0 +7,000 0 14,899 7 +7,013
Dam Safety and Security Program 1,247 0 1,247 0 0 0 0 0 1,247 0 0
Equipment Replacement Program 13,474 0 32,968 1 0 0 +16,956 0 49,924 1 +16,956
Subtotal, Special Programs 21,502 2 45,949 8 +13 0 +30,956 0 76,918 8 +30,969
Construction Planning 15,183 0 15,183 0 0 0 0 0 15,183 0 0
Construction Program Management &
Operations
Construction Program Management 2,838 8 2,902 8 +88 0 0 0 2,990 8 +88
Denver Service Center Operations 17,322 133 14,719 110 +1,439 0 0 0 16,158 110 +1,439
Harpers Ferry Center Operations 10,447 48 10,736 48 +461 0 0 0 11,197 48 +461
Regional Facility Project Support 9,314 29 6,534 20 +280 0 0 0 6,814 20 +280
Subtotal, Construction Program
Management & Ops. 39,921 218 34,891 186 +2,268 0 0 0 37,159 186 +2,268
Management Planning
Unit Management Plans 7,427 24 9,572 33 +244 0 +11,129 +15 20,945 48 +11,373
Special Resources Studies 1,486 6 1,529 6 +64 0 0 0 1,593 6 +64
EIS Planning and Compliance 3,765 13 5,979 20 +148 0 0 0 6,127 20 +148
Subtotal, Management Planning 12,678 43 17,080 59 +456 0 +11,129 15 28,665 74 +11,585
TOTAL, CONSTRUCTION 225,984 275 239,803 265 +2,737 0 44,085 15 286,625 280 +46,822
Supplemental Appropriations 229,472 38 1,500,000 38 0 0 -1,500,000 0 0 38 -1,500,000
TOTAL BUDGET AUTHORITY,
CONSTRUCTION 455,456 313 1,739,803 303 +2,737 0 -1,455,915 15 286,625 318 -1,453,178
1
FTE reports Current Direct FTE only
National Park Service FY 2024 Budget Justification
CONST-4
Fixed Costs and Related Changes
(Dollars in Thousands)
Fixed Cost Element
2023
Enacted
Total or
Change
2023
Enacted
to 2024
Request
Change Description
Change in Number of Paid Days -186 +201
This column reflects changes in pay associated with
the change in the number of paid days between 2023
and 2024. 2024 has one day more than 2023.
Pay Raise +1,935 +2,534
The President’s Budget for 2024 includes one quarter
of the 4.6% pay raise for 2023 and three quarters of a
planned 5.2% pay raise for 2024.
Employer Share of Federal Employee
Retirement System (FERS) 0 +2
This column reflects no budgeted increase to the
employer contribution to the Federal Employee
Retirement System and a 0.6% increase to the
employer contribution for the Law Enforcement
Federal Employees Retirement System.
Account Total Fixed Cost +2,737
National Park Service FY 2024 Budget Justification
CONST-5
CONSTRUCTION
Appropriations Language
For construction, improvements, repair, or replacement of physical facilities, and related equipment, and
compliance and planning for programs and areas administered by the National Park Service,
[$239,803,000] $286,625,000, to remain available until expended: Provided, That notwithstanding any
other provision of law, for any project initially funded in fiscal year [2023] 2024 with a future phase
indicated in the National Park Service 5-Year Line Item Construction Plan, a single procurement may be
issued which includes the full scope of the project: Provided further, That the solicitation and contract
shall contain the clause availability of funds found at 48 CFR 52.232–18: Provided further, That National
Park Service Donations, Park Concessions Franchise Fees, and Recreation Fees may be made available
for the cost of adjustments and changes within the original scope of effort for projects funded by the
National Park Service Construction appropriation: Provided further, That the Secretary of the Interior
shall [consult with] notify the Committees on Appropriations, in accordance with current reprogramming
thresholds, prior to making any charges authorized [by] under this [section] heading. (Department of the
Interior, Environment, and Related Agencies Appropriations Act, 2023.)
Justification of Major Proposed Language Changes
The phrase “notify” is substituted for “consult with” in order to make the language more consistent with
other terminology used in the President’s budget request.
Appropriations Language Citations
1. For construction, improvements, repair, or replacement of physical facilities, and related
equipment,
54 U.S.C. 100101, 100301-100302 creates the National Park Service to promote and regulate the
use of national park areas for their conservation and enjoyment and provides authority for
administering areas within the National Park System, thus implying authority for construction,
construction planning, and equipment replacement for these purposes. Also, Congress has enacted
limited authorizations for appropriations for specific construction projects.
54 U.S.C. 320101-320106 provides specific authority for the Secretary of the Interior to acquire
property and to restore, reconstruct, rehabilitate, preserve, and maintain historic and prehistoric
sites, buildings, objects, and properties of national historical or archeological significance.
54 U.S.C. 101501(a)-(e) provides specific authority for the Secretary of the Interior to plan,
acquire, establish, construct, enlarge, improve, maintain, equip, regulate, and protect airports in,
or in close proximity to national parks, monuments, and recreation areas when such airport is
included in the current national airport plan of the Secretary of Transportation.
2. and compliance and planning for areas and programs administered by the National Park
Service,
Specific authority is provided in 54 U.S.C. 100502 for general management plans for national
park areas. The National Park Service Omnibus Management Act of 1998 (P.L. 105-391) requires
an Act of Congress to specifically authorize a special resource study; however, it also allows the
National Park Service FY 2024 Budget Justification
CONST-6
NPS to conduct reconnaissance studies or other preliminary evaluations of areas, not to exceed
$25,000. 16 U.S.C. 1276d requires the Secretary of the Interior to conduct studies on potential
new wild and scenic rivers and submit reports to Congress.
The National Environmental Policy Act (P.L. 91-190), as amended, provides authority for the
National Park Service to conduct studies related to the environmental impact of proposed changes
concerning available resources.
3. $286,625,000, to remain available until expended:
The NPS proposes the availability of funding for the Construction account to remain available
until expended, consistent with past appropriations.
4. Provided, That notwithstanding any other provision of law, for any project initially funded
in fiscal year 2024 with a future phase indicated in the National Park Service 5–Year Line
Item Construction Plan, a single procurement may be issued which includes the full scope of
the project: Provided further, That the solicitation and contract shall contain the clause
availability of funds found at 48 CFR 52.232–18.
This provision allows the NPS to make a single procurement for multiple phases of projects.
These phases are planned for successive years and executing a single contract has the potential to
increase economies of scale and lower overall costs for the project. The “availability of funds”
clause at 48 CFR 52.232-18 States “Funds are not presently available for this contract. The
Government’s obligation under this contract is contingent upon the availability of appropriated
funds from which payment for contract purposes can be made. No legal liability on the part of the
Government for any payment may arise until funds are made available to the Contracting Officer
for this contract and until the Contractor receives notice of such availability, to be confirmed in
writing by the Contracting Officer.”
5. Provided further, National Park Service Donations, Park Concessions Franchise Fees, and
Recreation Fees may be utilized for the cost of adjustments and changes within the original
scope of effort for projects funded by the National Park Service Construction
appropriation: Provided further, That the Secretary of the Interior shall notify the
Committees on Appropriations, in accordance with current reprogramming thresholds,
prior to making any charges authorized under this heading.
This provision provides the NPS with the authority to address adjustments, subject to
reprogramming guidelines, for unforeseen circumstances to published estimated costs for specific
projects in a timely manner with other relevant appropriations.
National Park Service FY 2024 Budget Justification
CONST-7
Justification of Program and Performance
Activity: Line Item Construction
Line Item
Construction
($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change
from 2023
Enacted
(+/-)
Line Item
Construction
Projects 132,700 120,700 0 0 0 120,700 +0
Abandoned Mineral
Lands 0 2,000 0 0 +2,000 4,000 +2,000
Demolition and
Disposal 4,000 4,000 0 0 0 4,000 +0
Total
Requirements 136,700 126,700 0 0 +2,000 128,700 +2,000
Total FTE
Requirements 12 12 0 0 +0 12 +0
Summary of FY 2024 Program Changes for Line Item Construction
Program Change ($000) FTE
Conservation Initiative - Abandoned Mineral Lands
+2,000 +0
TOTAL Program Changes +2,000 +0
Mission Overview
The Construction Program facilitates implementation of mission-critical investments for facilities, utility
systems and other assets which contribute to and support the National Park Service mission, including the
management of natural and cultural resources, the safety of park visitors and employees, and recreational
and visitor experiences.
Activity Overview
Line Item Construction
This program component provides for recapitalization, modernization, alteration, replacement, and new
construction of assets needed to accomplish the management objectives approved for each park. This
activity focuses on projects that repair, replace, or improve high priority mission-critical and mission-
dependent assets, and ensures that investments are reasonable, cost effective, and fiscally sustainable over
the life-time of the investment. The NPS tracks the facility condition index (FCI), allowing NPS to
benchmark desired conditions on types of assets, and measure improvements at the individual asset level,
park level, and national level, allowing for representation of the outcomes of these efforts.
Abandoned Mineral Lands (AML)
This program component supports projects which mitigate abandoned mineral land safety issues and
resource impacts. Mining and other mineral resource development have occurred in many areas
National Park Service FY 2024 Budget Justification
CONST-8
throughout the United States that are now units of the National Park System. AML features were created
prior to Federal or State laws and regulations for mining cleanup or restoration.
Demolition and Disposal
This program component supports demolition and disposal projects which provide for the removal of
excess, unsafe, or unusable property, reducing the burden on park resources and redirecting those
resources toward higher priority assets. Often through property donation or land acquisition, parks have
excess property that does not add value to the park experience, or contribute to the delivery of the park
mission.
National Park Service FY 2024 Budget Justification
CONST-9
Activity: Line Item Construction
Program Component: Line Item Construction Projects
FY 2024 Program Activities
The following are examples of planned FY 2024 Line Item Construction Projects activities:
Fund nine high-priority projects that address recapitalization, alteration, and replacement of
mission-critical assets, mitigate health and safety issues affecting employees and visitors, enhance
accessibility and correct code compliance deficiencies, and/or preserve historic resources.
Ensure continued public recreational access at Crater Lake National Park in Oregon.
Upgrade utility systems at Great Smoky Mountains National Park and the White House.
Improve employee housing conditions at Mesa Verde National Park in Colorado and at Chaco
Culture National Historical Park in New Mexico.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the Line Item Construction program is $120,700,000 and 4 FTE. There
are no proposed program changes from FY 2023 Enacted.
Program Overview
Five-Year Line Item Construction Program: The NPS Five-Year Line Item Construction Program
provides a strategically-balanced, long-term approach to capital investment and financial sustainability
that addresses the highest priority critical life, health, safety, resource protection, and mission support
projects.
This program funds modernization and renewal of existing assets; space consolidation and elimination of
high cost leases; and replacement of assets in kind. Construction of new or consolidated replacement of
facilities are included when supported by an approved planning document, economic analysis, and
business case. All eligible NPS Line Item Construction projects are evaluated and prioritized based on
monetary and nonmonetary benefits, return on investment, and overall risk. The FY 2024 Line Item
Construction project list is the current set of construction priorities that meet the most urgent
programmatic needs during FY 2024.
At A Glance
501 Auburn Avenue (MLK Birth Home)
The FY 2023 NPS budget included funding to preserve the 127-year old Queen Anne style house in Martin Luther
King, Jr. National Historical Park where Dr. King was born. Work includes correcting structural and utility issues,
as well as preservation of exterior and interior architectural features. The NPS intends to award a construction
contract in the third quarter of FY 2023.
Exterior view of the 501 Auburn Avenue NE, Atlanta, Georgia
National Park Service FY 2024 Budget Justification
CONST-10
NATIONAL PARK SERVICE
FY 2024 LINE ITEM CONSTRUCTION PLAN
Fiscal
Year
Priority
within
the FY
Facility or Unit
Name Project Title
Congressional
District
Total
Project
Cost
Funded
to Date
Funding
Request
Remaining
to be
Funded
Future
Years of
Plan
with
Funding
Investment
Category/Work
Classification
Funding
Sources for
Other
Phases
DOI
Score
2024 1
Crater Lake
National Park
Rehabilitate Cleetwood Trail
and Marina OR02 50,801 1,501 49,300 0
Modernization
and Renewal
(Recapitalization) 79.78
2024 2
Great Smoky
Mountains
National Park
Repair and Rehabilitate Cades
Cove Water and Wastewater
Systems TN01 9,560 1,360 8,200 0
Modernization
and Renewal
(Recapitalization) 87.04
2024 3
Kalaupapa
National
Historical Park
Install Fuel Tanks to Ensure
Park Continued Operation HI02 10,002 302 9,700 0
Modernization
and Renewal
(Alteration) 52.29
2024 4
Mesa Verde
National Park
Rehabilitate Eight Residences
and Museum at Chapin Mesa CO03 12,960 1,460 11,500 0 Maintenance 79.84
2024 5
Independence
National
Historical Park
Address Deficiencies at Graff
House Site PA03 5,300 600 4,700 0
Modernization
and Renewal
(Alteration) 59.62
2024 6
Chaco Culture
National
Historical Park
Construct Multiplex Housing
Units, Improve Utilities and
Demolish Existing Units and
Trailer NM03 10,176 976 9,200 0
Modernization
and Renewal
(New Const.) 65.93
2024 7 White House
Upgrade Utilities Project F,
and Project G - Phase II DCAL 56,306 28,206 28,100 0 Maintenance
Line Item
Construction 90.00
Total 120,700
National Park Service FY 2024 Budget Justification
CONST-11
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 79.20
Planned Funding FY 2024: $49,300,000
Funding Source: Line Item Construction
Project Identification
Project Title: Rehabilitate Cleetwood Trail and Marina
Project Number: 264912A
Unit/Facility Name: Crater Lake National Park
Region/Area/District: Pacific West; IR 10
Congressional District: OR02
State: Oregon
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
0 255338 60 0.00
35240200 62911 63 0.86
40130400 93210 80 0.86
40751100 64250 88 0.89
Project Description:
This project will rehabilitate the Cleetwood trail and marina. Work will include mitigation of unstable slope areas
along the one-mile-long trail to the shore of Crater Lake, and will reconstruct the trail retaining walls, grades, and
cross slopes to make the trail level and stable. Disturbed landscapes will be revegetated. The project will also
rehabilitate the failing bulkhead and floating docks at the marina, and replace the existing toilet with three smaller
toilets.
Scope of Benefits (SB):
The Cleetwood trail and marina is the only designated point of access to the park’s primary natural resource: the
waters of Crater Lake. It serves park employees, concessionaires, and 60,000 annual visitors. Completion of this
project will allow for continued service of a concession-operated boat tour to Wizard Island and support the on-
going scientific research programs among park and its many partner institutions.
Investment Strategy (IS):
This project will make the necessary improvements to stabilize the trail and slopes so that routine maintenance is
able to sustain the trail in good condition. The additional restroom facilities will cost more to operate and maintain,
but the park expects to significantly reduce future unplanned maintenance repair costs on the trail and marina. The
project provides protection from collateral damage of falling rocks to other park assets such as trail features
(benches, retaining walls, signs, etc.). It will also protect the fuel line from the above ground fuel tank at the rim to
the marina to support boat operations. Additional assets that will be protected as a result of this project include the
bulkhead, docks, dock equipment, replacement toilet buildings, lake level monitoring station, seasonal boat
operation buildings, and moored boats.
With appropriate and durable geotechnical engineering solutions, the dock will not need significant reinvestment for
30 years, and the trail will not need significant reinvestment for 50 years.
Consequences of Failure to Act (CFA):
Without rehabilitation, the unstable slopes, deteriorated trail, and failed bulkhead will continue to erode into the lake
creating unsafe conditions for employees and visitors and causing damage to the parks natural resources. Further
deterioration could lead to closing or limiting access to the trail, which is the only access to the lakeshore. If the trail
closes, concession operated boat tours will cease. The boat tour is part of the larger park concession contract that
National Park Service FY 2024 Budget Justification
CONST-12
includes the Crater Lake Lodge, campgrounds, restaurants, and stores. The boat tour operation contributes
approximately 8 percent of the overall contract value. However, its loss will likely have contractual implications that
may require equitable adjustment to contract terms and value. Scientific research programs will also be impacted. A
closed trail does not prevent people attempting to access the lakeshore from inappropriate routes, resulting in the
potential for increased search and rescue efforts and could put park staff in unsafe situations.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 1.18
API Rating: n/a 72.75
API/FCI Score: (20%) 19.20
SB Score: (40%) 20.00
IS Score: (20%) 20.00
CFA Score: (20%) 20.00
Total Score: (100%) 79.20
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled N/A Completed 09/2022
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 0 0
Modernization/Renewal Work: $ 49,300 100
Divestiture Work $ 0 0
Total: $ 49,300 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 1,501
FY 2024 Line Item Construction Funding (this PDS): $ 49,300
Future Funding to Complete Project: $ 0
Total: $ 50,801
Class of Estimate: B
Estimate Escalated to: FY 2026/Q1
Planning and Design Funds (dollars in thousands):
Planning Funds Received in FY 2022: $ 249
Design Funds Received in FY 2022: $ 1,252
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q2
Actual: N/A
Project Complete
Scheduled: FY 2027/Q4
Actual: N/A
National Park Service FY 2024 Budget Justification
CONST-13
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $240,072
Projected: $254,734
Net Change: +$14,662
National Park Service FY 2024 Budget Justification
CONST-14
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 86.80
Planned Funding FY 2024: $8,200,000
Funding Source: Line Item Construction
Project Identification
Project Title: Repair and Rehabilitate Cades Cove Water and Wastewater Systems
Project Number: 293232A
Unit/Facility Name: Great Smoky Mountains National Park
Region/Area/District: Southeast; IR 02
Congressional District: TN01
State: Tennessee
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
40710300 64720 77 0.53
40710300 64721 77 0.56
40710900 64885 88 0.40
40710900 64888 88 0.41
Project Description:
This project will repair and rehabilitate the water and wastewater infrastructure at the Cades Cove Developed Area
and Cades Cove Cable Mill. Major components of the water and wastewater systems will be replaced at each
location to provide increased capacity and functionality. These water and wastewater systems were installed from
1940-1983 and are an average age of 60 years. This project will rehabilitate or replace critical water and wastewater
mains, laterals, septic tanks, drainage fields, treatment lagoons, and wastewater treatment facilities with code
compliant systems that will provide increased capacity. Project scope includes system controls that can be remotely
monitored to detect and modify system performance to alleviate the need for staff to physically respond on-site to
resolve every operational abnormality. Temporary restroom facilities will be provided during construction.
Scope of Benefits (SB):
This project involves critical infrastructure that - supports visitor services, recreational features, and protection of
primary park resources. Approximately 2.3 million annual visitors rely on services from the Cades Cove utility
systems. Safe drinking water and wastewater treatment is essential to visitor services and park operations. This
project will reduce repair-related closures of comfort stations, greatly enhancing visitor satisfaction.
Rehabilitating the water and wastewater infrastructure will safeguard activities in the park campgrounds from
interruption or closing due to disturbance in water supply or wastewater service. It will also support 50 park housing
units tied to these systems.
Investment Strategy (IS):
Various components of these utility systems have reached the end of their useful lives, resulting in increasingly
expensive unscheduled corrective maintenance costs and have the potential for catastrophic failure. In many cases
the technology is obsolete, finding replacement and repair parts is difficult, and the systems are becoming
irreparable.
This project will reduce unexpected system repairs and septic pumping costs, shorten repair time (because
replacement parts for newer equipment are more readily available), and reduce service interruptions through the
remote monitoring and leak detection systems.
After project completion, the system deficiencies addressed by this project are not expected to require major
recapitalization or modernization for approximately 1530 years.
National Park Service FY 2024 Budget Justification
CONST-15
Consequences of Failure to Act (CFA):
Uncorrected, the current conditions will continue to deteriorate resulting in additional pipe breaks, corrosion of
equipment, and septic backups and overflows. The park may not be able to provide enough volume of potable water
for fire suppression to employee housing units, guest areas, and maintenance facilities. There will be continued
health concerns from lead and copper components in existing water piping, and from potential improper handling of
septic wastes.
The park’s pristine waterways, used by visitors for fishing and wading, may be damaged due to erosion and
contamination from leaking water and wastewater systems. The park may lose the ability to support fire suppression,
potentially resulting in extensive damage to cultural resources and essential non-historic facilities.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.14
API Rating: n/a 82.50
API/FCI Score: (20%) 16.80
SB Score: (40%) 40.00
IS Score: (20%) 20.00
CFA Score: (20%) 10.00
Total Score: (100%) 86.80
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled 11/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 0 0
Modernization/Renewal Work: $ 8,200 100
Divestiture Work $ 0 0
Total: $ 8,200 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 1,360
FY 2024 Line Item Construction Funding (this PDS): $ 8,200
Future Funding to Complete Project: $ 0
Total: $ 9,560
Class of Estimate: C
Estimate Escalated to: FY 2025/Q2
Planning and Design Funds (dollars in thousands):
Planning Funds Received in FY 2023: $ 740
Design Funds Received in FY 2023: $ 620
National Park Service FY 2024 Budget Justification
CONST-16
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q1
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $396,283
Projected: $396,283
Net Change: $0
National Park Service FY 2024 Budget Justification
CONST-17
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 56.90
Planned Funding FY 2024: $9,700,000
Funding Source: Line Item Construction
Project Identification
Project Title: Install Fuel Tanks to Ensure Continuous Park Operation
Project Number: 248432A
Unit/Facility Name: Kalaupapa National Historical Park
Region/Area/District: Pacific West; IR 12
Congressional District: HI02
State: Hawaii
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
0 247058 52 0.00
40711200 80310 63 0.96
40720100 80319 59 0.31
40760100 239692 57 1.00
Project Description:
This project will construct a fuel farm and dispensing system to serve the entire Kalaupapa settlement’s fuel needs.
The work will include the installation of modular, above ground, double-walled fuel storage tanks, a fuel dispensing
and monitoring system, site clearing and grubbing, a concrete pad to support the fuel tanks and appurtenances,
associated road improvements, and an extension of telecommunications and electrical service to the site.
Scope of Benefits (SB):
The investment in a new fuel storage and dispensing station safeguards the continuity of park operations and timely
administration of the park’s historic and natural resources, assets, and cultural landscapes. Because of the park’s
extremely remote location and difficult access, there is no other alternative to having an on-site fuel supply.
Investment Strategy (IS):
Currently, fueling at Kalaupapa has been provided by a partner agency, the Hawaii Department of Health (DOH).
However, the park now needs to secure its own fuel system since DOH’s system warranty expired in 2021 and will
be decommissioned. The new fuel farm will be out of the tsunami flood zone to better protect the system and park
resources.
After project completion, the system deficiencies addressed by this project are not expected to require major
recapitalization or modernization for approximately 20 years.
Consequences of Failure to Act (CFA):
Failure to install this new infrastructure will result in critical gaps in park operations once the DOH fuel tanks are
decommissioned.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.62
API Rating: n/a 57.33
API/FCI Score: (20%) 16.90
SB Score: (40%) 20.00
National Park Service FY 2024 Budget Justification
CONST-18
Category Percent Score
IS Score: (20%) 20.00
CFA Score: (20%) 0.00
Total Score: (100%) 56.90
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled N/A Completed 02/2018
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 2,134 22
Modernization/Renewal Work: $ 7,566 78
Divestiture Work $ 0 0
Total: $ 9,700 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 302
FY 2024 Line Item Construction Funding (this PDS): $ 9,700
Future Funding to Complete Project: $ 0
Total: $ 10,002
Class of Estimate: A
Estimate Escalated to: FY 2025/Q3
Planning and Design Funds (dollars in thousands):
Planning Funds Received in FY 2023: $ 141
Design Funds Received in FY 2023: $ 161
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q2
Actual: N/A
Project Complete
Scheduled: FY 2026/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $296,004
Projected: $317,608
Net Change: +$21,603
National Park Service FY 2024 Budget Justification
CONST-19
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 79.40
Planned Funding FY 2024: $11,500,000
Funding Source: Line Item Construction
Project Identification
Project Title: Rehabilitate Eight Residences and Museum at Chapin Mesa
Project Number: 218998A
Unit/Facility Name: Mesa Verde National Park
Region/Area/District: Intermountain; IR 07
Congressional District: CO03
State: Colorado
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35290100 46066 90 0.10
35300200 46041 92 0.93
35300200 46048 85 0.32
35300200 46044 92 0.63
35300200 46046 85 0.66
35300200 46047 92 0.93
35300200 46043 85 0.65
35300200 46040 85 0.85
35800800 46045 85 0.68
40660100 56727 58 0.33
40750300 108078 50 0.03
40750300 111259 67 0.28
40760100 102822 68 0.45
40760100 46092 68 0.34
Project Description:
This project will rehabilitate and stabilize eight historic residences and the historic Chapin Mesa Museum.
The work for the residences includes selective demolition, rehabilitation of existing foundations and building
envelopes, replacement of mechanical, electrical, and plumbing systems, installation of fire suppression and smoke
detection, and interior fit-out. Site drainage issues will be addressed. Roads and parking areas associated with these
residences will be repaired.
The rehabilitation work for the museum includes repair of the building envelope, repointing of the exterior stone
mortar, repair of exterior wooden vigas and lintels, rehabilitation or replacement of exterior windows and doors,
repair and refinishing of floors, replacement of electrical wiring and appurtenances, and repairs to the building’s site
drainage.
Scope of Benefits (SB):
Two of these buildings are contributing elements of the Mesa Verde Administrative District National Historic
Landmark and seven others contribute to the Chapin Mesa Village Historic District. The project will provide
increased employee safety and halt the deterioration of these historic structures. The residences provide critically
needed housing for required occupancy employees that respond to afterhours emergency situations and ensure the
park visitors and resources are protected. The nearest population center, Cortez, Colorado, is about an hour’s drive
away. The museum is one of the oldest operating museums in the NPS and a significant visitor destination receiving
approximately half of the park’s 600,000 annual visitors.
National Park Service FY 2024 Budget Justification
CONST-20
Accessibility will be addressed as applicable for all buildings to meet Architectural Barriers Act Accessibility
Standards (ABAAS) requirements.
Investment Strategy (IS):
Insulation and energy efficient systems will be installed in the residences to reduce energy consumption. Drainage
systems will also be installed to ensure long term stabilization of the structures, further reducing the need for future
repairs. Having all housing units available will increase rental income that will be available for other park housing
maintenance and improvements.
After project completion, the facilities and systems addressed by this project should not require major
recapitalization or modernization for the next 20 years.
Consequences of Failure to Act (CFA):
The residences provide critically needed housing for required occupancy employees that respond to afterhours
emergency situations and ensure the park visitors and resources are protected. Three of the residences are currently
deemed uninhabitable. Not acting may result in the residences continual deterioration to an unusable state, loss of
housing inventory for required occupancy, further deterioration of the museum building envelope and electrical
system, and the loss of the integrity of a National Historic Landmark and historic district.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.56
API Rating: n/a 78.71
API/FCI Score: (20%) 19.40
SB Score: (40%) 40.00
IS Score: (20%) 20.00
CFA Score: (20%) 0.00
Total Score: (100%) 79.40
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled 06/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 8,970 78
Modernization/Renewal Work: $ 2,530 22
Divestiture Work $ 0 0
Total: $ 11,500 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 1,460
FY 2024 Line Item Construction Funding (this PDS): $ 11,500
Future Funding to Complete Project: $ 0
Total: $ 12,960
Class of Estimate: C
Estimate Escalated to: FY 2025/Q4
National Park Service FY 2024 Budget Justification
CONST-21
Planning and Design Funds (dollars in thousands):
Planning Funds Received in FY 2023: $ 860
Design Funds Received in FY 2022: $ 600
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $135,060
Projected: $128,893
Net Change: -$6,167
National Park Service FY 2024 Budget Justification
CONST-22
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 56.00
Planned Funding FY 2024: $4,700,000
Funding Source: Line Item Construction
Project Identification
Project Title: Address Deficiencies at Graff House Site
Project Number: 317634A
Unit/Facility Name: Independence National Historical Park
Region/Area/District: Northeast; IR 01
Congressional District: PA03
State: Pennsylvania
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35290100 26045 71 0.83
40750300 26044 20 0.01
Project Description:
This project rehabilitates the Graff House at Market and 7th Streets in Philadelphia, the site where Thomas Jefferson
rented rooms from Jacob Graff while writing the Declaration of Independence. The original building was
demolished in 1883, and the current structure was reconstructed by the National Park Service in 1975.
This project will repair the exterior envelope, rehabilitate the first floor for public visitation and period room
displays, and add entrances for accessibility and code compliance. It will also replace mechanical, electrical, and
plumbing systems. Unoccupied floors will receive minimal repairs and will be left in a mothballed condition. The
adjoining garden will be rehabilitated.
Scope of Benefits (SB):
Rehabilitation of the Graff House will allow it to be safely reopened to the public for interpretation of the
Declaration of Independence. Potential annual visitation is likely 75,000 or more. The work will rehabilitate the
first-floor interior to current life safety code requirements and accessibility standards. A rehabilitated garden space
will allow the park to increase its connection to adjacent community sites.
Investment Strategy (IS):
Other than minor preventative maintenance, the Graff House has had no significant renovation work since 1975. All
building components, finishes, mechanical systems are the original. Installation of efficient mechanical systems will
reduce park’s energy consumption. Though the site is currently closed to the public, the park continues to incur
energy bills and repair costs such as emergency repairs, graffiti and litter removal, and snow clearing.
After project completion, the system deficiencies addressed by this project are not expected to require major
recapitalization or modernization for approximately 40 years.
Consequences of Failure to Act (CFA):
The building has been closed to staff and visitors for several years due to deteriorating and unsafe conditions;
without this project, the closure could continue indefinitely.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.81
API Rating: n/a 45.50
National Park Service FY 2024 Budget Justification
CONST-23
Category Percent Score
API/FCI Score: (20%) 16.00
SB Score: (40%) 20.00
IS Score: (20%) 20.00
CFA Score: (20%) 0.00
Total Score: (100%) 56.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled 03/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 1,175 25
Modernization/Renewal Work: $ 3,525 75
Divestiture Work $ 0 0
Total: $ 4,700 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 600
FY 2024 Line Item Construction Funding (this PDS): $ 4,700
Future Funding to Complete Project: $ 0
Total: $ 5,300
Class of Estimate: C
Estimate Escalated to: FY 2025/Q4
Planning and Design Funds (dollars in thousands):
Planning Funds Received in FY 2023: $ 300
Design Funds Received in FY 2023: $ 300
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q3
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $71,018
Projected: $66,594
Net Change: -$4,424
National Park Service FY 2024 Budget Justification
CONST-24
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 69.10
Planned Funding FY 2024: $9,200,000
Funding Source: Line Item Construction
Project Identification
Project Title: Construct Multiplex Housing Units, Improve Utilities and Demolish Existing Units and Trailer
Project Number: 310250A
Unit/Facility Name: Chaco Culture National Historical Park
Region/Area/District: Intermountain; IR 07
Congressional District: NM03
State: New Mexico
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
0 252491 30 0.00
0 251143 40 0.00
35300100 71913 7 0.17
35300200 71911 30 0.85
35300200 72090 48 0.18
35300200 71912 48 0.05
35300200 71909 48 0.08
40660100 71991 38 0.00
40710300 71900 65 0.57
40710900 71901 77 0.39
40711100 92309 38 0.34
40711200 92298 55 0.51
40750300 114302 30 0.34
40750300 114301 30 0.88
40760100 71985 38 0.00
Project Description:
This project will provide a bed-for-bed replacement of obsolete housing. Four existing residences and one trailer
in a rock-fall zone will be removed, and the sites cleared and stabilized. Two new multiplex units will be
constructed, including associated site, utility, stormwater, road work, and parking lot in a new location. New or
upgraded utility services will be installed.
Scope of Benefits (SB):
This project will provide critical housing for permanent and seasonal staff that includes required/permitted
occupancy. Staff is critical to ensure safety and education to park visitors, resource protection, and facilities
maintenance. Housing is not available within the Navajo reservation. Housing is only available in the local
community 75 miles away from the park. This project will construct code-compliant and energy-efficient facilities.
New housing will meet the Architectural Barriers Act Accessibility Standard (ABAAS). Utility upgrades will meet
current standards and increase the required capacity. Site improvements will contribute to increased quality of life
for employees by removing the existing housing from a rockfall zone and elevating the housing to mitigate
floodplain concerns.
Investment Strategy (IS):
Offering code compliant housing units will help attract and retain staff and provide increased rental income, which
the park uses to maintain its housing portfolio. Due to the high mobilization costs to construct facilities in this
National Park Service FY 2024 Budget Justification
CONST-25
location, a comprehensive replacement and upgrade project, rather than completing this project through multiple
phased or piecemeal work, reduces construction costs.
After project completion, the system deficiencies addressed by this project are not expected to require major
recapitalization or modernization for approximately 40 years.
Consequences of Failure to Act (CFA):
If the construction of the replacement housing units is not completed, the park will not have sufficient housing to
meet its needs. Health and safety threats to employees will persist at the obsolete facilities—which are being in the
rock fall zone—and code compliance issues will remain due to lack of fire suppression to protect the existing
housing units. The project will eliminate a direct threat of flooding to new and existing housing by channeling
floodwaters away from the housing and sensitive areas. The park’s four eligible historic structures and
archaeological sites in the maintenance and residential areas will be protected from flooding through the mitigations
included in this project.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.18
API Rating: n/a 41.47
API/FCI Score: (20%) 19.10
SB Score: (40%) 40.00
IS Score: (20%) 10.00
CFA Score: (20%) 0.00
Total Score: (100%) 69.10
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled N/A Completed 01/2023
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 0 0
Modernization/Renewal Work: $ 9,108 99
Divestiture Work $ 92 1
Total: $ 9,200 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 976
FY 2024 Line Item Construction Funding (this PDS): $ 9,200
Future Funding to Complete Project: $ 0
Total: $ 10,176
Class of Estimate: B
Estimate Escalated to: FY 2025/Q4
Planning and Design Funds (dollars in thousands):
Planning Funds Received in FY 2023: $ 576
Design Funds Received in FY 2023: $ 400
National Park Service FY 2024 Budget Justification
CONST-26
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $154,834
Projected: $180,372
Net Change: +$25,538
National Park Service FY 2024 Budget Justification
CONST-27
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 90.00
Planned Funding FY 2024: $28,100,000
Funding Source: Line Item Construction
Project Identification
Project Title: Upgrade Utilities Project F, and Project G – Phase II
Project Number: 245130A, 310304E
Unit/Facility Name: President’s Park (White House)
Region/Area/District: National Capital; IR 01
Congressional District: DCAL
State: District of Columbia
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35290700 241163 100 0.79
Project Description:
Utility Project F will replace, install, and/or upgrade important utility systems and supporting components that serve
the Executive Residence, helping to safeguard human safety and ensure long-term preservation of the building. The
systems and purposes are classified, but they are important for occupancy and operation of the building. Phase II of
Project G covers equipment installation and other project expenses not addressed in the first phase.
Scope of Benefits (SB):
These utilities serve visitor-facing spaces and will maintain operations for visitors, residents, and workers in the
White House. This project will prevent a disruption in services provided by these utility systems.
Investment Strategy (IS):
Funding this project will provide life-cycle replacement of an important utility system, which is more cost-effective
than an emergency replacement.
Performing this utility upgrade will provide a minor reduction in unscheduled maintenance due to increased
reliability.
After project completion, the system deficiencies addressed by this project are not expected to require major
recapitalization or modernization for approximately 25 years.
Consequences of Failure to Act (CFA):
The details associated with these systems are classified, but they are important for life safety and long-term
preservation of the building.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.79
API Rating: n/a 100.00
API/FCI Score: (20%) 20.00
SB Score: (40%) 40.00
IS Score: (20%) 20.00
CFA Score: (20%) 10.00
Total Score: (100%) 90.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
National Park Service FY 2024 Budget Justification
CONST-28
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled Project F: 02/2023 Project G: Complete 09/2022
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 28,100 100
Modernization/Renewal Work: $ 0 0
Divestiture Work $ 0 0
Total: $ 28,100 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 4,806
FY 2023 Line Item Construction Funding: $ 23,400
FY 2024 Line Item Construction Funding (this PDS): $ 28,100
Future Funding to Complete Project: $ 0
Total: $ 56,306
Class of Estimate: B
Estimate Escalated to: FY 2025/Q1
Planning and Design Funds (dollars in thousands):
Planning Funds Received in FY 2017, 2021, 2022, 2023: $ 1,979
Design Funds Received in FY 2022. 2023: $ 2,827
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q3
Actual: N/A
Project Complete
Scheduled: FY 2025/Q3
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $660,180
Projected: $618,578
Net Change: -$41,602
National Park Service FY 2024 Budget Justification
CONST-29
NATIONAL PARK SERVICE
FY 2025 LINE ITEM CONSTRUCTION PLAN
Fiscal
Year
Priority
within
the FY
Facility or Unit
Name Project Title
Congressional
District
Total
Project
Cost
Funded
to Date
Funding
Request
Remaining
to be
Funded
Future
Years of
Plan
with
Funding
Investment
Category/Work
Classification
Funding
Sources
for Other
Phases
DOI
Score
2025 1
Christiansted
National Historic
Site Preserve the Steeple Building VIAL 8,710 610 8,100 0 Maintenance 90.0
2025 2
Federal Hall
National
Memorial
Preserve Federal Hall
Structure and Exterior
Envelope NY08 19,694 3,094 16,600 0 Maintenance 90.0
2025 3
Boston National
Historical Park
Repair and Replace Storm
Drain System at Charlestown
Navy Yard MA07 6,192 1,092 5,100 0
Modernization
and Renewal
(Recapitalization) 87.7
2025 4
Yosemite
National Park
Rehabilitate Hodgdon
Meadows Water Distribution
System CA04 14,689 2,289 12,400 0
Modernization
and Renewal
(Recapitalization) 89.9
2025 5
Andersonville
National Historic
Site
Rehabilitate National
Cemetery GA02 7,508 1,208 6,300 0
Modernization
and Renewal
(Alteration) 78.5
2025 6
Puuhonua O
Honaunau
National
Historical Park
Replace Maintenance Facility
and Restore Landscape HI02 23,774 2,524 21,250 0
Modernization
and Renewal
(New Const.) 65.7
2025 7
Jean Lafitte
National
Historical Park
and Preserve
Consolidate French Quarter
Visitor Centers LA02 9,352 1,452 7,900 0
Modernization
and Renewal
(Alteration) 87.0
2025 8
Harry S. Truman
National Historic
Site
Construct Replacement Park
Headquarters and Visitor
Services Facility MO05 10,034 1,534 8,500 0
Modernization
and Renewal
(New Const.) 59.9
2025 9
Dinosaur National
Monument
Replace Yampa District Multi-
Operations Facility, Demolish
Existing Structures CO03 23,016 3,516 19,500 0
Modernization
and Renewal
(New Const.) 55.9
2025 10
Virgin Islands
National Park Replace Maintenance Facility VIAL 17,569 2,519 15,050 0
Modernization
and Renewal
(New Const.) 46.0
Total 120,700
National Park Service FY 2024 Budget Justification
CONST-30
NATIONAL PARK SERVICE
FY 2026 LINE ITEM CONSTRUCTION PLAN
Fiscal
Year
Priority
within
the FY
Facility or Unit
Name Project Title
Congressional
District
Total
Project
Cost
Funded
to Date
Funding
Request
Remaining
to be
Funded
Future
Years of
Plan
with
Funding
Investment
Category/Work
Classification
Funding
Sources
for Other
Phases
DOI
Score
2026 1
San Antonio
Missions National
Historical Park
Stabilize Foundation and
Repair Structural Damage at
San Jose Indian Quarters TX35 31,405 4,935 26,470 0 Maintenance 100.0
2026 2
Golden Gate
National
Recreation Area
Rehabilitate Marin Headlands
Water System CA06 51,936 7,586 44,350 0
Modernization
and Renewal
(Recapitalization) 89.0
2026 3
Keweenaw
National
Historical Park
Rehabilitate C&H Warehouse
No. 1 for Multi-Park Museum
Facility MI01 18,770 2,722 16,048 0
Modernization
and Renewal
(Alteration) 59.0
2026 4
Tuskegee Institute
National Historic
Site
Rehabilitate Booker T.
Washington Home AL03 15,653 1,513 14,140 0 Maintenance 80.0
2026 5
Fort Vancouver
National Historic
Site
Rehabilitate Building 405 for
Multi-Park Museum Facility WA03 23,314 3,622 19,692 0
Modernization
and Renewal
(Recapitalization) 90.0
Total 120,700
National Park Service FY 2024 Budget Justification
CONST-31
NATIONAL PARK SERVICE
FY 2027 LINE ITEM CONSTRUCTION PLAN
Fiscal
Year
Priority
within
the FY
Facility or Unit
Name Project Title
Congressional
District
Total
Project
Cost
Funded
to Date
Funding
Request
Remaining
to be
Funded
Future
Years of
Plan
with
Funding
Investment
Category/Work
Classification
Funding
Sources for
Other
Phases
DOI
Score
2027 1
Petersburg
National
Battlefield
Rehabilitate Shoreline and
Seawalls, Stabilize Bluff VA04 9,916 1,209 8,707 0 Maintenance 69.4
2027 2
Colorado
National
Monument
Rehabilitate Saddlehorn
Water System CO03 8,257 1,297 6,960 0
Modernization
and Renewal
(Recapitalization) 89.8
2027 3
Golden Gate
National
Recreation Area
Remove High Hazard Dam
and Obsolete Ranch
Structures at Tennessee
Valley CA02 10,351 2,451 7,900 0 Divestiture 40.2
2027 4
Acadia National
Park
Rehabilitate Cadillac
Mountain Water System And
Sand Beach Water And
Wastewater Systems ME02 9,645 1,515 8,130 0 Maintenance 60.0
2027 5
Zion National
Park
Rehabilitate Water and
Wastewater Systems, Replace
Vault Toilets UT02 20,500 2,400 18,100 0
Modernization
and Renewal
(Recapitalization) 65.1
2027 6
Sitka National
Historical Park
Rehabilitate Visitor Center
Landscape Area - Phase I AKAL 13,567 1,277 5,760 6,530 2028 Maintenance
Line Item
Construction 89.1
2027 7
Antietam
National
Battlefield
Rehabilitate Antietam
National Cemetery MD06 22,890 3,717 19,173 0
Modernization
and Renewal
(Recapitalization) 59.2
2027 8
Great Smoky
Mountains
National Park
Replace Sugarlands
Maintenance Facilities TN01 54,540 8,570 45,970 0
Modernization
and Renewal
(New Const.) 45.9
Total 120,700
National Park Service FY 2024 Budget Justification
CONST-32
NATIONAL PARK SERVICE
FY 2028 LINE ITEM CONSTRUCTION PLAN
Fiscal
Year
Priority
within
the FY
Facility or Unit
Name Project Title
Congressional
District
Total
Project
Cost
Funded
to Date
Funding
Request
Remaining
to be
Funded
Future
Years of
Plan
with
Funding
Investment
Category/Work
Classification
Funding
Sources for
Other
Phases
DOI
Score
2028 1
Sitka National
Historical Park
Rehabilitate Visitor Center
Landscape Area - Phase II AKAL 13,567 7,037 6,530 0 Maintenance
Line Item
Construction 84.3
2028 2
National Mall
and Memorial
Parks
Provide Space for Natural
Resources and Science Staff DCAL 8,127 1,277 6,850 0 Maintenance 25.0
2028 3
Organ Pipe
Cactus National
Monument
Replace Law Enforcement
And Resource Management
Facility AZ03 32,368 4,646 27,722 0
Modernization
and Renewal
(New Const.) 69.9
2028 4
Katmai National
Park and
Preserve
Relocate NPS Administrative
Structures from Sensitive
Resources AKAL 9,245 1,453 7,792 0
Modernization
and Renewal
(Alteration) 35.4
2028 5
White Sands
National Park Rehabilitate Visitor Center NM02 11,075 1,740 9,335 0
Modernization
and Renewal
(Recapitalization) 89.3
2028 6
National Capital
Parks-East
Rehabilitate Piscataway Park
Wastewater and Water
Systems and Install Non-
Potable Water System MD04 16,170 2,541 13,629 0
Modernization
and Renewal
(Recapitalization) 68.6
2028 7
Cuyahoga Valley
National Park
Stabilize Railroad Track Bed
at Switch 2 OH11 34,739 5,459 29,280 0 Maintenance 80.0
2028 9
Great Sand
Dunes National
Park and
Preserve
Construct Visitor
Improvements CO03 23,124 3,562 19,562 0
Modernization
and Renewal
(New Const.)
56.1
Total 120,700
National Park Service FY 2024 Budget Justifications
CONST-33
Activity: Line Item Construction
Program Component: Abandoned Mineral Lands
FY 2024 Program Activities
The following are examples of planned FY 2024 Abandoned Mineral Lands activities:
Mitigate hundreds of AML features at dozens of sites throughout the National Park System. The
mitigation of physical safety hazards and environmental impacts at AML sites in NPS units
include closing unsafe mine openings, implementing solutions to mitigate degraded water quality
and damaged cultural resources, conservation of critical wildlife habitat (e.g., endangered bats
and desert tortoise), and restoration of disturbed ecosystems.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Abandoned Mineral Lands is $4,000,000 and 7 FTE, a program change
of +$2,000,000 and +0 FTE from FY 2023 Enacted.
Conservation Initiative - Abandoned Mineral Lands (+$2,000,000 / +0 FTE) – The FY 2024 budget
proposes to provide additional support for the Abandoned Mineral Lands program, for projects necessary
to improve the lands left behind after mineral extraction, making these places more environmentally safe
and mitigating hazards to visitors, employees, and wildlife. This increase contributes to the Budget
initiative to provide resources to communities impacted by abandoned hard rock mining and orphaned or
abandoned oil and gas wells. Projects will support the President’s commitment to create jobs for skilled
technicians and operators in some of the hardest hit communities in the Nation while cleaning up
hazardous sites. The increase will support efforts to improve the environment, restore water quality, and
restore natural resources to their original condition.
Program Overview
In 2014, the National Park Service released the Abandoned Mineral Lands in the National Park System
Comprehensive Inventory and Assessment report which identified and documented all abandoned mineral
lands (AML) in the System and estimated the cost to mitigate their hazards. AML sites are located across
the U.S. in over 140 NPS units. Precious metals, base metals, and industrial minerals were the primary
targets of mining activity on land in those areas. Mines in other parks produced similar commodities as
well as uranium, oil, and gas. The inventory completed in 2014 identified 37,050 AML features at 3,421
mine sites across the Service. Additional abandoned mine features and orphaned oil and gas wells are still
being found and recorded as they are encountered. Of those features, approximately 85 percent require no
action and five percent have already received long-term remedial action to address human health and
safety and environmental problems. The NPS has initiated or completed closures of 283 features (shafts,
adits, wells, unsafe structures) with prior funding, but approximately 3,600 AML features still require
remedial action, and an estimated 150 orphaned oil and gas wells need to be plugged in order to reduce
emissions and mitigate physical safety hazards.
National Park Service FY 2024 Budget Justifications
CONST-34
Activity: Line Item Construction
Program Component: Demolition and Disposal
FY 2024 Program Activities
The following are examples of planned FY 2024 Demolition and Disposal activities:
Conduct the pre-award planning, design, and compliance activities associated with demolition
and disposal projects.
Dispose or demolish multiple deteriorated surplus or unneeded assets.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the Demolition and Disposal program is $4,000,000 and 1 FTE. There
are no proposed program changes from FY 2023 Enacted.
Program Overview
Park units may seek to demolish real property improvements that are surplus to the land, operation, or
mission of the park. Parks may decide to dispose of a facility as part of the normal asset lifecycle or, in
the case of newly acquired facilities or lands, may deem certain facilities to be excess at the time of
acquisition. Facilities may be classified as “excess” for a variety of reasons, such as storm damage,
advanced deterioration or other poor condition, vulnerability to environmental effects (such as sea level
rise or geologic instability), and lack of value to the park’s mission. Such facilities can create health and
safety hazards and require resources to limit access that could be better spent on other activities.
Typically, there are environmental assessments that must be conducted prior to demolition and restoration
of lands that must happen afterwards. Due to McKinney-Vento Act requirements (for Federal agencies to
identify and make available suitable surplus Federal property for use by States, local governments, and
nonprofit agencies to assist the homeless), availability of funds, and the historical and environmental
assessments that may need to be completed, the process from start to finish can take several years.
Additionally, contaminants can increase the cost and duration of the disposal activities if they are found
during a demolition site assessment. The NPS received approval from the Department of Housing and
Urban Development to streamline the McKinney-Vento Homeless Assistance Act requirements for
demolition projects, significantly shortening the time it takes to work through regulatory requirements.
Demolition obligations in FY 2022 include a project to demolish obsolete and unsafe structures at Saint
Croix National Scenic River in Wisconsin. The buildings were removed on schedule and Resources
Management and Maintenance staff were able to perform restoration work.
National Park Service FY 2024 Budget Justifications
CONST-35
Activity: Special Programs
Special Programs
($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change
from 2023
Enacted
(+/-)
Emergency &
Unscheduled
Projects 3,848 3,848 +0 0 +7,000 10,848 +7,000
Housing
Improvement
Program 2,933 7,886 +13 0 +7,000 14,899 +7,013
Dam Safety
Program 1,247 1,247 +0 0 0 1,247 +0
Equipment
Replacement
Program 13,474 32,968 +0 0 +16,956 49,924 +16,956
Total
Requirements 21,502 45,949 +13 0 +30,956 76,918 +30,969
Total FTE
Requirements 2 8 - - +0 8 +0
Summary of FY 2024 Program Changes for Special Programs
Program Changes
($000) FTE
Conservation Initiative - Equipment Replacement – Zero Emission Fleet
Modernization
+10,701 +0
Conservation Initiative - Emergencies and Unscheduled Projects
+7,000 +0
Housing Improvement Program
+7,000 +0
Equipment Replacement – Department of the Interior Field Communications
Modernization (DIFCOM)
+6,255 +0
TOTAL Program Changes
+30,956 +0
Mission Overview
The Construction appropriation provides support to several National Park Service mission objectives,
including the preservation of natural and cultural resources, safety of park visitors and employees, and the
provision of visitor access and experiences.
Activity Overview
The Special Programs activity provides for the accomplishment of minor unscheduled and emergency
construction projects, and for the inspection, repair, or replacement of equipment and facilities. This
activity is composed of four subactivities:
Emergency and Unscheduled Projects
This subactivity provides for the preservation of resources and safety of the public and employees by
funding unscheduled and emergency construction projects. These projects protect and preserve park
resources and provide for safe and uninterrupted visitor use of facilities. The program also addresses
National Park Service FY 2024 Budget Justifications
CONST-36
unforeseen construction contract claim settlements, provides necessary infrastructure for approved
concessioner expansion projects, and ensures continuity of support and service operations.
Housing Improvement Program
This subactivity provides funds to construct, maintain, improve and replace NPS-provided housing for
NPS employees.
Dam Safety Program
This subactivity manages the risk to the safety of employees and the public, as well as safeguarding NPS
cultural and natural resources. The program provides engineering risk-based analyses including
inventories, inspections, assessments and initial corrective action planning for dams and other streamflow
control structures (levees, dikes, berms, elevated canal walls and plugs, as well as other similar
miscellaneous structures) located on NPS lands. It also seeks to coordinate these same types of efforts for
facilities located upstream of park lands where a failure would have adverse impacts on NPS visitors,
employees, facilities, or resources.
Equipment Replacement
This subactivity provides for systematic replacement of automated, motorized, and fixed information
technology equipment to support safe, energy-efficient operations and visitor services throughout the
National Park System. Existing equipment items that meet or exceed General Services Administration
(GSA) minimum replacement criteria are prioritized. Purchased replacement equipment complies with
NPS energy, security, and safety standards.
National Park Service FY 2024 Budget Justifications
CONST-37
Activity: Special Programs
Subactivity: Emergency and Unscheduled Projects
FY 2024 Program Activities
The following are examples of planned FY 2023 Emergency and Unscheduled Projects activities:
Support parks and regions during and after natural disasters, extreme weather events, and
unexpected asset or system failure.
Fund the modification of NPS facilities in response to the impacts of climate change.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the Emergency and Unscheduled Projects program is $10,848,000 and 0
FTE, a program change of +$7,000,000 and +0 FTE from FY 2023 Enacted.
Conservation Initiative - Emergencies and Unscheduled Projects (+$7,000,000 / +0 FTE) – The NPS
is a vital component of the governmentwide approach to address the impacts of climate change. The 2024
budget includes multiple and varied investments to better understand and address resource challenges on
park lands stemming from climate change. Additional funding would support an array of critical projects
that sustain or restore NPS operations during and after emergencies, critical system failures, and extreme
environmental conditions. NPS facilities and resources across the country face multiple environmental
threats—including, but not limited to, earthquakes, wildfires, structural fires, hurricanes, landslides,
drought, floods, shoreline erosion, and volcanic activity. Climate change increases the severity and
frequency of many weather-related events, necessitating additional resources to ensure that NPS
operations recover quickly after facilities and resources are damaged or destroyed during these events.
Other NPS major maintenance programs target regular or predictable asset deterioration—rehabilitating,
renewing, or replacing facilities as they age. As a result, these programs are generally programmed one or
more years in advance. In contrast, the Emergency and Unscheduled Projects program is only
programmed as needed, and specifically targets facility repair or replacement following unexpected
system failures or disasters. It serves as the primary fund source to rapidly address the NPS’s critical
infrastructure needs during or after natural and other disasters.
Program Overview
The National Park System contains over 75,000 assets, including thousands of individual utility systems.
Through the course of normal operations, these structures and systems can unexpectedly fail or be
damaged by natural disasters or malicious actions and require immediate attention to avoid more costly
reconstruction in the future. Work may include replacement of critical structural elements or entire
buildings damaged by severe wind, water, or fire; debris removal in the aftermath of catastrophic natural
disasters; park equipment and furnishings lost or damaged due to tsunami; potable water and wastewater
treatment facilities damaged through minor fires; mechanical breakdowns in critical park infrastructure
systems or equipment; or other unforeseen incidents. Work may also help parks adapt facilities to address
rapidly shifting conditions, such as arresting coast or shoreline erosion; reconfiguring docks and piers to
serve new water levels; or stabilizing or relocating assets that are threatened by advancing geologic
hazards. These projects often cross fiscal years and can only be executed as field conditions allow.
National Park Service FY 2024 Budget Justifications
CONST-38
Activity: Special Programs
Subactivity: Housing Improvement Program
FY 2024 Program Activities
The following is an example of planned FY 2024 Housing Improvement Program activities:
Continue the Housing Condition Initiative to eliminate and replace where applicable a substantial
amount of obsolete and poor condition units at parks including replacing obsolete and
deteriorated housing or adding housing capacity at multiple parks, including: Mammoth Cave
National Park, Acadia National Park, Sequoia and Kings Canyon National Parks, and Rocky
Mountain National Park.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the Housing Improvement Program is $14,899,000 and 7 FTE, a program
change of +$7,000,000 and +0 FTE from FY 2023 Enacted.
Housing Improvement Program (+$7,000,000 / +0 FTE) –Funding would support limited new
construction or rehabilitation of existing facilities to provide additional employee housing where local
market data shows that rentals are either unavailable or unaffordable. Across the country, the rise in short-
term vacation rentals—particularly at popular travel destinations—has further decreased the availability
and affordability of housing in communities near national parks. This funding increase will support
compliance, design and construction of single, duplex, or multiplex units that will replace obsolete and
deteriorated housing or add housing capacity at multiple parks, including at Mammoth Cave National
Park, Acadia National Park, Sequoia and Kings Canyon National Parks, and Rocky Mountain National
Park. FY 2024 projects would help 28-32 employees, depending on allocation to permanent employees or
seasonal staff. Funding would also be used to initiate planning and development for out-year projects
which will improve housing for at least 50 permanent and seasonal employees—including a project at
Acadia National Park that will help 28 employees.
Program Overview
Other than rental income, the Housing Improvement Program provides the only dedicated funding source
to improve the condition of 5,513 housing units. Housing assets range from 100-year-old cabins to
modern dormitories and duplexes; the average age of assets in the portfolio is 61 years. Many units are at
or beyond their maintainable life cycle. Some parks are in isolated areas where no adjacent community
with available housing exists. Other parks may have gateway communities with housing, but the housing
that is available is increasingly unaffordable, especially for seasonal employees. The NPS is focusing its
limited funds to rehabilitate or replace the poorest condition facilities, and support new construction of
additional capacity where housing is unavailable or unaffordable in the local community.
The NPS provides housing in 216 parks. The NPS has streamlined housing replacement by implementing
standardized housing designs that are adaptable to each park’s unique housing portfolio and other
considerations, such as the availability and connection to utilities and the mix of staffing that can be
housed. Housing units include not only multi-bedroom homes, but also dormitories and multi-plex units.
The NPS works to convert existing structures—both modern and historic—into housing where
appropriate.
National Park Service FY 2024 Budget Justifications
CONST-39
Housing improvement projects are selected using merit-based criteria that evaluate park housing capacity
needs; the existing condition of the available units in the park; the health and safety, accessibility, and
sustainability factors affecting the unit (both interior and exterior); the condition of the unit after work is
completed; and the cost effectiveness of the repairs. Housing Improvement projects also address critical
systems that have been identified which must be in good working order for a housing unit to function
effectively.
National Park Service FY 2024 Budget Justifications
CONST-40
Activity: Special Programs
Subactivity: Dam Safety Program
FY 2024 Program Activities
The following are examples of planned FY 2024 Dam Safety Program activities:
Update Emergency Action Plans and conduct tabletop exercises; participants will include NPS
personnel and other government public safety officials responsible for areas downstream of NPS
dams.
Perform comprehensive engineering risk reviews of NPS dams on 10 to 15-year cycle.
Undertake formal examination of high and significant hazard dams on 4 to 5-year cycle.
Conduct interim examination of high and significant hazard dams on 2-year cycle.
Reevaluate hazard classification of all significant and low hazard dams on 5-year cycle.
Work with Park Units to provide scoping level documentation to enable new project requests that
address deficiencies identified in examinations and risk reviews.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the Dam Safety program is $1,247,000 and 0 FTE. There are no
proposed program changes from FY 2023 Enacted.
Program Overview
The NPS Dam Safety Program (DSP) is mandated by Public Law 104-303, Section 215, National Dam
Safety and Security Program Act of 2002; U.S. Department of the Interior Departmental Manual, Part
753, Dam Safety Program; the NPS Management Policies, 2006; and the NPS Director’s Order #40. The
primary reason for creation of this program was to prevent structural dam failures leading to loss of
human life and property damage. NPS experienced both during the Rocky Mountain National Park Lawn
Lake Dam Failure of 1982 when three park visitors were killed and $30 million in damages occurred.
The mission of the NPS Dam Safety Program is to identify, and to the greatest extent possible, minimize
the risk posed by dams and water impoundment structures to park resources, facilities, personnel, visitors,
and neighbors. To accomplish this mission, the program provides regular inspections and studies to
identify new or worsening structural conditions and the associated risks posed by these structures.
Program staff help parks identify funding for projects that mitigate these risks by repairing, modifying, or
removing the dam. The program also provides parks with emergency action plans and exercises for each
dam with high or significant hazard ratings to minimize losses in the eventuality of a dam’s failure.
The current inventory consists of 51 jurisdictional dams. These dams are generally larger than 25 feet in
height or have 50 acre-feet of reservoir capacity. These dams are, by law, further classified by their threat
to downstream people or resources and facilities. Fifteen of the dams are rated as high hazard potential
(people will likely lose their lives if the dam fails). Ten of the dams are rated a significant hazard
(significant NPS resources or facilities would be damaged with no loss of life expected). Twenty four
dams are currently rated as low hazard (large enough to meet legal definitions, but with little to no threat
to life or significant property). One structure which may be jurisdictional is under construction on NPS
lands and one has been identified as needing hazard classification. Other small, non-jurisdictional dams
are generally not eligible for program funding, except for permanent removal or deactivation.
National Park Service FY 2024 Budget Justifications
CONST-41
In addition to dams, the Dam Safety program also monitors dozens of large canal hydraulic structures like
those located in the Chesapeake and Ohio Canal National Historical Park.
National Park Service FY 2024 Budget Justifications
CONST-42
Activity: Special Programs
Subactivity: Equipment Replacement Program
FY 2024 Program Activities
The following are examples of planned FY 2024 Equipment Replacement Program activities:
Prioritize the highest needs throughout the service to provide motorized, IT, and other equipment
necessary for the maintenance and operations of national park units.
Provide funding to acquire electric or hybrid vehicles, install electric vehicle charging stations,
and management to support the electric vehicle fleet.
Increase servicewide bandwidth in order to ensure that computing hardware and network
bandwidth are sufficient for the increasing demands for data and collaboration.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the Equipment Replacement program is $49,924,000 and 1 FTE, a
program change of +$16,956,000 and +0 FTE from FY 2023 Enacted.
Conservation Initiative - Equipment Replacement Program – Zero Emission Fleet Modernization
(+$10,701,000 / -0 FTE) – The request is part of a Department-wide plan to fully transition the
Department’s light duty fleet acquisitions to zero emission vehicles. This funding will provide critical
planning and coordination capabilities, utility build-out and charging infrastructure, and zero emission
vehicles. The planning includes prioritizing locations for deployment, determining infrastructure needs
such as increased electrical supply and access for electric vehicle supply equipment, and coordinating
installation to ensure Interior can maximize the use of these charging stations. By leveraging the buying
power of the Federal Government and transforming its fleet of more than 600,000 cars and trucks to an
all-electric fleet, the Administration can both save money for American taxpayers and accelerate the
Nation’s industrial capacity to supply domestically produced zero emission vehicles
Department of the Interior Field Communications Modernization (DIFCOM) (+$6,255,000 / +0
FTE) – This coordinated request across multiple bureaus builds on funding included in the 2023
appropriation for DOI. With the 2024 requested funding, NPS will participate in communications
modernization in Alaska, Hawaii and the insular areas, and the Southeastern contiguous United States.
Modernization enhances capabilities being implemented across DOI communities of practice. Across the
geography targeted for modernization in 2024, initial planning and design work will identify solutions
that are standardized and consistent by leveraging existing systems such as the FirstNet network,
including identification of potential sites for infrastructure-sharing with commercial entities and partners
where it would be beneficial to all parties. The assessments will identify where Interior can consolidate
sites or replace obsolete land mobile radio sites with lower cost options where it makes sense.
Program Overview
The NPS Equipment Replacement Program provides funding for systematic replacement of automated
systems, motorized vehicles, and fixed information technology equipment to support safe, energy-
efficient operations and visitor services throughout the National Park System. This fund source provides
critical funding for replacement of vehicles and other heavy equipment.
National Park Service FY 2024 Budget Justifications
CONST-43
The NPS utilizes merit-based criteria for eligible equipment items to be replaced using this fund source.
These are based on the unique requirements with respect to the types of equipment eligible, the respective
General Services Administration standard service life, and replacement eligibility criteria. Instructions for
reuse, sale and disposal of excess equipment are clearly articulated.
Zero Emission Vehicles and Charging Infrastructure
In support of the President’s goal of transitioning to a fully ZEV Federal fleet, the NPS budget includes
funding for ZEV (battery electric, plug-in electric hybrid, and hydrogen fuel cell vehicles) acquisitions
and deploying necessary vehicle charging and refueling infrastructure. These acquisitions are a significant
step towards eliminating tailpipe emissions of greenhouse gases (GHG) from the NPS fleet and aligning
the NPS’s fleet operations with the goal of achieving a fully ZEV Federal fleet. This action is important
because tailpipe emissions are currently the leading source of GHG emissions that threaten the planet and
harm U.S. communities.
ZEV acquisitions may include vehicles for both its agency-owned and GSA-leased segments of its vehicle
fleet, including incremental costs of leased vehicles and lease payments to GSA for conversion of agency-
owned vehicles to GSA’s leased fleet where appropriate. To ensure effective and efficient deployment of
ZEVs, the NPS will undertake preparation and planning for arriving ZEVs at its facilities, properly
prioritizing transition to ZEVs where it is simplest and allow time for additional planning where mission
demands pose a challenge to transitioning based on current technologies. Integral to this preparation is
growth in the number of agency-accessible re-fueling points (vehicle charging stations). In installing this
infrastructure on-site to support acquired ZEVs, the NPS will take the long-term view to ensure
efficiencies and thereby ensure wise infrastructure decisions that limit total expenditures. Using its
experienced personnel and lessons learned in the fleet arena, the NPS will undertake a process that relies
on a cross-functional team of staff from fleets, operations, facilities, finance, and acquisition departments
with executive leadership support. The collaboration will not stop with initial deployment, as the NPS
fleet and facility managers will work closely and employ existing training and tools to control utility costs
by managing the overall charging load and thereby ensuring a seamless operation that now will involve
building systems and vehicles together. Further, the NPS will ensure proper training of personnel to
address any initial shortcomings in terms of any necessary ZEV knowledge and operations as the
advanced vehicle technologies roll into the NPS fleet.
The Department is coordinating all of these efforts to meet or exceed the ZEV-related goals set forth in
the comprehensive plan. This investment will be complemented by Department of Energy funding to
provide technical assistance to agencies through the Federal Energy Management Program as the NPS
builds and grows its ZEV infrastructure. This investment serves as a down payment to support a
multiyear, whole-of-government transformation to convert the Federal motor vehicle fleet to ZEVs and
thereby reduce carbon emissions.
Department of the Interior Field Communications Modernization
The FY 2024 Department budget includes $32.2 million for field communications modernization. In FY
2024, DOI will focus on modernization in Alaska, the Southeastern United States, and the Pacific Islands
as, where feasible, it leverages deployment of communications networks outside of Interior’s owned
infrastructure, such as FirstNet and other dedicated public safety broadband, as well as improved satellite
systems in locations where terrestrial broadband is not feasible. This approach will assess and invest in
National Park Service FY 2024 Budget Justifications
CONST-44
updated technology where it makes sense while considering the Department’s historical reliance on the
traditionally more expensive LMR network in areas of the country where LMR remains the most reliable
means of communication.
National Park Service FY 2024 Budget Justifications
CONST-45
Activity: Construction Planning
Construction
Planning
($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change
from
2023
Enacted
(+/-)
Line Item
Construction
Planning 15,183 15,183 0 0 0 15,183 0
Total
Requirements 15,183 15,183 0 0 0 15,183 0
Total FTE
Requirements 0 0 0 0 +0 0 +0
Mission Overview
Construction Planning provides support to many areas of the National Park Service mission, contributing
to the protection and management of natural and cultural resources, the safety of park visitors and
employees, and the provision of appropriate recreational and visitor experiences.
Activity Overview
The Construction Planning activity lays the groundwork for actual construction through investigations,
surveys, analysis of alternatives, cost estimates, and design. These activities develop required technical
and contractual documents to successfully complete construction projects within budget and on schedule.
Construction Planning ensures projects are properly designed and meet asset maintenance, repair, and
replacement goals.
Construction Planning funds provide for contracted Architectural/Engineering services for supplemental
services, and project planning and design, which includes Pre-design (American Institute of Architects
(AIA) phases for pre-design and schematic design) and Final Design (AIA phases for Design
Development, and Construction Documents). Funds are used for supplemental services such as
archeological and historical surveys, and engineering investigations including site and geotechnical
surveys, environmental testing, hydrological surveys, and detailed condition assessments. Based on
survey and evaluation results, funds are used to prepare comprehensive construction plans and
specifications, and contractual documents needed to award construction contracts.
National Park Service FY 2024 Budget Justifications
CONST-46
Activity: Construction Planning
Subactivity: Line Item Construction Planning
FY 2024 Program Activities
The following are examples of planned FY 2024 Line Item Construction Planning activities:
Support the Pre-designs, Final Designs and Supplemental Services for successful execution of the
Line Item Construction Program. This effort supports over 35 projects in the first three years of
the Five-Year Plan and previously appropriated projects.
Provide funding for contract compliance for over 30 projects in the first three years of the Line
Item Construction Five-Year Plan and previously appropriated projects.
This fund source will also support project planning and project development for large-scale or
complex construction projects that will be submitted for Line Item Construction funding within
the next two years.
Justification of FY 2024 Program Changes
The FY 2024 budget request for the Construction Planning activity is $15,183,000 and 0 FTE. There are
no proposed program changes from FY 2023 Enacted.
Program Overview
This program supplies critical budgetary resources needed to develop construction plans and
specifications essential for acceptable completion of major maintenance, repair, replacement, and new
construction projects. Five activities are funded through construction planning: Compliance, Pre-design,
Schematic Design, Supplemental Services, and Final Design. Typically included during the pre-design
phase are project programming and budgeting, compliance activities, alternatives analysis, and schematic
design.
Supplemental services and compliance activities are usually completed concurrently during the pre-design
phase. Typically included are natural hazard assessments/surveys, cultural and archeological
investigations/surveys, coordination with State and Tribal Historic Preservation Offices, special
consultations, safety, ergonomics, preparation of historic structure documentation, rendering, modeling,
special graphic services, life-cycle cost analysis, value analysis studies, energy studies, resource
compliance studies, detailed cost estimating, monitoring and testing, and risk mitigation. Pre-design
activities and supplemental services conclude with presentation of recommended schematic design to the
Bureau Investment Review Board.
The final design phase includes the preparation of design development documents, and final architectural,
landscape and engineering drawings and specifications necessary for the construction of utilities, roads,
and structures. Under this activity, final construction drawings and specifications are prepared along with
the final independent government cost estimate and contract documents. Architectural/engineering
contractors will accomplish the majority of the pre-design, supplemental services, and final design
activities for the Line Item Construction program.
Priority funding consideration is typically given in the following order:
1. Planning and design for previously appropriated Line Item Construction projects.
National Park Service FY 2024 Budget Justifications
CONST-47
2. Planning and design for Line Item Construction projects appropriated in the current fiscal year.
3. Projects or phased components of projects of the National Park Service’s Five-Year Plan
scheduled for funding within the next two to four fiscal years.
4. Planning and design needs for projects funded in other construction program activities.
5. Conceptual development planning needs when a planning overview of a developed area is
required to determine the most cost-effective approach for addressing proposed projects.
The NPS will continue to prepare capital asset management plans for major construction projects,
consistent with OMB Circular A-11 and the Federal Acquisition Streamlining Act. These plans identify
the cost, schedule, and performance goals of proposed projects and then track the projects progress in
meeting those goals. The capital asset management plan is initiated at the pre-design phase and continues
through substantial completion of the construction phase.
National Park Service FY 2024 Budget Justifications
CONST-48
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
CONST-49
Activity: Construction Program Management & Operations
Construction
Program
Management &
Operations ($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change
from
2023
Enacted
(+/-)
Construction
Program
Management 2,838 2,902 +88 0 0 2,990 +88
Denver Service
Center Operations 17,322 14,719 +1,439 0 0 16,158 +1,439
Harpers Ferry
Center Operations 10,447 10,736 +461 0 0 11,197 +461
Regional Facility
Project Support 9,314 6,534 +280 0 0 6,814 +280
Total
Requirements 39,921 34,891 +2,268 0 0 37,159 +2,268
Total FTE
Requirements 218 186 0 0 +0 186 +0
Mission Overview
Construction Program Management & Operations provides support to many areas of the National Park
Service mission by contributing to the preservation and protection of natural and cultural resources, to the
safety of park visitors and employees, and to the provision of appropriate recreational and visitor
experiences.
Activity Overview
The National Park Service Construction Program is managed in accordance with applicable DOI and NPS
rules and guidelines to effectively ensure the economical use of human and fiscal resources. The
Construction Program centrally coordinates all major construction and rehabilitation projects for the NPS
for the consistent, effective, appropriate, and efficient construction and maintenance of visitor and
administrative facilities and supporting infrastructure at parks around the country. Some of this is
accomplished through the management of several key programs: Line Item Construction, Federal Lands
Highways Program, Management Planning, Recreation Fee projects, and others. The NPS provides two
central technical support offices. The Denver Service Center is the primary design and construction
project management office for major construction and rehabilitation projects, and Harpers Ferry Center
provides the highly specialized skills associated with developing media such as exhibits and films.
Contracting and other support services for consultant design and construction management contracts are
also administered within this activity.
Construction Program Management
Consistent with DOI’s Capital Planning and Investment Control (CPIC) guidance, this office manages a
servicewide project management control system to provide accurate assessments of project status. The
Construction Program Management office manages the Line Item Construction program, the Value
Analysis program, and supports the Bureau Investment Review Board, which manages the NPS
National Park Service FY 2024 Budget Justifications
CONST-50
investment portfolio. Additionally, this component supports Housing program management, and a
Servicewide Partnership Construction Program Coordinator to coordinate major infrastructure projects
that involve philanthropic funding and services.
Denver Service Center
The Denver Service Center (DSC) coordinates most major construction and planning activities, providing
for park planning, design, contracting services, project management, construction management, and
information management for the parks and regions within the National Park Service. DSC houses the
Technical Information Center, the designated central repository for planning, design, and construction
documents and records.
Harpers Ferry Center
The Harpers Ferry Center (HFC), the NPS Center for Media Services, provides servicewide support,
technical assistance, and project implementation in the highly specialized areas of communication and
interpretive media (exhibits, audiovisual programs, historic furnishings, etc.). Many of the DSC visitor
services construction projects include interpretive components administered by HFC.
Regional Facility Project Support
This component provides support at Regional Offices associated with construction activities including
project pre-planning, development, and scope and cost validation. It also provides funding for contract
compliance needs, such as preparation of environmental assessments and Tribal consultations, associated
with Line Item Construction projects.
National Park Service FY 2024 Budget Justifications
CONST-51
Activity: Construction Program Management & Operations
Program Component: Construction Program Management
FY 2024 Program Activities
The following are examples of planned FY 2024 Construction Program Management activities:
Continue to support the Line Item Construction Program as well as other large-dollar projects by
assisting with program coordination and review of project cost and scoping.
Evaluate project proposals to ensure that the highest priority, mission critical projects are
reflected in the National Park Service’s Line Item Construction Five-Year Plan.
Manage the Bureau Investment Review Board (IRB) which reviews approximately 100 major
construction projects annually to ensure projects are of high quality, incorporate sustainable
practices, are appropriate to their settings, and demonstrate defensible cost-conscious decisions
focused on cost reduction.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Construction Program Management is $2,990,000 and 8 FTE. There are
no proposed program changes from FY 2023 Enacted.
Program Overview
Consistent with CPIC guidance, Construction Program Management (CPM) manages the servicewide
project management control system to provide accurate assessments of project status and supports the
Bureau Investment Review Board’s (BIRB) review of major construction and rehabilitation projects for
functional suitability and cost-effectiveness. The BIRB is an executive level review committee that makes
decisions on the proper composition of the NPS asset portfolio to achieve strategic goals and objectives
within budget limits.
CPM communicates policy and provides guidance and oversight for park asset management planning,
investment development, capital construction, and facilities management, and dam safety on a
servicewide basis. CPM formulates and monitors Line Item Construction projects included on the Five-
Year Plan and manages the servicewide value analysis and facility modeling programs. Other
responsibilities include formulating and implementing major capital construction asset investment
strategies, reporting on the success of implementation activities, and recommending program adjustments
related to individual project construction activities. Its staff also oversee the Dam Safety Program,
providing support and subject matter expertise in the management of the NPS’s hydraulic structures, as
well as the methods to evaluate and mitigate the risks posed by those structures.
CPM is responsible for overseeing major infrastructure management partnerships. Associated
requirements involved with major capital improvement efforts are coordinated through this effort (e.g.,
determining the total cost of ownership and ensuring proposals favorably support the Service’s needs
from both a business and investment perspective). CPM also coordinates and provides guidance for major
infrastructure projects that involve philanthropic funding and services.
The Construction Program Management program also funds staffing and oversight of the NPS Housing
Program, ensuring parks can provide adequate housing for park employees to perform their functions,
such as preserving resources and ensuring the safety of the public. The central program ensures that parks
National Park Service FY 2024 Budget Justifications
CONST-52
provide and administer housing programs that are consistent with public laws and other directives, such as
OMB Circular No. 45 – Rental and Construction of Government Quarters. The program strives to identify
resources to help parks maintain and replace housing, and to ensure that housing units are managed as
assets through proper maintenance practices. Because park staffing needs change over time, housing
program staff work with parks and regions to assess housing needs and to identify projects that will help
parks meet those needs.
National Park Service FY 2024 Budget Justifications
CONST-53
Activity: Construction Program Management & Operations
Program Component: Denver Service Center Operations
FY 2024 Program Activities
The following are examples of planned FY 2024 Denver Service Center Operations activities:
Execute the Line Item Construction program, providing project management expertise for
hundreds of critical infrastructure and maintenance backlog projects across the service, as well as
projects commissioned by parks utilizing various other fund sources including the Great
American Outdoors Act/Legacy Restoration Fund (GAOA/LRF), Disaster Recovery, and
public/private partnerships.
Achieve small business goals and socioeconomic programs for NPS and DOI. In FY22, DSC
awarded more than $300 million to small businesses, accounting for over 38 percent of the NPS
and DOI goals for this program for small disadvantaged, service-disabled veteran, women owned,
and HUBZone businesses.
Support the management of construction and other infrastructure investments through access to
construction documentation, technical, planning, and scientific reports housed within the
Technical Information Center (TIC). More than 300,000 of these records are available to the NPS
on eTIC with over 50,000 available to the public. In FY 2022 over 4,000 orders for records from
eTIC were completed for users. DSC has developed and uses a number of information systems to
increase the productivity of business processes and improve data integration throughout the NPS
systems. These systems improve records management for more accurate and transparent records,
including those for construction management and contracting.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Denver Service Center Operations is $16,158,000 and 110 FTE. There
are no proposed program changes from FY 2023 Enacted.
Program Overview
The DSC provides park asset management planning, project design, contracting services, project
management, construction management, and information management for the parks and regions within
the NPS. The DSC base appropriation provides professional project management throughout the three to
five-year construction cycle. The Line Item Construction program also includes projects funded in prior
years, and the portfolio is estimated to comprise approximately $414 million in active construction
projects, $78 million of projects in the post construction phase, and $819 million in the Line Item
Construction design phase. Many of these projects are large in size, including the construction of the
Transcanyon Waterline replacement projects at Grand Canyon NP, and the rehabilitation of the Wawona
Wastewater Treatment Facilities at Yosemite NP.
DSC works to incorporate sustainable practices and materials, climate change science, adaptation and
resiliency strategies into park planning, investment decisions, and construction. At Everglades NP, the
Marjorie Stoneman Douglas visitor center has been designed to meet the latest building codes for coastal
high hazard zones, elevated above the flood zone, and designed for increased energy and resource-
efficient elements. DSC uses interdisciplinary teams to integrate climate resiliency throughout the
lifecycle of a project, from planning an investment through its final disposition.
National Park Service FY 2024 Budget Justifications
CONST-54
DSC also supports and enhances expression of our nation’s under-told stories, including new construction
for improved accessibility at the historic Carter Woodson Home, and rehabilitating and preserving the
birth home for Martin Luther King Jr. NHS. Other priorities include increasing access to parks and sites,
such as repairing the dock and seawall at Harkers Island at Cape Lookout NS, and rehabilitating Laurel
Falls Trail at Great Smoky Mountains NP.
In addition to projects funded through the Line Item Construction program, DSC supports other major
construction efforts funded through other sources, including natural disaster recovery efforts, like housing
repair at Virgin Islands NP for damaged housing units throughout the park and associated potable water
systems. DSC also supports public-private funded partnerships projects including the Old Courthouse
renovations at Gateway Arch NP, and the Lincoln Memorial undercroft and exhibits. When supporting
projects funded outside of the Construction, DSC personnel working on the project will charge their time
to the benefitting appropriation.
DSC operations also provide specialized technical expertise, quality assurance expertise including project
compliance, quality control, and risk assessment and management. DSC professionals provide cost-
efficient project management services and partner with contracted support of design and construction
firms nationwide to ensure best value and quality for park projects and services.
DSC operations include the TIC (the oldest NPS repository for service wide technical documents and
drawings) and eTIC. eTIC is a web-based document management system allowing the public and NPS
users the ability to instantly retrieve critical electronic information on park buildings and infrastructure,
providing additional transparency for NPS projects. It’s used for research, historical studies, disaster
recovery, project planning, natural as well as cultural resource and interpretive information. Public users
include academic researchers, educators, students, and history enthusiasts from within the U.S. as well as
international users. Effective records management improves NPS abilities to manage its security and
infrastructure investments. The new data system improvements use industry leading reporting technology
to enhance consistent reporting and increase the productivity of records management business practices.
These tools benefit numerous programs including Line Item, disaster recovery, Great American Outdoors
Act (GAOA) Legacy Restoration Funds (LRF) for reporting requirements.
National Park Service FY 2024 Budget Justifications
CONST-55
Activity: Construction Program Management & Operations
Program Component: Harpers Ferry Center Operations
FY 2024 Program Activities
The following are examples of planned FY 2024 Harpers Ferry Center Operations activities:
Support $60 million interpretive planning, media, and conservation projects.
Continue to manage over 250 interpretive media projects across the service.
Continue to support 30 Servicewide media contracts.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Harpers Ferry Center Operations is $11,197,000 and 48 FTE. There are
no proposed program changes from FY 2023 Enacted.
Program Overview
HFC, the NPS Center for Media Services, provides servicewide support, technical assistance, and project
implementation in the highly specialized areas of communication and interpretive media (exhibits,
audiovisual programs, mobile applications, historic furnishings, etc.).
Media projects are becoming increasingly complex – with more multi-media components, intellectual
property issues, and programmatic accessibility requirements. Most of these projects are focused on
updating media already in place to meet the latest scholarship, programmatic, and accessibility standards,
and to update media to better reach younger and more diverse audiences. HFC media specialists provide
consistent standards, effective contract and project management, and indefinite delivery, indefinite
quantity (IDIQ) contracts and capacity. Very few parks have dedicated technical staff or resources to
manage new and updated media projects to meet the public’s rising expectations for media that is
accurate, current, accessible, attractive, and interactive.
HFC’s interdisciplinary teams of planners, designers, application developers, filmmakers, curators,
cartographers, conservators and writers, supported by administrative and business staff, bring diverse
perspective and deep experience to the task of creating the media parks need to reach and inform visitors.
Each year HFC works on projects ranging from mobile phone applications to complex visitor center
exhibit packages, movie productions, wayside interpretive media, and conservation or artifacts. HFC
maintains Indefinite Delivery Indefinite Quantity media contracts to help the National Park System obtain
the highest quality, best value media products for park units. Visitor experience and safety within the
parks are enhanced using educational information introduced through a wide variety of media. Most
importantly, interpretive media connects visitors to the parks by providing the unique history and
significance of the resources within each site, giving visitors the opportunity to understand the need for
and their role in protecting those resources.
HFC products include digital content including mobile apps, publications, wayside and visitor center
exhibits, films, interpretive plans, and artifact and history collection conservation. HFC manages several
bureau-wide initiatives including the NPS Unigrid Brochure Program, NPS National Sign Program and
NPS Historic Photograph Collection.
National Park Service FY 2024 Budget Justifications
CONST-56
Activity: Construction Program Management & Operations
Program Component: Regional Facility Project Support
FY 2024 Program Activities
The following are examples of planned FY 2024 Regional Facility Project Support activities:
Supports regional staff, training, and program support to oversee and regional construction
programs, and program planning.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Regional Facility Project Support is $6,814,000 and 20 FTE. There are
no proposed program changes from FY 2023 Enacted.
Program Overview
The Regional Facility Project Support program provides staff salary and other support at the regional
offices for activities associated with development of major construction and maintenance investments.
This sub-activity funds staff to develop concept-supporting documents for facility investment decision-
making through all project development phases including the creating and refining project descriptions,
scopes, justifications, business cases, and initial cost estimates. Program staff are also responsible for
monitoring budget and financial activity, and for managing compliance issues that affect planned
development at NPS sites. The funding provides regional support, including a multitude of contracts, and
has enabled the NPS to properly oversee construction and major maintenance projects, ensure adherence
to architectural and construction standards throughout the process, and execute funds in a more timely and
efficient manner.
National Park Service FY 2024 Budget Justifications
CONST-57
Activity: Management Planning
Management
Planning ($000)
2022
Actual
2023
Enacted
Fixed
Costs
(+/-)
Internal
Transfers
(+/-)
Program
Changes
(+/-)
2024
Request
Change
from
2023
Enacted
(+/-)
Unit Management
Plans 7,427 9,572 +244 0 +11,129 20,945 +11,373
Special Resource
Studies 1,486 1,529 +64 0 0 1,593 +64
Environmental
Impact Planning and
Compliance 3,765 5,979 +148 0 0 6,127 +148
Total
Requirements 12,678 17,080 +456 0 11,129 28,665 +11,585
Total FTE
Requirement 43 59 0 0 +15 74 +15
Summary of FY 2024 Program Changes for Management Planning
Program Changes ($000) FTE
Racial Justice and Equity for Underserved Communities Initiative - Assess and
Address Transportation Barriers to National Parks
+7,000 +2
Conservation Initiative - Climate Vulnerability Assessments +4,129 +13
TOTAL Program Changes +11,129 +15
Mission Overview
The Management Planning Program budget activity supports all NPS goals by providing long-term
planning functions for park units and servicewide activities. More specifically, this activity supports
management of park resources; strategic and sustainable facility investments; collaboration with partners;
provision for visitor enjoyment and recreational opportunities; and preparation of studies of potential
additions to the National Park System as well as additions to the Wild and Scenic Rivers System,
National Trails System, new National Heritage Areas, and Affiliated Areas.
Activity Overview
Unit Management Plans
The Unit Management Plan (UMP) program provides a broad range of planning products and services to
help park managers make decisions on the many issues they face while also satisfying law and policy.
The program supports parks in meeting the statutory requirements for planning, as identified in the
National Parks and Recreation Act of 1978 (54 USC 100502), Wild and Scenic Rivers Act (16 USC
1274(d) (1)), and/or National Trails System Act (16 USC 1244(e) and (f)). Over recent years, the UMP
program has transitioned from exclusively preparing large stand-alone general management plans to a
more responsive and flexible planning framework that meets park planning needs and fulfills legal and
policy requirements in a more time and cost-efficient manner. The production of a broader portfolio of
plans allows the program to support more individual planning efforts and help parks target their most
urgent needs, including guiding major investment decisions, promoting racial justice and equity for
National Park Service FY 2024 Budget Justifications
CONST-58
underserved populations, expanding partnerships, and expanding efforts around climate adaptation and
resilience.
Special Resource Studies
The Special Resource Studies (SRS) program conducts Congressionally authorized studies of areas that
may have potential for addition to the National Park System or other national designations, such as a Wild
and Scenic River, National Trail, National Heritage Area, or Affiliated Area. Studies are prepared for
areas that Congress has deemed to be of interest due to natural, cultural, or historic values or uniqueness,
and are managed by the program office to ensure objectivity, consistency with NPS policy and guidance,
and cooperation with stakeholder entities, subject matter experts, and public involvement in the study
process. The SRS process considers an area’s national significance, suitability, and feasibility for
inclusion as an NPS unit, which includes potential staffing requirements and projected facility investment
costs. Studies also consider whether direct NPS management, or existing/alternative protection by other
public agencies or the private sector, is appropriate for the area. The study process is usually truncated if a
negative finding is made for any one of the criteria. This program also conducts reconnaissance surveys,
which offer indications of whether the area is likely to meet the criteria to be eligible for designation.
Reconnaissance surveys are most often requested to investigate additions to the national park system but
can also be undertaken for other types of national designations. By law, reconnaissance survey costs may
not exceed $25,000; beyond this dollar amount, studies require prior Congressional approval (54 U.S.C.
100507(b) (5)).
Studies are conducted in chronological order and initiated within one year of authorization, once funding
is made available and depending on staff capacity. The average estimated time for NPS to produce an
SRS is 18 months and for a Reconnaissance Survey 9 months.
The SRS Program addresses the Administration priorities as well as needs identified in the NPS System
Plan One Hundred Years, which provides a framework for proactively directing the future of the National
Park System, identifying gaps in the nation’s protected natural and cultural areas, and establishing a
collaborative conservation system that fully reflects our nations’ cultural and natural heritage.
Environmental Impact Planning and Compliance
This program component supports parks, regions, and headquarters offices in the process of completing
Environmental Impact Statements (EISs), Environmental Assessments (EAs), and other compliance
documents related to the National Environmental Policy Act (NEPA), with a priority emphasis on
legislatively or judicially mandated NEPA related actions. These planning and compliance actions relate
to major management decisions that do not fit within the normal scope of the construction program or the
unit management planning program, and thorough completion helps ensure appropriate stewardship of
natural and cultural resources.
National Park Service FY 2024 Budget Justifications
CONST-59
Activity: Management Planning
Program Component: Unit Management Plans
FY 2024 Program Activities
The following are examples of planned FY 2024 Unit Management Plans activities:
Conduct planning efforts addressing key park needs, including visitor access plans, foundation
documents, resource stewardship strategies, trail management plans, site plans and financially
sustainable development/facilities plans.
Lead servicewide efforts towards greater consistency, innovation, and focus in the areas of visitor
access (including equity for underserved communities), racial justice, climate
adaptation/resilience, and strategic facility investment planning.
Develop and refine NPS servicewide planning program policy and guidance, including the roll
out of updated General Management Planning Guidance and an updated Reference Manual on
park planning.
Support parks in meeting the statutory requirements for general management plans, including
several streamlined standalone general management plans and additional collaboration with NPS
transportation programs to accomplish more out of available funds.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Unit Management Plans is $20,945,000 and 48 FTE, a program change
of +$11,129,000 and +15 FTE from FY 2023 Enacted.
Racial Justice and Equity for Underserved Communities Initiative - Assess and Address
Transportation Barriers to National Parks (+$7,000,000 / +2 FTE) - This funding will deploy existing
tools that assess the accessibility of park units from underserved communities in partnership with the
Federal Highway Administration (FHWA) and improve trip planning and convenient connections in an
effort to promote car-free travel using the General Transit Feed Specification (GTFS). In FY 2024, the
NPS will build upon existing efforts to research and identify gaps where municipal transit or alternative
modes of transportation are unavailable to nearby underserved or disadvantaged communities. This work
will entail urban, suburban, and rural areas of persistent poverty (or using related factors) near NPS units
where transit/trail connections provide opportunities for access. The NPS would expand partnerships with
municipalities and other organizations to bring these populations to Federal lands. A partnership between
Delaware Water Gap NRA and the Monroe County Transit Authority provides this type of service
through their River Runner program. GTFS will enhance the existing NPS app by making public
transportation data more universally accessible. Programs for access and user health benefits can be
developed and ready for implementation using micro-mobility, such as e-scooters and bikeshare, or other
transport methods.
Conservation Initiative - Climate Vulnerability Assessments (+$4,129,000 / +13 FTE) – Vulnerability
assessments (VAs) are ideally timed to link with other NPS planning processes so that the results directly
inform management decisions, ensuring NPS operations and investments are resilient to the effects of
climate change. National or regional planning priorities—such as Resource Stewardship Strategies,
Strategic Facility Investment Planning programs, or individual projects—all benefit from greater
understanding of climate risks. Dedicated VA efforts improve major NPS investment decisions by
National Park Service FY 2024 Budget Justifications
CONST-60
weighing the scope of the project or effort, gathering, or utilizing available information to identify and
better understand key threats, and by recommending how to manage the risks posed by the threats. FY
2024 funding will provide substantial resources to conduct VAs across the country, including up to 13
additional staff throughout the NPS regions.
Program Overview
The Unit Management Plan program funds a broad range of products and services to help park managers
make decisions on the issues they face while also satisfying law and policy requirements. The program
promotes broad cost efficiencies through cooperative efforts with other program leads, Federal agencies,
and partners in areas of mutual concern. The program supports management planning for units of the
National Park System, National Trails System, Wild and Scenic Rivers, as well as Affiliated Areas, and
other special projects where Congress has directed the NPS to prepare a management plan in cooperation
with others.
The Unit Management Plan program continues to serve as the primary NPS fund source to assist park
units in meeting the statutory requirements for general management plans (54 USC 100502), now
satisfied through park planning portfolios. Park planning portfolios serve as an assemblage of planning
documents that guide management and decision making and satisfy law and policy. Over recent years, the
UMP program has transitioned from exclusively preparing large stand-alone general management plans to
a more responsive and flexible planning products that meets park needs and fulfills legal and policy
requirements in a more time and cost-efficient manner. The production of a broader portfolio of plans
allows the program to support more individual planning efforts and help parks target their most urgent
needs, including guiding major investment decisions, promoting racial justice and equity for underserved
populations, fostering partnerships, and expanding efforts around climate adaptation and resilience.
The program prioritizes support for new unit plans, in order to meet legislative requirements, seek
partnership opportunities, and set critical management direction. The program will continue support for
several projects that are piloting an assessment streamlined model of a standalone general management
plan in FY 2022—particularly benefiting recent additions to the National Park System. Examples of
planning products funded by the Unit Management Plan program include general management plans,
visitor use management plans, site plans/development concept plans, partnership plans, facility
investment plans, and trail management plans.
Vulnerability Assessments
Vulnerability assessments (VAs) are ideally timed to link with NPS planning processes so that the results
directly inform management decisions. Over 100 projects per year require VA efforts that directly inform
existing park planning processes. VAs also provide critical insight into national or regional planning
priorities, such as Resource Stewardship Strategies, Strategic Facility Investment Planning, or individual
projects that are part of region and park planning portfolios. The per unit cost of a climate change
vulnerability assessment can range from $5,000 to $300,000 based on:
The scope of the planning effort or management decision the VA is intended to inform. A single
project such as repair or siting of a coastal road, or a management plan for a cultural landscape
may be more simple and direct, whereas a study to inform park-wide management of natural
resources or a strategic plan for the full inventory of park infrastructure is a much broader and
more complicated process.
National Park Service FY 2024 Budget Justifications
CONST-61
The availability of necessary information regarding the target resources. NPS park units, spread
across the country, have a wide difference in the quality of available data for facilities, natural or
cultural resources, visitor health, and safety. Where good information is not available, the VA
process may have to gather new data in order to properly assess the key threats being
considered—including the target’s sensitivity and exposure to those threats.
The complexity of the threats themselves. For instance, the threats posed by sea level rise are on a
different timescale compared to wildfires and have wide differences in how they impact resources
and infrastructure.
National Park Service FY 2024 Budget Justifications
CONST-62
Activity: Management Planning
Program Component: Special Resource Studies
FY 2024 Program Activities
The following are examples of planned FY 2024 Special Resource Studies activities:
Initiate or continue work on 16 previously requested studies in addition to studies in the
transmittal process to Congress.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Special Resource Studies is $1,593,000 and 6 FTE. There are no
proposed program changes from FY 2023 Enacted.
Program Overview
As directed by Congress (54 U.S.C. 100507), the NPS considers resources that exhibit qualities of
national significance and conducts studies where specifically authorized to determine if areas have
potential for inclusion in the National Park System. Special Resource Studies (SRS) collect information
about candidate areas to determine if they meet established criteria for national significance, suitability,
and feasibility as potential additions to the National Park System. These studies evaluate the need for
direct NPS management and alternative concepts for protection by others outside of the National Park
System, such as affiliated areas. Reconnaissance surveys offer indications of whether the area is likely to
meet the criteria to be eligible for designation. Reconnaissance surveys are most often requested to
investigate additions to the national park system but have also been undertaken for other types of national
designations such as Wild and Scenic Rivers, National Historic Trails, and Affiliated Areas.
Reconnaissance Surveys are limited to $25,000 each (54 U.S.C. 100507(b) (5)) and are eligible for
funding through a written request from a member of Congress, at the request of the Secretary of the
Interior, or the NPS Director.
The NPS also conducts evaluations similar to special resource studies to investigate potential additions to
the National Wild and Scenic Rivers System, National Trails System, and potential new National Heritage
Areas. These studies evaluate whether designation is merited using established criteria; solicit stakeholder
and public engagement; explore partnerships with local communities, States, or Tribes; and determine
potential for national designation by Congress.
The primary purposes of the SRS program are to provide Congress with expert analysis about the
resource qualities of a study area, potential for visitor enjoyment, efficient management of the resource(s),
and alternative methods or designations to protect important resources. The analysis of costs included in
special resource studies addresses the fiscal impact of adding new units or management responsibilities to
the National Park System; estimated costs are identified for operations, resource protection, visitor access,
interpretation, the construction of necessary new facilities, if any; and the repair or rehabilitation of
existing structures within a potential park boundary area. The SRS program addresses the
Administration’s priorities during the study process as well as after a unit may be established.
When evaluating additions to the National Park System, the SRS program references the NPS System
Plan, which identifies gaps and missing links in the National Park System for which opportunities for
future preservation, conservation, or interpretation exist. The gaps identified reflect a full representation
National Park Service FY 2024 Budget Justifications
CONST-63
of ecological regions, cultural themes, and stories of diverse communities that are not currently being
protected and interpreted.
In support of Executive Order 13985 and 14091, based on research and analysis of the impacts of
National Park units throughout the U.S., after a unit has been designated, potential economic benefits to
surrounding communities include likely increases in visitation to the park site and associated economic
benefits from tourism, visitor and education programs that serve both residents and outside visitors, and
local hiring opportunities.
In FY 2022, the NPS began piloting improvements to its Special Resource Study process. The first
studies in the pilot program are for new park units that started in FY 2022. Under the revised process,
studies should be completed in about 18 months after preliminary requirements (funds allocation,
initiation and scoping, and final project agreement). Of that time, the first 6 months is focused on scoping,
engagement, and public meetings; the following 8 months allows for evaluation and alternatives
development; and the final 4 months is for final review, revisions, and briefings. This timing may be
longer for more complex studies. To ensure studies remain on schedule, the study’s leadership team has
multiple, required points for check-ins for feedback and decision making. This new process will be
reviewed and updated as the pilot special resource studies progress, and those improvements will be
applied to the special resource studies that begin in FY 2024 or later. Processes for National Heritage
Areas, National Trails, or Wild and Scenic Rivers are not part of the pilot program; opportunities to
streamline those processes will be undertaken on a case-by-case-basis.
The NPS expects to initiate or continue work on the following studies in FY 2024.
Anticipated FY 2024 Special Resource Study work includes:
Rota (CNMI) SRS
Grand Village of the Natchez Indians (MS) Reconnaissance Survey
Historic Jefferson College (MS) Reconnaissance Survey
Julius Rosenwald and the Rosenwald Schools (Nationwide) SRS
Charles Young’s Birthplace Cabin (KY) Recon Survey
Penn’s Cave (PA) Reconnaissance Survey
John P. Parker House (OH) SRS
Dearfield Homestead (CO) SRS
Memphis Area Lynching Locations (TN) SRS
Los Angeles Coastal Area (CA) SRS
Little Manatee River (FL) WSR Study
Kissimmee River (FL) WSR Study
Buckeye Trail (OH) NST Feasibility Study
Kaena Point (HI) NHA Feasibility Study
Great Dismal Swamp (VA) NHA Feasibility Study
Guam NHA Feasibility Study
National Park Service FY 2024 Budget Justifications
CONST-64
Activity: Management Planning
Program Component: Environmental Impact Planning and Compliance
FY 2024 Program Activities
The following are examples of planned FY 2024 Environmental Impact Planning and Compliance
activities:
Directly support dozens of parks, regions, and other NPS programs in preparing National
Environmental Policy Act (NEPA) planning documents, with emphasis on planning efforts
necessitated by court orders, litigation, national precedence, or those of an unusually complex or
controversial nature. These planning and compliance actions relate to major management
decisions that do not fit within the normal scope of the construction program or the management
planning program. Their completion helps ensure appropriate stewardship of natural and cultural
resources and achieves significant cost savings by reducing the potential for litigation.
Develop and refine NPS servicewide NEPA policy and guidance and provide training to NPS
staff on NEPA implementation.
Develop and maintain tools to facilitate the completion of concise, focused, and timely NEPA
reviews.
Serve as the servicewide focal point for matters concerning NEPA, and provide technical
assistance to parks, regions and other NPS programs on NEPA-related matters.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Environmental Impact Planning and Compliance is $6,127,000 and 20
FTE. There are no proposed program changes from FY 2023 Enacted.
Program Overview
The Environmental Impact Planning and Compliance program supports parks, regions, and headquarters
offices with Environmental Impact Statements (EIS), Environmental Assessments (EA), and other
compliance documents related to the National Environmental Policy Act (NEPA), focusing on
legislatively or judicially mandated NEPA related actions. This program serves as the focal point for
matters relating to NPS NEPA planning and other related environmental mandates; provides NEPA-
related technical assistance and training to parks, regions and WASO offices; and develops servicewide
guidance for NEPA planning and other Federal resource protection mandates.
The National Park Omnibus Management Act of 1998 and NEPA require park management decisions to
be based on a full examination of alternatives, impacts, and opportunities for public involvement. This
program enhances the NPS’s ability to conduct legally defensible, scientifically based analyses that
facilitate sound decision-making. To make NEPA and related compliance activities more efficient and
ensure both thoroughness and timeliness, an integrated system to relate funding, planning, compliance,
and public comment is in use for all NPS projects. This Planning, Environment, and Public Comment
(PEPC) system assures better coordination and timely completion of compliance through use of one
bureau-wide web-based system.
More information can be found at: www.nps.gov/orgs/1812/epc
National Park Service FY 2024 Budget Justifications
LASA-GAOA-1
Appropriation: Land Acquisition and State Assistance - GAOA
Appropriation Overview
The Land and Water Conservation Fund (LWCF) was established by Congress in 1964 to support the
protection of Federal public lands and waters – including national parks, forests, wildlife refuges, and
public lands recreation areas – and to provide recreation opportunities to all Americans. The LWCF also
provides for grants to State and local governments for the acquisition and development of public outdoor
recreation areas and facilities.
Through a variety of programs, LWCF supports our nationwide legacy of high-quality recreation and
conservation areas. The Fund receives revenue from offshore oil and gas leasing to support outdoor
recreation and conservation of natural, cultural, and historic resources across the country. Every State and
most counties in the Nation have benefited from the LWCF since its establishment.
The Department of the Interior is responsible for administering and implementing these important
programs, in concert with the U.S. Forest Service. The Great American Outdoors Act (GAOA) amended
the LWCF Act to make $900 million in permanent LWCF funding available annually. GAOA requires
the President’s annual budget submission to Congress include an allocation of LWCF funding by account,
program and project for consideration as part of the annual budget process. Mandatory LWCF funding is
subject to a sequestration reduction of 5.7%. Beginning in FY 2022, the sequestered amount becomes
available or “pops up” in the following year. Unless otherwise indicated, amounts referenced in this
section reflect the Net Budget Authority that would be available for programs to execute after
sequestration adjustments.
Program Overview
The Land Acquisition and State Assistance allocation uses funding derived from the Land and Water
Conservation Fund to support NPS land acquisition activities, American Battlefield Protection Program
grants, and grants to States and through States to local governments for acquisition and development of
public outdoor recreation. In 2020, pursuant to the Great American Outdoors Act (GAOA), funding from
LWCF became mandatory at the full authorized level of $900 million per year.
Land Acquisition, State Assistance, and the American Battlefield Protection Program each contribute to
conservation and recreation. Land Acquisition directly improves the visitor experience by supporting or
enhancing public access to outdoor spaces and expanding recreation opportunities. The State Assistance
activity supports partnerships with State and local agencies by providing grants for projects that create a
nationwide system of parks, open space, rivers, and trails for public enjoyment. These spaces provide
educational, recreational, and conservation benefits to the American people. The American Battlefield
Protection Program supports the protection of American Battlefields from the Civil War, Revolutionary
War, and War of 1812 for the public’s education and recreation.
Federal Land Acquisition
This activity provides for the acquisition of land and interests in land to preserve and protect, for public
use and enjoyment, the historic, scenic, natural, and recreational values of Congressionally authorized
areas within the National Park System. The acquisition of land may be through donation, exchange, or
purchase. This activity also provides for the administration and management of land acquisitions
National Park Service FY 2024 Budget Justifications
LASA-GAOA-2
throughout the National Park System in a responsible and accountable way, ensuring compliance with
existing guidelines and laws. The National Park Service works closely with regions and parks, sister
bureau personnel, and non-profit partners to provide public access for outdoor recreation and create
opportunities for furthering a legacy of conservation stewardship.
American Battlefield Protection Program
Under this budget activity, the NPS awards grants to eligible entities (including State, local, and Tribal
governments and non-profit organizations) with acquisition, protection, and stewardship of nationally
significant Civil War, Revolutionary War, and War of 1812 battlefields and associated historic properties
outside of the National Park System. This activity includes Battlefield Acquisition grants, Battlefield
Interpretation Grants and Battlefield Restoration Grants. This activity also provides for the administration
of all three grant programs.
State Conservation Grants
This activity provides matching grants to States, benefitting State, Tribal, and local units of government
for the acquisition and development of land and facilities that will provide the public with access to new
opportunities to engage in outdoor recreation. The grants provide incentives for continuing mandatory
State planning efforts to address outdoor recreation needs and for greater commitments from State, Tribal,
and local governments to conserve and improve recreation resources. Beginning in 2014, a nationally
competitive component was added to this program. This activity also provides for the administration of
grants to States and through States to Tribal and local governments, as well as ensuring that areas that
have received assistance are open and available for public outdoor recreation use in perpetuity as required
by the LWCF Act. Further tasks include the provision of technical assistance to States in developing and
updating of State-wide outdoor recreation plans.
National Park Service FY 2024 Budget Justifications
LASA-GAOA-3
Land and Water Conservation Fund Programs for NPS
Net Budget Authority
1
(Dollars in Thousands)
Account
2022
Actual 2023 Enacted 2024 Request
2024 vs.
2023
2023
FTE
2024
FTE
3
2024 vs.
2023
FTE
3
Federal Land Acquisition
Emergencies, Hardships, Relocations 2,358 3,368 5,000 +1,632 0 0 0
Inholdings, Donations, & Exchanges 6,601 7,000 11,000 +4,000 0 0 0
Projects 55,445 65,925 61,825 -4,100 0 0 0
Recreational Access 13,673 14,500 12,000 -2,500 0 0 0
Acquisition Management 13,673 14,500 14,500 0 82 82 0
Subtotal, Federal Land Acquisition
2
91,750 105,293 104,325 -968 82 82 0
State Conservation Grants
Formula State Conservation Grants 196,144 200,456 157,197 -43,259 0 0 0
Competitive State Conservation Grants 103,730 124,145 135,000 +10,855 0 0 0
State Conservation Grants Administration
3
11,316 11,083 13,347 +2,264 32 42
+10
Subtotal, State Conservation Grants
2
311,190 355,684 305,544 -30,140 32 42 +10
American Battlefield Protection Program (ABPP)
ABPP Acquisition Grants 16,408 17,400 17,400 0 0 0 0
ABPP Interpretation Grants 943 1,000 1,000 0 0 0 0
ABPP Restoration Grants 943 1,000 1,000 0 0 0 0
ABPP Grants Administration 566 600 600 0 2 2 0
Subtotal, ABPP
2
18,860 20,000 20,000 0 2 2 0
Total, LWCF NPS Funding (Net Budget Authority) 421,800 460,977 429,869 -31,108 116 126 +10
Sequester Adjustments 25,496 827 -1,930 -2,757
Total, LWCF NPS Funding (New Budget Authority) 447,296 461,804 427,939 -33,865
1
Bureau line item funding amounts are Net Budget Authority, the amount available to execute after sequester and Pop-up adjustments. All mandatory LWCF funding is subject to a sequestration
reduction of -5.7% across all programs. After FY 2022, amounts sequestered from LWCF programs become available for obligation (“Pop-Up”) in subsequent years.
2
Subtotals may not appear to add correctly due to rounding of sequester adjustments.
3
The increase of ten FTE for State Conservation Grant Administration is not captured in the total FTE levels reflected in the budget overview.
National Park Service FY 2024 Budget Justifications
LASA-4
Appropriation Language
This account does not require annual appropriations language due to permanent appropriation authorized
by the Great American Outdoors Act, P.L. 116-152 (GAOA). However, Section 200303(c)(1) of 54
U.S.C. includes a statutory requirement for the Department to submit an allocation of Land and Water
Conservation Fund funding to Congress as part of the annual budget process.
Authorizing Statutes
The Land and Water Conservation Fund Act of 1965 (54 U.S.C. 2003), provides funds and authorization
for funding to the States in planning, acquisition, and development of needed land and water areas and
facilities. 54 U.S.C. 200306 authorizes the acquisition of lands, waters, or interests in lands or waters
within the exterior boundaries of the national park system, national scenic trails, the national wilderness
preservation system, and federally administered components of the National Wild and Scenic Rivers
System.
The American Battlefield Protection Act of 1996 (54 U.S.C. 3081), as amended, authorizes the American
Battlefield Protection Program to assist citizens, public and private institutions, and governments in
planning, interpreting, and protecting sites where historic battles were fought on American soil.
The John D. Dingell, Jr. Conservation, Management, and Recreation Act (P.L. 116-9), permanently
authorizes the Land and Water Conservation Fund.
The Great American Outdoors Act, National Parks and Public Land Legacy Restoration Fund (P.L.
116-152) authorizes a permanent appropriation of $900,000,000 per year from the Land and Water
Conservation Fund.
FY 2024 National Park Service LWCF Account Summary Table
(Dollars)
Budget Authority/Activity Amount
1
FY 2024 New Budget Authority 427,938,677
FY 2024 Estimated Sequestration Reduction (-5.7%) -24,392,505
FY 2024 Estimated Pop Up (+5.7% of 2023) +26,322,828
FY 2024 Net Budget Authority 429,869,000
1
Totals may not appear to add correctly due to rounding of sequester adjustments.
National Park Service FY 2024 Budget Justifications
LASA-5
National Park Service
Allocation of Land and Water Conservation Fund FY 2024
Dollars (Net Budget Authority)
Account/Activity/Project State Amount
Land Acquisition and State Assistance
State Conservation Grants
Formula State Conservation Grants
[157,197,000]
Competitive State Conservation Grants
[135,000,000]
State Conservation Grants Administration
[13,347,000]
State Conservation Grants Total
305,544,000
American Battlefield Protection Program (ABPP)
ABPP Acquisition Grants
[17,400,000]
ABPP Interpretation Grants
[1,000,000]
ABPP Restoration Grants
[1,000,000]
ABPP Grants Administration
[600,000]
American Battlefield Protection Grants Total
20,000,000
Federal Land Acquisition
Acquisition Management
[14,500,000]
Recreational Access
[12,000,000]
Emergencies, Hardships, Relocations, and Deficiencies
[5,000,000]
Inholdings, Donations, and Exchanges
[11,000,000]
Grand Teton National Park WY [7,875,000]
Yukon-Charley Rivers National Preserve AK [2,050,000]
Petrified Forest National Park AZ [7,500,000]
Ala Kahakai National Historic Trail HI [3,800,000]
Valles Caldera National Preserve NM [2,500,000]
Zion National Park UT [2,600,000]
Battlefield Protection Various [2,680,000]
Voyageurs National Park MN [1,500,000]
Gauley River National Recreation Area WV [920,000]
Ozark National Scenic Riverways MO [975,000]
New River Gorge National River WV [655,000]
Minute Man National Historical Park MA [1,860,000]
San Juan Island National Historical Park WA [905,000]
Hot Springs National Park AR [785,000]
Ste. Genevieve National Historical Park MO [430,000]
Obed Wild and Scenic River TN [320,000]
San Antonio Missions National Historical Park TX [1,221,000]
Rocky Mountain National Park CO [6,230,000]
Big South Fork National River and Recreation Area KY, TN [950,000]
Congaree National Park SC [250,000]
National Park Service FY 2024 Budget Justifications
LASA-6
Account/Activity/Project State Amount
Death Valley National Park CA [500,000]
Jean Lafitte National Historic Park and Preserve LA [390,000]
Sleeping Bear Dunes National Lakeshore MI [1,365,000]
Missouri National Recreation River NE, SD [1,855,000]
Big Cypress National Preserve FL [270,000]
Biscayne National Park FL [2,200,000]
Big Cypress National Preserve FL [1,195,000]
Lake Clark National Park and Preserve AK [8,044,000]
Land Acquisition Projects
[61,825,000]
Federal Land Acquisition Total
104,325,000
National Park Service FY 2024 Budget Justifications
LASA-7
Activity: Federal Land Acquisition (GAOA)
FY 2024 Program Activities
The following are examples of planned FY 2024 Federal Land Acquisition Activities:
Pursue high-priority acquisitions in 27 park units from willing sellers, including over 100 acres of
land that will benefit underserved communities and over 35,000 acres to help preserve and protect
resources within national park system units that relate to Tribal and Indigenous people’s heritage.
Increase recreational opportunities, including hiking, kayaking, rafting, and visiting culturally and
historically significant landscapes.
Justification of FY 2024 Program Changes
The FY 2024 budget request for Federal Land Acquisition is $104,325,000 and 82 FTE, a program
change of -$968,000 and 0 FTE from FY 2023 Enacted.
Emergencies, Hardships, Relocations (+$1,632,000 / +0 FTE) — This $1.632 million increase will
bring the total available to address these specific needs to $5.0 million. This subactivity provides the
opportunity to acquire lands within national park system unit boundaries when landowners are
experiencing personal hardships from life events such as medical or family circumstances. Additionally,
when an emergency arises for the management team of a unit, such as an owner wanting to sell their land
for unsympathetic development, these funds can quickly be allotted to allow Federal protection of the
resource.
Inholdings, Donations and Exchanges (+$4,000,000 / +0 FTE) — This $4.0 million increase will add
flexibility and capacity to acquire significant inholdings as they come to market. This fund source allows
for a more nimble response than itemized acquisition projects. This larger amount provides the flexibility
to address the expense of unexpected acquisition availability inside boundaries of national park system
units. This subactivity also funds costs associated with due diligence activities required to complete
donations and exchanges for lands inside of park unit boundaries that are often presented by partner
organizations.
Federal Land Acquisition Projects (-$4,100,000 / +0 FTE) — The NPS land acquisition allocation
includes 28 projects that provide investments across the United States. The NPS land acquisition program
requests funding to acquire approximately 69,200 acres of land within 27 units. This funding level will
directly support the NPS’ efforts to acquire priority inholdings within Congressionally authorized
boundaries.
Recreational Access (-$2,500,000/ +0 FTE) — The $2.5 million funding decrease will allow for larger
allocations in other acquisition activities. This $12.0 million allocation level will support the NPS’s
efforts to invest in acquisitions that meet recreation access needs by working with willing landowners to
secure rights-of-way, easements or fee simple lands that provide access or consolidate federal ownership
so that the public has unbroken spaces for recreation on park lands.
National Park Service FY 2024 Budget Justifications
LASA-8
Mission Overview
The Federal Land Acquisition activity supports the NPS mission by contributing to protection of natural
and cultural resources and their enjoyment by visitors for recreational experiences. The NPS acquisition
of land is required to be within authorized park boundaries.
Subactivity Overview
Since its inception in 1916, the NPS has served as the ultimate caretaker of the country’s most valuable
natural and cultural resources, while providing for public use and enjoyment of those resources. Today
the National Park System has a vast and diverse portfolio of assets under its care totaling more than 85
million acres.
Federal Land Acquisition Projects
This subactivity supports high priority land acquisition projects. Many of the parcels identified for
acquisition protect critical habitat for endangered species, preserve rapidly eroding coastal habitat, and
strengthen resiliency to climate change. Other parcels set aside public lands in suburban or urban areas in
order to preserve and share the histories of underserved or marginalized communities.
Emergencies, Hardships and Relocations
The NPS makes use of this subactivity to fund acquisition of lands where the owner is experiencing
financial hardship and must quickly sell her or his land within the boundary of a park unit, or there is a
management emergency that can best be addressed through acquisition from a willing seller. The funds in
this subactivity are also used to pay deficiencies for condemnation cases previously filed in court and for
the payment of relocation claims as directed in P.L. 91-646, the Uniform Relocation Assistance and Real
Property Acquisition Policies Act of 1970, as amended. Historically, these funds have been used to
acquire land within park units in diverse hardship cases, such as an Alaska Native Corporation that
desired to raise additional Tribal funds or an older couple who faced significant medical expenses and
needed to raise money by selling their lands. Funds have also been used in emergency situations ranging
from a proposed subdivision development on top of an historic battlefield to the protection of the last
privately owned parcel in an historic district that protects a unique ecosystem.
Inholdings, Donations, and Exchanges
The NPS makes use of funding in this subactivity to complete expedited purchases of tracts and interests
in land from willing sellers within units of the National Park System. The Service uses funding for
inholdings to permanently protect land, prevent development within park boundaries, improve
management efficiencies, and provide or expand public access within parks. Funding is also used to
purchase interests in land in the form of leases for use of land within the boundary of the National Park of
American Samoa. As of the end of 2022, there were approximately 2.2 million acres of privately held
inholdings identified for protection with an estimated value of approximately $2.7 billion. These
acquisitions are only purchased when opportunities arise and are therefore funded on an as-needed basis
throughout the fiscal year.
This subactivity is also used to fund costs associated with donations and exchanges of land. These costs
include due diligence activities such as title research, environmental site assessments, and appraisals, as
well as equalization payments when necessary to complete an exchange.
National Park Service FY 2024 Budget Justifications
LASA-9
Recreational Access
This subactivity provides funds to allow NPS to work with State, local, and private landowners to acquire
parcels adjacent to existing NPS-managed lands where authority permits. These parcels will create,
supplement, or enhance recreational opportunities for the public. Additional acres may be acquired to
allow visitors to access entry or exit points for watercraft along waterways, connect gaps in scenic trails,
or provide a buffer to protect neighboring landowners. Lands to be acquired through this subactivity are
chosen by first applying the same criteria as general acquisition requests are subject to in the annual
priority setting process, and then additional scrutiny for recreational opportunities is explored. These
include access points, recreational opportunities such as expanded hunting or fishing; equestrian trail
connectivity; watercraft use such as kayaking, canoeing, or boating; and hiking or walking trail
connectivity or safety concerns. Each request has an expressed willing seller. Once funding is approved
the NPS will act to protect the resource and make it available to the public.
Acquisition Management
This subactivity manages the acquisition of lands within the boundaries of the National Park System to
ensure compliance with existing guidelines and laws. This subactivity supports the protection of natural,
cultural, and historic landscapes, including watershed and riparian habitat to increase outdoor recreation
opportunities, and preserve the footprint of nationally significant historical moments or events.
Acquisition Management funds support personnel and all costs for the administration, implementation,
coordination, and evaluation of the NPS’s Federal land acquisition program. The staff provides specialty
support for several realty-based functions, including, but not limited to: assisting parks preparing land use
plans, providing guidance and assistance in the preparation of land acquisition requests, working with
willing sellers from the initial explanations of Federal acquisition options to the final acquisition
procedures, preparing responses for official information requests from a variety of sources, providing the
regional and national levels of scoring of annually renewed acquisition requests towards a nationally
ranked listing, and conducting research into issues such as proposed developments.
The National Park Service prepares a quarterly report on unobligated LWCF funds allocated to Federal
Land Acquisition projects as directed by Congress. This effort includes review of the status of each park’s
land acquisition projects, detailing the step in the process that is underway, e.g., appraisal has been
ordered, title report has been received, closing is scheduled on a particular date, residual funds are being
used to complete relocation, etc. This information informs programmatic decisions on when and how to
make use of any residual balances at parks. In instances where there are no additional willing sellers or
available lands within the park boundary, NPS proactively reallocates and/or reprograms any residual
funds consistent with legislation requirements. NPS uses these residual funds to expeditiously pursue
protection of additional resources from willing sellers in other park units within the National Park
System. Balances at the park level will be combined with other funds to provide substantive amounts to
allow work to continue at park units where there are willing sellers and active acquisition efforts
underway.
Federal Acquisition Project Lists
Consistent with Congressional direction, the NPS submits the following Federal land acquisition projects
as part of the 2024 Budget process. Detailed final project data sheets for each identified project are
included in this section and will be made available on the Department’s LWCF website:
https://www.doi.gov/lwcf. In addition, consistent with language in the FY 2023 Omnibus Appropriations
National Park Service FY 2024 Budget Justifications
LASA-10
Bill (P.L. 117-328), the Department submits a Supplemental list of Federal Land Acquisition projects.
Project Data Sheets for supplemental projects and color maps for Request and Supplemental projects will
also be provided separately.
The projects listed below are listed in priority order and have identified willing sellers. The Department
will keep Congress informed should the circumstances of a specific project change during the course of
the 2024 Budget process. Federal Land Acquisition project funding amounts are shown in Net Budget
Authority - the amount needed to execute after sequester reductions and pop-up adjustments.
FY 2024 NPS LWCF Land Acquisition Requested Project List
(Dollars in Thousands)
Priority Project Name State(s)
Funding
($000) Acres
1 Grand Teton National Park WY $7,875 35
2 Yukon-Charley Rivers National Preserve AK $2,050 1,458
3 Petrified Forest National Park AZ $7,500 35,901
4 Ala Kahakai National Historic Trail HI $3,800 36
5 Valles Caldera National Preserve NM $2,500 8
6 Zion National Park UT $2,600 675
7 Battlefield Protection Various $2,680 N/A
8 Voyageurs National Park MN $1,500 33
9 Gauley River National Recreation Area WV $920 227
10 Ozark National Scenic Riverways MO $975 368
11 New River Gorge National River WV $655 310
12 Minute Man National Historical Park MA $1,860 2
13 San Juan Island National Historical Park WA $905 26
14 Hot Springs National Park AR $785 17
15 Ste. Genevieve National Historical Park MO $430 1
16 Obed Wild And Scenic River TN $320 58
17 San Antonio Missions National Historical Park TX $1,221 26
18 Rocky Mountain National Park CO $6,230 31
19 Big South Fork National River & Recreation Area KY, TN $950 600
20 Congaree National Park SC $250 46
21 Death Valley National Park CA $500 1,387
22 Jean Lafitte National Historical Park and Preserve LA $390 85
23 Sleeping Bear Dunes National Lakeshore MI $1,365 70
24 Missouri National Recreation River NE, SD $1,855 500
25 Big Cypress National Preserve FL $270 3
26 Biscayne National Park FL $2,200 231
27 Big Cypress National Preserve FL $1,195 6,795
28 Lake Clark National Park and Preserve AK $8,044 20,226
FY 2024 Requested Project List
$61,825 69,155
National Park Service FY 2024 Budget Justifications
LASA-11
FY 2024 NPS LWCF Land Acquisition Supplemental Project List
(Dollars in Thousands)
Priority Project Name State(s)
Funding
($000) Acres
Supp_1 Historic Preservation Training Center MD $1,100 10
Supp_2 Statue of Liberty National Monument NY $6,125 3
Supp_3 Golden Gate National Recreation Area CA $9,390 1,106
Supp_4 Grand Teton National Park WY $31,213 320
FY 2024 Supplemental Project List
$47,828 1,439
National Park Service FY 2024 Budget Justifications
LASA-12
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Grand Teton National Park
Priority: 1
State(s): WY
Congressional District(s): WY- At Large
Location: Teton County, Wyoming
Limitation Amount: There are no limitations.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 35 $7,875,000
Acquired to Date 8,625 $89,224,080
Remaining to be Acquired 1,421 $140,525,000
Project Description:
Grand Teton National Park was established in February 1929, to showcase the awe-inspiring Teton mountain range,
pristine glacial lakes, the expansive sage-covered valley of Jackson Hole, and the wild and scenic Snake River.
Grand Teton National Park is in the heart of the Greater Yellowstone Ecosystem, one of Earth’s largest intact
temperate ecosystems. The park is home to some of the greatest populations of wildlife in the world: elk, moose,
bison, pronghorn, mule deer, grizzly and black bears, gray wolves, coyotes, otters, wolverines, and about 300 bird
species. The central feature of the park is the Teton Range, an active, fault-block mountain front that is 40 miles
long and includes 12 peaks over 12,000 feet. The park protects seven morainal lakes along the base of the Teton
Range and more than 100 alpine and backcountry lakes. The Snake River bisects the valley of Jackson Hole and is
the headwaters of the Columbia River system.
Purpose / Need:
This request would provide funding to acquire one of the two remaining 35-acre parcels of the Snake River Ranch
(SRR), just inside the park’s southwest boundary. This is a highly visible and scenic area that provides the
foreground for the Teton Range. Working with The Conservation Fund (TCF), the NPS has already acquired four
SRR parcels. The tracts provide critical moose and elk winter range and are within a significant elk migration
corridor.
The NPS has already acquired four of the six tracts known as the Snake River Ranch. These tracts were acquired in
FY 2001, 2003, 2020 and 2022, with the support of TCF. The total acquisition will protect the unparalleled scenic
and wildlife values of Grand Teton National Park. The option to acquire this parcel, held by TCF, expires on
December 31, 2023. With the expiration of this option, and no acquisition of the parcel, the sixth and final parcel is
also likely to be lost.
Cooperator(s):
The Conservation Fund
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $0 $0
National Park Service FY 2024 Budget Justifications
LASA-13
Describe O&M:
There are neither costs nor savings associated with this acquisition.
National Park Service FY 2024 Budget Justifications
LASA-14
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Yukon-Charley Rivers National Preserve
Priority: 2
State(s): AK
Congressional District(s): AK - At Large
Location: Along the Canadian border in eastern Alaska, within the Southeast Fairbanks Census Area
Limitation Amount: There are no limitations.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 1,458 $2,050,000
Acquired to Date 10,388 $69,877
Remaining to be Acquired 284,796 $400,000,000
Project Description:
The Preserve was formed, in part, to “protect and interpret historical sites and events associated with the gold rush
on the Yukon River.” The owner has been in conversation with NPS to sell this property, which is a historical area
where the mining infrastructure and cultural landscape is closely linked. The mining history dates back to the
earliest days of the 1890s gold rush. Visitors will be able to explore significant areas of the national preserve, learn
about the region’s cultural legacy, and view wildlife throughout these lands. In addition, Eagle Village tribal elders
will be able to return to places of significance from their youth, sharing these lands with new generations and
passing on the traditions and stories of their culture.
Purpose / Need:
This is the last parcel needed to unite two historic mining camps and complete the story of the gold rush history on
the Yukon River. There is no substitute for this parcel. Acquisition by a private party is likely to result in removal of
the historic landscape and natural resource degradation.
Cooperator(s):
The Conservation Fund is an active partner for protection of resources in this area. Alaska Native elders from nearby
Eagle Village have repeatedly expressed the desire to tour the mining camp where they lived and worked in the
1940s and 1950s. This acquisition would increase their chances of visiting the site (which is now only viewable by
small, fixed-wing aircraft) and helping to document its history.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $150,000 $0
Describe O&M:
The figure above is an estimate of the cost for research and a cultural landscape inventory, as well as possible
signage or interpretive material to be prepared following the initial research. The area is extremely remote with
access limited to air transportation only.
National Park Service FY 2024 Budget Justifications
LASA-15
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Petrified Forest National Park
Priority: 3
State(s): AZ
Congressional District(s): AZ-2
Location: Northeast Arizona, Apache and Navajo Counties
Limitation Amount: There are no limitations.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 35,901 $7,500,000
Acquired to Date 38,452 $15,577,748
Remaining to be Acquired 74,246 $24,000,000
Project Description:
Petrified Forest National Park contains globally significant fossils from the Late Triassic Period. The park is a
virtual laboratory offering opportunities for paleontological research and visitor appreciation that are unparalleled.
These globally and nationally significant resources located on State lands complement those already protected in the
park and connect landscapes for visitor access and enjoyment.
Purpose / Need:
These State parcels are interspersed with NPS properties in a checkerboard pattern that creates significant access and
management issues. Currently, these parklands cannot be opened to the public and the park pays thousands of
dollars a year to the State for staff to access the NPS parcels blocked by State-owned sections. Acquisition of these
State lands would open almost twice the acreage to visitor use and scientific study and research and will ensure that
the important scientific data they provide is disseminated to the scientific community and general public. These
parcels also provide unparalleled open space opportunities to hikers, explorers, wildlife enthusiasts and
photographers. Indigenous communities have used these resources for centuries and access to the lands allows their
story to continue.
Cooperator(s):
The Trust for Public Land
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $700,000 $700,000
Estimated O&M Costs: $2,000 $2,000
Describe O&M:
The park is currently paying to hold an annual grazing lease on these State parcels that allows access to the
checkerboarded NPS parcels. The NPS also holds a special use permit that allows small-scale guided tours for
visitors. The park is currently charged the full Animal Unit Months (AUM) for the grazing leases despite having no
livestock on the land. The State would prefer the park to hold a commercial lease instead of a grazing lease, which
was estimated in 2007 to cost $700,000 annually. Elimination of the need for these annual permits would provide
savings to the government.
Increased operating costs will be borne by the Park’s existing base operating budget and/or completed with Park
staff.
National Park Service FY 2024 Budget Justifications
LASA-16
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Ala Kahakai National Historic Trail
Priority: 4
State(s): HI
Congressional District(s): HI-2
Location: Hawaii County on the Island of Hawaii
Limitation Amount: There are no limitations.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 36 $3,800,000
Acquired to Date 91 $9,500,000
Remaining to be Acquired TBD TBD
Project Description:
Ala Kahakai National Historic Trail (Trail) was designated as a component of the National Trails System in 2000, to
be administered by the National Park Service. The Trail passes through four National Park System units: Pu’ukohola
Heiau National Historic Site, Kaloko-Honokohau National Historical Park, Pu’uhonua o Honaunau National
Historical Park, and Hawai’i Volcanoes National Park. Since its designation, the Trail has been collaborating with
several community-based non-profit organizations, including The Trust for Public Land and the Hawaiian Islands
Land Trust, and State, county and Federal agencies on land protection, community-based trail access efforts and
conservation acquisitions. The parcel is bordered to the north by Lapakahi State Historical Park and to the south by a
Hawaii County parcel recently acquired as a result of the local land protection effort. Acquisition of the parcel will
result in completing protection of 15 miles of contiguous coastline within the trail corridor and will be entirely
publicly owned. This segment of the trail corridor contains numerous archeological features which constitutes an
intact cultural landscape of significance to the entire Hawaiian Islands.
Ala Kahakai National Historic Trail is a 175-mile coastal trail corridor that traverses all of Hawai’i Island’s western
half and most of its southern coast. The Ka`u Coast is nesting grounds for eighty to ninety percent of the Hawksbill
Sea Turtle. The Hawaiian Honu (Green Sea Turtle) are found in the water all along the Ka`u Coast. The population
of the most critically endangered marine mammal in the United States today, the Hawaiian Monk Seal, is slowly
rising along the Ka`u Coast. Various sea, shore, and migratory birds have been observed along or above
Kaunamano’s shoreline. The vegetation in the grazed upland areas of the property is largely nonnative with stands
of Polynesian-introduced Noni trees protected within lava tube openings, but the coastal landscape is dominated by
native plants.
Purpose / Need:
Protecting this parcel is about preserving the cultural and environmental context and landscape of the 15-mile
coastline. In addition to the physical resources, Ala Kahakai NHTs foundation documents call for the enhancement
and perpetuation or continuance of ancestral/generational connections that many families have to the western coast
of the North Kohala District. Connection to place perpetuates traditional ecological knowledge and the application
of this knowledge to stewardship, ceremonies, and sustainable gathering practices.
Cooperator(s):
Kohala Lihikai and Malama Kohala Kahakai, both community nonprofit organizations (consortium of conservation
organizations for preserving Kohala Coast and public access) are working with NPS to protect and preserve the Trail
corridor.
National Park Service FY 2024 Budget Justifications
LASA-17
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $0 $5,000
Describe O&M:
Annual trail maintenance will cost approximately $5,000.
National Park Service FY 2024 Budget Justifications
LASA-18
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Valles Caldera National Preserve
Priority: 5
State(s): NM
Congressional District(s): NM-3
Location: North of Albuquerque in Sandoval County
Limitation Amount: There are no limitations.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 8 $2,500,000
Acquired to Date 89,806 $4,331,000
Remaining to be Acquired 0 $0
Project Description:
NPS is establishing a Science and Education Center (SEC) in Jemez Springs. The landowner has offered the NPS
the right of first refusal for this property. Acquisition will allow NPS to fully operationalize the SEC. Housing for
science and education program participants is critical; regional school districts serving rural Hispanic and American
Indian communities cannot afford field programs without low-cost housing. With the ability to provide overnight
housing to visiting school groups, scientists, and seasonal staff, the park can significantly expand science and
education programming to diverse, underserved rural Hispanic and indigenous communities. The parcel will also
connect to Forest Service land and numerous trails and will expand public access to the river corridor for habitat
restoration and species recovery in this area.
Purpose / Need:
Acquisition of the property will provide important continuity of the science, management and recreation/public use
activities at the park by providing consolidated logistics of centralized operational activities and on-site housing
facilities for staff and visitors in Jemez Springs. There are multiple buildings currently designed for housing that will
be used for participants in the educational component of the Science and Education Center. There is also a storage
facility for use in protecting field and recreational equipment for the school groups and researchers the Center will
serve. Acquisition also would enhance geographic continuity of public access to National Forest Service lands for
recreation, as well as public access to both banks of the Jemez River.
Cooperator(s):
USDA Forest Service, Santa Fe National Forest
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $53,000
Estimated O&M Costs: $620,000 $45,000
Describe O&M:
Start-up costs estimated to bring the facility on-line of $620,000, including select renovation and demolition.
A conservative analysis of annual housing rental income each year ($53,000/yr.) is estimated to exceed Operations
and Maintenance costs ($45,000). This assumes 45% occupancy on an annual basis; most of the occupancy will be
in the summer field season period.
National Park Service FY 2024 Budget Justifications
LASA-19
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Zion National Park
Priority: 6
State(s): UT
Congressional District(s): UT-2
Location: Washington, Iron, and Kane Counties, Utah
Limitation Amount: There are no limitations.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 675 $2,600,000
Acquired to Date 143,793 $3,015,752
Remaining to be Acquired 3,449 $45,500,000
Project Description:
July 31, 1909, President William H. Taft issued a proclamation setting aside 15,200 acres to establish Zion National
Park. Over the years, the park has been enlarged by a variety of presidential proclamations and legislation, with
Congress establishing it as a National Park in 1919 by P.L. 66-83. Located in southwestern Utah, Zion National Park
encompasses some of the most scenic canyon country in the United States. The park is characterized by high
plateaus, a maze of narrow, deep, sandstone canyons, and striking rock towers and mesas. The North Fork of the
Virgin River has carved a spectacular gorge through Zion Canyon, where sandstone walls rise 2,000 to 3,000 feet
above the canyon floor. Zion’s spectacular scenery attracts visitors from all over the world, with 4.5 million visitors
in 2019.
Purpose / Need:
The parcels are located in the Kolob Terrace area of the park. This area has high development potential as well as
significant natural resources. Along the Kolob Terrace Road, several glamping and resort developments are either in
place, under construction, or approved by the County Commission. This activity has increased the interest in the
park inholdings for development and second home opportunities. Development in this area, known as Cave Valley,
would greatly diminish the scenic values along a principal park road. Also, the Cave Valley is renowned for its
archeological site density, including several archeological site locations that require protection. Additionally, the
parcels contain the riparian zone of perennial Hop Valley Creek (and associated springs) classified as Wild and
Scenic Rivers. While recreation, wilderness and scenic views are outstanding, these water resources and riparian
areas are compromised by active, intense grazing. In this desert environment, cattle tend to congregate along water
courses for forage and water availability. Trampling by livestock impacts the riparian vegetation and reduces
wildlife habitat value including potential habitat for the Federally threatened southwest willow flycatcher. The Hop
Valley Trail crosses these inholdings and connects to other trails. It is the most heavily used wilderness/backcountry
trail in the park and the terrain doesn’t allow for re-routing the trail to bypass these private lands.
Cooperator(s):
Support from local entities and partners is strong. Acquisition of the tract is supported by the Trust for Public Land,
Zion Forever Project, the National Parks Conservation Association, the Nature Conservancy, Virgin River Land
Preservation Association (local group helping landowners preserve open space), and Washington County.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $93,000 $0
National Park Service FY 2024 Budget Justifications
LASA-20
Describe O&M:
A small amount of fencing will be removed, and targeted sites restored; the park has the labor, demolition
equipment, skilled staff, and native plant nursery resources to accomplish restoration.
National Park Service FY 2024 Budget Justifications
LASA-21
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Battlefield Protection
Priority: 7
State(s): GA, MD, MS, NC, NM, NY, PA, SC, TN, VA, WV
Congressional District(s): Various throughout the states
Location: Various throughout the states
Limitation Amount: Various depending on the unit
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 TBD $2,680,000
Acquired to Date TBD TBD
Remaining to be Acquired TBD TBD
Project Description:
Funds provided will be used for the Federal acquisition of lands or interests in lands needed to preserve and protect
battlefield sites within the National Park System. Historic fields of battle that shaped the country are being
developed into suburban landscapes as populations continue to grow.
NPS partners have acquired and continue to hold, in anticipation of Federal acquisition, lands within the core areas
of Civil War battlefields within the National Park System. This funding request will provide the flexibility necessary
to acquire such land as the need arises. Priority needs exist at Cedar Creek and Belle Grove National Historical Park,
Guilford Courthouse National Military Park, Fort Donelson National Battlefield, Fredericksburg and Spotsylvania
County Battlefields Memorial National Military Park, Gettysburg National Military Park, Moore’s Creek National
Battlefield, Petersburg National Battlefield, Richmond National Battlefield Park, Saratoga National Historical Park,
Shiloh National Military Park, and Vicksburg National Military Park, among others.
Purpose / Need:
The funds will be used to acquire high-priority battlefield land that is privately held within the National Park
System. These Battlefield units are experiencing significant threats to the resources they were authorized to protect,
including relic hunting, development, and vandalism of historic landscapes and structures. These lands are often
temporarily protected by partner organizations able to nimbly navigate real estate acquisitions and then wait for the
Federal Government to bring land into the individual park units. These funds will be directed to the highest priority
shovel ready” acquisitions, which will be dynamic as landowners consider options once funding is available for
NPS. Units that tell the story of the American Revolution, including Guilford Courthouse National Military Park and
Moore’s Creek National Battlefield have active land acquisition programs that will benefit from this line item.
Cooperator(s):
American Battlefield Trust, Friends of Stones River National Battlefield, Piedmont Land Trust, Guilford
Battleground Co., and Trust for Public Land are all working to assist NPS in preserving the resources at various
units.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: TBD TBD
Estimated O&M Costs: TBD TBD
National Park Service FY 2024 Budget Justifications
LASA-22
Describe O&M:
Annual maintenance costs for each individual acquisition would be negligible due to the small size of each tract, and
savings are likely to result because of management efficiencies with more contiguous lands.
National Park Service FY 2024 Budget Justifications
LASA-23
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Voyageurs National Park
Priority: 8
State(s): MN
Congressional District(s): MN-8
Location: Northern Minnesota near International Falls in Koochiching and St. Louis Counties
Limitation Amount: There is a statutory ceiling of $38,315,000.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 33 $1,500,000
Acquired to Date 107,782 $12,238,595
Remaining to be Acquired 1,038 $47,000,000
Project Description:
Voyageurs National Park is a waterway of four large lakes connected by narrows and was once the route of the
French-Canadian voyageurs. With over 500 islands, the lakes surround a peninsula of boreal forest. The park was
established to preserve and protect the outstanding scenery, geological conditions, and waterway systems that
constituted part of the historic route of the voyageurs who contributed to the opening of the United States. It was
authorized January 1, 1971, and the land acquisition program has been underway since fiscal year 1972. Of the
218,222 acres comprising the park, only 1,038 acres remain in private ownership.
Purpose / Need:
Four high-priority tracts have been identified for acquisition:
Two tracts are on Namakan Lake. The friends’ group, Voyageurs Conservancy, has been contacted by both owners
to assist in facilitating these acquisitions. One property has several buildings, as well as an encroachment issue.
Purchase of vacant land and the possibility of a small land exchange would preserve a large section of undeveloped
land while solving the encroachment problem. The other property is a straightforward acquisition of vacant land.
Two other tracts, one on Gruner Island in Rainy Lake and one on the shore of Sand Point Lake, have motivated
sellers. The first is located in a prime visitor use area, with two excellent beaches, and has an historic structure on
the tract. The second is the last piece of private property on Staege Bay, with no other development around it. It is a
remote bay and is popular with fishermen, paddlers, birders, and photographers.
Cooperator(s):
Voyageurs Conservancy and Voyageurs National Park Association
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $24,100 $0
Describe O&M:
Only the Gruner Island tract would incur costs to remove structures at a later date at an estimated cost of $24,100.
Any day-to-day costs would be absorbed by the current operating budget, as they are considered negligible.
National Park Service FY 2024 Budget Justifications
LASA-24
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Gauley River National Recreation Area
Priority: 9
State(s): WV
Congressional District(s): WV-1
Location: Fayette County, WV
Limitation Amount: There are no limitations.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 227 $920,000
Acquired to Date 5,055 $11,323,212
Remaining to be Acquired 5,083 $7,500,000
Project Description:
The 11,566-acre Gauley River National Recreation Area was established in 1988 to provide the public with outdoor
recreation opportunities, including whitewater boating, picnicking, camping, hiking, fishing and hunting, while
protecting a large natural area. The mostly wooded National Recreation Area encompasses a 25-mile section of the
Gauley River and a 5.5-mile section of the Meadow River in Nicholas and Fayette Counties, West Virginia. Both of
these rivers have formed narrow gorges in the rugged Allegheny Plateau, part of the Appalachian physiographic
region. Recreational and residential development along the river threatens to diminish public access to the river and
its resources.
Purpose / Need:
These lands contain significant resources for recreation in the park. One tract includes 1.1 miles of rail grade, which
runs the entire length of the Meadow and Gauley Rivers. The surrounding counties and the NPS envision converting
the tract to a biking trail. The counties of Fayette & Greenbriar have acquired a long section of the rail grade up-
river from the park boundary and have begun improvements. Acquisition of this property would fill in a large
missing piece of NPS ownership of the rail grade within the park’s boundary. Another property located at the
confluence of the Meadow and Gauley Rivers contains an unmaintained State road, which could be abandoned by
the State to the NPS, cuts through the property and provides access to the two rivers and rail trail. Currently, there is
no public access to the Meadow River and private boaters trespass through private land to launch and take-out from
river trips. Outfitters bring boats down an extremely dangerous road while their clients hike down a trail on the other
side of the river. Outfitters then ferry the boats over to the clients. This property would provide a safe and public
access to the Meadow River, the confluence of the Meadow and Gauley Rivers, and the rail trail from Fayette &
Greenbriar counties.
Additionally, the riparian zone of the Gauley contains the majority of the rare plants found within the park. There
are 59 subpopulations of the Federally Threatened Virginia Spiraea located in the riparian zone of the park. Federal
protection following acquisition will help the species of flora and fauna unique to this area to flourish as law
enforcement will be able to more effectively restrict motorized access to the land in this area. This property would
allow the NPS to expand public recreation along the Gauley River to a variety of user groups other than river rafters.
Day use for hiking along the banks of the rivers, birding, picnicking, fishing and hunting will become accessible
with a protected, accessible land base for the National Recreation Area.
Cooperator(s):
West Virginia Land Trust and The Conservation Fund
National Park Service FY 2024 Budget Justifications
LASA-25
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $0 $15,000
Describe O&M:
Future annual costs include additional law enforcement patrol hours. Existing park staff will perform these duties.
National Park Service FY 2024 Budget Justifications
LASA-26
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Ozark National Scenic Riverways
Priority: 10
State(s): MO
Congressional District(s): MO-8
Location: Southeastern Missouri counties of Carter, Dent, Shannon and Texas
Limitation Amount: There is a statutory ceiling of $10,804,000; an annual overceiling authority of ten percent or
$1 million, whichever is greater, permits this request (54 USC 200306).
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 368 $975,000
Acquired to Date 61,557 $11,485,862
Remaining to be Acquired 5,255 $5,000,000
Project Description:
Ozark National Scenic Riverways was the first designated National Scenic Riverway, predating the Wild and Scenic
Rivers Act by four years. It protects and preserves the Current and Jacks Fork River corridors that provide many
recreational opportunities for visitors, including water sports, hunting, and cave exploration. The southeast Missouri
Ozarks are typified by narrow, steep-sided hollows, numerous streams, and bluffs. The area is underlain by soluble
dolomite, giving rise to sinkholes, caves and springs of classical Karst topography. Several caves have been
identified as having critical habitat for the endangered Indiana and Gray bats. There are 112 species of fish, 197
species of birds, and 58 species of mammals found in the park. There are also 26 species of amphibians and 46
species of reptiles found in the park area, including four venomous snakes. The park is home to approximately 1,000
plant species.
Purpose / Need:
Acquisition of these tracts will directly benefit the water quality of the rivers and streams within the Scenic
Riverway, the integrity of the riverbank, and visitor access to these lands. The acquisition includes a tract that fronts
the Lower Current River just upstream from the nationally significant Big Spring. It includes riverfront shrub-forest
communities and will assist the park in maintaining a minimum 300-foot riparian buffer along the main river
channel. Federal ownership ensures protection of the area in perpetuity and preserves the scenic viewshed along the
river.
Cooperator(s):
The Nature Conservancy
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $1,000 $1,000
Describe O&M:
The costs associated with ownership are minimal but may include additional staff time and fuel costs for mowing
vacant lands and/or law enforcement patrols.
National Park Service FY 2024 Budget Justifications
LASA-27
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: New River Gorge National Park and Preserve
Priority: 11
State(s): WV
Congressional District(s): WV-1
Location: In the vicinity of Oak Hill, in Fayette, Raleigh and Summers Counties, West Virginia
Limitation Amount: There are no limitations.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 310 $655,000
Acquired to Date 57,508 $52,330,637
Remaining to be Acquired 13,571 $13,500,000
Project Description:
New River Gorge National Park and Preserve was created to protect and preserve the New River Gorge in the
Appalachian Mountains of southern West Virginia. It was originally established as a national river to protect one of
the oldest rivers on the North American continent and was redesignated in 2020 to recognize the many facets of
recreational activities and cultural significance located within the boundaries of the park unit. It stretches for over 50
miles and is rich in cultural and natural history, home to some of the country’s best whitewater rafting as well as one
of the most popular climbing areas on the East Coast.
Purpose / Need:
This is the last remaining unacquired tract on the river between Stonecliff and Terry, located in one of the most
biologically diverse parts of the park. This area does not have a railroad or other feature disrupting the continuity
from rim to river--a fact that makes the tract important for some of the park’s rarer birds. It contains documented
populations of at least five rare plants, and contributes to the habitat for rare species, including two species of
Federally endangered bats. It contributes to the nationally significant unfragmented eastern forest. It provides a key
1.5 mile link in the proposed through-park trail, the last remaining unacquired segment between the northern
boundary of the park and the town of Terry.
Cooperator(s):
West Virginia Land Trust and The Conservation Fund
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $0 $15,000
Describe O&M:
Out year costs will be minimal - additional patrol time for law enforcement with current park staff.
National Park Service FY 2024 Budget Justifications
LASA-28
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Minute Man National Historical Park
Priority: 12
State(s): MA
Congressional District(s): MA-5
Location: Vicinity of Concord, Middlesex Count, in the Commonwealth of Massachusetts
Limitation Amount: For lands added through P.L. 111-11, 123 Stat. there is no acquisition funding ceiling. The
current request is for a portion of the lands added through this law.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 2 $1,860,000
Acquired to Date 795 $13,390,410
Remaining to be Acquired 48 $6,750,000
Project Description:
Minute Man National Historical Park was established by P.L. 86-321 in 1959, and after completion of the 1991
general management plan, P.L. 102-488 (1992) broadened the park’s strategic mission and expanded the park
boundary, especially along the Battle Road. The park preserves historic sites, structures, properties, and landscapes
associated with the opening battles of the American Revolution, which occurred on April 19, 1775. It also preserves
resources related to America’s literary tradition. The park is located approximately 16 miles northwest of Boston,
Massachusetts. The region surrounding the park has developed from a semi-rural area to mature suburbs and
experiences continual growth pressures. Growth from residential, commercial, and industrial development has
increased impacts from traffic, noise, and density in and around the park. The park attracts more than one million
visitors each year.
Purpose / Need:
The property is within the authorized park boundary of Barrett’s Farm Unit and directly adjacent to Col. Barretts
home and barn. The land is currently listed in the “Barrett Farm Historic District” as it was formerly part of the
historic core of the Barrett farm, which in 1775 was the storage site for the Town of Concord’s militia gunpowder
and cannons. Restoration of the parcel to its historical field setting will greatly enhance visitor understanding and
experience at Barrett’s Farm Unit. The parcel is 450 ft west of the regional Bay Circuit Trail, a 200-mile corridor of
linked open spaces for passive recreation, and the Town of Concord conserves land to the north and south.
Acquisition will provide access to the Trail and the Town’s open spaces.
Acquisition of the parcel will allow visitor access and create the opportunity to place orientation and wayside signs
in an appropriate setting. This has been identified as the best location for visitor access, ADA accessible arrival and
orientation to the site. The parcel is 900 feet from the Assabet National Wild and Scenic River corridor and includes
wetland area that seeps into the corridor. The site abuts both NPS land and Town of Concord conservation land,
including a 1792 smallpox grave site/cemetery. At this time, visitors cut across private land to view the small
cemetery.
Cooperator(s):
Save Our Heritage, American Battlefield Trust, Town of Concord, Battle Road Scenic Byway
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $135,000 $1,000
National Park Service FY 2024 Budget Justifications
LASA-29
Describe O&M:
Annual costs will increase by approximately $1,000 for mowing and wayside signage. Initial costs are for
demolition of non-historic structures that may be funded by a non-profit partner. However, if an agreement is not
reached, funds will be sought from the NPS Demolition account.
National Park Service FY 2024 Budget Justifications
LASA-30
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: San Juan National Historical Park
Priority: 13
State(s): WA
Congressional District(s): WA-2
Location: San Juan County, Washington
Limitation Amount: There is a dollar ceiling of $5,575,000; an annual overceiling authority of ten percent or $1
million, whichever is greater, permits this request (54 USC 200306).
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 26 $905,000
Acquired to Date 2,115 $9,510,671
Remaining to be Acquired 31 $1,200,000
Project Description:
With over six miles of shoreline, trails, prairies, and military camps, this park commemorates the peaceful
settlement of the San Juan Boundary Dispute between Great Britain and the United States from 1853 to 1872,
including the Pig War crisis of 1854. Within the park’s boundary lies one of the last remaining native prairies in the
Puget Sound/Northern Straits region. Visitors can also view Orca whales from the park’s pristine beaches. The park
was authorized on September 9, 1966.
Purpose / Need:
The park was created to commemorate historic events that led to the Pig War of 1859 - namely, the shooting of a pig
by an American Settler. The location of the shooting of said pig was in Lyman Cutlar’s potato patch, which is
immediately adjacent to federal land within the unit boundary. The parcels in the request are owned by the San Juan
County Land Bank and part of the historic potato patch. A public hiking trail of slightly over a mile connects these
lands to the NPS visitor center. It offers views across the farmland to old homesteads, distant islands, and Mount
Baker, preserving the landscape much as it was at the time of the incident. Additionally, this open space provides
habitat for the recently listed endangered island marble butterfly.
Cooperator(s):
San Juan County Land Bank
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $20,000 $20,000
Describe O&M:
The proposed acquisition contains Island Marble Butterfly sites, which the NPS monitors due to its status as
proposed for listing under the Endangered Species Act. Additionally, a section of American Camp Trail runs
through the property. $20,000 is expected to cover butterfly monitoring activities and possible wayside signage and
other maintenance activities for the trail.
National Park Service FY 2024 Budget Justifications
LASA-31
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Hot Springs National Park
Priority: 14
State(s): AR
Congressional District(s): AR-4
Location: Hot Springs city in Garland County, Arkansas
Limitation Amount: There are no limitations.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 17 $785,000
Acquired to Date 4,101 $14,751,377
Remaining to be Acquired 114 $2,300,000
Project Description:
The park was established to preserve and protect the 47 thermal springs that fluctuate in flow from 750,000 to
950,000 gallons a day and has grown to include 26 miles of hiking trails and scenic drives in the forested Ouachita
Mountains of south-central Arkansas. This unit was first designated for preservation in 1832 before the concept of a
national park existed. It was known as Hot Springs Reservation and set aside for recreation and preservation of the
hot waters that were of important to several Native American tribes. The Bathhouse Row is a National Historic
Landmark District and contains eight architecturally significant structures that represent Gilded Age architecture.
Purpose / Need:
This is one of the last privately-owned parcels in an area that has essentially been returned to a natural vegetative
state. The acquisition of this land would allow the park to complete the return of this area to a wooded environment
while also preserving the historic Samuel W. Fordyce house, which is listed in the National Register of Historic
Places. The Park will be able to more effectively interpret the history of Bathhouse Row, the Fordyce Bathhouse
Visitor Center and the early development of the thermal waters used for therapeutic medicine.
Cooperator(s):
The NPS is working directly with the landowner to protect this property.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $20,000 $1,500
Describe O&M:
Initial re-vegetation of the land, as well as connecting sections of the trail network directly one to the other through
this property would require a small investment once this becomes federal land. Annual costs will be minimal for
mowing and possible additional trail maintenance to supplement what is already in the operating budget.
National Park Service FY 2024 Budget Justifications
LASA-32
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Ste. Genevieve National Historical Park
Priority: 15
State(s): MO
Congressional District(s): MO-8
Location: Ste. Genevieve County, Missouri
Limitation Amount: There are no limitations.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 1 $430,000
Acquired to Date 12 $738,000
Remaining to be Acquired 3 $1,000,000
Project Description:
Ste. Genevieve National Historical Park was established on March 23, 2018, to preserve, protect, and interpret
themes of French settlement, vernacular architecture, and community form and farming on the frontier associated
with Ste. Genevieve. In 1739, French Canadian settlers established Ste. Genevieve, the first permanent European
settlement west of the Mississippi. The settlers were drawn to the area by its rich agricultural lands, known as Le
Grand Champ or “The Big Field.” Ste. Genevieve National Historic Park shares the stories and histories of the
communities that have called this area home. The park also preserves the largest grouping of still-standing buildings
of the iconic French Colonial architectural style, including the Bauvais-Amoureux House.
Purpose / Need:
The purchase of this land will protect property directly across from the Bauvais-Amoureux House, a critical cultural
and historical part of the unit. For restoration and preservation of the cultural landscape of the trading village, this is
a vital acquisition for the long-term historic integrity of the National Historic Landmark District, as well as for the
park unit. The acquisition will increase visitor access and enhance the visitors’ experience of the original landscape.
The owner of the property recently passed away. The owner had originally wanted the National Park Service to
acquire and preserve the landscape. Public Law 115-141 specifically provided acquisition authority for this property.
This property is one of few for sale that is connected to Le Grand Champ, which is a highly important, related
resource that has the potential to contain previously unexamined archaeological resources.
Cooperator(s):
The NPS is working directly with the estate to complete the Federal acquisition of this property.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $0 $2,500
Describe O&M:
At present, this property contains a gravel drive and parking lot with a large steel building. It will require minor
grounds maintenance and will have use as maintenance storage and overflow/oversized parking for the adjacent
historic property, the Bauvais-Amoureux House.
National Park Service FY 2024 Budget Justifications
LASA-33
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Obed Wild and Scenic River
Priority: 16
State(s): TN
Congressional District(s): TN-3
Location: Morgan and Cumberland Counties, Tennessee
Limitation Amount: There is a statutory limit of up to $2 million for land acquisition; an annual overceiling
authority of ten percent or $1 million, whichever is greater, permits this request (54 USC 200306).
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 58 $320,000
Acquired to Date 4,231 $6,631,052
Remaining to be Acquired 1,368 $3,000,000
Project Description:
Obed Wild and Scenic River was established October 12, 1976, to preserve segments of the Obed River in free-
flowing condition as a component of the National Wild and Scenic Rivers System. The dramatic and rugged gorges
of the Obed Wild and Scenic River are nationally significant resources and are unique as they stand among the
wildest and most primitive areas remaining east of the Rocky Mountains. Visitors come from all over the world to
climb its overhanging cliff faces and navigate its highly challenging whitewater. These sections of Clear Creek
support an extremely rich array of plant and animal life, including 28 State and/or Federally listed species.
Purpose / Need:
Acquisition is critical for the protection of the resources, viewshed, and recreational opportunities along the most
scenic and popular stream sections in the park. These tracts include property both on the rim of the gorge and river
frontage. The Park’s General Management Plan proposes a 20.5-mile loop-trail that will be the centerpiece of the
park’s trail system. Acquisition is essential to the completion of that long-distance trail as well as securing primary
access for the park’s most popular and heavily used rock-climbing area.
Cooperator(s):
Tennessee Citizens for Wilderness Planning
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $10,000 $0
Estimated O&M Costs: $10,000 $2,000
Describe O&M:
Acquiring these tracts will significantly reduce the need for law enforcement on nearby park property. These areas
have experienced crime since the park’s creation. Also, the park will be able to close unpermitted dirt access roads.
These closures will initially require a cost to block access and restore the lands that have been damaged through
erosion (the start-up cost of approximately $5,000-$10,000), but in the long run will protect park resources by
directing access to appropriate areas and preventing further damage. The park will restore the land along these
roads/tracks and will bear some out-year costs to maintain the vegetation and appropriate paths (~$2,000/year).
National Park Service FY 2024 Budget Justifications
LASA-34
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: San Antonio Missions National Historical Park
Priority: 17
State(s): TX
Congressional District(s): TX-15, TX-20, and TX-28
Location: Bexar County, Texas
Limitation Amount: The park units enabling legislation authorizes appropriations not to exceed $10,000,000 for
acquisition. This request results in that total.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 26 $1,221,000
Acquired to Date 572 $8,779,000
Remaining to be Acquired 89 $10,900,000
Project Description:
The park was authorized November 10, 1978, to restore, preserve, and interpret the Spanish Missions. Four Spanish
frontier missions, part of a colonization system that stretched across the Spanish Southwest in the 17th, 18th and
19th centuries are preserved here. The San Antonio Missions are historically and architecturally significant remnants
of the Spanish quest for lands and converts in the New World. The Missions exist amidst a backdrop of urban
development and are the only UNESCO World Heritage Site in Texas.
Purpose / Need:
Protection of the Espada Acequia (an actively used irrigation ditch) through the purchase of scenic easements has
long been a priority for the San Antonio Missions NHP. This funding will allow NPS to work with various
landowners to clearly define a zone of protection for the Espada Acequia. The boundary lines run through backyards
with no protection or compensation. Purchasing and legitimizing these easements will help to clearly define this
“zone of protection” adjacent to the acequia. This will protect one of the few working acequia systems dating to the
Spanish Colonial period in US history.
Cooperator(s):
Espada Ditch Company (non-profit) and other private landowners are working directly with the NPS.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $0 $0
Describe O&M:
There are no O&M savings/ costs associated with this acquisition of scenic easements.
National Park Service FY 2024 Budget Justifications
LASA-35
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Rocky Mountain National Park
Priority: 18
State(s): CO
Congressional District(s): CO-2
Location: In the vicinity of Estes Park, Colorado, in Boulder, Grand, and Larimer Counties.
Limitation Amount: There are no limitations.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 31 $6,230,000
Acquired to Date 10,476 $20,169,933
Remaining to be Acquired 194 $35,000,000
Project Description:
The park’s rich scenery, typifying the massive grandeur of the Rocky Mountains, is accessible by Trail Ridge Road,
which crosses the Continental Divide. Numerous peaks towering over 13,000 feet shadow wildlife and wildflowers
in these 415 square miles of the Rockies. From meadows found in the montane zone to glistening alpine lakes to the
towering mountain peaks, there is something for everyone to discover. The park is the third busiest national park in
the country, serving more than 4.6 million visitors annually and includes over 300 miles of hiking trails and
incredible wildlife viewing opportunities.
Purpose / Need:
This request is for the acquisition of two parcels that lie along the eastern approach to the park and are adjacent to
the park headquarters. One parcel is currently used as a full-service campground and will continue to be used in this
way. The other parcel will provide access to the North Inlet Trail. It is the last remaining private tract in the former
Summerland Park subdivision of Grand County. The East Troublesome Fire burned the cabin on this parcel in
October 2020. The cabin was rustic, occupied in summer only, and the area has been cleared of what remained of
the cabin. Acquisition of the parcels will protect the viewshed, complete protection of this area and allow unfettered
visitor use of the North Inlet Trail.
Cooperator(s):
Rocky Mountain Conservancy is working with NPS to assist with these acquisitions.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $5,000 $15,000
Estimated O&M Costs: $20,000 $13,000
Describe O&M:
Management of the existing campground will be converted to NPS standards, and continued use of the facility,
along with revenue, will be realized over time.
National Park Service FY 2024 Budget Justifications
LASA-36
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Big South Fork National River & Recreation Area
Priority: 19
State(s): KY, TN
Congressional District(s): KY-5, TN-3, TN-6
Location: McCreary County, KY and Fentress, Morgan, Pickett, and Scott Counties, TN
Limitation Amount: There is a statutory ceiling of $13,000,000.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 600 $950,000
Acquired to Date 10,402 $8,814,893
Remaining to be Acquired 6,029 $19,300,000
Project Description:
The Water Resources Act of 1974 authorized Big South Fork National River and Recreation Area (NRRA). In 1990,
the law was amended to transfer administrative jurisdiction to the Secretary of the Interior. The unit was established
to protect the free-flowing Big South Fork of the Cumberland River. This was the first National Park System unit
designated as both a National River and a National Recreation Area, reflecting the decision to preserve the area and
offer recreational opportunities.
Purpose / Need:
This property protects the headwaters of the Laurel Fork drainage and includes one of the most remote gorge areas
in the park where roads have never been constructed. It contains remote, steep, and pristine areas that have a high
backcountry recreational value for solitude and exploration, and the land is important biologically because the
streams inside the property link to the North White Oak Creek and ultimately to the Big South Fork. This land is a
natural migration pathway for aquatic and terrestrial organisms, especially fish moving upstream to spawn. This
tract also links to larger existing protected areas and provides a refuge for species avoiding the adjoining developed
areas and associated threats. Protection of the water quality of this stream is critically important to the preservation
of downstream resources.
Cooperator(s):
NPS is working directly with the owners of the properties to complete this acquisition.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $100,000 $0
Estimated O&M Costs: $25,000 $15,000
Describe O&M:
Savings will result from not having to repair damage to the resource following timely Federal acquisition. Costs are
associated with surveying the threatened and endangered plants and wildlife, and a small annual increase in salary
costs for patrols along the river.
National Park Service FY 2024 Budget Justifications
LASA-37
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Congaree National Park
Priority: 20
State(s): SC
Congressional District(s): SC-6
Location: Richland County, South Carolina
Limitation Amount: There are no limitations.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 46 $250,000
Acquired to Date 26,601 $95,392,642
Remaining to be Acquired 255 $3,500,000
Project Description:
Congaree National Park is located in the Longleaf Pine Landscape. Originally established as a National Monument
in 1973, Congress redesignated it as a National Park in 2003. Situated along the meandering Congaree River in
central South Carolina, Congaree National Park is home to champion trees, primeval forest landscapes, and diverse
plant and animal life. This 26,640-acre park protects the largest contiguous tract of old-growth bottomland
hardwood forest remaining in the United States. Known for its giant hardwoods and towering pines, the parks
floodplain forest includes one of the highest canopies in the world and some of the tallest trees in the eastern United
States. The park provides a sanctuary for plants and animals, a research site for scientists, and a place for visitors to
walk and relax in a tranquil wilderness setting.
Purpose / Need:
The parcels comprise acreage on the northern shoreline and bluff of Cedar Creek, adjacent to the creek’s floodplain.
Acquisition will protect upland habitat, fragile slope communities, and provide floodplain resources with a buffer
from adjacent land use activities. These tracts are identified as proposed wilderness areas and are adjacent to
Congaree’s designated wilderness. They are near the most-used canoe launch in the park and will benefit visitors
with an unparalleled experience of wilderness values along Cedar Creek Canoe Trail. Acquisition of these tracts will
provide for added protection for visitor wilderness experience, help ensure visitor safety, enhance continuity and
connectivity between park lands preserved for their wilderness character, and protect forest resources and associated
viewsheds in the broader landscape surrounding Cedar Creek.
Cooperator(s):
Friends of Congaree Swamp is working with the Park to protect these lands.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $25,000 $5,000
Describe O&M:
The initial costs are estimated for removing hunting stands that have been placed on some of the land, and for
reforesting areas that have recently been clearcut. Annual out-year costs, while minimal, will be directed toward
replanting and ensuring that intended native species, including trees, are restored to the landscape.
National Park Service FY 2024 Budget Justifications
LASA-38
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Death Valley National Park
Priority: 21
State(s): CA, NV
Congressional District(s): CA-3, CA-23, and NV-4
Location: Inyo County, California and Nye County, Nevada
Limitation Amount: Act of October 31, 1994, there are authorized appropriations for land acquisition by NPS and
BLM not to exceed a total of $300 million.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 1,387 $500,000
Acquired to Date 15,854 $12,703,101
Remaining to be Acquired 9,716 $30,000,000
Project Description:
Death Valley National Park was established on October 31, 1994, with the passage of the California Desert
Protection Act. It’s predecessor, Death Valley National Monument, was enlarged to a total of about 3.4 million acres
and designated a National Park with the passage of the Act. Death Valley National Park is the largest national park
unit in the contiguous 48 states. This desert park contains mountain ranges, sand dunes, dry lake playas, and many
desert springs. It is the lowest point in North America at 282 feet below sea level, and one of the hottest places on
Earth. The Nevada section of the park is home to the critically endangered Devils Hole pupfish, a tiny desert fish
endemic to the underground habitat. The park’s water rights are critical to the survival and continued flow of springs
and seeps in the park.
Purpose / Need:
This land is surrounded by park wilderness and would become wilderness after acquisition. There are also wells on
the land with associated water rights. The large amount of water these wells can produce would make it attractive to
local commercial and agricultural interests. The wells are within 12 miles of Devils Hole and pumping here has the
potential for adverse impacts to the endangered Devils Hole pupfish, which the park actively protects. The subject
parcels are close to the eastern park boundary and the community of Amargosa Valley. The Amargosa River flows
through this area; downstream, the Amargosa River has been designated wild and scenic to protect surface flows and
endemic biological species, including the endangered Amargosa pupfish and Amargosa vole. Groundwater
extraction in the over drafted Amargosa Desert basin is one of the most significant threats the park faces. In addition
to protecting Devils Hole and the wild and scenic Amargosa River, it is likely that sub-surface water that could be
extracted is flowing deeper into the park, and being expressed at various surfaces, forming biologically important
water sources. These springs in Death Valley support rare plant species and wildlife such as endemic
macroinvertebrates, bighorn sheep, bobcats, and mountain lions. Additionally, acquisition of some of the subject
tracts would ensure that the entire corridor of the Surprise Canyon Wild and Scenic River are within Federal
ownership, enhancing protection of the outstanding and remarkable values for which the wild and scenic river was
designated.
Cooperator(s):
Mojave Desert Land Trust
National Park Service FY 2024 Budget Justifications
LASA-39
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $2,500
Estimated O&M Costs: $0 $0
Describe O&M:
The reduced ground-water extraction will lead to some cost savings relative to species protection at Devils Hole,
including of the endangered Devils hole pupfish.
National Park Service FY 2024 Budget Justifications
LASA-40
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Jean Lafitte National Historical Park and Preserve
Priority: 22
State(s): LA
Congressional District(s): LA-1, LA-2, and LA-3
Location: Southwest of New Orleans
Limitation Amount: There is a statutory ceiling of $50,000,000 for land acquisition with approximately
$25,000,000 remaining.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 85 $390,000
Acquired to Date 17,965 $24,844,406
Remaining to be Acquired 6,309 $6,500,000
Project Description:
Jean Lafitte NHP was established by Congress in 1978 “for the education, inspiration, and benefit of present and
future generations, significant examples of natural and historical resources of the Mississippi Delta region, and to
provide for their interpretation in such manner as to portray the development of cultural diversity in the region.
Coastal Louisiana is among the most highly threatened landscapes in the United States, characterized by rapid land
loss from coastal erosion, marsh die-off, and subsidence. Marsh die-off and subsequently increased rates of land loss
are driven significantly by saltwater introduced through derelict canal networks, and changes in
freshwater/sediment/nutrient inflow from the leveeing of the Mississippi River, including the cessation of seasonal
overbank flooding. The most threatened estuary in North America, wetlands in the Barataria Basin are becoming
increasingly scarce.
Purpose / Need:
These upland tracts are surrounded by wetlands of national significance within one of twelve EPA-designated Clean
Water Act Section 404(c) areas. The wetlands are located within the Barataria-Terrebonne National Estuary, and
they buffer the levee system that protects a large population in a portion of Greater New Orleans. The acquisition
would help sustain ecosystem restoration of the Barataria Estuary under the authority of the Louisiana Coastal Area
Plan authorized by Congress and the State of Louisiana’s 2017 Comprehensive Master Plan for a Sustainable Coast.
The NPS is one of many Federal, State, and local agencies that have partnered to preserve the Louisiana Coast in
many different contexts. The proximity of the parcels to New Orleans makes the five tracts ideal for resource-based
recreation, fishing, boating, canoeing, hiking, birding, and wildlife photography.
Cooperator(s):
NPS is working directly with the owner of the property to complete this acquisition.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $25,000 $15,000
Describe O&M:
Initial costs include a survey and study, working with other groups in the region (EPA, Corps of Engineers,
Louisiana Coastal Protection and Restoration Authority, and Southeast Louisiana Flood Protection Authority
National Park Service FY 2024 Budget Justifications
LASA-41
(Orleans Levee Board)), to identify appropriate actions to provide protection to delta communities, as well as
ecosystem restoration and archeological discovery. Outyear costs include the maintenance of visitor access points
such as watercraft put-in/take-out areas; as well as law enforcement patrols and continued restoration of the
landscape and estuarian ecosystem.
National Park Service FY 2024 Budget Justifications
LASA-42
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Sleeping Bear Dunes National Lakeshore
Priority: 23
State(s): MI
Congressional District(s): MI-1
Location: Benzie and Leelanau Counties in Northwest Michigan along Lake Michigan shoreline
Limitation Amount: There is a Statutory limit of $84,149,558; an annual overceiling authority of ten percent or $1
million, whichever is greater, permits this request (54 USC 200306).
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 70 $1,365,000
Acquired to Date 71,611 $111,032,724
Remaining to be Acquired 1,099 $8,330,000
Project Description:
The Act of October 21, 1970, authorized establishment of Sleeping Bear Dunes National Lakeshore to protect and
preserve outstanding natural resources along the mainland shore of Lake Michigan and on certain nearby islands in
Benzie and Leelanau Counties, Michigan. The national lakeshore is a diverse landscape with massive sand dunes,
quiet rivers, sand beaches, beech-maple forests, clear lakes, and rugged bluffs towering as high as 460 feet above
Lake Michigan. Two offshore wilderness islands offer tranquility and seclusion.
Purpose / Need:
Some of the tracts are surrounded by NPS property and have structures potentially eligible for the National Register
of Historic Places. These acquisitions are critical to the protection of all the natural and cultural resources within the
lakeshore and will enhance recreational opportunities for 1.3 million annual visitors. Access to the lakeshore, the
nature trails, and day use areas will be increased. Some tracts are along the scenic roadway with lakeshore
overlooks, and are wooded, creating a buffer between visitors and wildlife, and other tracts lie on the lakeshore or on
the shore of small inland lakes, offering access to recreational waters.
Cooperator(s):
Individual, private owners have engaged with NPS from the outset, including “right of first refusal” clauses in
property deeds. NPS continues to work with owners as they indicate a desire to sell their land. interests, and local
community groups.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $500
Estimated O&M Costs: $0 $5,500
Describe O&M:
There are negligible operational costs and savings associated with this acquisition. The lands will be operated in
their natural state. There is one small cottage that will be maintained in its current condition for the foreseeable
future. Funds are estimated for small additional mileage and minimal staff time on law enforcement patrols from
neighboring lands, and reduced impact of trespass activities on lands adjacent to these that are already in Federal
ownership, as well as some maintenance to ensure any structures are stabilized and maintained.
National Park Service FY 2024 Budget Justifications
LASA-43
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Missouri National Recreational River
Priority: 24
State(s): NE, SD
Congressional District(s): NE-3, SD (at large),
Location: Dixon County, Nebraska; Yankton County, South Dakota
Limitation Amount: There is a dollar ceiling of $21,000,000 and an acreage limitation of 40,320.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 500 $1,855,000
Acquired to Date 872 $3,287,894
Remaining to be Acquired 2,482 $6,000,000
Project Description:
Two reaches of the Missouri River are protected as a National Recreational River. The portion originally set aside,
from Gavins Point Dam near Yankton, South Dakota, to Ponca, Nebraska, still exhibits the river’s dynamic
character in its islands, bars, chutes, and snags. An upper reach between Lewis and Clark Lake and Fort Randall
Dam has native floodplain forest, tallgrass and mixed-grass prairies, and habitats for several endangered species.
The river was designated for remarkable fish, and scenic, recreational, cultural, and ecological values, and was
authorized in 1978 at a length of 59 miles, though the authorization was later expanded in 1991 to a length of 67
miles.
Purpose / Need:
The tract consists of roughly 310 acres of bottomland riparian forest and 250 acres of prime row-crop farmland that
is threatened by the prospect of development. The property has extensive, ecologically significant old growth
cottonwood forests that provide high quality habitat for wildlife, including bald eagles and other birds of prey. The
unstable shoreline and connected backwaters and chutes (formed by geologically significant paleo-channels) provide
habitat for numerous fish species, including the Federally endangered pallid sturgeon. The property’s natural
character helps maintain the scenic viewshed from the Yankton Sioux Tribe reservation on the opposite shore, where
the culturally significant 1858 Treaty Monument was placed. Nearby, the geologic anomaly Old Baldy was visited
by early explorers, including Lewis and Clark. The fish and wildlife and scenic beauty of this property and the
surrounding area bring many visitors to fish, bird watch, or simply float down the river and its associated Water
Trail.
Cooperator(s):
NPS is working directly with the owner of the property to complete this acquisition.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $10,000 $10,000
Describe O&M:
The acquisition of this property will not create significant direct costs or savings for the park. The land will remain
unaltered, but a small outlay of funds will be necessary to monitor the land for visitor safety purposes.
National Park Service FY 2024 Budget Justifications
LASA-44
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Big Cypress National Preserve
Priority: 25
State(s): FL
Congressional District(s): FL-26
Location: Collier, Miami-Dade, and Monroe Counties, Florida
Limitation Amount: There is a statutory ceiling of $49,500,000 that applies to only the “Addition” defined by P.L.
100-301. This tract is not in the Addition area.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 3 $270,000
Acquired to Date 677,345 $184,370,581
Remaining to be Acquired 1,864 $8,500,000
Project Description:
The Big Cypress National Preserve was set aside in 1974 to ensure the preservation, conservation, and protection of
the natural scenic, flora and fauna, and recreational values of the Big Cypress Watershed. The importance of this
watershed to Everglades National Park was a major consideration for its establishment. In 1988, Big Cypress
National Preserve was expanded by about 146,000 acres with the passage of the Big Cypress National Preserve
Addition Act (P.L. 100-301).
Purpose / Need:
The tract is within the original Big Cypress National Preserve boundaries and is currently listed for sale. The
property is attractive as it fronts a county road for easy access but is otherwise surrounded by Federally owned and
managed lands. Opportunities to purchase tracts such as this only arise when an owner becomes a willing seller.
Once NPS acquires this parcel, it will remove fill dirt and restore natural vegetation to protect the wetland habitat
and water flow patterns the Preserve is intended to provide. This acquisition will improve visual aesthetics, expand
recreational opportunities, and increase environmental function.
Cooperator(s):
NPS is working directly with the owner of the property to complete this acquisition.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $1,000 $2,000
Estimated O&M Costs: $10,000 $2,000
Describe O&M:
Out-year funding impacts will be small and represent savings of regular time and resources restoring degradation of
lands adjacent to this tract, which are damaged by activities private individuals undertake that flow over onto public
lands. There will be an equally small outlay of funds to ensure that the land and its resources are protected once it
becomes federal land.
National Park Service FY 2024 Budget Justifications
LASA-45
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Biscayne National Park
Priority: 26
State(s): FL
Congressional District(s): FL- 27, FL-28
Location: Dade County, Florida near the city of Homestead
Limitation Amount: An Act of June 28, 1980, increased the ceiling to $36,850,000 for acquisition.
Project Estimates
Land/Cost Acres Cost
Estimate for FY 2024 231 $2,200,00
Acquired to Date 171,395 $32,004,716
Remaining to be Acquired 360 $6,100,000
Project Description:
The Ragged Keys are located in the northern central part of Biscayne National Park. This acquisition encompasses
Ragged Key 2 (RK2) and Ragged Key 3 (RK3), two of the last three privately owned inholdings in the park. RK3
has been developed for most of the twentieth century and may have been developed since the middle eighteenth
century, when it might have been used by local prehistoric Indians such as the Tequesta. The keys contain important
cultural and natural resources, including the house that was used by the CIA as a listening post during the Cold War.
RK2 is a protected resting area for migrating shorebirds, including listed species, and contains grasses and
mangroves with an extensive amount of submerged land as part of the property. RK2 would be ideal for private
development of a stilt house, even though it is over-washed during most hurricanes. The islands are important keys
in the chain of islands that comprise the northernmost Florida Keys, which originate with Key Biscayne. These keys
are formed on coral rock outcropping of the Key Largo limestone formation.
Purpose / Need:
The Ragged Keys are an important feature of Biscayne National Park and contain resources the Park was created to
protect. These barrier islands are located on the northern end of the islands of the park and separate the eastern coral
reef areas in the Atlantic Ocean from Biscayne Bay and the developed areas of Miami-Dade County to the west of
the park boundary. They are important as geophysical features separating the bay and the reef and thereby providing
protection for the developed areas of Miami-Dade County during hurricanes and extreme storm events. They are
important ecological habitats for coastal wading birds, shore birds, and sea birds. These islands represent a rare
habitat type along the east coast of highly developed south Florida and are biologically important to protect.
Cooperator(s):
NPS is working directly with the owner of the property to complete this acquisition.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: n/a n/a
Estimated O&M Costs: $10,000 $15,000
Describe O&M:
There may be considerable savings in the form of events not occurring, such as removal of historic resources or
sewage discharge or fuel spilling from improper storage. Some costs will be incurred once these Keys become the
responsibility of the park, including increased coverage by water patrols and treatment of exotic invasive plants.
Treatment will be administered for about five years to ensure eradication.
National Park Service FY 2024 Budget Justifications
LASA-46
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Big Cypress National Preserve
Priority: 27
State(s): FL
Congressional District(s): FL-26
Location: Collier, Miami-Dade, and Monroe Counties, Florida
Limitation Amount: Statutory ceiling of $49,500,000 applies to only the “Addition” defined by P.L. 100-301. The
lands requested for acquisition are in both the original Preserve and the Addition. There is $24 million still to be
appropriated under the ceiling.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 6,795 $1,195,000
Acquired to Date 677,345 $184,370,581
Remaining to be Acquired 1,864 $8,500,000
Project Description:
The Big Cypress National Preserve was set aside in 1974 to ensure the preservation, conservation, and protection of
the natural scenic, flora and fauna, and recreational values of the Big Cypress Watershed. The importance of this
watershed to Everglades National Park was a major consideration for its establishment. In 1988, Big Cypress
National Preserve was expanded by about 146,000 acres with the passage of the Big Cypress National Preserve
Addition Act.
The law provides for the Federal government to fund 80 percent of the land acquisition costs and the State to fund
20 percent of the land acquisition costs. The Federal government has agreed to reimburse the State of Florida any
acquisition costs paid by the State over 20 percent.
Purpose / Need:
The tracts collectively referred to as the “school lands” are owned by the State of Florida, Board of Education. They
represent the one of the largest single acquisition opportunities in the Big Cypress National Preserve containing
6,795 acres widely distributed across the Preserve constituting approximately 16 percent of the remaining
unacquired lands within the Preserve. Unlike other unacquired tracts, the school lands are large blocks of land, each
640 acres (1 square mile) or larger.
This acquisition will significantly improve freshwater sheet flow and enhance habitat that the Preserve was created
to provide. Acquisition of the parcels provides land continuity and enhances recreational opportunities. Acquisition
prevents environmental degradation and reduces the risk of wildfire arising from unlawful occupancy and
unauthorized uses.
Cooperator(s):
NPS and the State of Florida work collaboratively to transfer these lands and meet the objectives of both parties.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $0 $2,500
National Park Service FY 2024 Budget Justifications
LASA-47
Describe O&M:
The tracts are remote and not regularly monitored by the State. They will require monitoring by NPS Law
Enforcement once they become federal property.
National Park Service FY 2024 Budget Justifications
LASA-48
LAND AND WATER CONSERVATION FUND
Project Data Sheet
Agency: National Park Service
Fiscal Year: 2024
Project / Unit: Lake Clark National Park and Preserve
Priority: 28
State(s): AK
Congressional District(s): AK- At Large
Location: Lake Clark National Park and Preserve is located on the Kenai Peninsula, Lake-and-Peninsula, and in
Unorganized Boroughs
Limitation Amount: There are no limitations.
Project Estimates
Land/Cost Acres Cost
Estimate for FY2024 20,226 $8,044,000
Acquired to Date 3,740,755 $9,393,245
Remaining to be Acquired 80,926 $40,315,000
Project Description:
These lands lie along the shoreline of Lake Clark, along the Chulitna River and along the lower reach of the
Tazimina River. Funding would allow due diligence to begin for negotiations with the Kijik Corporation (KC)
(surface estate) and Bristol Bay Native Corporation (BBNC) (subsurface estate). KC subdivided a large portion of
their lands on Keyes Point and Portage Bay and only has about 20 lots remaining. The primary value of the subject
lands is their wild, undeveloped nature and their contribution to the protection of natural and cultural resources. The
area around the Chulitna River is also one of the highest priority subsistence areas for the Dena’ina people of Lake
Clark’s resident zone communities. The Conservation Easement would prohibit commercial development, provide
essential public access, and protect critical salmon spawning habitat and large mammal migration corridors -
resource qualities that would be put at risk if these properties were developed. It will improve protection of one of
the key watersheds supporting the largest remaining sockeye salmon fishery in the world and advance the
Secretary’s commitment to the Southwest Alaska Salmon Habitat Partnership.
Purpose / Need:
The natural and cultural resources at the southeast end of Lake Clark are of national significance. The parcels
provide valuable habitat for important terrestrial and aquatic species; moose and black bear inhabit portions of the
parcels year-round, brown bears are seasonal inhabitants, and bald eagles nest there. The positioning of these parcels
between the mountains to the southeast and Lake Clark make this area an important travel corridor for brown bears
and gray wolves that use the salmon resources in the adjacent lake and riverine habitat. Based on cultural resources
documentation and the presence of late prehistoric and historic Dena’ina sites adjacent to these lands, there is high
potential for significant prehistoric and historic sites to be present here.
Cooperator(s):
NPS is working with several Alaska Native Claims Settlement Act village corporations.
Operations & Maintenance
Savings/Cost Start-up Annual
Estimated O&M Savings: $0 $0
Estimated O&M Costs: $0 $2,500
Describe O&M:
Approximately $2,500 will be needed annually to monitor the easement and provide general safety for visitors to the
lands along the lakeshore.
National Park Service FY 2024 Budget Justifications
LASA-49
Activity: State Conservation Grants (GAOA)
FY 2024 Program Activities
The following are examples of planned FY 2024 State Conservation Grants Activities:
States/territories and local units of government will create, enhance and expand recreational
opportunities through acquisition, development or rehabilitation in about 400 park areas.
Through these grants, the program expects to protect approximately 32,000 new park area land
acres in perpetuity.
Justification of FY 2024 Program Changes
The FY 2024 budget request for State Conservation Grants is $305,544,000 and 32 FTE, a program
change of -$30,140,000 and +10 FTE from FY 2023 Enacted.
Formula State Conservation Grants (-$43,259,000 / +0 FTE) — At a funding level of $157.2 million,
the NPS will continue to work with its state partners to create, enhance and expand recreational
opportunities through acquisition, development or rehabilitation.
Competitive State Conservation Grants (Outdoor Recreation Legacy Program) (+$10,855,000 / +0
FTE) — This increase will support states and local units of government to create and expand recreational
opportunities through acquisition and development of additional park areas in underserved urban areas
crossed the country.
State Conservation Grants Administration (+$2,264,000 / +10 FTE) — This requested increase will
allow the program to continue to build the capacity it needs to improve the efficiency and effectiveness of
the program, which has expanded dramatically following GAOA.
Mission Overview
The State Conservation Grants support, through partnerships with State and local agencies, a nationwide
system of protected parks, open spaces, and trails, providing outdoor recreational and conservation
benefits to the public. This program also contributes to NPS’s mission to assist in expanding and
improving recreational access and opportunities, increasing public access, and catalyzing land
conservation partnership projects.
Subactivity Overview
The State Conservation Grants activity provides matching grants to States and through States to local
units of government for the acquisition and development of public outdoor recreation areas and facilities
that provide public access to lands, waters, and other recreation resources. Grants to States also provide
for continuing State planning efforts to address outdoor recreation needs. Since 1965, more than $5.2
billion has been apportioned to the States, resulting in the award of over 45,000 grants. States, Tribes, and
localities have matched this amount at least dollar-for-dollar, doubling the Federal investment. This
program has successfully allowed States to take greater responsibility for the protection and development
of open space and outdoor recreation resources.
National Park Service FY 2024 Budget Justifications
LASA-50
Formula State Conservation Grants
The Formula State Conservation Grants program is a 1:1 Federal/non-Federal matching grant program.
The program provides funding to States to acquire open spaces and natural areas for outdoor recreation
purposes and develop outdoor recreation facilities. Additionally, States are required to sustain the
property for outdoor recreation purposes in perpetuity. Funding is also provided to assist States in
development of Statewide Comprehensive Outdoor Recreation Plans (SCORPs). These plans assess and
prioritize the need for new and enhanced outdoor recreation areas and facilities. States use their Open
Project Selection Process, which provides objective criteria and standards for grant selection based on
each State’s priority needs as identified in its SCORP. States are also initially responsible for soliciting
and selecting projects from eligible State agencies, Tribal governments, and local units of government.
Projects are then submitted to NPS for review to ensure that criteria are met, and proposed projects are
consistent with the State SCORPs.
Competitive State Conservation Grants (Outdoor Recreation Legacy Program)
The competitive Outdoor Recreation Legacy Partnership (OLRP) program complements the traditional
formula State Conservation Grants program and aligns with one of the President’s top priorities –serving
underserved communities. Specifically, the ORLP program helps urban communities acquire or develop
land to create or reinvigorate public parks and other outdoor recreation spaces in ways that will provide
opportunities for people, especially youth, to connect or re-connect with the outdoors. Priority is given to
projects that provide new recreational opportunities, particularly those that will increase access to nature’s
benefits and natural landscapes, engage and empower underserved communities and youth, and leverage
and expand public-private partnerships.
Like traditional State conservation grants, the LWCF ORLP is subject to the general authorities of 54
U.S.C. 2003 and program requirements, including the purpose of the grants, types of grants, consistency
with SCORP, 50 percent match requirement, and protection of assisted areas as required by the Act (54
U.S.C. 200305(f)(3)). The program is administered in conjunction with the NPS’s State partners. The
States are responsible for soliciting, reviewing and submitting proposals for the national competition to
the NPS. An evaluation panel scores and ranks proposals, and successful applicants will submit final
proposals though their regular State processes. Grant administration and project monitoring is done
jointly between the States and NPS.
State Conservation Grants Administration - NPS
This subactivity provides for the administration of the NPS program responsibilities to provide grants to
States and through States to local governments, as well as ensuring that areas that have received
assistance are open and available for public outdoor recreation use in perpetuity as required by the LWCF
Act. Further tasks include the provision of technical assistance to States in developing and updating of
SCORPs.
With the increase in funding to State Conservation Grants through GAOA and GOMESA, the number of
applications from States has approximately doubled in the last five years, from 350 to 700. The NPS
needs to increase the staff-to-State ratio to be able to provide a comparable level of support in light of the
increased applications. In addition to program officer positions, NPS intends to add some specialized
grant administration positions, planners who can support the States in their SCORP development, and
National Park Service FY 2024 Budget Justifications
LASA-51
staff with expertise in Federal laws such as the NEPA and NHPA, to expand the types of technical
assistance that can be provided to support the States.
State Conservation Grants Administration - States
Language enacted in the Consolidated Appropriations Act, 2023 authorized the NPS to retain up to seven
percent of the State Conservation Grants assistance program amounts to disburse to States, the District of
Columbia, and insular territories as 50:50 matching grants to support State program administrative costs.
This includes formula, competitive, and GOMESA program amounts. In doing so, States will provide a
plan to NPS for approval, identifying their need for and intended use of the funds covering costs such as
personnel, travel, training, and supplies. Grants will be capped at a maximum amount per State depending
upon the size of the State’s apportionment. Any funds not requested for administration grants will be
returned to the program to be distributed through the apportionment. The NPS proposes the same
authority in the FY 2024 budget request.
National Park Service FY 2024 Budget Justifications
LASA-52
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
LASA-53
Activity: American Battlefield Protection Program
FY 2024 Program Activities
The following are examples of planned FY 2024 American Battlefield Protection Program Activities:
The program expects to award 18-24 Battlefield Land Acquisition Grants to assist the with
acquisition of fee and less-than-fee interests in battlefield lands and associated historical
properties, 8-12 Battlefield Interpretation Grants to enhance virtual and onsite visitor experiences,
and 6-10 Battlefield Restoration Grants to restore “day-of-battle” conditions at eligible American
Revolution, War of 1812, and Civil War sites.
Justification of FY 2024 Program Changes
The FY 2024 request for the American Battlefield Protection Program is $20,000,000 and 2 FTE. There
are no program changes from FY 2023 Enacted.
Mission Overview
The American Battlefield Protection Program (ABPP) promotes the preservation of significant historic
battlefields associated with wars on American soil. The goals of the program are 1) to protect battlefields
and sites associated with armed conflicts that influenced the course of our history, 2) to encourage and
assist all Americans in planning for the preservation, management, and interpretation of these sites, and 3)
to raise awareness of the importance of preserving battlefields and associated sites for future generations.
The ABPP focuses primarily on land use, cultural resource and site management planning, and public
education. The Further Consolidated Appropriations Act, 2020 (P.L. 116-94) extended the authority for
the ABPP grant programs through FY 2028.
Subactivity Overview
American Battlefield Protection Program (ABPP) Battlefield Acquisition Grants
These grants support State and local governments and their non-profit partners in the acquisition of fee-
simple or less-than-fee (easement) interests in eligible battlefield lands and associated sites. This program,
originally known as the Civil War Battlefield Grants program, was renamed by the Omnibus Public
Lands Management Act of 2009 (P.L. 111-11). Under this authorization, grants were awarded for
acquisition of interests in sites identified in the Civil War Sites Advisory Commission’s 1993 Report on
the Nation’s Civil War Battlefields. The National Defense Authorization Act for Fiscal Year 2015
broadened the scope of the program so that grants can now be awarded for acquisition of interests in
principal sites related to the Revolutionary War and the War of 1812 identified in the NPS’s Report to
Congress on the Historic Preservation of Revolutionary War and War of 1812 Sites in the United States.
Grants require a non-Federal cost share of at least 50 percent. In FY 2022, the program awarded 24 grants
totaling more than $12.4 million to assist State and local governments and non-profit organizations to
acquire 860 acres at 22 battlefields and associated historic properties. These sites are not part of the
National Park System.
ABPP Interpretation Grants
This subactivity supports project grants that contribute to historic preservation and interpretation,
community engagement, museums, and digital or physical public access to historic sites. Grant funds are
National Park Service FY 2024 Budget Justifications
LASA-54
awarded on a competitive basis for projects that deploy technology to modernize and enhance battlefield
interpretation and education at Revolutionary War, War of 1812, and Civil War battlefield sites eligible
for assistance under the battlefield acquisition grant program established under 54 U.S.C. 308103(b).
Grants require a non-Federal cost share of at least 50 percent. State, local, and Tribal governments and
non-profit organizations are eligible to apply. This grant program was established in December of 2019
via The Further Consolidated Appropriations Act, 2020 (P.L. 116-94). In FY 2022, the program awarded
$489,200 for six projects that will enhance visitor experiences at more than two dozen battlefields from
Massachusetts to Georgia.
ABPP Battlefield Restoration Grants
This subactivity funds grants to States, Tribes, local governments, and non-profit organizations for
projects that restore day-of-battle conditions at Revolutionary War, War of 1812, and Civil War
battlefields and associated historic properties acquired with assistance under the battlefield acquisition
grant program established under 54 U.S.C. 308103(b). Grants require a non-Federal cost share of at least
50 percent. This grant program was established in December of 2019 via The Further Consolidated
Appropriations Act, 2020 (P.L. 116-94). In the initial offering in FY 2022, the program awarded
$345,205 to support four preservation projects at Civil War battlefields in Pennsylvania and Virginia.
ABPP Grants Administration
This subactivity provides for the administration of the three grant programs under this activity, including
the Acquisition, Interpretation, and Restoration grants, that are awarded annually to States, Tribes, local
governments, and non-profit organizations. Administrators ensure the grant programs are carried out in
accordance with all relevant law, regulation, and policy.
National Park Service FY 2024 Budget Justifications
LASA-GOMESA-1
Appropriation: Land Acquisition and State Assistance - GOMESA
Land Acquisition and State Assistance
Mandatory Appropriation ($000)
2022
Actual
1
2023
Estimate
1
2024
Estimate
1
Change from
2023 Estimate
State Conservation Grants (GOMESA) 83,598 117,375 117,375 0
Administrative Support (GOMESA) 500 500 500 0
Total Requirements (Net BA) 84,098 117,875 117,875 0
Total FTE Requirements 0 0 0 0
Sequester Adjustments 5,083 7,125 7,125 0
Total, GOMESA Funding (New Budget
Authority)
89,181 125,000 125,000 0
1
Bureau line item funding amounts are Net Budget Authority, the amount available to execute after sequester and Pop-up
adjustments.
Appropriation Overview
Gulf of Mexico Energy Security Act (GOMESA)
The Gulf of Mexico Energy Security Act (GOMESA, P.L. 109-432) established a mandatory stream of
funding derived from revenues generated by Outer Continental Shelf (OCS) oil and gas leasing in the
Gulf of Mexico. Under this Act, for each of fiscal years 2016 through 2055, 12.5 percent of certain OCS
revenues, up to $162.5 million in 2021 and up to $125.0 million annually afterward through 2055, are
directed to the Land and Water Conservation Fund, which is distributed to States for public outdoor
recreation purposes through the State Conservation Grants program.
Program Overview
State Conservation Grants
The State Conservation Grants program provides matching grants to States and through States to local
units of government for the acquisition and development of public outdoor recreation areas and facilities
that provide public access to lands, waters, and other recreation resources. Providing mandatory funding
allows the States to better plan their efforts from year to year. Since 2009, $343.8 million from GOMESA
has been directed to State Conservation Grants. States and localities have matched this amount at least
dollar-for-dollar, doubling the Federal investment.
Administrative Support – NPS and States
The Consolidated Appropriations Act, 2023 authorized the NPS to retain and use up to three percent of
the permanent funds for NPS administration of State grants. This administrative provision has been
included since FY 2009 and is proposed to be continued in FY 2024. Additionally, language enacted in
the Consolidated Appropriations Act, 2023 authorized the NPS to retain up to seven percent of the State
Conservation Grants assistance program amounts to disburse to States, the District of Columbia, and
insular territories as 50:50 matching grants to support State program administrative costs. This includes
formula, competitive, and GOMESA program amounts. The NPS proposes the same authority in the FY
2024 budget request.
National Park Service FY 2024 Budget Justifications
LASA-GOMESA-2
FY 2024 Program Performance
The NPS will use this funding, in partnership with States, Territories and local units of government, to
enhance and expand recreation opportunities through acquisition, development, or rehabilitation in
approximately 500 park areas. Through State Conservation Grants, the program protects new park area
land in perpetuity as required by the Act (54 U.S.C. 200305(f)(3)
National Park Service FY 2024 Budget Justifications
LRF-1
Allocation: National Parks and Public Land Legacy Restoration Fund
(GAOA)
Appropriation Overview
Great American Outdoors Act
The Great American Outdoors Act (GAOA) is historic legislation that combines a financial commitment
to conservation and recreation for future generations with a significant investment in the facilities needed
to carry out Interior’s important mission, including the care and maintenance of America’s national
treasures. This investment provides an unprecedented opportunity to reduce the Department of the
Interior’s deferred maintenance backlog and restore deteriorating assets. To do so effectively requires
investment prioritization and a sound program execution and management strategy.
National Parks and Public Land Legacy Restoration Fund
The Department of the Interior is responsible for administering and implementing GAOA’s National
Parks and Public Land Legacy Restoration Fund (LRF) program, which is shared with the U.S. Forest
Service. For fiscal years 2021 through 2025, Congress authorized up to $1.9 billion annually to be
deposited in the LRF Fund for projects that reduce deferred maintenance. The annual deposit is equal to
50 percent of energy development revenues from oil, gas, coal, alternative, or renewable energy on
Federal land and water credited, covered, or deposited into the Treasury as miscellaneous receipts under
Federal law in the preceding fiscal year.
National Park Service FY 2024 Budget Justifications
LRF-2
Fund Source: National Parks and Public Land Legacy Restoration Fund
Program Component: Projects
FY 2024 Program Activities
In FY 2024, the NPS has identified 26 projects, which will address $1.25 billion in deferred maintenance.
This funding will improve the condition of roads, buildings, utility systems, and other assets in 24 park
units located in more than 20 States, territories, and the District of Columbia. These projects will address
critical life, health, and safety issues, as well as related code compliance and accessibility deficiencies.
Funding will also be used to remove dilapidated and unneeded structures that detract from the visitor
experience and attract vandalism.
Program Overview
The resources made available to the LRF will support and advance several Administration priorities. The
work funded by the program—as well as the facilities rehabilitated—promotes economic revitalization
and job creation. With these resources, the NPS has a tremendous opportunity to accomplish much
needed asset repairs and reconditioning, conserving its resources or protecting them from emerging
threats. Improved facilities will be more resilient to climate change and operate more efficiently and
cleanly.
All bureaus in the Department of the Interior (DOI) used similar criteria when selecting projects. Those
criteria include addressing a significant amount of deferred maintenance, maximizing return on
investment, and safeguarding those we serve—our partners, volunteers, and workforce. Projects that meet
those criteria ensure funds are used to rehabilitate assets to support conservation and recreational
opportunities for years to come.
At a Glance…
LRF Goals and Priorities
DOI LRF Program Goals
Improve the Department’s financial health
Maximize return on investment and citizens
served
Protect those we serve
Planning for the future
Administration Priorities
Supports Economic Revitalization / Job
Creation
Prioritizes Climate Resilient Infrastructure
Conserves or Protects Against Threats to
Resources
Utilizes Clean Energy
Supports Youth Corps Programs
Benefits Overburdened and Underserved
Communities
Within the NPS, projects are evaluated and prioritized by the NPS Bureau Investment Review Board
(BIRB or Board), a committee of the National Leadership Council (NLC) comprised of senior managers,
which provides a servicewide policy perspective for and oversight of NPS construction programs and the
formulation of individual projects. The Board is authorized by the NPS Director to serve as the executive
body that sets direction for the NPS facility investment portfolio. LRF projects address significant
deferred maintenance by targeting the NPS’s priority assets. Projects are further weighed based on the
business case for the investment, and the timeliness of obligation.
National Park Service FY 2024 Budget Justification
LRF-3
Deferred maintenance needs are not spread evenly across the park units, and the NPS generally
considered only large-scale projects for LRF funding that will be ready to obligate in FY 2024, as these
projects have been historically out of reach with discretionary appropriations—relying on its discretionary
construction and major maintenance programs (such as repair/rehabilitation) to address smaller-scale
projects. To further narrow the list, the BIRB carefully considered the business case for each investment,
requiring that restored facilities and infrastructure can be maintained in acceptable condition throughout
their respective lifecycles. As with all NPS investments, priority was given to projects that protect the
safety of NPS visitors, partners, employees, and the natural and cultural resources the bureau safeguards.
The work accomplished by these projects will sustain or improve not only the NPS’s conservation
activities, but also recreational opportunities for its visitors.
Potential projects were evaluated and prioritized based on the following criteria:
Critical assets at risk of failure
Critical life, health, safety, or environmental impacts
Percentage of net construction that will address deferred maintenance
Accessibility
Demolition or disposal of facilities
National Park Service FY 2024 Budget Justification
LRF-4
Fund Source: National Parks and Public Land Legacy Restoration Fund
Project Component: Project Planning and Compliance
FY 2024 Program Activities
At the proposed FY 2024 funding level, planning and compliance funding will:
Support the Pre-designs, Final Designs, and Supplemental Services for successful execution
of LRF projects.
Support project planning and project development for large-scale or complex construction
projects that will be submitted for LRF funding in future years.
Provide funding for project compliance activities.
Program Overview
Funding will address the preconstruction planning and compliance required for current and future LRF
projects. This approach mirrors the structure of the NPS’s discretionary Construction Appropriation,
which relies on a Construction Planning lump-sum account to support preconstruction activities. These
activities include:
Planning: This activity supplies critical budgetary resources needed to develop construction plans
and specifications and cost estimates essential for acceptable completion of major maintenance,
repair, and replacement construction projects for the LRF. In addition to final design documents,
this funding typically supports pre-design project programming and budgeting, schematic
alternatives, and concept drawings.
Compliance: This activity also provides funding for compliance needs related to addressing
impacts to natural and cultural resources. Regulatory requirements that frame compliance
activities include the National Environmental Policy Act (NEPA), Section 106 of the National
Historic Preservation Act, executive orders, and State requirements. Examples of compliance
support include archeological surveys, hazardous material surveys, preparation of historic
structure documentation, coordination with State/Tribal Historic Preservation Offices, and
environmental assessments.
Planning and compliance funding is a necessary component of any construction program, and includes
project pre-planning, development, and scope and cost validation. This activity enhances the NPS’s
ability to conduct legally defensible, scientifically based analyses that facilitate sound decision-making. It
also provides support for compliance needs associated with major construction projects.
National Park Service FY 2024 Budget Justification
LRF-5
Fund Source: National Parks and Public Land Legacy Restoration Fund
Project Component: Project Management
FY 2024 Program Activities
At the proposed FY 2024 funding level, project management funding will:
Provide project management expertise and capacity to support LRF projects.
Support and oversee project coordination, design, and contracting/acquisition.
Justify, document, and support expenses directly attributed to LRF funded projects.
Support small business goals and socioeconomic programs for the NPS and DOI.
Track and monitor risks; implement internal controls.
Program Overview
Funding will provide professional project management and contracting services of current and future
projects throughout the construction cycle. This approach mirrors the structure of the NPS’s discretionary
Construction Appropriation, which relies on the Denver Service Center (DSC) to support project
management activities. DSC will support many LRF projects, but portions of this funding will also be
provided to parks and regions that will manage projects.
The funding supports quality assurance including project compliance, quality, specialized technical
expertise, and risk assessment and management. Project Management encompasses tasks completed over
the life of project such as assembling a project team with the expertise necessary to execute the project,
establishing the technical objectives, planning the project, and managing changes to the scope and
controlling the undertaking so that it is completed on schedule and within budget. Staff funded through
this activity provide cost-efficient project management services and rely on the contracted support of
design and construction firms nationwide to ensure best value and quality for park projects and services.
Project Management activities include coordinating major construction and planning activities, providing
for design, compliance, and construction management services, and providing contracting support.
National Park Service FY 2024 Budget Justification
LRF-6
Fund Source: National Parks and Public Land Legacy Restoration Fund
Project Component: Program Administration
FY 2024 Program Activities
At the proposed FY 2024 funding level, program administration staff will:
Evaluate project proposals to ensure that the highest priority, mission critical projects are
reflected in the LRF plan.
Support the Bureau Investment Review Board to ensure projects are of high quality,
incorporate sustainable practices, are appropriate to their settings, and demonstrate defensible
cost-conscious decisions focused on cost reduction.
Coordinate with the Department’s GAOA Program Management Office.
Formulate and monitor current and future LRF projects.
Implement procedures and tools to ensure accurate data, timely reporting, and status briefs.
Track and monitor risks; implement internal controls.
Program Overview
LRF program administration staff support and oversee planning and execution of the LRF, including
efforts to advance or complete current and future projects. These activities are indirect costs and are not
directly applied to individual projects. An estimated 2.5 percent of the NPS allocation of LRF funds
received in FY 2021 through FY 2025 will be used to fund program administration through the life of the
LRF program, including project close-out beyond FY 2025. Some NPS funding will be transferred to the
Department of the Interior for the purposes of coordinating program administration across the bureaus.
NPS program managers will use industry best practices to initiate, plan, execute, monitor and control, and
close out projects. Existing NPS procedures and tools will be adapted and improved to ensure projects
stay within scope, budget, and schedule. Activities in this area are related to contracting, budget, finance,
external affairs, office support, field office support, human capital, engineering, and project management
whose focus is not directed towards a specific project. A series of internal control measures will be
applied to ensure all program administration expenses charged to LRF are appropriate.
National Park Service FY 2024 Budget Justification
LRF-7
Fund Source: National Parks and Public Land Legacy Restoration Fund
Project Component: Contingency Fund
FY 2024 Program Activities
At the proposed FY 2024 funding level, project contingency will:
Provide contingency funds to past, present, and future LRF projects to address cost increases,
unforeseen site conditions, and adapt project methods and schedules during unexpected
environmental events.
Support successful completion of major LRF projects that encounter challenges, ensuring
projects are not delayed or left unfinished while other funding is identified.
Reinforce the NPS’s ability to complete projects on time, minimizing closures of the
buildings, amenities, and roads improved by the projects, and ensuring they are reopened for
visitor enjoyment or park operations in a timely fashion.
Program Overview
Project contingency funding will be used to provide additional funds, as needed, for Legacy Restoration
Fund construction projects. Due to the nature of the construction process, projects must be prepared to
address multiple risks that frequently increase costs. These include unforeseen/unanticipated site
conditions that require adjustments to construction methods and timelines, unpredictable fluctuations in
prices for supplies and materials, and adjustments to project scheduling when contending with unexpected
environmental events. This funding will be used to ensure the bureau is able to address fluctuations in
construction costs to accomplish the scope described in the project data sheets for individual projects. The
NPS will not use this funding to add enhancements.
Typical NPS projects, including major projects within the LRF, include a certain percentage of
contingency funding built into their individual requests; however, the scope and scale of LRF projects
combined with the volatility of the construction market requires the NPS to also hold additional funds in
reserve. The Contingency Fund is held in reserve and not allocated to specific projects until it is needed.
The amount requested in this project data sheet represents approximately 12 percent of the total amount
for FY 2024 projects, but this funding will be made available for past, current, and future LRF projects
needing contingency funds to complete construction.
National Park Service FY 2024 Budget Justification
LRF-8
FY 2021 & 2022 Completed and In-Progress Project Examples
Project: Rehabilitate the Bridalveil Creek Campground Water Distribution System for Park Visitors
(N045)
Location: Yosemite National Park, California
Left: Pipe installation in progress. Right: New water tank.
This project, successfully completed during the 2022 construction season, replaced the entirety of the
aged and deteriorating water system at the Bridalveil Creek Campground. The cast iron and galvanized
steel water distribution system was replaced with new pipe, the groundwater treatment vault and
chlorination system were fully rehabilitated, and the underground water storage tank was replaced with a
new regulatory compliant aboveground tank.
Project: Correct Roof and Building Failures at HQ/Maintenance/Dispatch Complex (N007)
Location: Grand Teton National Park, Wyoming
Left: Roof under construction. Right: Workers on completed roof.
The NPS awarded a $15 million construction contract in May 2021 to eliminate leaks in the roof of the
70,000 square foot park headquarters complex, serving as administrative space for most of the park staff,
including the inteagency dispatch center. Construction began in September 2021 and became substantially
complete in November 2022.
National Park Service FY 2024 Budget Justification
LRF-9
Project: Replace Mammoth Cave Hotel Roof to Correct Deficiencies and Improve Visitor Experience
(N027)
Location: Mammoth Cave National Park, Kentucky
Left: Selective demolition of original lobby. Right: New lobby and roof under construction.
This project corrects deficiencies in the 55-year old park hotel including structural issues, water
infiltration, and visitor circulation. After awarding $7 million construction contract, work began in
January 2022. On site work is anticipated to be complete in September 2023.
Project: Rehabilitate Cave Trails: New Entrance to Frozen Niagara (N098)
Location: Mammoth Cave National Park, Kentucky
Workers staging construction materials inside Mammoth Cave.
This project replaces the deteriorated cave trails along Frozen Niagara and New Entrance routes. Work
includes construction of hardened trail surface to replace the often slippery dirt trail system. The NPS
awarded a $6.5 million contract, and construction work started in November 2022. All work is due to be
complete in September 2023.
National Park Service FY 2024 Budget Justification
LRF-10
Project: Stabilize Alcatraz Wharf (N068)
Location: Golden Gate National Recreation Area, California
Left: The Alcatraz fixed wharf with visitors waiting for ferry. Right: Deteriorated wharf structure below.
The NPS awarded a $35.5 million construction contract in FY 2022 for seismic retrofits of the Alcatraz wharf and
critical repairs of the steel-cased concrete piles, concrete beams, and concrete slabs. Stabilization of the island’s
point of access will ensure that the visitors, NPS staff, concessionaires, and park partners have consistent, safe
access to the island; and completion of the project will facilitate future rehabilitation/construction projects on the
island.. Construction began in January 2023, and is anticipated to continue through 2025, and will allow
uninterrupted access for the 1.6 million annual visitors to Alcatraz facilities during construction.
Project: Replace Laurel Fork Bridge (N011)
Location: Blue Ridge Parkway, North Carolina
Left: Demolition of the old bridge. Right: Construction of the replacement bridge.
The NPS awarded a $33 million contract in April 2022 for the relpacement of the Laurel Fork Bridge.
Demolition and construction work began in the summer of 2022, and completion is anticipated in the
summer of 2024. The 550-foot long 80-year old bridge was at the end of its service life, and had to be
closed in high winds. The new structure will allow for continued enjoyment of the parkway for the
visitors in the approximately 2,300 vehicles per day crossing the bridge.
National Park Service FY 2024 Budget Justification
LRF-11
Project: Demolish Vacant Excess Structures (N003)
Location: Cuyahoga Valley National Park, Ohio
Left: Abandoned house. Right: Restored site after demolition.
The project eliminated public hazards and reduced park operations and maintenance costs by removing
dozens of non-historic deteriorated structures. Sites were restored to natural conditions. A $2 million
contract was awarded in July 2021. Demolition and site restoration was completed in May 2022.
National Park Service FY 2024 Budget Justification
LRF-12
FY 2023 Planned Project Examples
Project: Rehabilitate Deteriorated and Failing Mission-Critical Utility System Infrastructure (N111)
Location: Gateway National Recreation Area, New York & New Jersey
Left: Fort Wadsworth area. Right: Existing powerlines at Sandy Hook.
This project will rehabilitate water, wastewater, and stormwater utility systems at Ft. Wadsworth (Staten
Island, NY), and electrical utility systems at Sandy Hook (NJ). These utility systems provide for both
visitor use and park operations. All of these systems have exceeded their useful life and currently require
rehabilitation or replacement. The original utility systems at Fort Wadsworth were constructed during the
1920s era. The overhead electric lines at Sandy Hook provide interrupted and sporadic service due storms
throughout the year. Moving the lines underground will provide more reliable service for the park,
housing, leasing, and park partners throughout the year.
Project: Rehabilitate Seawalls and Shoreline Landscape at the Tidal Basin and West Potomac Park
(N100)
Location: National Mall and Memorial Parks, District of Columbia
Left: Existing West Potomac Park seawall during low tide. Right: Tidal Basin
seawall and public walkways flooded during high tide.
The FY 2023 program included a project to repair the existing seawalls in the Tidal Basin and West
Potomac Park by reconstructing them in their historic location at their historic functional height. The
Tidal Basin project runs from the Inlet Bridge north to the Franklin Delano Roosevelt Memorial and east
to the Thomas Jefferson Memorial. The West Potomac Park project runs from the Inlet Bridge toward
Arlington Memorial Bridge. The new seawalls will account for current river levels and will be
constructed to allow for additional sea level rise, in the future, as needed
National Park Service FY 2024 Budget Justification
LRF-13
Project: Rehabilitate Hyde Street Pier and the NHL Eureka Ferryboat (N101)
Location: San Francisco Maritime National Historical Park, California
Left: Hyde Stree Pier and the Eureka. Right: Failing pier structural supports.
This project replaces the badly deteriorated timber framed Hyde Street Pier, including the dysfunctional
utility systems. This project will also repair the ferryboat Eureka, a National Historic Landmark wooden
ship built in 1890, which connected U.S. Route 101 across San Francisco Bay. Preservation work
includes the hull, decks, framing, planking, and utility systems. The project addresses extensive deferred
maintenance and code requirements that will improve park operations and provide a substantially
enhanced visitor experience.
National Park Service FY 2024 Budget Justification
LRF-14
FY 2024 Proposed Project Examples
Project: Replace Water Filtration System at King Salmon (N133)
Location: Katmai National Park & Preserve, Alaska
Left: Hazardous chemical storage needed to treat high mineral content raw water.
Right: Existing obsolete pumping equipment in undersized space.
This project will replace the park’s potable water treatment and distribution systems in the remote
community of King Salmon, Alaska. The current systems cannot adequately mitigate the levels of iron
and manganese from the raw water supply. The systems will also supply fire suppression for the park’s
facilities including eight housing units, an 11-room dormitory, and the maintenance building.
Project: Repair Historic Walls of Park Fortifications (N131)
Location: San Juan National Historic Site, Puerto Rico
Left: View of a section of City Walls looking west from Bastión de las Palmas.
Right: Workers filling subterranean voids with grout during a pilot project.
The National Park Service protects the Spanish colonial forts and nearly three miles of historic city walls
enclosing Old San Juan. In addition to their unique historic value, the masonry structures also act as
retaining walls, supporting the city parks, streets, and private buildings above them. The walls are
threatened with localized collapses due to hidden voids caused by centuries of water infiltration, as well
as rapid erosion when an internal drain fails. The park recently completed a pilot effort to test methods of
correcting these deficiencies, and is now prepared for a larger preservation effort. This project will
identify subsurface voids using ground-penetrating radar, and fill the voids with low-pressure grout
injection. Masonry and drains will be repaired using traditional methods.
National Park Service FY 2024 Budget Justification
LRF-15
National Park Service GAOA Legacy Restoration Fund Projects
Consistent with Congressional direction, the National Park Service submits the following Legacy
Restoration Fund projects as part of the FY 2024 Budget process. Detailed project data sheets will be
posted on the Department’s GAOA LRF website (https://www.doi.gov/gaoa-project-data) for each
identified project. The project lists below have been thoroughly considered and vetted and are considered
ready for implementation in FY 2024. The Department will keep Congress informed should the
circumstances of a specific project change during the course of the FY 2024 Budget process.
The FY 2024 project list below assumes the full $1.9 billion allowable for deposit into the Legacy
Restoration Fund is realized. Because determination of the deposit relies on the amount of qualifying
energy revenue collected in the prior year, the actual amount available for FY 2024 projects will not be
finalized until the start of FY 2024. Projects listed below are ranked and prioritized. National Park Service
will select and implement projects based on the prioritized list below until the LRF allocation is
exhausted net of the mandatory funding sequester (5.7% of funding) and previously unavailable
(sequestration “pop up”). Projects not funded with the FY 2024 allocation may be considered for FY 2025
implementation.
Included with the list of FY 2024 projects is a list of project modifications from the FY 2021 project list.
This list includes moving funds from completed projects to the Contingency Fund.
FY 2024 National Park Service Allocation Summary Table
(Dollars in Thousands)
Budget Authority/Activity Amount
FY 2024 Allocation (estimate) 1,330,000
FY 2024 Sequestration (estimate) -75,810
FY 2024 Previously Unavailable (from FY 2023) +75,810
FY 2024 Proposed Projects -1,330,000
Total Available/Unallocated (estimate) 0
National Park Service FY 2024 Budget Justification
LRF-16
FY 2024 National Park Service GAOA LRF Project List
(Dollars in Thousands)
Unique
ID Priority
Station or
Unit Name
Project/Activity
Title State
Cong.
District
Funding
Estimate
Estimated
DM
Addressed*
N106 1
Fort Sumter
and Fort
Moultrie
National
Historical Park
Repair or Replace
Docks at Fort
Moultrie and
Liberty Square SC SC01 38,409 43,617
N109 2
Grand Canyon
National Park
Rehabilitate the
North Rim and
Roaring Springs
Utility Systems AZ AZ02 180,642 186,980
N119 3
Virgin Islands
National Park
Replace Water and
Wastewater
Systems at
Cinnamon and
Trunk Bays VI VIAL 21,300 23,295
N125 4
Maintenance
Action Teams
at Multiple
Parks
Maintenance
Action Teams Multiple Multiple 25,000 20,000
N100 5
National Mall
and Memorial
Parks
Rehabilitate
Seawalls and
Shoreline
Landscape - Phase
II DC DCAL 38,634 45,837
N113 6
Boston
National
Historical Park
Rehabilitate
Building 107 and
Demolish Hoosac
Stores Warehouse
Building - Phase II MA MA07 59,392 46,892
N146 7
New River
Gorge
National Park
and Preserve
Remove Excess
Structures and
Abandoned
Buildings - Phase
2, and Address
Deficient Utilities,
Historic Structures,
and Visitor
Facilities WV WV01 36,169 44,986
N126 8
Gateway
National
Recreation
Area
Rehabilitate
Hangars 3 and 4 at
Floyd Bennett
Field NY NY08 25,625 30,000
N127 9
National
Capital Parks-
East
Rehabilitate Urban
Recreation Areas DC DCAL 11,800 9,500
National Park Service FY 2024 Budget Justification
LRF-17
Unique
ID Priority
Station or
Unit Name
Project/Activity
Title State
Cong.
District
Funding
Estimate
Estimated
DM
Addressed*
N128 10
Death Valley
National Park
Rehabilitate Water
and Wastewater
Systems at Furnace
Creek and Cow
Creek CA CA03 62,533 64,854
N129 11
Sleeping Bear
Dunes
National
Lakeshore
Rehabilitate
Facilities on
Manitou Islands MI MI01 31,860 37,800
N130 12
Yosemite
National Park
Rehabilitate El
Portal Wastewater
Treatment Facility
and Administrative
Camp CA CA05 179,661 365,212
N131 13
San Juan
National
Historic Site
Repair Historic
Walls of Park
Fortifications PR PRAL 41,662 49,429
N132 14
Hawaii
Volcanoes
National Park
Rehabilitate Water
Treatment System HI HI02 33,599 39,863
N133 15
Katmai
National Park
& Preserve
Replace Water
Filtration System
at King Salmon AK AKAL 7,938 8,895
N135 16
Saint-Gaudens
National
Historical Park
Replace Electrical,
HVAC, and Alarm
Systems, and
Rehabilitate Four
Historic Structures NH NH02 14,434 17,074
N136 17
Voyageurs
National Park
Replace Power
Distribution Line
Connecting Kettle
Falls Hotel MN MN08 13,856 16,151
N137 18
Gateway Arch
National Park
Preserve Features
and Systems of the
Old Courthouse MO MO01 17,110 20,300
N138 19
Bryce Canyon
National Park
Rehabilitate the
Main Water
System UT UT02 15,326 17,779
N139 20
Sequoia and
Kings Canyon
National Parks
Rehabilitate Water
Utility
Infrastructure and
Upgrade Access to
Campgrounds CA
CA05,
CA20 35,344 38,909
N140 21
Curecanti
National
Recreation
Area
Replace Water and
Wastewater
Systems at Elk
Creek and Lake
Fork CO CO03 13,055 15,043
National Park Service FY 2024 Budget Justification
LRF-18
Unique
ID Priority
Station or
Unit Name
Project/Activity
Title State
Cong.
District
Funding
Estimate
Estimated
DM
Addressed*
N141 22
Sequoia and
Kings Canyon
National Parks
Rehabilitate Grant
Grove Historic
Cabins and Shower
House and
Lodgepole Market CA CA20 21,590 25,287
N142 23
Great Sand
Dunes
National Park
& Preserve
Rehabilitate Park
Housing CO CO03 12,027 11,160
N144 24
Chickasaw
National
Recreation
Area
Address Critical
Repairs in the Platt
and Buckhorn
Developed Areas OK OK04 38,564 35,497
N145 25
Hampton
National
Historic Site
Preserve Historic
Structures MD MD02 15,375 17,432
N149 26
Apostle
Islands
National
Lakeshore
Rehabilitate
Waterfront at Little
Sand Bay and
Devils Island,
Reconstruct
Boathouse WI WI08 17,200 20,407
FY25+ Project
Planning and
Compliance
145,000
Program
Administration
(Indirect Costs)
19,950
Project
Management
35,000
Contingency Fund
121,945
Total
1,330,000** 1,252,199
Note: See project data sheets for detailed project descriptions.
* Estimated deferred maintenance numbers reflect the maintenance and repair work that will be addressed upon
completion of the project, not within the funding year.
**Total amount is net of FY 2024 sequestration and previously unavailable from FY 2023 (sequestration pop-up).
National Park Service FY 2024 Budget Justification
LRF-19
FY 2021 National Park Service Allocation Summary Table
(Dollars in Thousands)
Budget Authority/Activity Amount
FY 2021 Allocation 1,330,000
FY 2021 Congressionally Directed Projects -1,300,000
FY 2021 Project Funding Changes Proposed -3,101
FY 2021 Project Funding Reallocation Proposed (Contingency Fund) +3,101
Total Available/Unallocated (estimate) 0
FY 2021 National Park Service GAOA LRF Project Modifications
(Dollars in Thousands)
Unique
ID
Station or Unit
Name
Project/Activity
Title
State Cong. District Funding
Estimate
Change
Action
N031
National Mall
and Memorial
Parks
Complete
Jefferson
Memorial
Exterior Marble
Restoration DC DCAL -204 Completion
N010
Yosemite
National Park
Critical Repair
and
Replacement of
70KV
Transmission
Line From
Parkline to Hwy
140 Powerhouse CA CA04 -2,897 Completion
Contingency 3,101 Reallocation
Total
0
Note: See project data sheets for detailed project descriptions.
National Park Service FY 2024 Budget Justification
LRF-20
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 60.60
Planned Funding Fiscal Year (FY) 2024: $38,409,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Repair or Replace Docks at Fort Moultrie and Liberty Square
Project Number: GAOA ID #N106; NPS PMIS #318708A
Unit/Facility Name: Fort Sumter and Fort Moultrie National Historical Park
Region/Area/District: Southeast; IR 02
Congressional District: SC01
State: South Carolina
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
40130400 45989 70 1.00
40130400 45790 55 0.33
Project Description:
This project will replace the park’s dock at Fort Moultrie and repair the dock at Liberty Square. The dock at Fort
Moultrie provides administrative access for park operations and facilities at Sullivans Island that service Fort
Sumter. The project will also rehabilitate the dock at Liberty Square, which provides public ferry access from
downtown Charleston to Fort Sumter. Work on both docks will address deferred maintenance and repair needs while
improving safety and providing enhanced recreational use. The scope will include dredging as needed. New dock
heights and configurations will account for sea level rise, changing harbor traffic, and other coastal morphology
projections.
Scope of Benefits (SB):
These two docks operate together to provide visitor and administrative access to Fort Sumter, the park’s signature
resource. Liberty Square dock is the launching point for the concession ferry from downtown Charleston to Fort
Sumter. The Fort Moultrie dock provides access to Fort Sumter for administrative activities, law enforcement,
maintenance personnel, and equipment. Upgrades to the two docks will comply with the Architectural Barriers Act
Accessibility Standards (ABAAS).
Investment Strategy (IS):
Repairing the Liberty Square dock and replacing the dock at Fort Moultrie will ensure safe access to Fort Sumter
while reducing corrective maintenance. The completed project will facilitate annual inspections, accommodate the
concession vessels, create resiliency against increased wave action due to a deepened channel, promote safer
transitions during loading and unloading, and will enable significant mooring positioning efficiencies for vessels.
Investments in the annual cost of operation and maintenance will continue to be required throughout the lifecycle of
these facilities.
After project completion, the facilities and systems addressed by this project should not require major rehabilitation
or replacement for the next 50 to 75 years. This project is estimated to address $43.6 M of deferred maintenance and
repair needs.
Consequences of Failure to Act (CFA):
Malfunction of any of these docks could interrupt public access, facility maintenance work, and law enforcement
activities. Failure of the Fort Moultrie dock would pose significant operational challenges to park staff who travel
throughout the day between Fort Moultrie and Fort Sumter to maintain facilities, patrol and respond to incidents, and
provide visitor information. In 2022, the Fort Sumter dock provided access to 485,000 visitors and Fort Moultrie
National Park Service FY 2024 Budget Justification
LRF-21
dock served over 50,000 visitors. Failure of the dock at Fort Sumter could cause the park to suspend visitor access to
the park’s primary visitor attraction until repairs could be made.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.76
API Rating: n/a 62.50
API/FCI Score: (20%) 16.60
SB Score: (40%) 20.00
IS Score: (20%) 20.00
CFA Score: (20%) 10.00
Total Score: (100%) 66.60
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 06/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 36,873 96
Modernization/Renewal Work: $ 1,536 4
Divestiture Work $ 0 0
Total: $ 38,409 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 7,161
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 38,409
Future Funding to Complete Project: $ 0
Total: $ 45,570
Class of Estimate: C
Estimate Escalated to: FY 2025/Q2
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 3,906
LRF Design Funds Received: $ 3,255
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q3
Actual: N/A
National Park Service FY 2024 Budget Justification
LRF-22
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $168,100
Projected: $168,100
Net Change: $0
National Park Service FY 2024 Budget Justification
LRF-23
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 60.00
Planned Funding Fiscal Year (FY) 2024: $180,642,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Rehabilitate the North Rim and Roaring Springs Utility Systems
Project Number: GAOA ID #N109; NPS PMIS #318719A&B
Unit/Facility Name: Grand Canyon National Park
Region/Area/District: Intermountain; IR 08
Congressional District: AZ02
State: Arizona
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
40710300 99678 77 0.38
40710900 72271 70 1.00
40711200 107900 59 0.68
40711200 81703 47 0.75
40711200 79838 57 1.00
Project Description:
This project will address critical system deficiencies associated with the North Rim and Roaring Springs water,
wastewater, electrical, and communication systems, along with their associated equipment, components, and support
structures. Critical and obsolete aspects of these utility systems will be replaced and rehabilitated to meet code
requirements. These utility systems support visitor services and administrative operations.
Scope of Benefits (SB):
This project will replace and improve the utility system on the North Rim of Grand Canyon which has had up to
300,000 visitors. This includes water, wastewater, electrical, and communication systems that serve approximately
300 administrative residents who operate 280 park-owned buildings and concessioner services. These utility systems
are interrelated, so the successful operation of one system impacts others. The updated electrical lines will supply
the increased power need of the new water pumps and water treatment components. The water and wastewater line
replacements will reduce waterline losses and associated energy used to pump water to compensate for these line
losses. The communications lines will allow remote monitoring and control of these systems, which will improve
operational efficiency.
Investment Strategy (IS):
Most of the utility systems, facilities, and related structures have far exceeded their useful lifespan and are in an
advanced state of deterioration. As a result, these systems are inefficient and require regular emergency repair to
maintain a minimally acceptable operational condition. This project will replace high-priority, outdated, critical
system components that are beyond the point of cost-effective repair or rehabilitation.
North Rim construction logistics are difficult and expensive to execute. Simultaneously, replacing these related
systems in a closely coordinated effort will provide for a single construction mobilization, comprehensive
construction material purchasing and transport, and an organized sequence of excavation and backfilling. This will
enable the logical placement of new utility lines and allow for the development of more accurate as-built”
documentation to help future repairs to be executed without damaging adjacent lines during excavation.
National Park Service FY 2024 Budget Justification
LRF-24
After project completion, the utility system deficiencies addressed by this project will not require major
recapitalization or modernization for 40 to 50 years. This project is estimated to address $187.0 M of deferred
maintenance and repair needs.
Consequences of Failure to Act (CFA):
The electrical, wastewater, communications, and water distribution systems located at the North Rim are critical to
operations of that remote site. The systems are in an advanced state of deterioration, which will continue to
accelerate over time. Numerous power outages, wastewater spills, and water pipeline breaks have occurred over the
last few years due to the age and deteriorated condition of these systems, which lack the capacity to consistently
provide power, collect and treat wastewater, and deliver potable water to meet surge demands.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.51
API Rating: n/a 62.00
API/FCI Score: (20%) 20.00
SB Score: (40%) 20.00
IS Score: (20%) 20.00
CFA Score: (20%) 0.00
Total Score: (100%) 60.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 04/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 113,804 63
Modernization/Renewal Work: $ 66,838 37
Divestiture Work $ 0 0
Total: $ 180,642 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 33,679
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 180,642
Future Funding to Complete Project: $ 0
Total: $ 214,321
Class of Estimate: C
Estimate Escalated to: FY 2026/Q4
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 18,370
LRF Design Funds Received: $ 15,309
National Park Service FY 2024 Budget Justification
LRF-25
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2028/Q1
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $4,960,989
Projected: $4,960,989
Net Change: $0
National Park Service FY 2024 Budget Justification
LRF-26
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 69.00
Planned Funding Fiscal Year (FY) 2024: $21,300,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Replace Water and Wastewater Systems at Cinnamon and Trunk Bays
Project Number: GAOA ID #N119; NPS PMIS #201188A
Unit/Facility Name: Virgin Islands National Park
Region/Area/District: Southeast; IR 02
Congressional District: VIAL
State: Virgin Islands
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
0 252925 55 0.00
0 252924 55 0.00
40710300 241392 55 1.00
40710900 33351 88 1.00
35500400 33636 55 1.00
35500400 33490 55 0.63
40710300 33353 55 1.00
40710900 33532 78 1.00
Project Description:
This project demolishes and replaces the wastewater plant at Cinnamon Bay and the reverse osmosis (RO) water
plant at Trunk Bay to meet visitor capacity and Environmental Protection Agency (EPA) standards. The systems
will include automated controls and various distribution piping and valves. The RO treatment plant building at
Cinnamon Bay will also be replaced, including RO equipment, a supply well, and associated mechanical equipment.
Additional work at Cinnamon Bay includes tank rehabilitation or replacement, piping and valve replacement, brine
disposal, and demolition of an obsolete tank. At Trunk Bay, the project rehabilitates the septic system including
piping, septic tank, lift station, force main, and disposal system.
Scope of Benefits (SB):
The combination of these investments will support access and enjoyment of the park’s most highly visited beaches.
Trunk Bay is a day-use beach, and Cinnamon Bay hosts both day-use and overnight accommodations, including a
campground. Completion of this work will allow park visitors and local businesses to access and benefit from the
services provided through these water and wastewater utilities. Demolition and replacement of the deteriorated
plant, including various buildings and equipment, will eliminate significant amounts of deferred maintenance.
Following completion, the rehabilitated systems will be functional, reliable, sustainable, and efficient.
Investment Strategy (IS):
These utility system investments are needed to provide potable water and wastewater treatment.
Rebuilding these facilities will support park operations and allow fee collection to resume at Trunk Bay.
Constructing the Trunk Bay water plant replacement above the floodplain will also extend the lifecycle of
system components and protect them from storms and environmental elements. This project will allow the
park to maintain these systems through a regular cyclic maintenance schedule and significantly decrease
the frequency and expense of emergency and unscheduled repair work. After project completion, the
facilities and systems addressed by this project will not require major rehabilitation or replacement for the
National Park Service FY 2024 Budget Justification
LRF-27
next 35 to 40 years. This project is estimated to address $23.3 M of deferred maintenance and repair
needs.
Consequences of Failure to Act (CFA):
The wastewater system at Cinnamon Bay has failed and is beyond repair. The park has been trucking wastewater
several miles each day, over winding mountain roads to the municipal sewer system at the town of Cruz Bay; on
occasion the trucks have been ferried to the island of St. Thomas. Recent issues with the RO system at Cinnamon
Bay have required drinking water to be trucked in every day. The water system at Trunk Bay is beyond its useful life
and at high risk of failing again in a storm event due to its location in a flood prone area. As the additional
components of the systems continue to deteriorate, they become more prone to failure, requiring emergency repair
work that disrupts park operations. Defective and deteriorated equipment creates risks that the treated water
produced by the plants will not meet regulations, potentially creating liabilities for the park and impacting the visitor
experience. Eventually, visitors and campers may not have access to park amenities at Cinnamon Bay.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.79
API Rating: n/a 63.00
API/FCI Score: (20%) 19.00
SB Score: (40%) 40.00
IS Score: (20%) 10.00
CFA Score: (20%) 0.00
Total Score: (100%) 69.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled N/A Completed 11/2022
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 18,105 85
Modernization/Renewal Work: $ 2,982 14
Divestiture Work $ 213 1
Total: $ 21,300 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 3,701
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 21,300
Future Funding to Complete Project: $ 0
Total: $ 25,001
Class of Estimate: C
Estimate Escalated to: FY 2025/Q3
National Park Service FY 2024 Budget Justification
LRF-28
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 1,752
LRF Design Funds Received: $ 1,460
Planning Funds Received from Other Fund Sources: $ 489
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q3
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $154,312
Projected: $152,178
Net Change: -$2,134
National Park Service FY 2024 Budget Justification
LRF-29
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: N/A
Planned Funding Fiscal Year (FY) 2024: $25,000,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Maintenance Action Teams
Project Number: GAOA ID # N125; NPS PMIS # N/A
Unit/Facility Name: Maintenance Action Teams at Multiple Parks
Region/Area/District: Multiple
Congressional District: Multiple
State: Multiple
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
N/A N/A N/A N/A
Project Description:
In FY 2024, the NPS will use Maintenance Action Teams (MAT) to address deferred maintenance and repair needs
across multiple types of asset and parks. This builds on the FY 2021 and FY 2023 MAT projects in the Legacy
Restoration Fund program. Anticipated MAT work will address deferred maintenance and repair needs on trails,
buildings, utilities, cemeteries as well as other historic and non-historic assets. In addition to work at parks, NPS
will use MAT funding from FY 2021, 2023, and 2024 to complete projects at all NPS-administered national historic
and scenic trails with eligible assets.
Whenever possible, these projects will allow for staff training and hands-on educational opportunities, which
provide NPS personnel with skillsets that will last throughout their careers. The deteriorated condition of many
facilities is often the result of prior use of incompatible materials, attrition of skilled craftspeople, budget shortfalls,
and a failure to prioritize the asset’s need for preservation and recurring preventative maintenance. Upon completion
of MAT projects, facility staff will be better able to properly maintain park assets and critical systems, which will
help to extend the lifecycle of these assets and avoid the need for emergency repairs or rehabilitation.
Scope of Benefits (SB):
Maintenance activities performed by the MATs help to restore and protect administrative and public use facilities;
remediate assets in poor condition; reduce or eliminate deferred maintenance; and potentially reduce annual
operating costs. NPS staff will be instructed on proper preventative maintenance and repair techniques that will
enable them to responsibly care for these assets throughout their lifecycle.
MAT activities are also excellent partnering opportunities. A primary objective of the MAT program is to strengthen
relationships and enhance partnerships with targeted organizations so the NPS can increase the diversity of
candidate pools for employment and internship opportunities. These organizations include public land corps, youth
conservation corps, veterans’ groups, volunteers, and interns. The NPS is currently executing a strategy to facilitate
project scoping for MAT projects that are specifically targeted toward successful integration of these organizations.
Investment Strategy (IS):
Using the MATs in close coordination with field-based maintenance and preservation professionals throughout the
agency will further leverage the skills of our experienced workforce to train and develop the next generation of NPS
staff who will become the stewards of these assets. MAT coordinators will manage the program within an efficient
and cost-effective framework to rehabilitate high-priority assets and create long-term operational savings for parks
through implementation of responsible lifecycle asset management practices. These projects are estimated to address
up to $20.0 M of deferred maintenance and repair needs.
National Park Service FY 2024 Budget Justification
LRF-30
Consequences of Failure to Act (CFA):
Many NPS staff who have years of experience repairing and maintaining facilities are approaching the end of their
careers. The MAT program creates opportunities for these seasoned employees to pass along years of institutional
knowledge and skill to the next generation. It also provides cost-effective training and development experiences to
less tenured NPS staff while helping to repair and rehabilitate high-priority assets. If the MAT program is not
funded, experienced park staff may not have the opportunity before they retire, to share institutional knowledge and
experience with the next generation of facility management staff.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.00
API Rating: n/a 0.00
API/FCI Score: (20%) 0.00
SB Score: (40%) 0.00
IS Score: (20%) 0.00
CFA Score: (20%) 0.00
Total Score: (100%) 0.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: N/A
Value Engineering (VE) Study: Scheduled N/A Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance/Repair Work: $ 25,000 100
Modernization/Renewal Work: $ 0 0
Divestiture Work: $ 0 0
Total: $ 25,000 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 34,116
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 25,000
Future Funding to Complete Project: $ 0
Total: $ 59,116
Class of Estimate: N/A
Estimate Escalated to: N/A
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 0
LRF Design Funds Received: $ 0
Major Milestones
Construction Award/Start
Scheduled: N/A
Actual: N/A
National Park Service FY 2024 Budget Justification
LRF-31
Project Complete
Scheduled: N/A
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $0
Projected: $0
Net Change: $0
National Park Service FY 2024 Budget Justification
LRF-32
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 87.70
Planned Funding Fiscal Year (FY) 2024: $38,634,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Rehabilitate Seawalls and Shoreline Landscape - Phase II
Project Number: GAOA ID #N100; NPS PMIS #318722F
Unit/Facility Name: National Mall and Memorial Parks
Region/Area/District: National Capital; IR 01
Congressional District: DCAL
State: District of Columbia
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
40130400 94971 63 0.52
Project Description:
This project phase will continue rehabilitating portions of the failing West Potomac Park seawall. The existing stone
masonry seawall will be removed and reconstructed along the historic alignment and elevation. Designs will include
foundations that can bear the weight of additional stone and concrete, which will allow the walls to be extended
vertically in response to future sea level rise or increasing storm surge elevations. Where feasible, stone masonry
from the historic wall will be salvaged and reused in the reconstruction. The park will seek opportunities to realign
and connect existing pedestrian walkways to provide a seamless and accessible route to the rehabilitated seawall.
Scope of Benefits (SB):
By completing this project, the NPS will address significant high priority deferred maintenance and repair needs
while improving its ability to preserve, protect, and foster appreciation of the iconic memorials and landscapes
within West Potomac Park and along the Tidal Basin. NPS staff will spend less time on reactive maintenance such
as debris clean-up after high tides flow over the existing walls, monitoring and fencing the subsiding walkways atop
the wall, and replacing the iconic cherry blossom trees that are severely stressed or die when their root systems are
over-saturated by high tide waters. This project will also help protect public and private investments in the planning,
design, construction and operation of these iconic memorials.
Investment Strategy (IS):
The National Mall and Memorial Parks have bundled construction of seawall systems within West Potomac Park
and along the Tidal Basin to streamline project compliance and design activities, as well as reduce construction costs
and timelines. The seawalls will be reconstructed using current technology that provides for an extensive service life
while preserving the historic character. The new walls should not require significant repair or rehabilitation for 100
years. However, based on current projections, future investments will likely be needed to keep pace with sea level
rise. These combined improvements to the seawalls should enhance the NPS’ ability to maintain safe, accessible
outdoor spaces while also providing a level of protection to the existing monuments, infrastructure, grounds, and
memorials. This project is estimated to address $45.8 M of deferred maintenance and repair needs.
Consequences of Failure to Act (CFA):
Despite various repairs over the decades since their original construction, these seawall systems are not structurally
sound and can no longer protect the park against the destructive forces of the surrounding waterways, especially the
Potomac River. Without improvements, soil behind the wall will continue to erode, walkways will continue to
buckle, and the walls will continue to deteriorate. Water flowing over the walls and the lack of proper drainage will
continue to affect the wall, potentially impacting the historic landscape and visitor safety.
National Park Service FY 2024 Budget Justification
LRF-33
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.52
API Rating: n/a 71.50
API/FCI Score: (20%) 17.70
SB Score: (40%) 40.00
IS Score: (20%) 20.00
CFA Score: (20%) 10.00
Total Score: (100%) 87.70
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled N/A Completed 09/2022
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 38,634 100
Modernization/Renewal Work: $ 0 0
Divestiture Work $ 0 0
Total: $ 38,634 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 29,765
FY 2023 Legacy Restoration Fund Funding: $ 124,292
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 38,634
Future Funding to Complete Project: $ 0
Total: $ 192,691
Class of Estimate: B
Estimate Escalated to: FY 2026/Q2
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 15,491
LRF Design Funds Received: $ 14,274
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2028/Q2
Actual: N/A
National Park Service FY 2024 Budget Justification
LRF-34
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $212,720
Projected: $212,720
Net Change: $0
National Park Service FY 2024 Budget Justification
LRF-35
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 66.30
Planned Funding Fiscal Year (FY) 2024: $59,392,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Rehabilitate Building 107 and Demolish Hoosac Stores Warehouse Building - Phase II
Project Number: GAOA ID #N113; NPS PMIS #318750E
Unit/Facility Name: Boston National Historical Park
Region/Area/District: Northeast; IR 01
Congressional District: MA07
State: Massachusetts
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35600100 60342 82 1.00
Project Description:
This project continues rehabilitation of Building 107 and utility connections at the Charlestown Navy Yard. The
rehabilitated facility will house maintenance shops, offices, and meeting space for Boston National Historical Park
and the regional office. Work includes rehabilitation of the building’s interior for adaptive reuse. The buildings
interior walls, windows, building systems will be repaired or replaced; the floorplan will be reconfigured to
accommodate Park and Regional offices, operations, meeting spaces, and storage needs.
Scope of Benefits (SB):
Charlestown Navy Yard is one of the most popular sites along Boston’s Freedom Trail with over 1.5 million annual
visitors, and serves as the operational base for the National Parks of Boston. Rehabilitation of Building 107 is a key
step in achieving the Park’s Master Development Strategy (MDS). The Building 107 project will enable park offices
to consolidate into a central facility while allowing many of the vacated buildings to be prepared for rehabilitation
and leasing. Once the MDS is achieved, operation and maintenance costs for the National Parks of Boston will be
significantly reduced.
Investment Strategy (IS):
The Park has analyzed its space needs and revenue generating opportunities for its assets, including condition
assessments and cost estimates for future projects that would rehabilitate five vacant historic structures to prepare
them for leasing. The Park plans to transfer facility operation and maintenance responsibilities to the lessees. Once
the facilities are leased, the annual cost of operation and maintenance will be the lessee’s responsibility.
When rehabilitation work is completed at Building 107, the facilities and systems addressed by this project should
not require major rehabilitation or replacement for the next 50 years. This project is estimated to address $46.9 M of
deferred maintenance and repair needs.
Consequences of Failure to Act (CFA):
Building 107 is the keystone to the MDS. If the interior of Building 107 is not completed, National Parks of Boston
will not be able to consolidate and repurpose its footprint, expand leasing opportunities, and reduce cumulative
deferred maintenance and repair needs.
National Park Service FY 2024 Budget Justification
LRF-36
Ranking Categories:
Category Percent Score
FCI Rating: n/a 1.00
API Rating: n/a 61.00
API/FCI Score: (20%) 16.30
SB Score: (40%) 20.00
IS Score: (20%) 20.00
CFA Score: (20%) 10.00
Total Score: (100%) 66.30
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled N/A Completed 05/2022
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 11,283 19
Modernization/Renewal Work: $ 48,109 81
Divestiture Work $ 0 0
Total: $ 59,392 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 24,520
FY 2023 Legacy Restoration Fund Funding: $ 36,628
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 59,392
Future Funding to Complete Project: $ 0
Total: $ 120,540
Class of Estimate: B
Estimate Escalated to: FY 2026/Q3
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 12,231
LRF Design Funds Received: $ 12,289
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2027/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
National Park Service FY 2024 Budget Justification
LRF-37
Annual Operations & Maintenance Costs $
Current: $854,907
Projected: $315,761
Net Change: -$539,146
National Park Service FY 2024 Budget Justification
LRF-38
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 56.70
Planned Funding Fiscal Year (FY) 2024: $36,169,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Remove Excess Structures and Abandoned Buildings - Phase 2, and Address Deficient Utilities,
Historic Structures, and Visitor Facilities
Project Number: GAOA ID #N146; NPS PMIS #326119A
Unit/Facility Name: New River Gorge National Park and Preserve
Region/Area/District: Northeast; IR 01
Congressional District: WV01
State: West Virginia
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
0 244274 77 0.00
35100000 88116 77 1.00
35240200 3307 37 0.70
35240200 3227 65 0.57
35240200 87620 20 1.00
35240200 3220 65 0.56
35240200 3365 77 0.69
35290700 3265 65 0.60
35291800 3290 30 1.00
35300200 50098 100 1.00
35300200 87590 43 0.89
35300200 87696 31 1.00
35300200 87698 31 1.00
35300200 87694 80 1.00
35410100 3361 40 0.94
35410500 87705 31 0.94
35410500 87702 31 1.00
35410500 99932 31 1.00
35410500 87585 20 1.00
35410500 88103 31 1.00
35410500 87692 80 1.00
35410500 3359 77 0.88
35410500 87710 46 0.95
35410500 87604 20 1.00
35410500 87598 23 1.00
35410500 3366 77 1.00
35410500 97097 31 1.00
35410500 12186 47 0.86
35410500 87581 20 1.00
35410500 87652 80 0.91
35410500 88104 23 1.00
35410500 12188 46 0.98
35410500 88105 31 1.00
35410500 87713 31 1.00
35410500 87691 80 1.00
National Park Service FY 2024 Budget Justification
LRF-39
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35410500 12187 40 0.95
35410500 87711 31 1.00
35410500 87708 80 1.00
35410500 87583 20 1.00
35410500 87599 23 1.00
35410500 87582 20 1.00
35410600 87630 0 0.98
35500200 87704 80 0.31
35500500 3362 40 0.66
35600100 3360 13 0.55
35600100 3262 52 0.48
35800500 87584 20 1.00
35800500 237310 12 1.00
40130400 3372 90 1.00
40710300 236239 79 0.00
40710300 88877 57 0.71
40710300 88878 50 0.72
40710300 86390 65 0.49
40710900 86912 88 0.32
40710900 88879 88 0.23
40710900 111100 68 0.41
40710900 111097 57 0.41
40710900 88881 73 0.37
40710900 111099 57 0.41
40710900 111098 57 0.41
40750300 3371 72 0.28
40780200 88106 12 1.00
Project Description:
This project will rehabilitate historic and recreational assets in high-visitation areas, rehabilitate utilities, water and
wastewater systems at several sites, and demolish numerous excess buildings and structures. High priority historic
structures located in the Thurmond Historic District including the National Bank of Thurmond, Goodman-Kincaid
Building, Mankin-Cox building, McClung House, McGuffin House, and Lipscomb House will receive varying
levels of stabilization, repair, and rehabilitation. Work will correct code compliance issues, improve accessibility
and visitor experience, provide potable water to visitors and staff, and protect the New River watershed. Investments
will also be made in utility infrastructure and visitor use facilities. Repairing and restoring critical building systems,
including roof, heating, ventilation, and air conditioning systems, fire alarm and security systems, exterior and
interior features, exterior building envelopes, and surrounding grounds will make costly emergency repairs less
frequent, reduce utility bills, and correct longstanding deficiencies on high-priority assets.
Scope of Benefits (SB):
This project addresses deficiencies associated with these historic buildings including structural stabilization and
enhancing accessibility, safety, and security. Staff and visitor safety will be improved through updating of fire alarm
and security systems. Completion of this project will provide for the health and safety of park visitors and staff as
well as protecting the park’s natural resources by remediating backlog deferred maintenance and repair needs
associated with critical systems, including water and wastewater utilities, and addressing code compliance and
accessibility issues throughout these facilities.
Investment Strategy (IS):
Demolition of deteriorating and excess structures will allow the park to focus cyclic maintenance efforts on assets,
which better serve park operations and the public. The park has continually struggled to maintain outdated utility
systems, restrooms, high-use areas and historic structures — this project will make these facilities safe and available
National Park Service FY 2024 Budget Justification
LRF-40
for visitor use and enjoyment. Operations and maintenance costs may be reduced by utilizing sustainable building
materials and more efficient systems. Replacing mechanical systems controls will improve the energy efficiency.
Replacement of systems that are beyond their useful lives will reduce unscheduled maintenance and repair costs.
After project completion, the utility system deficiencies addressed by this project will not require major
recapitalization or modernization for 40 to 50 years. This project is estimated to address $45.0 M of deferred
maintenance and repair needs.
Consequences of Failure to Act (CFA):
Vacant and deteriorated structures that are not demolished will remain attractive nuisances, posing safety hazards,
remaining subject to rampant vandalism, and continuing to decay. Failure to address the deficiencies associated with
outdated utility systems may require more frequent and costly repairs. Failure to address the critical deficiencies
associated with the historic assets will result in continued and accelerated deterioration, potentially requiring more
frequent repairs and causing permanent loss of historic fabric.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.65
API Rating: n/a 49.00
API/FCI Score: (20%) 16.70
SB Score: (40%) 20.00
IS Score: (20%) 20.00
CFA Score: (20%) 0.00
Total Score: (100%) 56.70
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 09/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 31,467 87
Modernization/Renewal Work: $ 1,447 4
Divestiture Work $ 3,255 9
Total: $ 36,169 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 5,442
FY 2023 Legacy Restoration Fund Funding: $ 1,237
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 36,169
Future Funding to Complete Project: $ 0
Total: $ 42,848
Class of Estimate: C
Estimate Escalated to: FY 2026/Q1
National Park Service FY 2024 Budget Justification
LRF-41
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 2,272
LRF Design Funds Received: $ 3,170
Major Milestones
Construction Award/Start
Scheduled: FY 2025/Q1
Actual: N/A
Project Complete
Scheduled: FY 2027/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $672,100
Projected: $584,351
Net Change: -$87,749
National Park Service FY 2024 Budget Justification
LRF-42
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 76.60
Planned Funding Fiscal Year (FY) 2024: $25,625,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Rehabilitate Hangars 3 and 4 at Floyd Bennett Field
Project Number: GAOA ID#N126; NPS PMIS #308504A
Unit/Facility Name: Gateway National Recreation Area
Region/Area/District: Northeast; IR 01
Congressional District: NY08
State: New York
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35600100 42330 69 1.00
Project Description:
This project will rehabilitate Hangars 3 and 4 to restore their original appearance, similar to the adjacent Hangars 1
and 2. Rehabilitation work will include exterior building envelope repairs to masonry and flashing, rehabilitation of
the hangar doors, fenestration repair and replacement, installation of new and accessible interior restrooms, and
interior building finishes. The project also includes replacement of mechanical, electrical, plumbing, and lighting
systems; complete roof system replacement; and replacement of exterior hardscape. The project will also include a
new fire detection, alarm, and suppression system.
Scope of Benefits (SB):
The building, known as Hangars 3 and 4, was originally constructed between 1929-1936. It remains essentially
unaltered since its construction, but has been abandoned and neglected in recent years. Rehabilitation of the building
would restore and preserve a historic structure considered significant for its time period. Not only is the building
representative of commercial aviation architecture from the art deco era, but it is also one of several, almost identical
hangar buildings that collectively contribute to the character of the surrounding Floyd Bennett Field National
Register Historic District. Updating utilities and restoring the exterior shell will provide the National Park Service
with an accessible and structurally stable historic structure.
Investment Strategy (IS):
Rehabilitation of this structure makes it available and more viable for long-term leasing opportunities. Potential
lessees would not only occupy and pay rent for the space, but they would also be required as part of their lease
contract to perform routine operations and maintenance of the structure and its immediate surroundings. The parks
2014 General Management Plan recommended preservation of the hangar along with other nationally significant
cultural and historical assets located in the surrounding National Register District.
After project completion, the building deficiencies addressed by this project will not require major recapitalization
or modernization for 40 to 50 years. This project is estimated to address $30.0 M of deferred maintenance and repair
needs.
Consequences of Failure to Act (CFA):
If left in its deteriorated state, the facility presents no opportunity for educational, recreational, or leasing
opportunities, and not positively contribute to the visitor experience. Site conditions in and around the facility would
remain unsafe, preventing the park from fully leveraging the building for new lease revenue. This vacant, yet
historically significant asset would continue to deteriorate and potentially increase the costs of future renewal efforts
or become unusable.
National Park Service FY 2024 Budget Justification
LRF-43
Ranking Categories:
Category Percent Score
FCI Rating: n/a 1.00
API Rating: n/a 69.00
API/FCI Score: (20%) 6.60
SB Score: (40%) 40.00
IS Score: (20%) 20.00
CFA Score: (20%) 10.00
Total Score: (100%) 76.60
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled 09/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 10,250 40
Modernization/Renewal Work: $ 15,375 60
Divestiture Work $ 0 0
Total: $ 25,625 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 4,778
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 25,625
Future Funding to Complete Project: $ 0
Total: $ 30,403
Class of Estimate: C
Estimate Escalated to: FY 2025/Q4
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 2,606
LRF Design Funds Received: $ 2,172
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
National Park Service FY 2024 Budget Justification
LRF-44
Annual Operations & Maintenance Costs $
Current: $311,257
Projected: $285,767
Net Change: -$25,490
National Park Service FY 2024 Budget Justification
LRF-45
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 69.20
Planned Funding Fiscal Year (FY) 2024: $11,800,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Rehabilitate Urban Recreation Areas
Project Number: GAOA ID #N127; NPS PMIS #326240A
Unit/Facility Name: National Capital Parks-East
Region/Area/District: National Capital; IR 01
Congressional District: DCAL
State: District of Columbia
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35230900 18255 48 0.18
35240100 18269 35 0.22
35240100 18509 35 0.86
35240100 18510 35 0.99
35240100 18511 35 0.62
40750300 20574 77 0.04
40750300 18616 45 0.73
40750300 20968 75 0.39
40750300 21260 75 0.08
40750300 20952 64 0.59
40800000 18352 60 1.00
35291100 18258 58 0.03
Project Description:
This project will address deficiencies in urban recreation areas throughout National Capital Parks-East. Tennis and
basketball courts, playgrounds, picnic pavilions, skating rink, and Mission 66 comfort stations, along with features,
such as fencing and lighting, will be replaced or rehabilitated at Anacostia, Fort Dupont, Kenilworth, Battery
Rickets, River Terrance Park, Randall Circle, Alabama Avenue, Fort Stanton, and D.C. Recreation Center. The
infrastructure and landscape in the Parkland Area of Shepherd Parkway will be rehabilitated to accommodate a wide
range of events and recreational opportunities.
Scope of Benefits (SB):
This project addresses high-priority deferred maintenance and repair needs of critical and non-critical systems.
Many of the sites included in this project are utilized by local District of Columbia (D.C.) residents for recreation,
including tennis, basketball, picnics, and children’s playgrounds. Visitation at many of these park facilities is
primarily from local, underserved communities. Anacostia Park, Shepherd Parkway, and Fort Dupont Park are in
Wards 7 and 8 in Washington, D.C., with 145,000 ward residents. The total combined annual visitation at Anacostia
Park, Shepherd Parkway, and Fort Dupont is approximately 900,000. Investments in these parks will impact the
quality of life for the residents in communities they serve.
Investment Strategy (IS):
When completed, the project will address most of the deferred maintenance and repair needs at several parks.
Recapitalization of the numerous assets described herein will return them to acceptable condition, reestablish the
lifecycle of the components, and support continued visitor use and services.
National Park Service FY 2024 Budget Justification
LRF-46
The facility improvements described above would represent a significant investment in park visitors by allowing
them to continue their recreational use and enjoyment of these places. In addition, these improvements will result in
greater use of facilities, and therefore, permit fee revenue that will be used to further support visitor use.
The system deficiencies addressed by this project will not require major recapitalization or modernization for
approximately 20 to 25 years. This project is estimated to address $9.5 M of deferred maintenance and repair needs.
Consequences of Failure to Act (CFA):
If no action is taken, the tennis and basketball courts will continue to deteriorate or present risks to visitors, and the
park may eventually need to close the courts to public recreation for safety reasons. Failing to rehabilitate the picnic
pavilions and comfort stations will result in the continued deterioration of these facilities Poor health and safety
conditions, as well as increased visitor complaints and dissatisfaction, will continue.
Unhealthy trees and stumps will continue to pose safety risks. Outdated and failing playground surfaces and
equipment pose a safety risk for families. Deterioration of hardscapes will continue to impede the safe travel of
visitors. Poor signage in the Parkland Area will continue to cause confusion for visitors and fail to alleviate their
safety concerns. Other features and amenities, such as fences, lamp posts, benches, trash receptacles, and community
kiosks will continue to deteriorate without rehabilitation or replacement.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.45
API Rating: n/a 71.33
API/FCI Score: (20%) 19.20
SB Score: (40%) 40.00
IS Score: (20%) 10.00
CFA Score: (20%) 0.00
Total Score: (100%) 69.20
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 03/2024 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 5,300 45
Modernization/Renewal Work: $ 6,500 55
Divestiture Work $ 0 0
Total: $ 11,800 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 6,527
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 11,800
Future Funding to Complete Project: $ 28,000
Total: $ 46,327
Class of Estimate: C
Estimate Escalated to: FY 2026/Q1
National Park Service FY 2024 Budget Justification
LRF-47
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 3,560
LRF Design Funds Received: $ 2,967
Major Milestones
Construction Award/Start
Scheduled: FY 2025/Q3
Actual: N/A
Project Complete
Scheduled: FY 2027/Q3
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: NO
Annual Operations & Maintenance Costs $
Current: $104,549
Projected: $139,844
Net Change: -$705
National Park Service FY 2024 Budget Justification
LRF-48
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 79.90
Planned Funding Fiscal Year (FY) 2024: $62,533,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund
Project Identification
Project Title: Rehabilitate Water and Wastewater Systems at Furnace Creek and Cow Creek
Project Number: GAOA ID #N128; NPS PMIS #318717A
Unit/Facility Name: Death Valley National Park
Region/Area/District: Pacific West; IR 10
Congressional District: CA03
State: California
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
0 255992 56 0.00
0 251824 53 0.00
0 249566 59 0.00
35500200 110985 52 0.13
35500500 63681 53 0.95
40660100 103950 30 0.00
40710300 47989 83 0.50
40710300 51674 78 0.55
40710900 51466 83 0.81
40710900 60185 67 0.75
40750100 51691 50 0.36
40750300 56466 75 0.84
40760200 108214 33 0.99
Project Description:
This project will rehabilitate, replace, and upgrade various components of the water and wastewater system in the
Furnace Creek and Cow Creek areas. Wastewater system work will include replacing service laterals, correcting
pressured force mains and gravity sewer mains, as well as repairing or replacing the manholes and pump stations.
Lagoon improvements will include repairs and upgrades to improve capacity.
Water system work at Cow Creek will consist of developing a new well, reconstructing the reverse osmosis
building, upgrading the control system and air quality monitoring equipment, installing a generator and security
fence, and rehabilitation of the non-potable system in the housing area. At the Furnace Creek water system, the
project will include rehabilitating reservoir access hatch and internal stairs, constructing a chlorination building, and
replacing well pumps. Deficiencies with distribution piping and appurtenances will also be addressed.
Scope of Benefits (SB):
Furnace Creek is the park’s primary developed area, which is used by nearly all of the park’s 1.7 million annual
visitors, as well as over 1,100 residents of Cow Creek, the park concessioner, and the Timbisha Shoshone Tribe. The
Cow Creek system, located three miles from Furnace Creek, serves as the park’s primary housing and administrative
center that includes extensive visitor use facilities, administrative buildings, along with buildings and areas used by
park partners.
The Furnace Creek and Cow Creek utility systems are deteriorated and have capacity issues. These investments will
meet state regulations and will ensure operational reliability of the water and wastewater system. Infrastructure
improvements will address the flow violation notices issued by the Lahontan Regional Water Quality Control Board
(LRWQCB) and will include remote system monitoring and controls to ensure compliance with regulations for
National Park Service FY 2024 Budget Justification
LRF-49
monitoring and reporting for public utilities. These systems will also be sized with adequate capacity to support
significant increases in park visitation, which are expected to continue, and to accommodate potential future
increases in park support facilities at these sites.
Investment Strategy (IS):
Completing this work will resolve the deferred maintenance and repair needs for these utility systems.
Improvements will allow the park to perform recurring preventative and cyclic maintenance on a predictable
schedule, which will enhance operational reliability. Although there will be a modest increase in scheduled
operational and maintenance expenses, the upgrades will reduce the frequency and expense of unscheduled and
emergency system repairs.
After project completion, the utility system deficiencies addressed by this project will not require major
recapitalization or modernization for 40 to 50 years. This project is estimated to address $64.9 M of deferred
maintenance and repair needs.
Consequences of Failure to Act (CFA):
Service interruptions associated with these aging and failing water utilities should be resolved to prevent risks to
employee and visitor safety issues in the park’s harsh desert environment. Emergency wastewater line breaks have
increased in frequency and severity as these systems continue to deteriorate, and repairs often require park staff to
work in extreme heat conditions that can present a serious occupational safety hazard. Steep, unstable slopes and
lack of testing platforms or adequate lighting at the wastewater lagoons also create potential safety hazards for utility
staff.
As the condition of these assets continues to diminish, the park diverts an increasing amount of regular staff time
from scheduled maintenance activities to resolve unanticipated failures and system outages, incurring overtime
expenses, costs for port-a-potty rentals, and expenses for renting equipment to make repairs.
Without improvements, the systems do not comply with regulatory monitoring and reporting requirements for public
utility systems, and the park will continue to be cited for flow violations by the LRWQCB. If visitation continues to
increase or new infrastructure is added, the limited capacity of these systems could impact the park’s ability to
provide potable and fire suppression water to all users.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.19
API Rating: n/a 59.38
API/FCI Score: (20%) 19.90
SB Score: (40%) 40.00
IS Score: (20%) 20.00
CFA Score: (20%) 0.00
Total Score: (100%) 79.90
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled N/A Completed 10/2022
National Park Service FY 2024 Budget Justification
LRF-50
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 0 0
Modernization/Renewal Work: $ 62,533 100
Divestiture Work $ 0 0
Total: $ 62,533 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 9,710
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 62,533
Future Funding to Complete Project: $ 0
Total: $ 72,243
Class of Estimate: B
Estimate Escalated to: FY 2025/Q4
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 5,296
LRF Design Funds Received: $ 4,414
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $1,228,701
Projected: $1,248,893
Net Change: +$20,192
National Park Service FY 2024 Budget Justification
LRF-51
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 67.00
Planned Funding Fiscal Year (FY) 2024: $31,860,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Rehabilitate Facilities on Manitou Islands
Project Number: GAOA ID #N129; NPS PMIS #318729A
Unit/Facility Name: Sleeping Bear Dunes National Lakeshore
Region/Area/District: Midwest; IR 03
Congressional District: MI01
State: Michigan
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35240100 2173 69 0.95
35290800 1868 82 0.09
35300200 1832 85 0.60
35300200 1825 92 0.34
35300200 1851 92 0.08
35300200 1848 92 0.26
35300200 1830 92 0.70
35300200 1827 92 0.19
35300200 1819 92 0.58
35300200 1824 92 0.47
35300200 1831 92 0.43
35300200 1849 92 0.90
35300200 1826 92 0.72
35600100 2137 63 0.22
35600100 1838 52 0.15
35730100 1883 80 0.02
35800800 86028 31 0.11
35800800 98498 52 1.00
35800800 1870 69 1.00
35800800 1860 52 0.43
35800800 1878 50 0.40
35800800 1874 50 0.14
35800800 1829 50 0.18
35800800 99883 80 1.00
35800800 99884 40 1.00
35800800 108267 40 0.21
35800800 1886 80 0.93
35800800 1884 80 0.40
35800800 1981 70 0.56
35800800 1879 50 0.13
35800800 1881 31 0.08
35800800 1872 72 0.27
35800800 45293 31 0.29
35800800 86019 50 0.92
35800800 51745 50 0.16
35800800 1861 52 1.00
National Park Service FY 2024 Budget Justification
LRF-52
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35800800 1859 40 1.00
35800800 1885 72 0.62
35800800 1877 50 0.17
35800800 49948 31 1.00
35800800 51620 40 0.63
35800800 2135 50 0.16
35800800 49936 41 0.20
40130400 1855 69 1.00
40130400 1853 69 1.00
40710300 2160 80 1.00
40710300 1951 80 0.87
40711200 1971 60 1.00
40711200 39063 71 1.00
40750100 1806 20 0.73
40750300 46750 75 0.23
40750300 99861 70 1.00
40750300 1957 30 0.09
40750300 1966 40 1.00
40750700 229008 40 1.00
Project Description:
This project includes rehabilitation of historic structures, utilities, and marinas on South and North Manitou Islands.
Housing rehabilitation efforts will include building envelopes, utilities, tanks, and drain fields. In addition, efforts to
renew administrative structures and meet code requirements will include repair and replacement of obsolete exterior
components, utilities, fixtures, foundations, and historic features. Where necessary, the project will abate hazardous
materials and carry out selective demolition. Utility systems will be rehabilitated and obsolete systems replaced.
This will include water, wastewater, fuel, and electrical power system components.
The marina systems will be rehabilitated during this project. Components of the dock’s structure and the jib crane
will be selectively replaced or relocated as appropriate. Landscape features, camp sites, and interpretive media will
also be repaired or replaced.
Scope of Benefits (SB):
Correcting serious problems with the docks through this project are expected to address current litigation between
the park and ferry concessionaire. Redesign, replacement, and relocation of the docks will reduce or eliminate the
frequency of dredging and repairs and will enhance visitor safety and access to park features. Rehabilitation of
structures and landscape features will ensure availability and safety, as well as enhance visitor enjoyment and
improve park operations. Preserving historic properties and landscapes on the islands will help retain and even
improve their historical, cultural, or architectural value.
Investment Strategy (IS):
This project leverages a single, significant investment to address multiple needs in a logistically challenging area of
the park. Rather than accomplishing multiple sections of work through a variety of smaller contracting actions, this
project will address several high priority needs in a single effort. The single greatest cost factor for island projects is
construction mobilization. Bundling work together into a single project will reduce overhead costs associated with
design, compliance, and mobilization in this remote location.
After project completion, the deficiencies addressed by this project will not require major recapitalization or
modernization for 40 to 50 years. This project is estimated to address $37.8 M of deferred maintenance and repair
needs.
National Park Service FY 2024 Budget Justification
LRF-53
Consequences of Failure to Act (CFA):
If deficiencies are not addressed as described above, these assets will continue to deteriorate, potentially increasing
the cost of repairs or resulting in the loss of assets. Until a major reinvestment is made to bring the assets up to
modern codes, the docking structures on each island will continue to lack compliance with accessibility standards.
In addition to the ongoing maintenance costs of the assets themselves, the dock’s current design and condition
requires annual dredging. High water levels and the current dock’s design intermittently compromise visitor and
staff access, and wave action is damaging the structure. The ferry boat concession suspended operations in 2020 due
to the risks posed by the dock’s condition and the park expects conditions to continue deteriorating.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.62
API Rating: n/a 62.89
API/FCI Score: (20%) 17.00
SB Score: (40%) 40.00
IS Score: (20%) 10.00
CFA Score: (20%) 0.00
Total Score: (100%) 67.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 04/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Perce
nt
Maintenance Work: $ 10,832 34
Modernization/Renewal Work: $ 21,028 66
Divestiture Work $ 0 0
Total: $ 31,860 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 5,544
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 31,860
Future Funding to Complete Project: $ 0
Total: $ 37,404
Class of Estimate: C
Estimate Escalated to: FY 2026/Q1
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 3,024
LRF Design Funds Received: $ 2,520
National Park Service FY 2024 Budget Justification
LRF-54
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2027/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $517,630
Projected: $498,503
Net Change: -$19,127
National Park Service FY 2024 Budget Justification
LRF-55
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 89.50
Planned Funding Fiscal Year (FY) 2024: $179,661,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Rehabilitate El Portal Wastewater Treatment Facility and Administrative Camp
Project Number: GAOA ID #N130; NPS PMIS #196416A
Unit/Facility Name: Yosemite National Park
Region/Area/District: Pacific West; IR 10
Congressional District: CA05
State: California
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
0 255168 100 0.00
0 255169 100 0.00
0 255164 100 0.00
0 255165 100 0.00
0 255163 100 0.00
0 255166 100 0.00
0 255167 100 0.00
0 255170 100 0.00
35500200 109248 57 0.32
35500400 12723 100 1.00
35500400 12722 100 1.00
35500400 12724 100 0.33
35500400 12721 100 0.29
35801100 9598 23 0.95
40710300 6304 88 0.56
40710900 6299 100 0.63
40711200 6588 100 0.17
40750300 8469 21 0.91
40760100 11228 23 0.91
Project Description:
This project will rehabilitate the 45-year-old El Portal wastewater treatment plant, the largest in the NPS, and the
sole wastewater treatment service for the Yosemite Valley, El Portal, and adjacent communities, treating up to one
million gallons per day. The existing facility features an undersized two-story arrangement with limited access
points and failing systems. It is not feasible to modify the existing plant to accommodate required improvements to
lab and office space, make room for more effective treatment process infrastructure, or provide adequate space for
system operation and maintenance activities.
Proposed plant modifications and improvements will address an extensive list of deficiencies to resolve insufficient
treatment capacity in the primary and secondary clarifiers. System redundancy will be provided in addition to
upgrades to process automation components. Replacement components are difficult to procure or are no longer
manufactured due to the age of the existing plant, resulting in the need to fully replace the electrical service,
switchgear, motor control center, and distribution systems. This project scope also includes demolition of obsolete
buildings and infrastructure.
This project will also rehabilitate the former El Portal administrative camp to be used as RV sites for construction
workforce housing and a contractor staging area. NPS plans to rehabilitate or replace infrastructure and utility
National Park Service FY 2024 Budget Justification
LRF-56
systems to support the RV sites. NPS will implement its best practices for RV-based campground design to arrange
the RV sites to improve natural and cultural resource protection.
Scope of Benefits (SB):
The El Portal Wastewater Treatment Plant provides sanitary treatment of wastewater generated from NPS operations
and visitor services within Yosemite Valley and El Portal area, which is essential to four million annual visitors and
700 El Portal residents and the park, concession, and partner employees who work in El Portal. The treatment plant
is located about 125 feet from the Merced River, which has Wild and Scenic designation and protection.
This project aligns with Departmental and bureau strategic goals by addressing health and safety concerns,
complying with federal and state regulations, promoting sustainability, and ensuring fiscal responsibility.
Investment Strategy (IS):
This project will return a high-priority facility to an acceptable condition, extending its lifecycle and ensuring its
operation can be financially sustained with park base funding and reimbursements from concessions and other non-
NPS users.
More modern systems will likely lead to an increase in the park’s scheduled operational and maintenance burden,
but the increased reliability will reduce the frequency and expense of unscheduled and emergency repairs and allow
for uninterrupted utility operations. Outdated and inefficient equipment and system components will be replaced and
upgraded where required to meet current codes. The project also improves remote system monitoring and control,
allowing plant operators to check and evaluate flow rate changes and other system dynamics, and to make timely
adjustments to prevent overflows. After project completion, the facilities and systems addressed by this project
should not require major recapitalization or modernization for another 50 years. This project is estimated to address
$365.2 M of deferred maintenance and repair needs.
Rehabilitation of the former El Portal trailer court to use as construction staging and a contractor RV sites for the
duration of the project will result in significant savings from the high costs associated with contractor lodging and
greater productivity due to decreased commute time.
Consequences of Failure to Act (CFA):
Without these investments, the plant will continue to operate inefficiently and unreliably, placing the park at risk of
not complying with more stringent discharge standards in 2024, potentially resulting in fines from regulatory
agencies. As the system continues to deteriorate, equipment failures will continue, creating potential health and
safety risks as well as code violations. Severe breakdowns that require extensive emergency repairs could cause the
plant to be entirely unable to provide wastewater treatment to this area of the park. Risks of overflows could also
increase, placing downstream users at potential risk of encountering or using contaminated water. Severe overflows
could require the Wild and Scenic Merced River to close to visitors and pose risks to residents.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.64
API Rating: n/a 84.84
API/FCI Score: (20%) 19.50
SB Score: (40%) 40.00
IS Score: (20%) 20.00
CFA Score: (20%) 10.00
Total Score: (100%) 89.50
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled N/A Completed 09/2021
National Park Service FY 2024 Budget Justification
LRF-57
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 3,593 2
Modernization/Renewal Work: $ 170,678 95
Divestiture Work $ 5,390 3
Total: $ 179,661 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 35,377
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 179,661
Future Funding to Complete Project: $ 0
Total: $ 215,038
Class of Estimate: B
Estimate Escalated to: FY 2026/Q1
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 18,271
LRF Design Funds Received: $ 15,226
Planning Funds Received from Other Fund Sources: $ 1,880
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2027/Q2
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $5,982,111
Projected: $6,540,074
Net Change: +$557,963
National Park Service FY 2024 Budget Justification
LRF-58
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 98.90
Planned Funding Fiscal Year (FY) 2024: $41,662,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Repair Historic Walls of Park Fortifications
Project Number: GAOA ID #N131, NPS PMIS #317505A
Unit/Facility Name: San Juan National Historic Site
Region/Area/District: Southeast; IR 09
Congressional District: PRAL
State: Puerto Rico
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
40800000 236978 87 0.02
40800000 236990 87 0.02
40800000 242494 87 0.05
40800000 242503 87 0.05
40800000 242498 87 0.02
40800000 236950 87 0.01
40800000 242495 87 0.04
40800000 66166 100 0.11
40800000 242506 87 0.05
40800000 242496 87 0.04
40800000 236986 87 0.04
40800000 230958 87 0.05
40800000 242499 87 0.05
40800000 242500 87 0.10
40800000 66172 100 0.11
40800000 242507 87 0.05
40800000 236955 87 0.02
40800000 66174 100 0.03
40800000 242492 87 0.04
Project Description:
This project will repair critical sections of the historic masonry retaining walls of park fortifications, including
addressing hidden voids and failing historic drains. Prior to repair work, specific deficiencies will be identified by
analysis of test samples and surveying by ground-penetrating radar. Work areas will include temporary safety
features to protect visitors in public areas below the walls.
Scope of Benefits (SB):
San Juan National Historic Site is the only National Park unit on the island of Puerto Rico. It was designated as a
World Heritage Site in 1983. The historic walls of the city extend over 2.7 miles and include three forts (El Morro,
San Cristobal, and El Cañuelo).
This project will stabilize the retaining walls, which will by extension preserve and support adjacent structures and
infrastructure within the historic city. Erosion and voids behind the walls, caused by storm drain failure or other
water infiltration, threaten to cause destabilization or collapse. Large sink holes and internal cavities are present in
many areas of the historic walls. These unstable structures can endanger park visitors and nearby residents. When
tropical rains generate significant surface water, collapsing earth affects the surrounding commercial areas, which
National Park Service FY 2024 Budget Justification
LRF-59
are essential to the local community. This project will address the issue by restoring structural stability to the historic
fortifications.
Investment Strategy (IS):
This project’s objective is to correct deferred maintenance and repair needs prior to localized structural failure and
potential collapse of the park’s primary cultural resources. The cost of these proactive repairs is likely an order of
magnitude less expensive than reconstruction of collapsed areas. These repairs, unlike reconstruction work, will also
avoid disruption to the historic appearance of long, uniform wall sections. As the walls stabilize and protect the
municipal and private property behind them, the repairs will avoid the potential cost of claims associated with a
structural failure.
After project completion, the historic masonry retaining walls addressed by this project should not require major
rehabilitation or replacement for the next 40 to 50 years. This project is estimated to address $49.4 M of deferred
maintenance and repair needs.
Consequences of Failure to Act (CFA):
Without action, sections of these National Historic Landmark walls are likely to collapse. The buildings and
infrastructure sited above and supported by these walls could also be damaged by a partial collapse or structural
failure.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.06
API Rating: n/a 89.05
API/FCI Score: (20%) 18.90
SB Score: (40%) 40.00
IS Score: (20%) 20.00
CFA Score: (20%) 20.00
Total Score: (100%) 98.90
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 02/2024 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 41,662 100
Modernization/Renewal Work: $ 0 0
Divestiture Work $ 0 0
Total: $ 41,662 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 7,768
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 41,662
Future Funding to Complete Project: $ 0
Total: $ 49,430
National Park Service FY 2024 Budget Justification
LRF-60
Class of Estimate: C
Estimate Escalated to: FY 2026/Q1
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 4,237
LRF Design Funds Received: $ 3,531
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q3
Actual: N/A
Project Complete
Scheduled: FY 2027/Q3
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $3,112,545
Projected: $3,112,545
Net Change: $0
National Park Service FY 2024 Budget Justification
LRF-61
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 57.40
Planned Funding Fiscal Year (FY) 2024: $33,599,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Rehabilitate Water Treatment System
Project Number: GAOA ID #N132, NPS PMIS #326181A
Unit/Facility Name: Hawaii Volcanoes National Park
Region/Area/District: Pacific West; IR 12
Congressional District: HI02
State: Hawaii
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35410300 21501 88 1.00
35410300 21502 88 0.81
35500500 21491 90 1.00
40710300 38689 90 0.32
40710300 40178 90 0.28
40710300 21513 90 0.03
40710300 40177 90 0.28
40710300 21516 90 0.24
40710300 22273 90 0.30
40800000 97131 40 1.00
Project Description:
This project will rehabilitate the park’s only potable water system, including historic rain shed structures that have
been in operation since 1924. The rain sheds are integral to park operations, as they provide the sole source of
potable water to serve more than two million visitors, park staff, concessionaires, and partners. Rehabilitation of the
rainwater harvesting components of this system includes replacement of roofs, siding, gutters, structural repairs, as
well as electrical and seismic upgrades. This project will also rehabilitate or replace water lines, sand filters, fencing,
and storage tanks for raw and treated water. Lastly, improvements to the chemical treatment building are needed to
ensure water processing can meet current and future regulatory requirements.
Scope of Benefits (SB):
This water system was built over the course of time through a series of small-scale efforts. Completing this more
comprehensive project will ensure that an integrated water treatment system will provide lasting improvements to
the efficacy of water processing and delivery. Many components will have similar design life after installation,
allowing the park to establish a predicable cyclic maintenance schedule rather than responding to unscheduled issues
as they occur. The rehabilitated water system will serve approximately 1.5-2 million visitors each year in visitor-
facing facilities, including a hotel and two restaurants and 250 employees/partners. The new system will feature
additional isolation valves to allow the park to isolate smaller sections of waterline for future service, repair, or
replacement, resulting in fewer users affected by temporary shutdowns. Additional water meters will allow the park
to better troubleshoot leaks in buried waterline sections.
Investment Strategy (IS):
This project represents the most critical and largest source of deferred maintenance and repair needs at the park.
Completing the rehabilitation will address high-priority deferred maintenance and repair needs and will significantly
reduce the frequency and expense of unscheduled and emergency repairs. With less time spent addressing sporadic
repairs to this system, park staff and system operators will have additional time to perform other operational and
National Park Service FY 2024 Budget Justification
LRF-62
preventative maintenance tasks on utility systems throughout the park. After project completion, the utility system
deficiencies addressed by this project will not require major recapitalization or modernization for 50 years. This
project is estimated to address $39.9 M of deferred maintenance and repair needs.
Consequences of Failure to Act (CFA):
Failure to act would jeopardize the park’s only water source, which serves two million visitors each year. If forced
to shut down the system for major repairs, the park could be required to incur significant costs for water hauling
operations, which would also divert resources and staff from addressing other critical deferred maintenance and
repairs.
The project also includes critical repairs to historic structures within the water system that assist with harvesting
rainwater. If deficiencies with the roofs and gutters are not addressed, these historical structures will likely continue
to degrade.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.64
API Rating: n/a 84.60
API/FCI Score: (20%) 17.40
SB Score: (40%) 20.00
IS Score: (20%) 20.00
CFA Score: (20%) 0.00
Total Score: (100%) 57.40
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 04/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 20,831 62
Modernization/Renewal Work:
$ 12,768 38
Divestiture Work $ 0 0
Total: $ 33,599 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 6,280
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 33,599
Future Funding to Complete Project: $ 0
Total: $ 39,879
Class of Estimate: C
Estimate Escalated to: FY 2025/Q4
National Park Service FY 2024 Budget Justification
LRF-63
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 3,417
LRF Design Funds Received: $ 2,847
Planning Funds Received from Other Fund Sources: $ 16
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q2
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $3,288,901
Projected: $3,247,202
Net Change: -$41,669
National Park Service FY 2024 Budget Justification
LRF-64
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 35.01
Planned Funding Fiscal Year (FY) 2024: $7,938,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Replace Water Filtration System at King Salmon
Project Number: GAOA ID #N133; NPS PMIS #312344B
Unit/Facility Name: Katmai National Park & Preserve
Region/Area/District: Alaska; IR 11
Congressional District: AKAL
State: Alaska
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35410700 38428 40 0.40
35600100 54348 25 0.17
40710300 85047 40 1.00
40711200 86630 30 0.00
Project Description:
This project will replace the obsolete water treatment and distribution system in King Salmon, Alaska. The final
treatment method will provide up to 10,000 gallons per day of potable water and have capacity to provide structural
fire suppression for an 11-room dorm, eight housing units, and the maintenance building in King Salmon, Alaska.
The new water system will be easier to operate and will provide filtration and treatment to mitigate high levels of
iron and manganese in the raw water. A back-up generator will be replaced and relocated to a weatherized cabinet
outside the building and away from the water treatment system. Treated water lines will be extended a short distance
to a fire hydrant outside the park’s Marina building. This Marina building is currently serviced by a low capacity,
untreated well, which will be abandoned.
Scope of Benefits (SB):
This project will eliminate the high concentrations of manganese and iron from the domestic water supply, making it
safe for consumption. It will also ensure that all buildings served by the water system have adequate fire protection.
Relocating the generator to a weatherized cabinet outside of the building will improve interior working conditions
and provide additional interior space for the new treatment system components.
Investment Strategy (IS):
The current water treatment and distribution system has aged beyond its design life. The frequency of costly and
inconvenient after-hours calls for emergency repair service has increased. Completing this project will provide
improved water quality, pressure, and flow rates, and will significantly reduce unscheduled and emergency
maintenance call outs.
After project completion, the utility system deficiencies addressed by this project will not require major
recapitalization or modernization for approximately 50 years. This project is estimated to address $8.9 M of deferred
maintenance and repair needs.
Consequences of Failure to Act (CFA):
The current King Salmon water system has insufficient pressure and flow rates, and is unable to appropriately
mitigate iron and manganese in the raw water. The presence of iron is relatively benign but reduces the lifecycle of
plumbing components and fixtures, as well as discoloring clothing and appliances. Manganese is a heavy metal
linked to developmental disorders in children. If the park does not resolve these system deficiencies, iron and
National Park Service FY 2024 Budget Justification
LRF-65
manganese will continue to impact water system components and could potentially pose health risks to staff and
their families.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.06
API Rating: n/a 33.75
API/FCI Score: (20%) 15.01
SB Score: (40%) 20.00
IS Score: (20%) 0.00
CFA Score: (20%) 0.00
Total Score: (100%) 35.01
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 01/2024 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 0 0
Modernization/Renewal Work: $ 7,938 100
Divestiture Work $ 0 0
Total: $ 7,938 100
Project Funding History (entire project):
History Dollars in
thousands
Funded to Date: $ 1,782
FY 2024 GAOA Legacy Restoration Fund Funding (this PDS):
$ 7,938
Future Funding to Complete Project: $ 0
Total: $ 9,720
Class of Estimate: C
Estimate Escalated to: FY 2025/Q4
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 834
LRF Design Funds Received: $ 695
Design Funds Received from other Fund Sources: $ 253
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q4
Actual: N/A
National Park Service FY 2024 Budget Justification
LRF-66
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $17,435
Projected: $16,162
Net Change: -$1,273
National Park Service FY 2024 Budget Justification
LRF-67
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 79.00
Planned Funding Fiscal Year (FY) 2024: $14,434,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Replace Electrical, HVAC, and Alarm Systems, and Rehabilitate Four Historic Structures
Project Number: GAOA ID #N135, PMIS ID #326086A
Unit/Facility Name: Saint-Gaudens National Historical Park
Region/Area/District: Northeast; IR 01
Congressional District: NH02
State: New Hampshire
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35100000 25641 100 0.23
35290100 25638 100 0.26
35290100 25644 93 0.17
35290100 25639 93 0.13
35290100 25645 93 0.16
35290100 25646 93 0.15
35290700 25643 67 0.07
35290800 25647 100 0.28
35290800 25642 83 0.30
35291500 115223 100 0.35
35300200 115225 75 0.87
35410500 115581 75 0.49
35410500 25712 75 0.28
35410500 115582 69 0.84
35500200 25713 75 0.34
35600100 25710 42 0.09
35800500 25640 93 0.29
40710300 27109 55 0.26
40710900 27110 78 0.11
40750300 25539 100 0.19
Project Description:
This project will replace mission critical fire and security systems, provide data connectivity to various facilities,
update electrical infrastructure, modify the facilities to meet physical accessibility standards, and replace heating,
ventilation, and air conditioning (HVAC) systems at multiple buildings of the park’s Aspet unit. Work also includes
rehabilitation of historic structures at Blow-Me-Down Farm (BMDF) National Register Historic District, including
the Dance Hall, Carriage House, Blacksmith Shop, and Chauncey Cottage.
Scope of Benefits (SB):
The BMDF is a new unit of the park that receives approximately 25 percent of the park’s annual visitation. In their
current condition, the facilities have not generated leasing interest. Once renovated, the BMDF facilities will serve
as a center for the arts, with one building available for short-term lease and up to three others available for long-term
lease opportunities.
National Park Service FY 2024 Budget Justification
LRF-68
Fully functional security, fire, electrical, and HVAC systems will ensure these buildings and their occupants, and
contents are fully protected by safe, code compliant features. Visitors will benefit from the improved condition and
accessibility enhancements of the renovated structures. The new building systems will be more reliable, resilient,
and energy efficient, improving temperature and humidity control in sensitive museum environments while
safeguarding high-value museum collections from theft, damage, and deterioration.
Investment Strategy (IS):
This project will prepare four BMDF buildings for economically viable lease opportunities. In their current
condition, the buildings are not viable for leasing since their condition would require prospective leaseholders to
invest in the replacement of critical building systems. After project completion, these historic structures will
subsequently be advertised for lease as venues to support arts programming.
After project completion, the deficiencies addressed by this project will not require major recapitalization or
modernization for approximately 30 to 40 years. This project is estimated to address $17.1 M of deferred
maintenance and repair needs.
Consequences of Failure to Act (CFA):
Failure to rehabilitate the buildings at BMDF buildings will allow advanced deterioration of these structures to
continue, increasing the cost of their eventual repair. The parks high-value fine art collections are under threat from
recent break-ins and vandalism. Failure to provide functional building systems may leave park facilities and fine art
museum collections vulnerable to fire, theft, and interior environmental conditions that are not optimal for
preservation. Failure to act could ultimately lead to damage or loss of historic building features or museum
collection materials, and a lack of interest from potential leaseholders.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.08
API Rating: n/a 82.95
API/FCI Score: (20%) 19.39
SB Score: (40%) 40.00
IS Score: (20%) 20.00
CFA Score: (20%) 0.00
Total Score: (100%) 79.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 05/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Perce
nt
Maintenance Work: $ 1,588 11
Modernization/Renewal Work: $ 12,846 89
Divestiture Work $ 0 0
Total: $ 14,434 100
National Park Service FY 2024 Budget Justification
LRF-69
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 2,691
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 14,434
Future Funding to Complete Project: $ 0
Total: $ 17,125
Class of Estimate: C
Estimate Escalated to: FY 2025/Q4
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 1,468
LRF Design Funds Received: $ 1,223
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q3
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $187,354
Projected: $169,690
Net Change: -$17,664
National Park Service FY 2024 Budget Justification
LRF-70
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 56.00
Planned Funding Fiscal Year (FY) 2024: $13,856,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Replace Power Distribution Line Connecting Kettle Falls Hotel
Project Number: GAOA ID#N136; NPS PMIS #306890A
Unit/Facility Name: Voyageurs National Park
Region/Area/District: Midwest; IR 03
Congressional District: MN08
State: Minnesota
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
40711200 108793 65 1.00
Project Description:
This project will replace the main underwater high voltage cable and multiple transformer boxes that run from the
mainland to the Kettle Falls district. Pad-mounted switchgear, sectionalizing enclosures, elbow terminations, as well
as individual and other associated components will be replaced as needed. An improved level of emergency backup
generation for critical loads at Kettle Falls Area will be installed.
Scope of Benefits (SB):
The Kettle Falls Hotel is visited by approximately one third of the park’s 300,000 annual day use visitors and 3,000
overnight visitors. The current electrical system is beyond its service life and frequently fails, resulting in lengthy
power outages to the remote historic hotel. The new electric system will produce power with increased safety,
efficiency, and reliability for guests and visitors.
Investment Strategy (IS):
Reliable electrical service will be provided to thousands of visitors who visit the historic hotel and surrounding area.
Due to the remoteness of the electrical line, repairs can involve significant operational impacts. The Kettle Falls
Hotel is among the park’s most critical assets. The new electrical line will help to ensure there is reliable fire
protection, functioning water/wastewater systems, showers, and safe food storage, which are vital to hotel operation.
The park risks losing visitor revenue, straining financial relationships with concessioners, or potentially losing the
hotel to fire without reliable electrical power service.
After project completion, the electrical utility system deficiencies addressed by this project will not require major
recapitalization or modernization for approximately 50 years. This project is estimated to address $16.2 M of
deferred maintenance and repair needs.
Consequences of Failure to Act (CFA):
Visitor services and cultural resources will continue to be impacted. Power outages will increase in frequency and
visitor satisfaction will be negatively impacted. Revenue to the concessionaire will be lost and fire risks to one of the
park’s most critical historic assets will continue.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 1.00
API Rating: n/a 65.00
National Park Service FY 2024 Budget Justification
LRF-71
Category Percent Score
API/FCI Score: (20%) 16.00
SB Score: (40%) 40.00
IS Score: (20%) 0.00
CFA Score: (20%) 0.00
Total Score: (100%) 56.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 05/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 0 0
Modernization/Renewal Work: $ 13,856 100
Divestiture Work $ 0 0
Total: $ 13,856 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 2,643
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 13,856
Future Funding to Complete Project: $ 0
Total: $ 16,499
Class of Estimate: C
Estimate Escalated to: FY 2025/Q2
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 1,409
LRF Design Funds Received: $ 1,174
Planning Funds Received From Other Fund Sources: $ 60
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
National Park Service FY 2024 Budget Justification
LRF-72
Annual Operations & Maintenance Costs $
Current: $56,120
Projected: $56,120
Net Change: $0
National Park Service FY 2024 Budget Justification
LRF-73
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 70.00
Planned Funding Fiscal Year (FY) 2024: $17,110,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Preserve Features and Systems of the Old Courthouse
Project Number: GAOA ID #N137, NPS PMIS #325913A
Unit/Facility Name: Gateway Arch National Park
Region/Area/District: Midwest; IR 04
Congressional District: MO01
State: Missouri
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35290100 19270 100 1.00
40750300 19287 80 0.07
Project Description:
This project will rehabilitate various features throughout the Old Courthouse and its grounds. Plumbing systems will
be repaired or replaced including potable water, wastewater, and storm water. Portions of the buildings electrical
and lighting components were recently upgraded in a prior mechanical systems project; this project will complete
the upgrades throughout the courthouse. Other interior work consists of conservation of the atrium frescos, repair
interior finishes such as walls and doors, and correcting deficient service access in non-public spaces including attic
catwalks.
Exterior repairs include masonry preservation, restoration of the dome copper roofing and architectural features, and
repair of the doors and windows that were excluded from the recent mechanical project. Grounds repairs include
structural rehabilitation of retaining walls, site accessibility upgrades, and repair of landscape lighting.
Scope of Benefits (SB):
Repairs and upgrades to the failing plumbing and electrical systems will result in better performance and
improvements to these high priority systems. They will handle increased load capacity and have improved
performance. Replacement of windows will reduce water infiltration, improve the efficiency of the mechanical
systems and provide ultraviolet protection for exhibits and building furnishings. Improvements will be made to
accessibility. Unsafe exposure to lead and asbestos containing material will be mitigated and other unsafe conditions
will be corrected as well. Historic fabric and artwork will be preserved.
Investment Strategy (IS):
The upgrades and repairs to the Old Courthouse will result in improved facility serviceability and visitor experience.
Repairs to the structure and surrounding grounds will also preserve historic features and provide for visitor
enjoyment. Operating and utility costs may be reduced, and systems will operate as intended.
After project completion, the system deficiencies addressed by this project will not require major recapitalization or
modernization for 40 to 50 years. This project is estimated to address $20.3 M of deferred maintenance and repair
needs.
Consequences of Failure to Act (CFA):
The historic building and grounds will continue to deteriorate and jeopardize previous investments made by the
bureau and park partners. Failure to improve the air flow and indoor air quality will continue to lead to employee
and visitor discomfort and unsatisfactory work conditions. Plaster and paint will continue peeling due to water
National Park Service FY 2024 Budget Justification
LRF-74
infiltration at gutters, downspouts, and roof failures. Uneven walking surfaces will continue to lead to pedestrian
injuries.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.19
API Rating: n/a 90.00
API/FCI Score: (20%) 20.00
SB Score: (40%) 40.00
IS Score: (20%) 10.00
CFA Score: (20%) 0.00
Total Score: (100%) 70.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 04/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 15,912 93
Modernization/Renewal Work: $ 1,198 7
Divestiture Work $ 0 0
Total: $ 17,110 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 3,930
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 17,110
Future Funding to Complete Project: $ 4,832
Total: $ 25,872
Class of Estimate: C
Estimate Escalated to: FY 2025/Q2
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 2,144
LRF Design Funds Received: $ 1,786
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q1
Actual: N/A
National Park Service FY 2024 Budget Justification
LRF-75
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $1,052,568
Projected: $1,011,966
Net Change: -$40,602
National Park Service FY 2024 Budget Justification
LRF-76
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 59.40
Planned Funding Fiscal Year (FY) 2024: $15,326,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Rehabilitate the Main Water System
Project Number: GAOA ID #N138, NPS PMIS #318695A
Unit/Facility Name: Bryce Canyon National Park
Region/Area/District: Intermountain; IR 07
Congressional District: UT02
State: Utah
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35300200 46304 35 0.28
35300200 46308 35 0.05
35300200 46289 35 0.05
35300200 46290 35 0.05
35300200 45962 46 0.03
35300200 45972 46 0.36
35300200 45969 46 0.26
35300200 45970 46 0.47
35300200 46292 35 0.04
35300200 46293 52 0.06
35300200 46284 35 0.04
35300200 46295 52 0.05
35300200 45967 46 0.22
35300200 46288 35 0.22
35300200 45971 46 0.26
35300200 46301 35 0.04
35300200 46305 52 0.20
35300200 46298 52 0.20
35300200 46291 35 0.05
35300300 46313 40 0.39
35300300 45964 46 0.04
35300300 46319 40 0.15
35300300 46327 40 0.45
35300500 46209 46 0.08
35300500 46207 46 0.15
35300500 46206 46 0.08
35300500 46211 46 0.15
35300500 46213 46 0.15
35500200 46388 55 0.26
35500200 46392 55 0.38
40710300 45902 65 0.32
40710300 45903 15 0.00
40710900 45898 100 0.19
40760100 45896 100 0.09
National Park Service FY 2024 Budget Justification
LRF-77
Project Description:
This project will rehabilitate and/or replace obsolete, critical system components of the East Creek water system.
Water distribution line improvements include replacing laterals and upsizing water lines for structural fire protection
in several visitor use areas. Meters will be installed to track utility usage and unused, and obsolete system
components will be removed. Fire hydrants will be replaced. Water tank coatings will be restored as required to
prevent corrosion. Additionally, the wastewater system will also be replaced in the Mission 66 housing area.
Scope of Benefits (SB):
Replacement of the obsolete water distribution system will provide a safe, reliable supply of potable water for
visitors, concessioners, park staff, and support overall park operations. Demolition and removal of unused
infrastructure will allow impacted sites to be restored. Adequate water pressure and flow rates will help provide fire
protection to park historic resources, employee housing, and visitor use areas.
Rehabilitation of the wastewater system will reduce the costs and operational impacts associated with unscheduled
and emergency maintenance and repairs to these systems.
Investment Strategy (IS):
The park’s water and wastewater systems are well beyond their expected service life. The escalating frequency of
repairs of the outdated systems is no longer cost effective. The park typically serves more than two million visitors
annually and provides utility services to three concessioners and up to 200 residents, all of whom require a reliable
water supply for domestic use and fire suppression. The cost of emergency repairs and unscheduled maintenance
will be reduced through this system replacement, but the overall operational costs may increase due to inflation of
energy, materials, supplies, and labor costs. The water system will be more reliable and resilient to surges in end
user consumption. Upgraded pipe material will reduce leaks and associated pressure losses, increasing system
efficiency. Upgraded system components and metering will allow the park to measure and recover its costs for the
utilities provided to park concessioners.
After project completion, the utility system deficiencies addressed by this project will not require major
recapitalization or modernization for approximately 30 to 50 years. This project is estimated to address $17.8 M of
deferred maintenance and repair needs.
Consequences of Failure to Act (CFA):
This water and wastewater infrastructure has exceeded its expected lifecycle. Critical system failures disrupt park
operations, impact visitors, diminish the efficacy of fire suppression systems, and interrupt water supply. In the
event of a major service interruption or system failure, concession operations may be reduced or temporarily closed,
impacting visitor enjoyment and concession fee revenue to the National Park Service (NPS). The cost to repair and
maintain this outdated system is expected to continue to rise as critical components further degrade over time.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.04
API Rating: n/a 46.62
API/FCI Score: (20%) 19.40
SB Score: (40%) 20.00
IS Score: (20%) 20.00
CFA Score: (20%) 0.00
Total Score: (100%) 59.40
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 02/2024 Completed N/A
National Park Service FY 2024 Budget Justification
LRF-78
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 0 0
Modernization/Renewal Work: $ 14,866 97
Divestiture Work $ 460 3
Total: $ 15,326 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 2,858
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 15,326
Future Funding to Complete Project: $ 0
Total: $ 18,184
Class of Estimate: C
Estimate Escalated to: FY 2025/Q4
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 1,559
LRF Design Funds Received: $ 1,299
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $703,678
Projected: $694,407
Net Change: -$9,271
National Park Service FY 2024 Budget Justification
LRF-79
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 66.30
Planned Funding FY 2024: $35,344,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Rehabilitate Water Utility Infrastructure and Upgrade Access to Campgrounds
Project Number: GAOA ID #N139, NPS PMIS #326160A
Unit/Facility Name: Sequoia and Kings Canyon National Parks
Region/Area/District: Pacific West; IR 10
Congressional District: CA05 & CA20
State: California
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35240100 67925 65 0.58
35240100 66898 54 1.00
35240100 67936 54 0.57
35240100 66896 54 0.70
35240100 67934 54 0.48
35240100 67930 65 1.00
35240100 67939 54 0.49
35240100 67928 54 1.00
35240100 67927 65 1.00
35240100 67929 54 1.00
35240100 67937 54 0.57
35240100 67935 54 0.58
35240100 68151 65 0.75
35240100 67932 54 1.00
35240100 67938 54 0.59
35240100 66894 54 0.54
35240100 67933 54 1.00
35240200 246122 54 0.99
35500500 243909 30 1.00
40710300 74282 77 0.97
40710300 67587 77 1.00
40710300 67590 69 0.69
40710300 67596 77 0.05
40710800 72981 88 0.54
40710800 67584 88 0.54
40710900 67592 35 1.00
40750100 68180 44 0.92
40750100 66891 36 1.00
40750100 68181 44 1.00
40750100 68182 36 1.00
40750100 66890 50 0.78
40760100 73068 56 0.33
40760100 73938 42 0.77
40760100 73862 57 0.07
40760100 73067 56 1.00
40760100 73069 56 0.16
National Park Service FY 2024 Budget Justification
LRF-80
DOI Asset Code FRPP Unique Id# API: FCI-Before:
40760100 73863 49 0.20
40760100 73066 64 0.16
40760100 73074 63 1.00
40760100 73080 40 1.00
Project Description:
This project will rehabilitate water utility systems, including service mains, laterals, water storage tanks, pumps,
hydrants, valves, treatment systems, and other critical system components at Wolverton/Wuksachi district, Grant
Grove district, Potwisha campground, and Buckeye Campground to provide safe domestic water service and fire
protection. Asbestos water lines will be removed from service. The Potwisha campground, portions of the Ash
Mountain, and portions of the Grant Grove wastewater systems will also be rehabilitated.
This project will also include rehabilitation of Sunset, Azalea, and Crystal Springs campgrounds, including
improvements to comfort stations, campsite amenities, site drainage and erosion control, repaving and surface
repairs, and accessibility to enhance the visitor experience. Erosion control, pathway improvements, pavement
repairs, and site revegetation will be completed.
Scope of Benefits (SB):
This project addresses deferred maintenance and repair needs on high-priority assets to provide safe and reliable
drinking water, storage, and fire flows to the Grant Grove developed area, as well as to the Wolverton/Wuksachi and
Foothills campgrounds. These developed areas support visitors, park operations, and concession facilities including
a restaurant, lodge, market, gift shop, maintenance facility, permanent and seasonal housing, tent cabins, and a bath
house.
Accessibility deficiencies will be addressed throughout the visitor service areas and campgrounds that serve over 1.6
million visitors annually. This work will improve employee and visitor access, safety, and overall experience.
Investment Strategy (IS):
Replacement of aging water lines, valves, inefficient pumps, and electrical components should reduce the frequency
and expense of unscheduled maintenance and repairs, allowing the park to establish regular and recurring cyclic
maintenance schedules for these systems. After project completion, the utility system deficiencies addressed by this
project will not require major recapitalization or modernization for 50 years. This project is estimated to address
$38.9 M of deferred maintenance and repair needs.
Campgrounds are a source of income for the park. This project will reduce the frequency of emergency repair work,
allowing campgrounds to remain open more consistently, serving visitors and generating revenue that will be
reinvested in system maintenance and operation.
Consequences of Failure to Act (CFA):
Deficiencies and service disruptions associated with aging utility infrastructure can impact the health, safety, and
enjoyment of campgrounds and other visitor facing facilities. Without these investments, the frequency of service
outages may increase and could ultimately result in catastrophic failure of water distribution in the developed areas
of Grant Grove and the Foothills campgrounds. Extended water service interruptions to lodging, camping, dining,
and education/interpretation could also decrease concessioner revenue and related funding for the park. Without
action, visitors and staff at the campgrounds will continue encountering eroded road shoulders, failing pavement,
deteriorated campsites, as well as inaccessible and outdated comfort stations.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.14
API Rating: n/a 56.25
API/FCI Score: (20%) 16.30
SB Score: (40%) 20.00
National Park Service FY 2024 Budget Justification
LRF-81
Category Percent Score
IS Score: (20%) 20.00
CFA Score: (20%) 10.00
Total Score: (100%) 66.30
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 05/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity
Dollars in
thousands Percent
Maintenance Work: $ 15,198 43
Modernization/Renewal Work: $ 20,146 57
Divestiture Work $ 0 0
Total: $ 35,344 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 6,589
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 35,344
Future Funding to Complete Project: $ 0
Total: $ 41,933
Class of Estimate: C
Estimate Escalated to: FY 2025/Q4
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 3,594
LRF Design Funds Received: $ 2,995
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $3,232,878
Projected: $3,229,795
Net Change: -$3,083
National Park Service FY 2024 Budget Justification
LRF-82
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 69.30
Planned Funding FY 2024: $13,055,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Replace Water and Wastewater Systems at Elk Creek and Lake Fork
Project Number: GAOA ID #N140, NPS PMIS #318472A
Unit/Facility Name: Curecanti National Recreation Area
Region/Area/District: Intermountain; IR 07
Congressional District: CO03
State: Colorado
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
40710300 84533 65 0.39
40710900 75384 88 1.00
40710900 75837 81 0.76
Project Description:
This project will replace and upgrade water and sewer systems at Elk Creek and Lake Fork. Primary and secondary
water distribution systems, and wastewater collection and distribution systems will be replaced at Elk Creek.
Existing wastewater collection, distribution piping, septic tank, leach field, and the lift station at the Lake Fork area
will be replaced or refurbished. Electrical and mechanical upgrades will be made as required for the new equipment.
Cutting and patching of asphalt and concrete will be completed where utility installations intersect roadways and
parking lots. Sewage lagoon liners, pumps, and generators will be replaced or rehabilitated to meet state regulations.
Operational improvements should include a potable water truck filling station. A supervisory control and data
acquisition (SCADA) system will be installed to improve operational efficiency and enable remote monitoring and
control of these water and wastewater systems.
Scope of Benefits (SB):
Elk Creek and Lake Fork are two of the highest visitor use areas of the park. The age and heavy use of these utilities
in the most highly visited areas of the park has resulted in unreliable and maintenance-intensive systems. Closures of
facilities due to system failures have had a negative impact on visitor enjoyment and experience as well as park
operations. Water and sewer lines are buried at depths of 7 to 8 feet or more to protect them from freezing, which
makes repairs to the systems difficult and time-consuming for park staff. Replacement of the most critical
components of these systems will reduce unscheduled and emergency repairs, improving reliability, and maintaining
visitor satisfaction and enjoyment. Work will comply with requirements related to current codes, best management
practices, and address safety issues.
Investment Strategy (IS):
Improvements to these high priority systems will allow park utility crews to sustain uninterrupted operations through
regularly scheduled preventive and recurring maintenance, which will reduce the service disruptions and visitor
impacts associated with unscheduled and emergency repairs. Resolving these high priority challenges will allow the
park to refocus its resources on other critical assets that contribute to visitor satisfaction and enjoyment.
After project completion, the utility system deficiencies addressed by this project will not require major
recapitalization or modernization for 30 to 50 years. This project is estimated to address $15.0 M of deferred
maintenance and repair needs.
National Park Service FY 2024 Budget Justification
LRF-83
Consequences of Failure to Act (CFA):
The condition of these high priority utility systems will continue to deteriorate and the frequency of failures will
increase if the repair work and component replacements associated with this project are not completed. Operational
costs associated with the inefficiencies of unscheduled and emergency repairs will diminish the park’s ability to
address other high priority assets. Excavation of failed distribution and collection lines is challenging and time
consuming, and often results in multi-day facility closures.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.29
API Rating: n/a 78.00
API/FCI Score: (20%) 19.30
SB Score: (40%) 20.00
IS Score: (20%) 20.00
CFA Score: (20%) 10.00
Total Score: (100%) 69.30
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 11/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 0 0
Modernization/Renewal Work: $ 13,055 100
Divestiture Work $ 0 0
Total: $ 13,055 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 2,434
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 13,055
Future Funding to Complete Project: $ 0
Total: $ 15,489
Class of Estimate: C
Estimate Escalated to: FY 2025/Q4
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 1,328
LRF Design Funds Received: $ 1,106
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
National Park Service FY 2024 Budget Justification
LRF-84
Project Complete
Scheduled: FY 2026/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $36,231
Projected: $36,231
Net Change: $0
National Park Service FY 2024 Budget Justification
LRF-85
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 65.80
Planned Funding FY 2024: $21,590,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Rehabilitate Grant Grove Historic Cabins and Shower House and Lodgepole Market
Project Number: GAOA ID #N141, NPS PMIS #317643A
Unit/Facility Name: Sequoia and Kings Canyon National Parks
Region/Area/District: Pacific West; IR 10
Congressional District: CA20
State: California
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35240100 85071 71 0.83
35291100 85093 46 1.00
35291700 85000 55 1.00
35291700 85070 48 1.00
35291700 85090 40 1.00
35291700 85036 48 1.00
35291700 84998 55 1.00
35291700 85068 48 1.00
35291700 84994 55 1.00
35291700 85057 48 1.00
35291700 85028 55 1.00
35291700 85015 55 1.00
35291700 85013 55 1.00
35291700 85027 55 1.00
35291700 85029 55 1.00
35291700 85001 55 1.00
35291700 85010 55 1.00
35291700 85006 55 1.00
35291700 85005 55 1.00
35291700 85014 55 1.00
35291700 85060 48 1.00
35291700 84995 55 1.00
35291700 85007 55 1.00
35291700 85012 55 1.00
35291700 85069 48 1.00
35291700 85026 55 1.00
35291700 85031 55 1.00
35291700 85062 48 1.00
35291700 85037 48 1.00
35291700 85003 55 1.00
35291700 85025 55 1.00
35291700 85091 40 1.00
35291700 85004 55 1.00
35291700 85033 55 1.00
35291700 85056 48 1.00
35291700 85055 48 1.00
National Park Service FY 2024 Budget Justification
LRF-86
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35291700 85066 48 1.00
35291700 85002 55 1.00
35291700 85064 48 1.00
35291700 85032 55 1.00
35291700 85011 55 1.00
35291700 85058 48 1.00
35291700 84999 55 1.00
35291700 84997 55 1.00
35291700 85061 48 1.00
35291700 85009 55 1.00
35291700 85030 55 1.00
35291700 85063 48 1.00
35291800 106734 65 0.64
35300500 227886 48 1.00
Project Description:
The Grant Grove Historic District is one of the most visited destinations in Kings Canyon National Park and a
primary point of visitor contact. The historic cabins in Meadow Camp and Tent City are a popular lodging choice in
Kings Canyon. The Shower House building provides basic amenities for Tent City. The buildings have extensive
deferred maintenance, health and safety deficiencies, and are not compliant with the Architectural Barriers Act
Accessibility Standards (ABAAS).
This project will rehabilitate cabins and the Shower House to comply with current code and accessibility standards
while retaining the district’s historic character. This funding will also rehabilitate critical systems, including heating,
ventilation, air conditioning, electrical, and roofing at the Lodgepole Market, which provides an important visitor
retail service in Sequoia National Park. The market provides groceries, laundry facilities, showers, and concessioner
housing.
Scope of Benefits (SB):
This project will have a substantial and direct impact to park visitors and concessioners by providing safe and
accessible lodging and employee housing. In addition to creating barrier-free access to facilities, addressing deferred
maintenance of the historic cabins will increase the availability of visitor lodging by allowing use of these facilities
for an extended period each year and potentially reducing the number of days these units are offline for repairs.
Addressing deferred maintenance at the Lodgepole Market will enhance services by restoring use of employee
quarters located above the market and restoring use of the in-market grill. The park’s concession’s contract requires
the concessionaire to operate a grill, but they have been unable to perform this service due to fire code issues
resulting from the deferred maintenance needs.
Investment Strategy (IS):
Concessioners provide important visitor services and generate revenue to support park operations. A key component
to visitor satisfaction is uninterrupted concessioner operations, and this project will help ensure that they are
ongoingly functional. These investments will also ensure future concession contracts are viable and attractive to
prospective bidders. The employee housing assets improved by this project will benefit both NPS and concessioner
staff.
After project completion, the deficiencies addressed by this project will not require major recapitalization or
modernization for 35 to 40 years. This project is estimated to address $25.3 M of deferred maintenance and repair
needs.
Consequences of Failure to Act (CFA):
Current conditions have negatively impacted concessioner revenues. Without intervention, conditions at these aging
facilities will continue to deteriorate and may reduce the viability of future concession contracts. As a result, there
could be a significant impact to visitor experience and enjoyment due to significantly reduced services. The lack of
National Park Service FY 2024 Budget Justification
LRF-87
accessible facilities also results in a failure to provide inclusive and enjoyable experiences for people with
disabilities.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 1.00
API Rating: n/a 52.50
API/FCI Score: (20%) 15.80
SB Score: (40%) 20.00
IS Score: (20%) 20.00
CFA Score: (20%) 10.00
Total Score: (100%) 65.80
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled 05/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 17,272 80
Modernization/Renewal Work: $ 4,318 20
Divestiture Work $ 0 0
Total: $ 21,590 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 4,026
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 21,590
Future Funding to Complete Project: $ 0
Total: $ 25,616
Class of Estimate: C
Estimate Escalated to: FY 2025/Q4
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 2,196
LRF Design Funds Received: $ 1,830
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q3
Actual: N/A
National Park Service FY 2024 Budget Justification
LRF-88
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $263,323
Projected: $246,296
Net Change: -$17,027
National Park Service FY 2024 Budget Justification
LRF-89
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 71.40
Planned Funding Fiscal Year (FY) 2024: $12,027,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Rehabilitate Park Housing
Project Number: GAOA ID #N142, NPS PMIS #315541A
Unit/Facility Name: Great Sand Dunes National Park & Preserve
Region/Area/District: Intermountain; IR 07
Congressional District: CO03
State: Colorado
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
40710900 254996 52 0.00
35300100 74121 43 1.00
35300100 74122 20 0.43
35300200 74112 53 1.00
35300200 74109 43 0.95
35300200 74111 53 1.00
35300200 74116 53 1.00
35300200 74108 43 1.00
35300200 74118 53 0.02
35300300 113339 23 0.55
Project Description:
This project will rehabilitate 13 housing units with major components either replaced, upgraded, or modified to
correct obsolete conditions. Deficiencies vary for each unit and the scope of this work may include modifications,
repairs, or replacement of various building components and systems. Deficiencies associated with Architectural
Barriers Act Accessibility Standards (ABAAS) will be corrected where applicable. Fire protection systems will be
installed or upgraded where required to meet current life safety codes. Various components of the outdated
wastewater systems associated with these housing units will be evaluated, repaired, replaced, and upgraded as
needed to address more stringent regulatory requirements. Site improvements will be made to address resiliency.
Site conditions will be restored after excavation or earthwork has been performed. Temporary leases of housing
units will be provided during construction.
Scope of Benefits (SB):
Housing at Great Sand Dunes National Park and Preserve, most of which was constructed in the 1960s, supports
mission critical park operations during all seasons. These modifications and improvements to park housing units will
directly benefit 25-35 park employees and their families with more energy efficient, accessible, safe, reliable, and
comfortable living accommodations. The ability to provide and maintain an inventory of well-maintained employee
housing units helps the park to recruit and retain a highly capable workforce. Park operations will continue to benefit
from the proximity and reduced emergency response times due to having staff who reside onsite. The parks
maintenance operations will benefit from a reduced need for unscheduled and emergency repairs, allowing
maintenance resources to be redirected to other high priority park needs.
Investment Strategy (IS):
After project completion, the housing units and systems addressed by this project will not require major
recapitalization or modernizations for 25 to 40 years. This project is estimated to address $11.2 M of deferred
maintenance and repair needs. This work will also reduce the costs and impacts of unscheduled maintenance and
National Park Service FY 2024 Budget Justification
LRF-90
repairs. The park will continue to use quarters rental income, base funds, and other facility project fund sources to
maintain park housing units on a predictable and regularly recurring schedule.
Consequences of Failure to Act (CFA):
Failure to address the deferred maintenance and lack of accessibility in park housing will result in unsafe or
substandard living environments and will negatively impact the park’s ability to recruit and retain staff. Staff will
face increased health risks due to continued rodent activity. In addition, accessible housing will not be available. The
assets themselves will continue to deteriorate, and systems may fail unexpectedly resulting in the need for
emergency repairs.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.17
API Rating: n/a 43.60
API/FCI Score: (20%) 11.40
SB Score: (40%) 40.00
IS Score: (20%) 20.00
CFA Score: (20%) 0.00
Total Score: (100%) 71.40
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 01/2024 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 361 3
Modernization/Renewal Work: $ 11,666 97
Divestiture Work $ 0 0
Total: $ 12,027 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 2,121
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 12,027
Future Funding to Complete Project: $ 0
Total: $ 14,148
Class of Estimate: C
Estimate Escalated to: FY 2025/Q4
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 1,157
LRF Design Funds Received: $ 964
National Park Service FY 2024 Budget Justification
LRF-91
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $19,703
Projected: $51,458
Net Change: +$31,755
National Park Service FY 2024 Budget Justification
LRF-92
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 56.00
Planned Funding FY 2024: $38,564,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Address Critical Repairs in the Platt and Buckhorn Developed Areas
Project Number: GAOA ID #N144, NPS PMIS #240631A
Unit/Facility Name: Chickasaw National Recreation Area
Region/Area/District: Intermountain; IR 06
Congressional District: OK04
State: Oklahoma
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
0 248514 88 0.00
0 256411 30 0.00
35100000 33189 65 0.19
35230900 33223 88 0.39
35240100 33209 43 0.06
35240100 33206 52 0.21
35240100 33268 20 0.26
35240100 33200 53 0.06
35240100 33198 62 0.13
35240100 33222 31 0.14
35240100 33221 12 0.14
35240100 33217 40 0.17
35240100 33204 52 0.16
35240100 33273 39 0.23
35240100 33224 31 0.12
35240100 33271 20 0.31
35240100 33218 40 0.17
35240100 33274 39 0.27
35240100 33228 58 0.04
35240100 33229 58 0.04
35240100 33197 62 0.15
35240100 33208 53 0.12
35240100 33225 40 0.14
35290800 33211 53 0.63
35290900 33182 53 1.00
35290900 33186 79 0.15
35290900 33179 79 0.12
35290900 33226 17 0.05
35291100 33193 73 0.36
35300100 113953 21 0.10
35300200 33172 58 0.32
35300200 33165 48 0.23
35300200 33168 58 0.12
35300600 33178 42 0.17
35410100 33245 42 0.15
35410500 33250 7 0.15
National Park Service FY 2024 Budget Justification
LRF-93
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35410700 33212 65 0.08
35500500 33227 77 0.00
35500500 33239 0 0.00
35500500 33241 0 0.00
35600100 33249 23 0.11
35600100 33214 65 0.19
35600100 33246 42 0.18
35600100 33213 65 0.43
40130400 89525 55 0.07
40130400 89531 25 0.43
40130400 89527 55 0.04
40130400 89530 48 0.16
40180300 46889 79 0.19
40181700 232015 63 0.32
40181700 232050 87 0.32
40181700 232052 80 1.00
40181700 232020 87 0.45
40181700 232049 87 0.38
40181700 232054 87 0.46
40660100 33984 59 0.60
40660100 33881 69 0.48
40660100 55081 75 0.03
40660100 33978 50 0.52
40660100 55064 73 1.00
40710300 79729 77 0.01
40710900 79714 100 0.04
40750100 33160 60 0.28
40750100 33162 50 0.02
40750100 33149 53 0.25
40750100 33158 60 0.05
40750100 33147 83 0.07
40750100 33163 12 0.22
40750100 33157 27 0.10
40750100 33155 30 0.08
40750200 233628 80 1.00
40750300 231070 52 0.03
40750300 231069 52 0.37
40750300 39089 65 0.00
40750300 233165 72 0.08
40750300 231072 79 0.36
40750300 231071 60 0.26
40750300 232157 43 0.14
40750300 107317 53 0.14
40750300 232096 39 0.09
40750700 234350 88 0.02
40750800 58977 21 0.27
40751100 34011 69 0.06
40751100 34020 75 0.19
40751100 34006 43 0.31
40751100 34016 75 0.01
40751100 34007 43 0.51
40751100 34015 75 0.23
National Park Service FY 2024 Budget Justification
LRF-94
DOI Asset Code FRPP Unique Id# API: FCI-Before:
40751100 34002 79 0.05
40751100 34005 20 1.00
40751100 34008 43 0.49
40760100 239928 100 0.60
40760100 33543 63 0.23
40760100 54891 0 0.06
40760100 33400 100 0.46
40760100 33539 100 0.11
40760100 54889 69 0.34
40760100 33848 92 0.11
40760100 33829 80 0.27
40760100 33525 27 0.37
40760100 54890 77 0.18
40760100 33541 69 0.20
40760100 33524 42 0.27
40760200 33842 52 0.05
40760500 105876 67 0.01
40760500 105875 67 0.03
40760500 55115 87 0.41
40760500 55113 77 0.02
40760500 55114 77 0.06
40780100 58986 62 0.86
Project Description:
This project includes repair or replacement of water and wastewater systems, improvement and relocation of
electrical infrastructure, replacement of lift stations, and rehabilitation of park comfort stations. The existing water
treatment plant will be demolished and replaced. Supervisory Control and Data Acquisition (SCADA) system
monitoring will be installed. Surfaces and pavement impacted by construction will be repaired or replaced. The
project includes site rehabilitation, removal of woody vegetation along banks, restoration of historic weirs, scour
repair, and restoration of damaged historic resources in maintained landscapes and trails.
Repairs, replacements, historic restoration, removal of non-historic elements, and code compliance improvements
will be made to walkways, restrooms, parking, RV sites, trails, campsites, campsite features, and multiple park
buildings. Where possible, buildings will be consolidated to improve efficiency.
Scope of Benefits (SB):
The existing systems have failing components and are not compliant with current codes. This project will improve
utility operations and increase system reliability, automation, and safety. Electrical hazards in the campground will
be resolved with the installation of upsized and tamper-proof breakers. Lift stations will function automatically and
be monitored remotely with SCADA. Correcting walkways, restrooms, parking, and select campsite modifications
will also improve the park’s compliance with the Architectural Barriers Act Accessibility Standards (ABAAS).
Investment Strategy (IS):
Replacement of the water treatment plant, water lines, lift stations, and the rehabilitation of the comfort stations and
campground roads will address deferred maintenance and increase maintenance efficiencies. Improvements to the
campgrounds should result in an improved RV occupancy rate and campground revenue increase. The project also
consolidates built space and removes unused structures, further increasing maintenance efficiencies. This project is
estimated to address $35.5 M of deferred maintenance and repair needs.
National Park Service FY 2024 Budget Justification
LRF-95
Consequences of Failure to Act (CFA):
Failure to address this deferred maintenance will result in a greatly diminished experience for employees and
visitors. If the water treatment plant is not replaced it will continue to deteriorate, requiring more maintenance and
attention each year, and potentially causing potable water service disruptions in various parts of the park. In severe
cases, lack of potable water may be cause for limited use or closures of buildings serving visitors and employees.
Comfort stations will continue to be inaccessible and impacted due to water infiltration.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.06
API Rating: n/a 56.51
API/FCI Score: (20%) 16.00
SB Score: (40%) 20.00
IS Score: (20%) 20.00
CFA Score: (20%) 0.00
Total Score: (100%) 56.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
Value Engineering (VE) Study: Scheduled 01/2024 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 6,556 17
Modernization/Renewal Work: $ 31,237 81
Divestiture Work $ 771 2
Total: $ 38,564 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 7,190
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 38,564
Future Funding to Complete Project: $ 0
Total: $ 45,754
Class of Estimate: C
Estimate Escalated to: FY 2025/Q4
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 3,922
LRF Design Funds Received: $ 3,268
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
National Park Service FY 2024 Budget Justification
LRF-96
Project Complete
Scheduled: FY 2026/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $6,819,624
Projected: $6,506,984
Net Change: -$312,640
National Park Service FY 2024 Budget Justification
LRF-97
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 83.90
Planned Funding Fiscal Year (FY) 2024: $15,375,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Preserve Historic Structures
Project Number: GAOA ID #N145, PMIS ID #326087A
Unit/Facility Name: Hampton National Historic Site
Region/Area/District: Northeast; IR 01
Congressional District: MD02
State: Maryland
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35290100 27391 100 0.14
35290100 27416 85 0.11
35290100 27591 52 0.06
35800800 27400 72 0.43
35800800 27398 79 1.00
35800800 27413 79 0.19
35800800 27417 79 0.19
35800800 27411 80 0.17
35800800 27415 72 0.11
35800800 27401 50 0.07
35800800 27393 79 0.06
35800800 27396 79 0.40
35800800 27392 75 0.45
35800800 27410 87 0.20
35800800 27397 79 0.38
35800800 27407 92 0.57
35800800 27399 72 0.38
35801500 27395 48 0.48
35801500 27394 31 0.52
40660100 104709 32 0.02
40660100 94406 67 0.08
40660100 107554 42 0.28
40750300 27587 100 0.02
40750700 233732 72 0.00
40750700 233773 87 0.00
40750700 233777 80 0.00
40750700 233733 100 0.00
40750700 233771 80 0.00
40750700 233736 79 0.00
40750700 233776 80 0.00
40760100 27585 55 0.01
40760200 27429 100 0.04
Project Description:
This project will rehabilitate up to 14 historic buildings and their surroundings, including the mansion, slave
quarters, overseer’s house, and greenhouses. The exterior envelopes and interior finishes of the buildings will be
National Park Service FY 2024 Budget Justification
LRF-98
rehabilitated, and structural deficiencies will be addressed. Mechanical, electrical, fire detection and suppression,
security, and plumbing systems will be replaced, and hazardous materials will be abated. Improvements include
incorporating Architectural Barriers Act Accessibility Standards (ABAAS), addressing landscape and drainage
issues, improving or adding utility connections, and removing non-contributing or non-historic elements.
Scope of Benefits (SB):
This project addresses high priority deferred maintenance and repair, improves the visitor experience, and positions
the park to operate and maintain its facilities through a schedule of regular and recurring maintenance.
Rehabilitation of the historic mansion and other high priority assets will help to preserve the character of the
buildings and grounds so that the stories of the enslaved at Hampton Mansion can be presented in a historically
accurate setting.
Investment Strategy (IS):
Upon completion of this project, the park will be better positioned to proactively operate and maintain these
rehabilitated historic structures and sites. The improved condition of these assets may also help to create historic
leasing opportunities and partnerships to occupy and maintain these facilities. The deficiencies addressed by this
project will not require major recapitalization or modernization for 30 to 40 years. This project is estimated to
address $17.4 M of deferred maintenance and repair needs.
Consequences of Failure to Act (CFA):
Failure to address the deferred maintenance and repair needs of these assets may allow their deterioration to
accelerate. Visitor enjoyment of the assets will continue to be impaired and environmental conditions within some
buildings may make operation and interpretation of some facilities impractical. With time, the assets may be subject
to further loss of their historic fabric and future renovations could require reproduction or replacement at greater
expense. Structural evaluation and repairs will be deferred, resulting in possible closures or curtailment of visitor
and staff access.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.26
API Rating: n/a 73.88
API/FCI Score: (20%) 13.90
SB Score: (40%) 40.00
IS Score: (20%) 20.00
CFA Score: (20%) 10.00
Total Score: (100%) 83.90
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled 05/2023 Completed N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 10,916 71
Modernization/Renewal Work: $ 4,459 29
Divestiture Work $ 0 0
Total: $ 15,375 100
National Park Service FY 2024 Budget Justification
LRF-99
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 2,871
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 15,375
Future Funding to Complete Project: $ 0
Total: $ 18,246
Class of Estimate: C
Estimate Escalated to: FY 2025/Q4
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ 1,564
LRF Design Funds Received: $ 1,303
Design Funds Received from Other Fund Sources: $ 4
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q4
Actual: N/A
Project Complete
Scheduled: FY 2026/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $686,145
Projected: $653,958
Net Change: -$32,187
National Park Service FY 2024 Budget Justification
LRF-100
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 82.80
Planned Funding FY 2024: $17,200,000
Funding Source: Great American Outdoors Act (GAOA) Legacy Restoration Fund (LRF)
Project Identification
Project Title: Rehabilitate Waterfront at Little Sand Bay and Devils Island, Reconstruct Boathouse
Project Number: GAOA ID #N149, NPS PMIS ID #270691A
Unit/Facility Name: Apostle Islands National Lakeshore
Region/Area/District: Midwest; IR 03
Congressional District: WI08
State: Wisconsin
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
35800800 25202 79 0.44
40130400 78499 92 1.00
40130400 78506 77 1.00
Project Description:
This project rehabilitates and stabilizes the marina waterfront systems at Little Sand Bay and Devils Island. This
project includes reinforcement of the seawall and wooden cribbing, and re-engineered surface features to reduce
exterior wave overtopping, interior wave height, and decrease sediment transport into the two marinas. Work at
Devils Island also includes repair of a retaining wall and reconstruction of the historic boat house using salvaged
materials.
Scope of Benefits (SB):
The Little Sand Bay Marina is the only mainland marina in the park and serves as the port-of-entry to the western
and northern islands, providing safe harbor access to approximately 30,000 annual visitors to the area who come as
sightseers, beach goers, boaters of all types, school groups, and picnickers. The Little Sand Bay area has a new
visitor center that was completed in late summer 2019 which has increased visitation to the marina. This project
ensures that there is an accessible route to the marina and the public viewing platform on the marina.
Devils Island Marina provides the only access to the island for the public, U.S. Coast Guard, park law enforcement,
and resource protection staff. Reconstruction of the boathouse will utilize salvaged historic fabric from the original
structure to avoid adverse impacts to this historic light station district.
Investment Strategy (IS):
Completion of Little Sand Bay Marina will result in high resiliency design that will reduce cyclic operational costs
by minimizing the need for dredging and spring repairs. Failure to rehabilitate the marina will likely lead to an
accelerated failure of the waterfront system resulting in the need for costly emergency repairs. Without a safe
harbor, the park would be prevented from mooring maintenance vessels, resulting in increased fuel costs and
consumption.
There has been a dock at Devils Island for 130 years and there has not been an extensive reconstruction of the dock
in over 75 years. The new design life will exceed 50 years, provide additional protection, and will include
substantial reinforcement of addition of armor stone to the adjoining retaining wall. It will provide protection from
the battering waves and winter ice and requires very little annual maintenance to keep it in good condition. The new
design and materials are engineered to survive these extremes. This project is estimated to address $20.4 M of
deferred maintenance and repair needs.
National Park Service FY 2024 Budget Justification
LRF-101
Completing both marina projects simultaneously is advantageous as it will greatly reduce mobilization and
demobilization costs which are a large percentage of Marine projects in remote areas.
Consequences of Failure to Act (CFA):
The Little Sand Bay Marina is a key access point for park operations including resource protection, search and
rescue, and maintenance activities. The U.S. Coast Guard and emergency responders also use the marina for
emergency response. The marina houses a fueling station utilized for park boat operations. A sound marina structure
is critical to the protection of the fueling system located at the edge of the Lake Superior. Should the marina fail,
relationships with stakeholders would be negatively impacted.
Failure to replace the severely damaged Devils Island marina would deny safe access to a park island site impacting
thousands of visitors annually, including concessioners. Further, a national register listed asset would be lost.
Without a safe harbor, the park would be prevented from mooring boats to provide critical park operations. Without
the timely replacement of the protective marina, one of the few surviving historic light station boathouses on Lake
Superior will be lost which will create an adverse impact to this historic light station. The U.S. Coast Guard
maintains the navigational aid portion of the lighthouse, which would also be impacted by a failure to address these
facility deficiencies.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.96
API Rating: n/a 82.67
API/FCI Score: (20%) 12.80
SB Score: (40%) 40.00
IS Score: (20%) 20.00
CFA Score: (20%) 10.00
Total Score: (100%) 82.80
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: Scheduled N/A Completed 01/2023
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 3,612 21
Modernization/Renewal Work: $ 13,588 79
Divestiture Work $ 0 0
Total: $ 17,200 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 1,984
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 17,200
Future Funding to Complete Project: $ 0
Total: $ 19,184
Class of Estimate: B
Estimate Escalated to: FY 2024/Q3
National Park Service FY 2024 Budget Justification
LRF-102
Planning and Design Funds (dollars in thousands):
Planning Funds Received in FY 2023: $ 1,073
Design Funds Received in FY 2023: $ 911
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q3
Actual: N/A
Project Complete
Scheduled: FY 2026/Q3
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $10,673
Projected: $10,428
Net Change: -$245
National Park Service FY 2024 Budget Justification
LRF-103
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: N/A
Planned Funding FY 2024: $145,000,000
Funding Source: Legacy Restoration Fund
Project Identification
Project Title: FY25+ Project Planning and Compliance
Project Number: N/A
Unit/Facility Name: N/A
Region/Area/District: N/A
Congressional District: N/A
State: N/A
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
N/A N/A N/A N/A
Project Description:
This funding will be used to complete planning and compliance required for current and future LRF projects. This
includes:
Planning: This activity supplies critical budgetary resources needed to develop construction plans and specifications,
and cost estimates essential for acceptable completion of major facility maintenance, repair, and replacement
construction projects for the LRF. In addition to final design documents, this funding typically supports pre-design
project programming and budgeting, schematic alternatives, and concept drawings.
Compliance: This activity also provides funding for compliance needs related to addressing impacts to natural and
cultural resources. Regulatory requirements that frame compliance activities include the National Environmental
Policy Act (NEPA), Section 106 of the National Historic Preservation Act, executive orders, and State requirements.
Examples of compliance support include archeological surveys, hazardous material surveys, preparation of historic
structure documentation, coordination with State/Tribal Historic Preservation Offices, and environmental
assessments.
Planning and compliance funding are a necessary component of any construction project, supporting activities
including project pre-planning, development, and scope and cost validation. This activity enhances the NPS’s ability
to conduct legally defensible, scientifically based analyses that facilitate sound decision-making. It also provides
support for compliance needs associated with major construction projects.
At the FY 2024 funding level, planning and compliance funding will support the Pre-designs, Final Designs,
Supplemental Services and Compliance for successful execution of potential future LRF projects, such as utility
systems at Mammoth Cave National Park, and Chesapeake & Ohio Canal National Historical Park’s Potomac River
Dams 4 and 5.
Scope of Benefits (SB):
N/A
Investment Strategy (IS):
N/A
Consequences of Failure to Act (CFA):
N/A
National Park Service FY 2024 Budget Justification
LRF-104
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.00
API Rating: n/a 0.00
API/FCI Score: (20%) 0.00
SB Score: (40%) 0.00
IS Score: (20%) 0.00
CFA Score: (20%) 0.00
Total Score: (100%) 0.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: N/A
VE Study: N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance/Repair Work: $ 0 0
Modernization/Renewal Work: $ 0 0
Divestiture Work: $ 0 0
Total: $ 145,000 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 0
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 145,000
Future Funding to Complete Project: $ 0
Total: $ 145,000
Class of Estimate: N/A
Estimate Escalated to FY: N/A
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ N/A
LRF Design Funds Received: $ N/A
Planning Funds Received: $ N/A
Design Funds Received: $ N/A
Major Milestones
Construction Award/Start
Scheduled: N/A
Actual: N/A
Project Complete
Scheduled: N/A
Actual: N/A
National Park Service FY 2024 Budget Justification
LRF-105
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: N/A
Projected: N/A
Net Change: N/A
National Park Service FY 2024 Budget Justification
LRF-106
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: N/A
Planned Funding FY 2024: $19,950,000
Funding Source: Legacy Restoration Fund
Project Identification
Project Title: Program Administration (Indirect Costs)
Project Number: N/A
Unit/Facility Name: N/A
Region/Area/District: N/A
Congressional District: N/A
State: N/A
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
N/A N/A N/A N/A
Project Description:
This funding will be used to support and oversee planning and execution of the Great American Outdoors Act
(GAOA) National Parks and Public Land Legacy Restoration Fund (LRF), including efforts to advance or complete
current and future projects. These activities are indirect costs and are not directly applied to individual projects.
Approximately 2.5 percent total of the NPS allocation of LRF funds received in FY 2021 through FY 2025 will be
requested to fund project support and program administration through the life of the GAOA program, which will
extend several years beyond FY 2025.
The NPS will coordinate program administration between the NPS Comptrollers Office and the NPS LRF Program
Management Office (PMO). Additionally, some NPS funding will be transferred to the Department of the Interior to
support the Department’s PMO, which will coordinate program administration across the bureaus.
The NPS LRF PMO will use industry best practices to initiate, plan, execute, monitor, control, and close out
projects. Existing NPS procedures and tools will be adapted and improved to ensure projects stay within scope,
budget, and schedule. Activities in this area are related to contracting, budget, finance, external affairs, office
support, field office support, human capital, engineering, and project management whose focus is not directed
towards a specific project. A series of internal control measures will be applied to ensure all program administration
expenses charged to LRF are appropriate and within the boundaries of issued guidance.
At the FY 2024 funding level, the NPS LRF PMO will:
Evaluate project proposals to ensure that the highest priority, mission critical projects are reflected in the
LRF plan.
Support the Bureau Investment Review Board to ensure projects are of high quality, incorporate sustainable
practices, are appropriate to their settings, and demonstrate defensible cost-conscious decisions focused on
cost reduction.
Coordinate with the Department’s GAOA Program Management Office.
Formulate and monitor current and future LRF projects.
Implement procedures and tools to ensure accurate data, timely reporting, and status briefs.
Track and monitor risks; implement internal controls.
Scope of Benefits (SB):
N/A
National Park Service FY 2024 Budget Justification
LRF-107
Investment Strategy (IS):
N/A
Consequences of Failure to Act (CFA):
N/A
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.00
API Rating: n/a 0.00
API/FCI Score: (20%) 0.00
SB Score: (40%) 0.00
IS Score: (20%) 0.00
CFA Score: (20%) 0.00
Total Score: (100%) 0.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: N/A
VE Study: N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance/Repair Work: $ 0 0
Modernization/Renewal Work: $ 0 0
Divestiture Work: $ 0 0
Total: $ 19,950 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 0
FY 2023 Legacy Restoration Fund Funding (this PDS): $ 19,950
Future Funding to Complete Project: $ 0
Total: $ 19,950
Class of Estimate: N/A
Estimate Escalated to FY: N/A
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ N/A
LRF Design Funds Received: $ N/A
Planning Funds Received: $ N/A
Design Funds Received: $ N/A
Major Milestones
Construction Award/Start
Scheduled: N/A
National Park Service FY 2024 Budget Justification
LRF-108
Actual: N/A
Project Complete
Scheduled: N/A
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: N/A
Projected: N/A
Net Change: N/A
National Park Service FY 2024 Budget Justification
LRF-109
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: N/A
Planned Funding FY 2024: $35,000,000
Funding Source: Legacy Restoration Fund
Project Identification
Project Title: Project Management
Project Number: N/A
Unit/Facility Name: N/A
Region/Area/District: N/A
Congressional District: N/A
State: N/A
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
N/A N/A N/A N/A
Project Description:
This funding will be used to provide professional NPS project management and contracting services for current and
future projects throughout the typical three to five-year construction cycle. The funding also provides quality
assurance including project compliance, quality, specialized technical expertise, and risk assessment and
management. Project Management encompasses tasks completed over the life of a project such as assembling a
project team with the expertise necessary to execute the project, establishing the technical objectives, planning the
project, managing changes to the scope, and controlling the undertaking so that it is completed on schedule and
within budget. Staff funded through this activity provide cost-efficient project management services and rely on the
contracted support of design and construction firms nationwide to ensure best value and quality for park projects and
services. Project Management activities include coordinating major construction and planning activities, providing
for design, compliance, and construction management services, and providing contracting support.
At the FY 2024 funding level, LRF Project Management will:
Provide project management expertise and capacity to support LRF projects.
Support and oversee project coordination, design, and contracting/acquisition.
Justify, document, and support expenses directly attributed to LRF funded projects.
Support small business goals and socioeconomic programs for the NPS and DOI.
Support the unique NPS interpretive planning, media, and conservation elements of major construction
projects.
Track and monitor risks; implement internal controls.
Scope of Benefits (SB):
N/A
Investment Strategy (IS):
N/A
Consequences of Failure to Act (CFA):
N/A
National Park Service FY 2024 Budget Justification
LRF-110
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.00
API Rating: n/a 0.00
API/FCI Score: (20%) 0.00
SB Score: (40%) 0.00
IS Score: (20%) 0.00
CFA Score: (20%) 0.00
Total Score: (100%) 0.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: N/A
VE Study: N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance/Repair Work: $ 0 0
Modernization/Renewal Work: $ 0 0
Divestiture Work: $ 0 0
Total: $ 35,000 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 0
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 35,000
Future Funding to Complete Project: $ 0
Total: $ 35,000
Class of Estimate: N/A
Estimate Escalated to FY: N/A
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ N/A
LRF Design Funds Received: $ N/A
Planning Funds Received: $ N/A
Design Funds Received: $ N/A
Major Milestones
Construction Award/Start
Scheduled: N/A
Actual: N/A
Project Complete
Scheduled: N/A
Actual: N/A
National Park Service FY 2024 Budget Justification
LRF-111
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: N/A
Projected: N/A
Net Change: N/A
National Park Service FY 2024 Budget Justification
LRF-112
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: N/A
Planned Funding FY 2024: $121,945,000
Funding Source: Legacy Restoration Fund
Project Identification
Project Title: Contingency Fund
Project Number: N/A
Unit/Facility Name: N/A
Region/Area/District: N/A
Congressional District: N/A
State: N/A
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
N/A N/A N/A N/A
Project Description:
This funding will be used to provide contingency funds for all Legacy Restoration Fund construction projects. Due
to the nature of the construction process, projects must be prepared to address multiple risks that frequently increase
costs. These include unforeseen/unanticipated site conditions that require adjustments to construction methods and
timelines, unpredictable fluctuations in prices for supplies and materials, and adjustments to project scheduling
when contending with unexpected environmental events. This funding will be used to ensure the bureau is able to
address fluctuations in construction costs to accomplish the scope described in the project data sheets for individual
projects. The NPS will not use this funding to add enhancements.
While typical NPS projects include a certain percentage of contingency funding built into their individual requests,
the scope and scale of LRF projects requires the NPS to use a different budget strategy. The Contingency Fund is
held in reserve and not allocated to specific projects until it is needed. The amount requested in this project data
sheet represents approximately 12 percent of the FY 2024 project total, but this funding will be made available for
past, current, and future LRF projects needing contingency funds to complete construction.
At the FY 2024 funding level, the Contingency Fund will:
Provide contingency funds to past, present, and future LRF projects to address cost increases, unforeseen
site conditions, and adapt project methods and schedules during unexpected environmental events.
Support successful completion of major LRF projects that encounter challenges, ensuring projects are not
delayed or left unfinished while other funding is identified.
Reinforce the NPS’s ability to complete projects on time, minimizing closures of the buildings, amenities,
and roads improved by the projects, and ensuring they are reopened for visitor enjoyment or park
operations in a timely fashion.
Scope of Benefits (SB):
N/A
Investment Strategy (IS):
N/A
Consequences of Failure to Act (CFA):
N/A
National Park Service FY 2024 Budget Justification
LRF-113
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.00
API Rating: n/a 0.00
API/FCI Score: (20%) 0.00
SB Score: (40%) 0.00
IS Score: (20%) 0.00
CFA Score: (20%) 0.00
Total Score: (100%) 0.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: N/A
VE Study: N/A
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance/Repair Work: $ 0 0
Modernization/Renewal Work $ 0 0
Divestiture Work: $ 0 0
Total: $ 121,945 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 0
FY 2024 Legacy Restoration Fund Funding (this PDS): $ 121,945
Future Funding to Complete Project: $ 0
Total: $ 121,945
Class of Estimate: N/A
Estimate Escalated to FY: N/A
Planning and Design Funds (dollars in thousands):
LRF Planning Funds Received: $ N/A
LRF Design Funds Received: $ N/A
Planning Funds Received from Other Fund Sources: $ N/A
Design Funds Received from Other Fund Sources: $ N/A
Major Milestones
Construction Award/Start
Scheduled: N/A
Actual: N/A
Project Complete
Scheduled: N/A
Actual: N/A
National Park Service FY 2024 Budget Justification
LRF-114
Project Data Sheet
Prepared/Last Updated: 02/2023
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: N/A
Projected: N/A
Net Change: N/A
National Park Service FY 2024 Budget Justification
RecFee-1
Mandatory: Recreation Fee Permanent Appropriations
Recreation Fee Permanent Appropriation
($000)
2022
Actual
1
2023
Estimate
2
2024
Estimate
3
Change from
2023 Estimate
(+/-)
Recreation Fee Programs
348,631 358,500 365,494 +6,994
Recreation Fee Program
345,532 350,500 355,494 +4,994
Deed Restricted Parks Fee Program
3,099 8,000 10,000 +2,000
Transportation Systems Fund (Fund 45)
91 212 217 +5
Payment for Tax Losses on Land Acquired for
Grand Teton NP
16 16 17 +1
Total Receipts
348,738 358,728 365,728 +7,000
Total FTE Requirements
1,803 1,803 1,803 0
1
FY 2022 Actual column does not include these sequestered Receipt amounts: Recreational Fee Program’s $2,166, GRTE $1;
FY 2022 Actual column includes pop up of funds that were sequestered in FY 2021 but became available in FY 2022:
Recreational Fee Program’s $2,166, GRTE $1.
2
FY 2023 Estimate column does not include these sequestered Receipt amounts: Recreational Fee Program’s $2,166, GRTE $1;
FY 2023 Estimate column includes pop up of funds that were sequestered in FY 2022 but became available in FY 2023:
Recreational Fee Program’s $2,166, GRTE $1.
3
FY 2024 Estimate column does not include these estimated sequestered Receipt amounts: Recreational Fee Program’s $2,172,
GRTE $1; FY 2024 estimate column includes pop-up funds that are estimated to be sequestered in FY 2023 but are expected to
become available in FY 2024: Recreation Fee Program’s $2,166, GRTE $1.
Appropriation Overview, Justification of Program, and Performance
This section includes several permanent appropriations that are derived from recreation entrance and use
fees. They are discussed below as program components of the Recreation Fee Permanent Appropriation.
Program Overview
Recreation Fee Program
The Federal Lands Recreation Enhancement Act (FLREA) (16 U.S.C. 6801 et seq.), authorizes recreation
fees to be collected, retained, and expended by the National Park Service and other land management
agencies to provide benefits and services to the visitor. NPS uses revenue generated by recreation fees to
repair, maintain and enhance facilities; provide interpretation, information, and other visitor services;
restore habitat directly related to wildlife-dependent recreation; and provide law enforcement related to
public use and recreation both at the park where the fee is collected and throughout the National Park
System. Authorization for the program terminates October 1, 2024. The Department of the Interior’s FY
2024 budget request proposes appropriations language to allow for the implementation of the Federal
Lands Recreation Enhancement Act by an additional year.
FLREA fee receipts depend on visitation, which varies based on many factors including gas prices, health
of the economy, tour and travel industry trends, weather, construction, NPS initiatives, and park-specific
variables. Revenues collected through the program have fluctuated over the past several years, with an
increase of 32 percent from FY 2015 to FY 2019, due to increases in fee pricing and increases in
visitation. In FY 2020, the COVID-19 pandemic reduced park visitation, causing fee revenue to decline to
a level comparable to FY 2015. In FY 2021 and FY 2022, revenue levels began to rise again, above FY
2019 levels, primarily due to an increase in visitation.
National Park Service FY 2024 Budget Justification
RecFee-2
FLREA authorizes the NPS to retain all recreation fee revenue. At least 80 percent of collections must
remain at the park unit until expended, unless that revenue exceeds the reasonable needs for the unit for
that fiscal year, in which case the NPS can reduce the percent retained, but not below 60 percent. All
collections needed to support transportation systems remain at the park in which they were collected and
are spent in support of those systems.
At a Glance…
Fee-Free Days
The NPS will offer fee-free days in 2023, including the following:
Monday, January 16 – Martin Luther King, Jr. Day
Saturday, April 22 – First Day of National Park Week
Friday, August 4 –Anniversary of the Great American Outdoors Act
Saturday, September 23 – National Public Lands Day
Saturday, November 11 – Veterans Day
The NPS uses fee revenues to support a wide variety of work including operations and maintenance of
visitor-facing facilities like visitor centers, campgrounds, restrooms, and trails; facility modernization and
renewal investments; enhancement of recreational opportunities; and interpretation, law enforcement, and
other visitor services. NPS has an expenditure policy that requires parks to obligate 55 percent of
recreation fee allocations to deferred and preventative facility maintenance projects. Fee revenues are also
used to fund fee collection operations and program administrative costs. Collection expenses are paid
from the recreation fee funds retained at each park. These costs are monitored closely to ensure
appropriateness and cost effectiveness. The recreation fee program provides central and regional office
oversight and management.
Beginning in FY 2024, NPS will provide Congressional notification for Recreation Fee-funded projects
with estimated costs over $2,000,000 and 25 percent Capital Improvement and only project components
that include physical work.
National Park Service FY 2024 Budget Justification
RecFee-3
NPS Budgetary Resources: Recreation Fee Programs ($000)
Description FY 2022
Actual
FY 2023
Estimate
FY 2024
Estimate
Unobligated Balance Brought Forward and Recoveries 402,565 449,762 323,865
Total Fees Collected
1
348,631 358,500 365,494
Total Available for Obligation 751,196 802,262 689,365
Facilities Maintenance
168,672 337,492 217,500
Interpretation & Visitor Services
33,565 33,565 33,565
Transportation Systems
2
18,775 25,829 26,474
Habitat Restoration
6,752 6,752 6,752
Collection Costs
45,510 47,510 48,000
Law Enforcement (for public use and recreation)
1,461 1,461 1,461
Fee Management Agreement and Reservation Services 13,956 13,956 13,956
Administrative, Overhead and Indirect Costs 12,743 17,832 18,545
Total Obligations 301,434 484,397 366,253
End of Year Unobligated Balance
449,762 323,865 323,106
Total Expenditures (Outlays) 287,343 297,000 297,000
1
All columns include sequestration reductions and pop ups of previously sequestered funds.
2
Transportation system obligations from FLREA account only. Obligations from the Transportation Systems Fund are reported
separately.
Components of the Recreation Fee Program include the following:
America the Beautiful – The National Parks and Federal Lands Recreational Pass: The interagency
pass provides admission to all units of the NPS and the Fish and Wildlife Service (FWS) that charge an
entrance fee, and units of the Forest Service (USFS), Bureau of Land Management (BLM), and Bureau of
Reclamation (BOR) that charge a standard amenity fee. The pass is valid for 12 months from the date of
purchase and costs $80. The price of the interagency lifetime senior pass is $80 and an annual senior pass
costs $20. The first $10 million collected by NPS sites from the sale of senior passes in each fiscal year is
deposited into an endowment managed by the National Park Foundation, and any additional amounts
collected are deposited to the National Park Centennial Challenge Fund to be used for high-priority
projects and programs that have non-Federal matching donations. The interagency access pass is free for
citizens with permanent disabilities. Additionally, volunteers with over 250 hours of service, and
members of the US military may receive a free annual pass, and Gold Star Families, and Veterans may
receive a free lifetime pass. FY 2022 receipt totals and the estimated number of passes sold for the
various types of passes sold by NPS sites are listed below:
Annual interagency pass totals: $65 million; approximately 812,500 passes sold.
Senior pass totals: $ 17.6 million; approximately 423,500 (271,300 Annual and 152,200 Lifetime)
passes sold.
Fees from these passes are reported as part of the total revenues collected by parks.
National Park Service FY 2024 Budget Justification
RecFee-4
Recreation.gov (also known as Recreation One-Stop (R1S)): This website provides reservation
services for camping and other recreational activities for the NPS, USFS, US Army Corps of Engineers,
BLM, FWS, BOR, and Presidio Trust. It offers information and trip planning for over 3,500 Federal
recreation facilities. Recreation.gov provides reservation services for 170 NPS sites that offer camping,
tickets, permits or digital passes. The NPS offers 386 different camping, cabin, athletic field, and day use
facilities, 35 permits, 72 tours, 10 timed entry tickets, 10 digital activity passes, and 76 digital site passes.
In FY 2022, visitors made over 10 million reservations and lottery applications through recreation.gov
including 4.2 million camping and day use reservations, 1.1 million permit reservations, and 3.2 million
tour tickets reservations.
Servicewide Recreation Business Management System (RBMS): RBMS enables the NPS to
effectively and efficiently collect, account for, and report on recreational fee revenues with the use of
standardized front-end and back-end equipment and software. RBMS greatly enhances the NPS’ ability to
complete cash, check, and credit card transactions; prepare remittance paperwork; provide IT compliance;
provide enhanced employee security; and meet banking and Treasury requirements.
In September 2018, the NPS awarded a new contract, and the new system was implemented
across 144 fee-collecting parks by August 2021.
National Park Service FY 2024 Budget Justification
RecFee-5
Program Overview
Deed Restricted Parks Fee Program
Any recreation fees collected by park units at which entrance fees cannot be collected by reason of deed
restrictions are retained, used, and managed by those respective park units in a manner consistent with
recreation fees collected at non-deed restricted parks. This applies to Great Smoky Mountains NP,
Lincoln Home NHS, and Abraham Lincoln Birthplace NHS. Revenue collected by deed restricted parks
continues to be managed and reported in conjunction with other FLREA revenues. The Great Smoky
Mountains NP is implementing a new parking fee, leading to an increase in overall Deed-Restricted fee
revenue.
Program Overview
Transportation Systems Fund
The National Park Service was authorized by 54 U.S.C. 101531 to collect transportation fees for the use
of public transportation services within park units. All transportation fee monies must be spent on costs
associated with the transportation systems at the park unit where the transportation fee is collected.
Voyageurs NP and Point Reyes NS collect and expend revenue under the Transportation Fee Authority.
In FY 2022, Voyageurs NP raised its transportation fees and expanded its transportation operations.
However, the park experienced significant flooding, which delayed the operation of their transportation
system and the collection of their transportation fee revenue. Point Reyes NS did not operate or collect
revenue from its transportation systems in FY 2022.
Program Overview
Payment for Tax Losses on Land Acquired for Grand Teton National Park
As required by law (16 U.S.C. 406d-3), fees collected from visitors at Grand Teton NP are provided to the
State of Wyoming in amounts sufficient to compensate for tax revenues lost as a result of Federal
acquisitions of land in expanded areas of Grand Teton NP. Amounts may vary because of tax rate
changes; withdrawal of additional lands from the State’s tax rolls because of Federal acquisition; and
gradual reductions by law of the amount due for each tract of land after it is acquired.
National Park Service FY 2024 Budget Justification
RecFee-6
FY 2022 Recreation Fee-Funded Project Examples
George Washington Memorial Parkway
Construct Comfort Stations at the U.S. Marine Corps War Memorial – Iwo Jima
BEFORE AFTER
This project constructed the first comfort station at the U.S. Marine Corps War Memorial, replacing the
portable toilets that had been used at the site for decades.
The facility is easily accessible from the Memorial, provides a covered sitting area, and includes physically
accessible restrooms, a family restroom, a water bottle filling station, and a sewer lift station.
This site receives approximately 1.6 million visitors annually.
Canyonlands National Park
Provide Campground Interpretive Programs and Parkwide Interpretive Services
This project provides a variety of interpretive programs, particularly during the busy season. This has
allowed the park to expand campfire programs including night sky interpretation, Junior Ranger activities,
ranger talks focused at high-visitation areas, and roving interpretation.
The park welcomes approximately 800,000 visitors annually.
National Park Service FY 2024 Budget Justification
RecFee-7
Abraham Lincoln Birthplace National Historical Park
Rehabilitate the Knob Creek Tavern
BEFORE AFTER
This project repaired interior and exterior structural damage and addressed deferred maintenance to
adaptively reuse the 1933 Lincoln Tavern as a visitor center. Work included repairing and replacing log
walls; replacing electrical, plumbing, and mechanical systems to meet current code requirements; installing
a fire alarm and suppression system; abating asbestos and lead hazards; and replacing the roof.
The park receives 250,000 visitors annually.
Shenandoah National Park
Provide Education at the Trailhead and Backcountry Patrols for Visitor Safety
This project supports visitor education and orientation, trail patrols, and visitor assistance including
emergency medical assistance on trails and at trailheads throughout the park.
Shenandoah National Park has over 500 miles of trails and one of the most-used backcountry camping
programs in the National Park System.
The park welcomes nearly two million visitors every year.
National Park Service FY 2024 Budget Justification
RecFee-8
Grand Teton National Park
Perform Custodial Services and Operations in Visitor Use Areas
This project provides for custodial operations at visitor centers, comfort stations, trailheads, picnic areas,
launch areas, and vault toilets throughout the park including the highest visitor-use areas and more remote
locations.
Grand Teton National Park welcomes nearly four million visitors each year.
Natchez Trace Parkway
Rehabilitate Yockanookany Section of National Scenic Trail
This project employed youth from the Southeast Conservation Corps to repair several bridges, boardwalks,
trail treads, and water bars, as well as to remove dead and down trees and eliminate social trails.
Youth corps members acquired resource preservation skills through hands-on experience.
The park welcomes 6.5 million visitors per year.
National Park Service FY 2024 Budget Justification
RecFee-9
Kenai Fjords National Park
Rehabilitate Visitor Center Exterior
BEFORE AFTER
This project repurposed decking, pavement, and employee parking areas to increase physically accessible
plaza area for interpretive media. This accentuates the newly renovated visitor center and expands
accessible interpretive media from indoors to outdoors.
This facility welcomes approximately 400,000 visitors annually.
Assateague Island National Seashore
Provide Campground Custodial and Maintenance Services
This project provides for sanitary and safety services for comfort stations, shower rooms, and campsites;
maintainenance of water and wastewater systems; and solid waste collection and recycling.
The park hosts campers for more than 60,000 overnight stays each year.
National Park Service FY 2024 Budget Justification
RecFee-10
San Juan National Historic Site
Repair and Restore Historic Masonry Surfaces
This project repaired and restored over 20,000 square feet of historic masonry surfaces and drainage at a
UNESCO World Heritage Site.
All repairs were performed manually, using 17th-18th century traditional masonry techniques, in some
cases correcting repairs made incorrectly during the early 20th century.
The park has over 1.1 million visitors per year.
Jewel Cave National Monument
Replace Elevators
BEFORE AFTER
This project rehabilitated and modernized a 300-foot elevator shaft and support components to provide safe
visitor access to the cave.
The elevators (50 years old) and equipment (30 years old) were beyond their useful lives.
About 125,000 people visit the cave every year.
National Park Service FY 2024 Budget Justification
RecFee-11
Fort Larned National Historic Site
Repair and Maintain Interior and Exterior Walkways
BEFORE AFTER
This project raised the earthen floor height, widened a walkway, and replaced deteriorated boardwalk
inside of a well-preserved military fort. It also widened an exterior trail to improve egress and facilitate a
new flow pattern for foot traffic.
This site receives approximately 30,000 visitors annually.
Canaveral National Seashore
Maintain Park Trails, Campsites, and Turtle Nests
This project employed youth from the American Conservation Experience to maintain interpretive trails,
picnic areas, backcountry campsites, and areas along the beach and dunes. The crew also stabilized the
shoreline for preservation of archeological sites, viewing areas, and public fishing sites.
Youth corps members acquired resource preservation skills through hands-on experience.
The park has 2.2 million visitors annually.
National Park Service FY 2024 Budget Justification
RecFee-12
Castillo de San Marcos
Provide Visitor Services – Living History
This project funded staff to offer a variety of interpretive programs across the park, including weapons
demonstrations, fort tours, and hands-on demonstrations for children.
The park welcomes 600,000 visitors per year.
National Capital Parks East
Restore the Carter G. Woodson Home
This project is a full restoration of the home of Dr. Carter G. Woodson, the father of Black History month
and the pioneer of the study of African American history and heritage.
The full restorations encompassed plumbing, electrical, HVAC, fire and interior fire egress, structural
repairs, interior surface repairs including framing, door installation, drywall, paint telecommunication
systems and other smaller fixtures such as switches lights, trimming and jambs.
This overarching project leveraged funding from the Centennial Challenge, as well as donations.
National Capital Parks East welcomes about 1 million visitors per year.
National Park Service FY 2024 Budget Justification
RecFee-13
Summary Project Data Sheet for Recreation Fee – FY 2023
1
Fiscal
Year
2,3
Priority
Facility or
Unit Name Project Title
Cong.
District
Total
Project
Cost
($000)
Funded
to Date
($000)
Funding
Request
($000)
Remaining
to be
Funded
($000)
Future
Years of
Plan
with
Funding
Investment
Category/Work
Classification
Funding
Sources
for Other
Phases
DOI
Score
2023 1 Cape
Hatteras
National
Seashore
Improve and Restore Historic
Landscape at Cape Hatteras Light
Station
NC03
3,286 258 3,028 0
n/a Maintenance Recreation
Fee Park
Revenue
45
Total
3,028
1
NPS provides notification for projects with estimated costs over $2,000,000 and 25 percent capital improvement, and only for project components that include physical work.
2
Execution of the recreation fee program is dynamic; projects may shift between fiscal years as funding and scope allow.
3
FY 2023 projects were not previously identified for FY 2023; they are listed here as notification of intent to execute in FY 2023.
Summary Project Data Sheet for Recreation Fee – FY 2024
1
Fiscal
Year
2
Priority
Facility or
Unit Name Project Title
Cong.
District
Total
Project
Cost
($000)
Funded
to Date
($000)
Funding
Request
($000)
Remaining
to be
Funded
($000)
Future
Years of
Plan
with
Funding
Investment
Category/Work
Classification
Funding
Sources for
Other
Phases
DOI
Score
2024 1 Yosemite
National
Park
Construct Underground Power and
Communications to Wawona
Tunnel
CA04
9,149 799 8,350 0
n/a Modernization
and Renewal
(Recapitalizatio
n)
Recreation
Fee Park
Revenue
70
2024 2 Hawaii
Volcanoes
National
Park
Replace Kilauea Visitor Center
Restrooms
HI02
4,665 2,526 2,139 0
n/a Modernization
and Renewal
(New Const.)
2018
Disaster
Supplement
al 48
Total
10,489
1
NPS provides notification for projects with estimated costs over $2,000,000 and 25 percent capital improvement, and only for project components that include physical work.
2
Execution of the recreation fee program is dynamic; projects may shift between fiscal years as funding and scope allow.
National Park Service FY 2024 Budget Justification
RecFee-14
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 35.00
Planned Funding FY 2023: $3,028,000
Funding Source: Recreation Fee Park Revenue
Project Identification
Project Title: Improve and Restore Historic Landscape at Cape Hatteras Light Station
Project Number: 319351A
Unit/Facility Name: Cape Hatteras National Seashore
Region/Area/District: Southeast; IR 02
Congressional District: NC03
State: NC
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
40750300 28571 100 0.11
Project Description:
This project will improve and restore the historic landscape at the Cape Hatteras Light Station by reconstructing the
Cape Hatteras Light Station landscape. Visitor circulation paths will be constructed or improved throughout the light
station grounds. Interpretation exhibit stations will be installed along the pathways. The historic fence around the
Keeper’s Quarters buildings will be restored, and a shade structure will be constructed to support lighthouse climbs.
Landscaping will include new natural landforms and native plantings.
Scope of Benefits (SB):
This project will improve the circulation and mitigate native grass damage at this National Historic Landmark. The
park welcomes approximately 3 million visitors annually, and nearly 200,000 of those climb the steps of the
lighthouse.
Investment Strategy (IS):
This project complements a Line-Item Construction Project to repair the Cape Hatteras Lighthouse. It will
implement some of the recommendations of the site’s Cultural Landscape Report, including planting native
vegetation and improving visitor circulation and views. The park does not expect any change to operations and
maintenance costs as a result of this project.
Consequences of Failure to Act (CFA):
Without this project, the visitor experience will be limited for this National Historic Landmark. The landscape will
continue to degrade, potentially undercutting the lighthouse base due to storm impacts, which could necessitate
additional repairs or movement of the lighthouse structure further inland.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.00
API Rating: n/a 100.00
API/FCI Score: (20%) 15.00
SB Score: (40%) 20.00
IS Score: (20%) 0.00
CFA Score: (20%) 10.00
Total Score: (100%) 45.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
National Park Service FY 2024 Budget Justification
RecFee-15
Capital Asset Planning
Capital Plan Business Case Required: Yes
VE Study: C Scheduled 12/22 Completed 12/22
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 1,544 51
Modernization/Renewal Work: $ 1,484 49
Divestiture Work $ 0 0
Total: $ 3,028 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 258
FY 2023 Recreation Fee Park Revenue Funding (this PDS): $ 3,028
Future Funding to Complete Project:
$ 0
Total: $ 3,286
Class of Estimate: C
Estimate Escalated to: FY 23/Q1
Planning and Design Funds (dollars in thousands):
Planning Funds Received in FY 2023 (PMIS 327885): $ 258
Design Funds Received in FY 202#: $ 0
Major Milestones
Construction Award/Start
Scheduled: FY 2023/Q4
N/A
Project Complete
Scheduled: FY 2024/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 1/23
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $12,000
Projected: $12,000
Net Change: $0
National Park Service FY 2024 Budget Justification
RecFee-16
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 70.00
Planned Funding FY 2024: $8,350,000
Funding Source: Recreation Fee Park Revenue
Project Identification
Project Title: Construct Underground Power and Communications to Wawona Tunnel
Project Number: 229720A
Unit/Facility Name: Yosemite National Park
Region/Area/District: Pacific West; IR 10
Congressional District: CA04
State: CA
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
40711200 10661 100 0.25
40720100 8911 55 0.68
40720100 6313 55 0.00
Project Description:
This is the final phase of two-phase project. It will complete the construction for the project to replace the overhead
power transmission lines with underground power and communications to Wawona Tunnel.
This project will replace the failing overhead components with a duct bank system that will connect to a recently
constructed duct bank at Bridalveil Falls and continue the duct bank up to the Wawona Tunnel. Three replacement
12kV power lines and the replacement communication line will be installed in the new duct bank. The out-of-date
Supervisory Control Acquisition Data (SCADA) System will be replaced with new hardware to properly control all
tunnel ventilation and lighting.
The project will also replace, in-kind, existing surface mounted armored power and communication cables that
continue from the Wawona Tunnel location up to the Turtleback Dome Communication Tower site. This project
includes replacement of a generator, switchgear, transformers, and other appurtenances required to support the
replacement electric and communication systems. 
Scope of Benefits (SB):
The power distribution system feeding the Wawona Tunnel and Turtleback Dome Communication Tower is
currently supplied by overhead conductors on poles and as such has been susceptible to fire, snow, and rockslides.
The existing overhead electrical and direct bury communication lines that run from the powerhouse substation
location to the Wawona Tunnel are unreliable, past their useful component life, and endanger those who use the
tunnel. 
Loss of power to the Wawona Tunnel causes serious safety risks due to tunnel exhaust fans and tunnel lighting being
supplied by the existing overhead line. The replacement of this line in a new buried duct bank system will
significantly improve the reliability of the tunnel ventilation system as well as the communication systems at the
Turtleback Dome communication tower. Replacement of outdated SCADA control hardware will allow control of
Tunnel Exhaust Fans by a carbon monoxide (CO) sensor activated when the CO concentrations reach predetermined
levels, rather than running the fans continuously. Reliable mobile communication opportunities will benefit both
visitors and first responders. This project will improve the health and safety of the 1.6 million park visitors and
employees that utilize the Wawona Tunnel. 
In addition, an underground transmission system will improve the natural scenery and setting in the area, as well as
reduce fire danger due to downed lines. This project reduces tunnel closures that require visitors and first responders
National Park Service FY 2024 Budget Justification
RecFee-17
traveling between Wawona and the Valley to use the alternate route Highway 140, adding hours to their travel and
significantly impacting emergency services and visitor experiences. 
Investment Strategy (IS):
The underground electrical system will be less costly to maintain as it is less susceptible to wildland fires, treefall,
and rockfall accidents. New conductors will improve inefficiencies due to line loss in the existing distribution
system, resulting in overall less energy consumed and decreased maintenance costs.
The replacement of the out-of-date SCADA system will increase operation and maintenance efficiencies and will
decrease costs. Without SCADA control, the Tunnel Exhaust Fans are required to run continuously; SCADA control
saves energy and reduce maintenance costs of the large tunnel fan motors. 
In recent years, the existing operation and maintenance costs have included several hundred thousand dollars of
emergency repairs, equipment rentals, and overtime labor costs. Upon completion of the project, the operating and
maintenance costs will be dramatically lowered due to the increased reliability of the system as well as the ability for
remote monitoring. This increased reliability will reduce the need for emergency repairs, generator rentals to
maintain power to critical infrastructure, and overtime labor. 
Consequences of Failure to Act (CFA):
Failure to perform the improvements described in this project will result in continued utilization of the existing high
voltage overhead system which is known to be unreliable for the current needs. The existing unreliable tunnel
ventilation and lighting systems will continue to pose life, health, and safety risks to visitors as they ensure that
vehicular exhaust is expelled from the tunnel and fresh air is brought in for the motorists to breathe and that there is
sufficient lighting for safe vehicular travel. Communications will continue to be unreliable and compromised.
Consequently, the life and health of all visitors and park employees traveling through the tunnel are at risk. 
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.25
API Rating: n/a 70.00
API/FCI Score: (20%) 20.00
SB Score: (40%) 20.00
IS Score: (20%) 20.00
CFA Score: (20%) 10.00
Total Score: (100%) 70.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Y
VE Study: D Scheduled 05/23
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 0 0
Modernization/Renewal Work: $ 8,350 100
Divestiture Work $ 0 0
Total: $ 8,350 100
National Park Service FY 2024 Budget Justification
RecFee-18
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 799
FY 2024 Recreation Fee Park Revenue Funding (this PDS): $ 8,350
Future Funding to Complete Project: $ 0
Total: $ 9,149
Class of Estimate: C
Estimate Escalated to: FY 24/Q1
Planning and Design Funds (dollars in thousands):
Planning Funds Received in FY 2022: $ 344
Design Funds Received in FY 2022: $ 455
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q1
Actual: N/A
Project Complete
Scheduled: FY 2024/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 01/23
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $200,000
Projected: $10,000
Net Change: -$180,000
National Park Service FY 2024 Budget Justification
RecFee-19
NATIONAL PARK SERVICE
Project Data Sheet
Total Project Score/Ranking: 48.00
Planned Funding FY 2024: $2,139,000
Funding Source: Recreation Fee Park Revenue
Project Identification
Project Title: Replace Kilauea Visitor Center Restrooms
Project Number: 327801B
Unit/Facility Name: Hawaii Volcanoes National Park
Region/Area/District: Pacific West; IR 12
Congressional District: HI02
State: HI
Project Justification
DOI Asset Code FRPP Unique Id# API: FCI-Before:
00000000 257252 78 0.00
35240100 22567 78 0.26
Project Description:
This project will demolish and rebuild the Kilauea Visitor Center Restroom facilities and utility infrastructure. The
restroom facility and septic system will be demolished and replaced to meet current international building code, as
well as Architectural Barriers Act Accessibility Standards (ABAAS) and NPS facilities standards.
Scope of Benefits (SB):
The Kilauea Visitor Center is the park’s sole visitor center since a volcanic eruption in 2018 resulted in the closure
of the Jaggar Museum. This visitor center now serves 2 million visitors annually for information and orientation,
restrooms, and the partnering bookstore. The new restrooms will improve the visitor experience at the visitor center
while still integrating with the historic fabric of the Kilauea Visitor Center. The new restrooms will be farther from
areas where visitors gather, thereby reducing the nuisance of sounds and smells. The interior configuration of the
restrooms will be improved to meet accessibility standards.
Investment Strategy (IS):
This project will support disaster recovery efforts, complementing a larger disaster recovery project to replace the
functions of the Jagger Museum facilities complex, and will ensure appropriate visitor service infrastructure. The
park expects that the annual operating cost for this restroom will not change. However, the existing facility has
unmet deferred maintenance and repair needs of approximately $0.5 million that this project will address, including
repainting, tile repair and rehab, fixture replacement, and ABAAS improvements.
Consequences of Failure to Act (CFA):
Failure to replace this restroom facility will cause the park to continue to have nuisance issues with odors and
sounds that impact overall visitor experience. In addition, the facility will continue to fail to meet ABAAS
requirements for entry into and use of the restroom facility.
Ranking Categories:
Category Percent Score
FCI Rating: n/a 0.07
API Rating: n/a 78.00
API/FCI Score: (20%) 8.66
SB Score: (40%) 40.00
IS Score: (20%) 0.00
National Park Service FY 2024 Budget Justification
RecFee-20
Category Percent Score
CFA Score: (20%) 0.00
Total Score: (100%) 48.00
Combined ranking factors = (0.20 x API/FCI score) + (0.40 x SB score) + (0.20 x IS score) + (0.20 x CFA score)
Capital Asset Planning
Capital Plan Business Case Required: Y
VE Study: C Scheduled 3/23
Project Costs and Status
Project Cost Estimate (this PDS):
Activity Dollars in thousands Percent
Maintenance Work: $ 0 0
Modernization/Renewal Work: $ 1,711 80
Divestiture Work $ 428 20
Total: $ 2,139 100
Project Funding History (entire project):
History Dollars in thousands
Funded to Date: $ 2,526
FY 2024 Recreation Fee Park Revenue Funding (this PDS): $ 2,139
Future Funding to Complete Project: $ 0
Total: $ 4,665
Class of Estimate: C
Estimate Escalated to: FY 24/Q1
Planning and Design Funds (dollars in thousands):
Planning Funds Received in FY 2023: (PMIS 305150) $ 626
Design Funds Received in FY 2023: (PMIS 305150) $ 1,900
Major Milestones
Construction Award/Start
Scheduled: FY 2024/Q3
Actual: N/A
Project Complete
Scheduled: FY 2025/Q4
Actual: N/A
Project Data Sheet
Prepared/Last Updated: 12/22
DOI Approved: YES
Annual Operations & Maintenance Costs $
Current: $113,000
Projected: $113,000
Net Change: $0
National Park Service FY 2024 Budget Justifications
OPA-1
Other Permanent Appropriations
Other Permanent Appropriations ($000) 2022
1, 2
Actual
2023
3,4,5
Estimate
2024
6,7,8
Estimate
Change
from 2023
Contribution for Annuity Benefits for USPP 42,101 39,674 39,549 -125
Park Concessions Franchise Fees 143,200 131,632 140,153 +8,521
Concessions Improvement Accounts 9,802 9,800 9,800 0
Park Building Lease and Maintenance Fund 10,833 11,645 12,515 +870
Filming and Photography Special Use Fee Program 175 1,200 1,200 0
Operation and Maintenance of Quarters 24,039 24,640 25,253 +613
Delaware Water Gap, Route 209 Operations 5 25 25 0
Total Requirements 230,155 218,616 228,495 +9,879
Total FTE Requirements
397 397 397 0
1
FY 2022 Actual column does not include these sequestered Receipt amounts: Park Concessions Franchise Fees’ $393, Park
Building Lease & Maintenance Fund’s $26, Operation & Maintenance of Quarters’ $54
2
FY 2022 Actual column includes pop up of funds that were sequestered in FY 2021 but became available in FY 2022: Park
Concessions Franchise Fees’ $393, Park Building Lease & Maintenance Fund’s $26, Operation & Maintenance of Quarters’ $54
3
FY 2023 Estimate column does not include these sequestered Receipt amounts: Park Concessions Franchise Fees’ $393, Park
Building Lease & Maintenance Fund’s $26, Operation & Maintenance of Quarters’ $54
4
FY 2023 Estimate column includes pop up of funds that were sequestered in FY 2022 but became available in FY 2023: Park
Concessions Franchise Fees’ $393, Park Building Lease & Maintenance Fund’s $26, Operation & Maintenance of Quarters’ $54
5
FY 2023 Estimate column includes a transfer of $13,000 from Park Concessions Franchise Fees to Visitor Experience
Improvements Fund
6
FY 2024 Estimate column does not include these estimated sequestered Receipt amounts: Park Concessions Franchise Fees’
$399, Park Building Lease & Maintenance Fund’s $29, Operation & Maintenance of Quarters’ $57
7
FY 2024 Estimate column includes pop up of funds that were sequestered in FY 2023 but became available in FY 2024: Park
Concessions Franchise Fees’ $393, Park Building Lease & Maintenance Fund’s $26, Operation & Maintenance of Quarters’ $54
8
FY 2024 Estimate column includes a transfer of $5,919 from Park Concessions Franchise Fees to Visitor Experience
Improvements Fund
Justification of Program and Performance
This activity includes a variety of permanent appropriations that are derived from receipt sources other
than recreation fees.
Appropriation: Contribution for Annuity Benefits of the United States Park Police
Program Overview
This funding pays the costs of benefit payments to annuitants each year under the pension program for US
Park Police (USPP) officers hired prior to January 1, 1984 to the extent the payments exceed deductions
from salaries of active duty employees of the program. As amended in P.L. 85-157, the Annuity Benefits
are collected for Title V retirees. Payments are made to retirees, surviving spouses, and dependents. The
USPP pension program was funded before FY 2002 from appropriations made annually to the National
Park Service. Following enactment of the Department of the Interior and Related Agencies
Appropriations Act, 2002, (54 U.S.C. 103101), these payments have been made from funds warranted to
the National Park Service from a permanent, indefinite appropriation at the Treasury Department. The
estimates of $39.7 million for FY 2023 and $40.0 million for FY 2024 are based on the best available
National Park Service FY 2024 Budget Justifications
OPA-2
information, including actuarial tables, and projected pay increases, retirements, and cost-of-living
increases.
Appropriation: Park Concessions Franchise Fees and Concessions Improvement Accounts
Program Overview
Park Concessions Franchise Fees – This program involves all franchise fees and other monetary
considerations paid to the United States pursuant to concessions contracts under the National Park Service
Concessions Management Improvement Act of 1998 (P.L. 105-391; 54 U.S.C. 1019), as amended, (the
Act). All funds are deposited into a special account and used in the National Park System. The fees are
used for contract development, leasehold surrender interest obligations, programs and operations, and
concession activities support.
Concession contracts are issued competitively under the Act, which grants a right of preference to
concessioners with annual gross receipts of less than $500,000 and to outfitters and guide operators.
Under the Act, the Service has experienced increased competition for contracts, resulting in improved
visitor services, higher revenue, and increased returns to the government.
Construction, investment, leasehold surrender interest, and maintenance requirements are weighed against
the estimated contract gross receipts and estimated contract expenses when setting the concession
franchise fee for each contract.
Concessions Improvement Accounts – Some older National Park Service contracts with concessioners
require the concessioner to deposit a portion of gross receipts or a fixed sum of money in a separate bank
account. With NPS approval, these funds are expended for improvement of facilities that directly support
concession visitor services. Concessioners do not accrue possessory interest for improvements funded
from these accounts. These accounts are not included in contracts issued since the 1998 Act and continue
to be phased out as older contracts are replaced.
Appropriation: Park Buildings Lease and Maintenance Fund
Program Overview
As authorized by 54 U.S.C. 102102, and 54 U.S.C. 306121, rental payments under a lease for the use of
buildings and associated property administered as part of the National Park System are deposited in a
special Park Buildings Lease and Maintenance Fund. These funds are used for infrastructure, including
facility refurbishment, repair and replacement, infrastructure projects associated with park resource
protection, and direct maintenance of the leased buildings and associated properties.
Appropriation: Filming and Photography Special Use Fee Program
Program Overview
Authorized in 54 USC 100905, revenue from location fees collected from issuing permits to use park
lands and facilities for commercial filming and certain still photography are retained and used at the sites
where collected, in accordance with the formula and purposes established for the Recreational Fee
Program.
National Park Service FY 2024 Budget Justifications
OPA-3
Appropriation: Operations and Maintenance of Quarters
Program Overview
As authorized by P.L. 98-473 in 1984 (98 Stat. 1874; 5 U.S.C. 5911), rent and charges collected by
payroll deduction or otherwise, for the use or occupancy of Government Quarters in national park areas,
are deposited in a special fund to remain available until expended for the operation and maintenance of
Government Quarters. These funds are to be used to provide decent, safe, sanitary, and energy efficient
quarters to the assigned occupants.
In FY 2022 in addition to funds derived from rental income, the National Park Service recorded charges
totaling $2.9 million for housing maintenance and operations in the Operation of the National Park
System appropriation to cover rental income shortfalls. (This statement is provided as required by section
814(a)(14) of Division I of P. L. 104-333.)
Appropriation: Delaware Water Gap National Recreation Area, Route 209 Operations
Program Overview
Funds collected from fees, as authorized by P.L. 98-63 (97 Stat. 329) and P.L. 109-156, Sec. 4, as
amended by P.L. 115-101 for commercial use of US Route 209 within the boundaries of Delaware Water
Gap National Recreation Area are available for the management, operation, construction, and
maintenance of US Route 209 within the park boundaries. By law, US Route 209 within the boundaries of
Delaware Water Gap National Recreation Area is closed to commercial vehicular traffic, except for that
based within the recreation area, or serving businesses and persons located within or contiguous to its
boundaries, or with business facilities located or serving in certain nearby counties.
National Park Service FY 2024 Budget Justifications
OPA-4
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
MTF-1
Miscellaneous Trust Funds
Miscellaneous Trust Funds ($000) 2022 Actual 2023
Estimate
2024
Estimate
Change from
2023 Estimate
(+/-)
Donations (General)
96,931 52,000 52,000 0
Preservation, Birthplace of Abraham Lincoln
3 3 3 0
Total Requirements
96,934 52,003 52,003 0
Total FTE Requirements
243 243 243 0
Justification of Program and Performance
These permanent appropriations include donated funds consistent with legislative authority and the
wishes of the grantors for Federally matched signature projects and programs, non-matched donated funds
consistent with legislative authority and the wishes of the grantors, and funds used to preserve the
birthplace of Abraham Lincoln available from an endowment established for that purpose.
Appropriation: Donations, National Park Service
Program Overview
The Secretary of the Interior is authorized to accept and use donated funds for the purposes of the
National Park System. Use of these funds is strictly controlled by tracking each donation designated by
the donor for a certain purpose to ensure that it is so used or is returned to the donor. This account total
can fluctuate significantly from year to year. The fund also includes donations used as matching funds for
projects or programs within the Centennial Challenge Fund.
Appropriation: Preservation, Birthplace of Abraham Lincoln
Program Overview
By law (16 U.S.C. 212), a $50,000 endowment established by The Lincoln Farm Association was
accepted; the proceeds of which are used to help preserve the Abraham Lincoln Birthplace National
Historic Park. This endowment has been used by the park to preserve the Memorial Building and the
traditional birth cabin. Preservation projects have included various exterior repairs such as roof and
painting, along with interior painting, mold abatement, and HVAC repairs. The park plans to continue to
use this endowment to cover the upkeep of these structures in accordance with cultural resource
management plans.
Learn more about Abraham Lincoln Birthplace NHP at: www.nps.gov/abli/index.htm
National Park Service FY 2024 Budget Justifications
MTF-2
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
CC-M-1
Mandatory: National Park Centennial Challenge Fund
National Park Centennial Challenge Fund
($000)
2022
Actual
2023
Estimate
2024
Estimate
Change from
2023 Estimate
National Park Centennial Challenge Fund 7,606 7,500 7,500 0
Total Requirements 7,606 7,500 7,500 0
Total FTE Requirements
0 0 0 0
Authority Overview
The National Park Centennial Challenge Fund, created by Title I of the National Park Service Centennial
Act of 2016 (P.L. 114-289), allows the National Park Service to establish a fund to support projects and
programs that enhance the visitor experience. Amounts exceeding $10.0 million from the sale of age-
discounted Federal Recreational Lands Passes, commonly known as Senior Passes, are deposited into this
Fund as offsetting collections. The FY 2024 President’s budget estimates deposits into this Fund will be
$7.6 million in FY 2024. As all Federal funds must be matched on at least a 1:1 basis, private donations
will leverage the Federal funds for an estimated total benefit of $15.0 million.
Justification of Program and Performance
Revenue deposited into the Centennial Challenge Fund was $7,605,582 in FY 2022. As directed by
Sections 103502 and 103503 of U.S.C. Title 54, projects selected should prioritize deferred maintenance,
physical improvements to visitor services facilities, and trail maintenance. The NPS expects the following
projects will be executed using revenue collected through FY 2022.
Park Name Project Title Partner
Federal
($000)
Partner
($000)
Golden Gate National
Recreation Area
Rehabilitate the Deteriorated China Beach
Bathhouse and Terrace
Golden Gate National
Parks Conservancy 3,474 3,474
Grand Teton National Park
Address Critical Deferred Maintenance for
four Historic Structures on Mormon Row
Grand Teton National
Park Foundation 252 270
Great Smoky Mountains
National Park
Ramsey Cascades Trail Restoration
Project - Centennial Challenge Friends of the Smokies 200 325
Mammoth Cave National Park
Renovate and Restore Deteriorating
Sections of the Heritage Trail Adjacent to
the Mammoth Cave Hotel
National Parks
Concession, Inc. 750 750
Mount Rainier National Park
Repair Wonderland Trail Sections Six and
Seven
National Park
Foundation 90 90
Natchez National Historical
Park
Rehabilitate Public Spaces of Natchez
Visitor Center City of Natchez 1,157 1,157
Natchez National Historical
Park
Rehabilitate Public Spaces of Natchez
Visitor Center City of Natchez 204 204
Olympic National Park
Repair North Fork Quinault Trail Tread
and Structures
Washington’s National
Park’s Fund 100 100
Yosemite National Park Backcountry Trail maintenance
Yosemite
Conservancy 207 216
Yosemite National Park Backcountry Trail maintenance
Yosemite
Conservancy 210 216
National Park Service FY 2024 Budget Justifications
CC-M-2
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
VEIF-1
Visitor Experience Improvements Fund Revolving Account
Visitor Experience Improvement Fund
Revolving Account ($000)
2022
Actual
2023
1
Estimate
2024
2
Estimate
Change from
2023 Estimate
Visitor Experience Improvement Fund 0 12,259 6,323 -5,936
Total Requirements 0 12,259 6,323 -5,936
Total FTE Requirements 0 0 0 0
1
FY 2023 Estimate column includes an estimated transfer of $13,000 from Park Concessions Franchise Fees to Visitor
Experience Improvements Fund and reflects the impact of sequestering $741.
2
FY 2024 Estimate column includes an estimated transfer of $5,919 from Park Concessions Franchise Fees to Visitor Experience
Improvements Fund and reflects the impact of sequestering an estimated $337; FY 2024 estimate column includes pop-up funds
of $741 that are estimated to be sequestered in FY 2023 but are expected to become available in FY 2024.
Authority Overview
The National Park Service Visitor Experience Improvements Authority (VEIA), created by Title VII of
the National Park Service Centennial Act of 2016 (P.L. 114-289), allows the National Park Service to
establish a revolving fund to provide the NPS with tools to improve commercial visitor facilities and
services throughout the System. The initial funding of the revolving fund may come from transfers in,
without reimbursement, of funds or revenues in connection with the functions to be carried out under the
Authority.
Justification of Program and Performance
The Visitor Experience Improvements Fund (VEIF) will provide for the administration of commercial
services contracts, and related professional services contracts, for the operation and expansion of
commercial visitor facilities and visitor services programs in System units. This includes expenses
necessary for the management, improvement, enhancement, operation, construction, and maintenance of
commercial visitor services facilities. Net revenues collected pursuant to the contracts awarded and
services provided under the Authority will be credited to the VEIF. The revolving fund will give the
Service additional tools, flexibility, and agility to respond to park and visitor needs related to the quality
of commercial services facilities and operations. Funds will also be used to make payments for possessory
interest and leasehold surrender interest in existing commercial services contracts awarded under separate
authorities.
The VEIA can be used to provide visitor services that are “necessary and appropriate” for public use and
enjoyment of the park unit. Contract terms cannot exceed 10 years and no Leasehold Surrender Interest
(LSI) may be awarded under the VEIF. The authority may not be used for provision of outfitter and guide
services nor in cases where a preferential right of renewal currently exists. The current authority to enter
into a VEIA contract expires in 2025.
FY 2024 Program Performance
The NPS intends to pilot contracts in a cross section of parks, types of services, and scale of services
volume to demonstrate the effectiveness of the authority. The proposed rule to implement the authority
was open for public comment in 2022. The NPS has reviewed the comments and is currently developing
the administrative procedures necessary to issue a final rule.
National Park Service FY 2024 Budget Justifications
VEIF-2
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
FLTP-1
Allocation: Federal Lands Transportation Program
Appropriation Overview, Justification of Program, and Performance
The Federal Lands Transportation Program (FLTP, 23 U.S.C. 203) improves the transportation
infrastructure owned and maintained by the Federal land management agencies (FLMAs). FLMAs at the
Department of the Interior include the National Park Service (NPS), the U.S. Fish and Wildlife Service,
the Bureau of Land Management, and the Bureau of Reclamation. FLMAs at other agencies include the
U.S. Forest Service, U.S. Army Corps of Engineers (USACE), and various independent Federal agencies
with land and natural resource management responsibilities.
Through the program, the NPS has considerable responsibility and latitude for managing its program. The
Federal Highway Administration (FHWA) is responsible for ensuring the program is administered
according to the statutory and implementing regulations for title 23, U.S.C. This includes conformity to
highway planning, design, construction, maintenance, and safety standards.
In accordance with 23 U.S.C. 203(a) funds allocated to the FLMAs by the FLTP shall be used to pay the
costs of transportation planning, research, preventative maintenance, engineering, rehabilitation,
restoration, construction, and reconstruction of transportation facilities, and capital, operations, and
maintenance of transit facilities. Funding is limited to public transportation facilities and systems within,
adjacent to, or providing access to Federal lands that are open to the public. The program also covers
administrative expenses necessary to manage and oversee the program at each FLMA.
The program is usually authorized in five-year periods, with the most recent reauthorization enacted by
the Infrastructure Investment and Jobs Act (P.L. 117-58), also referred to as the Bipartisan Infrastructure
Law (BIL). The BIL provided authorized funding levels for the FLMAs from FY 2022-2026.
Program Overview
The NPS owns and maintains approximately 5,690 paved miles of park roads, 6,100 paved parking areas
(approximately equivalent to 990 paved miles), 1,451 bridges, and 63 tunnels that are open to the public
and eligible for FLTP dollars. The NPS owns an additional 7,526 miles of unpaved roads, of which only
500 miles are currently eligible for the FLTP Program. Transportation Assets including paved roads,
unpaved roads, parking, bridges, tunnels, transit, trails, and technology have a current replacement value
of $51.5 billion. These transportation assets are a significant part of the NPS asset portfolio and are
critical to meeting the NPS mission.
In FY 2021 (the most recent data available), the NPS’s transportation program rehabilitated 111.3 miles
of road; reconstructed 18.3 miles of road; performed routine maintenance (e.g. chip seals, mill and
overlays, and restriping) for 269.2 miles of road; and rehabilitated or improved the condition of 84
bridges and tunnels.
In addition to roads, bridges, and tunnels, in FY 2021, the NPS had 63 of 97 discrete transportation
systems operating (due to the Covid-19 pandemic), including 43 transit systems and 20 interpretive tours
in 43 parks across the Nation. The multimodal systems included shuttles, buses, vans, trams, boats,
ferries, trains, and planes. Of these:
National Park Service FY 2024 Budget Justifications
FLTP-2
58 percent operate under concession contracts and represent 34 percent of all passenger
boardings.
13 percent are owned and operated by the NPS and represent 2 percent of all passenger
boardings.
13 percent operate under service contracts and represent 47 percent of all passenger boardings.
16 percent operate under a cooperative agreement and represent 17 percent of passenger
boardings.
Transit systems in the NPS include a variety of vehicle types. Of the 63 systems that operated in FY
2021:
53 percent are shuttles, buses, vans, or trams.
40 percent are boats or ferries.
5 percent are planes.
5 percent are trains or trolleys.
In FY 2021, there were approximately 16.2 million passenger boardings, of which 13.9 million (85
percent) were associated with the top 10 high use transit systems (by passenger boardings) at parks, such
as Statue of Liberty National Monument; Grand Canyon, Zion, Rocky Mountain, Bryce Canyon, and
Acadia National Parks; and the National Mall and Memorial Parks.
Altogether, these multimodal systems offer attractive and convenient public access to, and within, parks
for visitors and park employees. They also contribute to preserving resources, such as air quality and
soundscapes, and they reduce wildlife and auto collisions.
Funding – The NPS manages its transportation assets using life-cycle asset management techniques to
optimize fund allocation. In FY 2022, more than half of all NPS transportation improvements were
funded through programs authorized under the BIL. Other maintenance and operational funds identified
to support transportation assets are NPS fund sources such as Repair/Rehabilitation and Cyclic
Maintenance Programs, and assistance provided through agreements with nonprofit organizations and
private corporations.
The BIL reauthorized the FLTP and included a 21 percent increase in funding for the NPS over the life of
the authorization period. The NPS FLTP receives $332 million in FY 2022; with the authorization level
increasing between $6-8 million annually, reaching $360 million in FY 2026.
Fiscal Year BIL FLTP
Funding Level
2022 $332 million
2023 $339 million
2024 $346 million
2025 $354 million
2026 $360 million
Total $1,731 million
National Park Service FY 2024 Budget Justifications
FLTP-3
The NPS is focusing this funding on the following:
Maintaining public roads and bridges in a state of good repair through investments focused on
sound asset strategies and management. Funding is distributed to the field based on condition,
usage, accidents, and inventory. Conditions are monitored and tracked using pavement and bridge
condition performance measures.
Addressing the state of good repair of existing Alternative Transportation Systems (ATSs)
infrastructure and leveraging outside funding and partnerships. A “Greening of the Fleet
Strategy” focuses clean energy resources to reduce greenhouse gas emissions, improve air
quality, reduce noise, and save on operating costs. Examples include legacy ATSs at Zion,
Acadia, and Grand Canyon National Parks, and planning and implementation of
bicycle/pedestrian trail connections at Mississippi National River and Recreation Area, Kennesaw
Mountain National Battlefield Park, and Cape Cod National Seashore.
Ensuring equity in transportation by providing improved connectivity to underserved
communities and promoting modal choices beyond roads—including transit and trails. Focusing
on the state of good repair of transportation transit and trails improves visitor experience, access,
and health benefits to the trail users. It also reduces vehicle emissions and saves dollars through
sound life cycle management and upkeep of assets.
Enhancing future multimodal approaches through testing and implementation of innovative
solutions. Emerging mobility is a focus area of NPS, which also dovetails with emphasis on
improved safety, providing transportation options like micromobility and offering choices across
all travel modes to support accessibility. An overarching aspect is supporting improved visitor
information systems to aid the traveling public in trip planning, and in route and in-park decision
making based on forecasted or real time data.
Leveraging funding opportunities from BIL, the NPS is working to develop resilient, innovative,
and equitable transportation systems, while also decreasing transportation emissions related to
visitation and operations. The NPS will invest these funds to repair and upgrade transportation
trails, transit systems, roads, bridges, and other critical transportation infrastructure. BIL provides
a number of discretionary grant programs and new formula programs for which NPS partners are
eligible applicants; NPS will continue to develop and strengthen partnerships with states and
other eligible agencies to mutually champion significant projects in and around NPS sites which
align well with the Administration’s focus areas. Past success stories include Arlington Memorial
Bridge, Tamiami Trail, Natchez Trace Parkway, and Zion National Park Bus Fleet Electrification.
Future challenges include Tennessee River Bridge, Toklat Bridge and Causeway, and Kelso Cima
Road.
Funding levels for projects will be adjusted annually to accommodate changes in condition and
scheduling, balance NPS priorities, and address legislative requirements.
FY 2024 Program Activities
During FY 2024, the program will continue to target NPS needs and performance goals. Allocation levels
have been developed to curtail deterioration based on the NPS’s Pavement and Bridge Management
Systems. The program will utilize Pavement and Bridge computer models which take advantage of
FHWA Engineering Technical Expertise, along with NPS investment and sustainability guidelines which
identify the highest priority to critical life, health, safety, and resource protection projects.
National Park Service FY 2024 Budget Justifications
FLTP-4
The NPS reports annually on the goals and achievements of its transportation program as required by the
FHWA’s Implementation Guidance for the FLTP. Annual accomplishment reports are available at:
www.nps.gov/orgs/1548/accomplishments.htm
FLTP Multi-Year Plan
The FLTP is a performance-based program with performance factors established in 23 U.S.C. 203 to
include state of good repair, safety, high-use and agencies goals. The FLTP is required to use similar
planning practices as required by the States and metropolitan areas as identified in 23 U.S.C. 134 and 135.
NPS statutes (54 U.S.C. 100101 et seq) provide further considerations and requirements for park
resources.
FLTP Category I funds two types of paved road and bridge projects in parks, generally defined as
maintenance (including major roadway and bridge preservation and rehabilitation) and modernization and
renewal (including pavement reconstruction, new construction, and extensive bridge rehabilitation).
Maintaining and improving the condition of paved roads and bridges is an NPS priority. These assets
comprise the core of the NPS transportation system. FLTP Category I projects reflect the priorities of the
NPS’s Facility Investment Strategy, including investing in climate resilient infrastructure. The NPS
transportation system is the primary access mechanism for the majority of park units and is used not only
by private automobiles, but also by transit systems and as a means to access ferries, trails, and other
modes of transportation. Projects emphasize sustainable opportunities, modernization and improved
access for visitors.
FLTP Category III provides funding for prioritized projects that focus on connecting visitors to parks
through the maintenance and expansion of existing alternative transportation systems, recapitalization of
transit fleet, and system modernization. Alternative transportation projects provide modal choices to
visitors by providing car free access alternatives to and within parks to improve recreational
opportunities, reduce carbon footprints, and increase active transportation. Projects are prioritized based
on the following criteria: demonstration of need, visitor experience/resource benefit, financial
sustainability/cost effectives, and asset condition. Project readiness is also considered as projects are
prioritized.
National Park Service FY 2024 Budget Justifications
FLTP-5
National Park Service
FY 2023 Federal Lands Transportation Program Plan
Budget Authority/Activity
Amount
($000)
FY 2023 Authorized* $338,867
Adj. Estimated Obligation Ceiling (P.L. 117-58 Sec 11102) $41,342
Available for Programming $297,525
Planning -$24,394
Administration -$8,874
Funds Available for Projects $264,257
Engineering & Construction Mgmt $71,152
* National Park Service (NPS) activities under the FLPP include: long-range transportation plans
(LRTPs); performance management activities—including the development, implementation, and
maintenance of safety, bridge, pavement, and congestion management program related to LRTP;
road and bridge inventory; development of unit-level transportation planning projects; and
support of transportation planning projects and transportation components of unit and multi-unit
management and facility investment plans
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2023 Acadia NP Repair Otter Cove Causeway Bridge ME
ME01,
ME02 $2,000 Category 1
2023 Acadia NP Enhance Island Explorer Bus System Phase 1 ME
ME01,
ME02 $1,060 Category 3
2023 Badlands NP Short-Term Stabilization Repairs on Cedar Pass SD SDAL $30 Category 1
2023 Blue Ridge Parkway Repair Big Pine Creek Bridge Route 077 NC
NC05,
NC10,
NC11 $5,910 Category 1
2023 Blue Ridge Parkway Pavement Preservation Projects NC, VA
NC05,
NC10,
NC11,
VA05,
VA06,
VA09 $4,000 Category 1
2023 Blue Ridge Parkway Rehabilitate US 421 Bridge at Deep Gap NC
NC05,
NC10,
NC11 $1,200 Category 1
National Park Service FY 2024 Budget Justifications
FLTP-6
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2023 Blue Ridge Parkway Conduct Bridge Preventative Maintenance Projects NC, VA
NC05,
NC10,
NC11,
VA05,
VA06,
VA09 $520 Category 1
2023 Blue Ridge Parkway Rehabilitate 2 Otter Creek Culverts on the Mainline Road VA
VA05,
VA06,
VA09 $271 Category 1
2023 Cape Cod NS Construct Connector for Province Lands Bike Trail MA MA09 $60 Category 3
2023 Cape Cod NS Rehabilitate Beech Forest Trail Spur MA MA09 $60 Category 3
2023
Catoctin Mountain Park Chesapeake & Ohio
Canal NHP Repair Park Central Road and Deerfield Road MD MD06 $5,687 Category 1
2023 Chesapeake & Ohio Canal NHP Improve Accessibility at Byron Bridge (TAP Match) MD MD06 $600 Category 3
2023 Chesapeake & Ohio Canal NHP Resurface Towpath MD MD06 $518 Category 3
2023 Colonial NHP Replace Traffic Barrier Guardrails on Davis Bayou Park Road VA
VA01,
VA04 $3,286 Category 1
2023 Cumberland Island NS Re-surface Grand Avenue GA GA01 $1 Category 3
2023 Curecanti NRA Dinosaur NM Quarry Access Road and Parking Lots Repair UT UT03 $3,002 Category 1
2023 Cuyahoga Valley NP Stabilize Riverbank OH
OH07,
OH11,
OH13 $3,243 Category 3
2023 Cuyahoga Valley NP Purchase Railroad Maintenance Vehicle with Hi-Rail Gear OH
OH07,
OH11,
OH13 $251 Category 3
2023 Delaware Water Gap NRA
Support Alternative Transportation Partnership and Plan and Deploy
Intelligent Transportation System PA,NJ
NJ05,
NJ07,
PA07,
PA08 $71 Category 3
2023 Denali NP & NPRES Construct McKinley Village Trailhead Parking Area AK AKAL $425 Category 3
2023 Fire Island NS Rebuild Trail Connections NY NY02 $35 Category 1
2023 Fort Matanzas NM Replace Fort Matanzas Ferry Boat FL FL06 $120 Category 3
2023 Fort Point NHS Widen and Reconstruct Long Ave CA CA11 $2,000 Category 3
2023 Friendship Hill NHS Rehabilitate Entrance Road and other park routes PA PA14 $1,450 Category 1
2023 Friendship Hill NHS Repair Cunard Road Slips PA PA14 $105 Category 1
2023 Gateway NRA Pavement Preservation for Several Routes NJ, NY
NJ06,
NY05,
NY08,
NY11 $850 Category 1
2023 Gauley River NRA Replace Failing Culverts on Masons Branch Creek and Access Road WV WV01 $36 Category 1
2023 George Washington Memorial Parkway Rehabilitate Mount Vernon Trail - Zones 2 and 3 (Smartscale Match) VA VA08 $3,000 Category 1
National Park Service FY 2024 Budget Justifications
FLTP-7
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2023 Gettysburg NMP Pavement Preservation for 11 routes PA PA13 $1,685 Category 1
2023 Glacier NP Replace Sprinter Buses in the Park’s Transit System MT MT01 $324 Category 3
2023 Golden Gate NRA
Construct Multi-use Trail Connection from Golden Gate Bridge
Vista Point to Fort Baker CA
CA02,
CA11,
CA15,
CA16 $2,400 Category 3
2023 Grand Canyon NP Modernize Grand Canyon Shuttle AZ
AZ02,
AZ09 $3,000 Category 3
2023 Grand Canyon NP
Complete Major Rehab of Park’s 2011 Compressed Natural Gas
Buses AZ
AZ02,
AZ09 $1,861 Category 3
2023 Grand Canyon NP
Procure Four New Compressed Natural Gas Buses to Replace 20-
year-old Buses AZ
AZ02,
AZ09 $700 Category 3
2023 Grand Canyon NP Construct Sagebrush Connector Pathway Project AZ
AZ02,
AZ09 $220 Category 1
2023 Grand Canyon NP Rehabilitate Quarry Shuttle Stop AZ
AZ02,
AZ09 $80 Category 3
2023 Great Basin NP Pavement Preservation for Great Basin NP NV NV04 $500 Category 1
2023 Great Smoky Mountains NP Replace Wiley Oakley Crossover Bridge TN
TN01,
TN02 $12,000 Category 1
2023 Great Smoky Mountains NP
Rehabilitate Cosby Campground Entrance Road & Picnic Area
Roads TN
TN01,
TN02 $6,096 Category 1
2023 Gulf Islands NS Construct Paved Shoulder on Davis Bayou Park Road MS MS04 $2,000 Category 3
2023 Gulf Islands NS Replace Traffic Barrier Guardrails on Davis Bayou Park Road MS MS04 $1,000 Category 1
2023
Gulf Islands NS, Jean Lafitte NHP & PRES,
Natchez NHP, Vicksburg NMP Pavement Preservation Projects
FL, LA,
MS
FL01,
LA01,
LA02,
LA03,
LA05,
MS02,
MS03,
MS04 $4,725 Category 1
2023 Hawai`i Volcanoes NP Realign Crater Rim Drive HI HI02 $5,000 Category 1
2023 Home of Franklin D. Roosevelt NHS Replace Shuttle Vans NY NY18 $75 Category 3
2023 Indiana Dunes NP Construct Marquette Greenway Trail IN IN01 $1,100 Category 3
2023 Katmai NP & NPRES Rehabilitate The Valley Of 10,000 Smokes Road AK AKAL $2,600 Category 1
2023 Kennesaw Mountain NBP Procure Vehicle For Shuttle Service to Mountain Top GA GA11 $175 Category 3
2023 Kings Canyon NP Rehabilitate Mineral King Road CA
CA05,
CA20 $12,339 Category 1
2023 Kings Canyon NP Stabilize Generals Highway due to Forest Fire Damage CA
CA05,
CA20 $1,500 Category 1
2023 Lake Mead NRA Realign and Reconstruct Willow Beach Road AZ AZ09 $22,101 Category 1
National Park Service FY 2024 Budget Justifications
FLTP-8
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2023 Lake Roosevelt NRA
Realign and Stabilize Hawk Creek Road at Eroding Embankment
Site WA
WA04,
WA05 $850 Category 1
2023 Lava Beds NM Rehabilitate and Resurface Main Road CA CA01 $55 Category 1
2023 Little Bighorn Battlefield NM Rehabilitate Route 10 MT MT02 $10,500 Category 1
2023 Lowell NHP Create Upper Pawtucket Canal Walkway MA MA03 $570 Category 3
2023 Mammoth Cave NP Renovate and Rehabilitate Green River Ferry Boat KY KY02 $10 Category 3
2023 Medgar and Myrlie Evers Home NM
Create Visitor Shuttle from Civil Rights Museum to Medgar Evers
Home MS MS02 $42 Category 1
2023 Minute Man NHP Repair Battle Road Trail Boardwalk MA
MA03,
MA05 $175 Category 3
2023 Minute Man NHP Reroute Battle Road Trail to Improve Safety MA
MA03,
MA05 $175 Category 3
2023 Minuteman Missile NHS Rehabilitate Delta-01 Access Road SD SDAL $295 Category 1
2023 Mississippi NR & RA Implement Multi-modal, Alternative Transportation Plan MN
MN02,
MN03,
MN04,
MN05,
MN06 $42 Category 3
2023 Missouri NRR Rehabilitate Myron Grove Access Road SD SDAL $155 Category 1
2023 Mojave National Preserve Implement Road Safety Action Plan CA CA23 $2,000 Category 1
2023 Natchez Trace NST Rehabilitate Multi-Use Trail Phase 1 MS MS02 $1,200 Category 3
2023 Natchez Trace NST Rehabilitate Multi-Use Trail Phase 2 MS MS02 $1,200 Category 3
2023 Natchez Trace NST Repair Multiple Bridges AL,MS
AL05,
MS01,
MS02,
MS03 $660 Category 1
2023 National Capital Parks – East Rehabilitate 3 Streets DC DCAL $4,640 Category 1
2023 National Capital Parks – East Rehabilitate Marshall and Hall Roads MD
MD03,
MD04,
MD05,
MD07 $800 Category 1
2023 National Capital Parks – East Execute Multimodal Strategic Implementation Plan DC DCAL $100 Category 3
2023 New River Gorge NP and PRES Repair Cunard Road Slips WV WV01 $2,050 Category 1
2023 North Cascades NP Complete Emergency Reroute of Stehekin Valley Road WA
WA02,
WA08 $15 Category 1
2023 North Cascades NP Pavement Preservation for North Cascades NP WA
WA02,
WA08 $6 Category 1
2023 Oregon Caves NM
Rehabilitate Oregon Highway 46, Park Boundary to Cave Parking
Lot (FLAP Match) OR OR02 $81 Category 1
2023 Petersburg NB Rehabilitate Multiple Routes VA VA04 $550 Category 1
National Park Service FY 2024 Budget Justifications
FLTP-9
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2023 Pinnacles NP Pavement Preservation for Pinnacles National Park CA CA18 $500 Category 1
2023 Redwood NP Replace Drop Inlet Culvert on Alder Camp Road CA CA02 $722 Category 1
2023 Rock Creek Park Rehabilitate Five Bridges in Rock Creek Park DC DCAL $2,050 Category 1
2023 Shenandoah NP Purchase Replacement Shuttle for Rapidan Camp VA
VA05,
VA06,
VA07,
VA10 $250 Category 3
2023 Sitka NHS Construct Sitka Seawalk AK AKAL $1,210 Category 3
2023 Sleeping Bear Dunes NL Replace Covered Bridge on Pierce Stocking Drive MI MI01 $110 Category 1
2023 Various Bridge Preservation in Various Colorado Parks CO Various $7,000 Category 1
2023 Various Improve Yellowtail Dam Road MT
MT02,
WYAL $6,800 Category 1
2023 Various Pavement Preservation in Various Colorado Parks CO Various $6,000 Category 1
2023 Various Pavement Preservation for Various Southern Utah Parks UT Various $5,500 Category 1
2023 Various Conduct Pavement and Bridge Preservation
DC, MD,
VA, WV Various $3,620 Category 1
2023
Whitman Mission NHS, Nez Perce NHP, Big
Hole NB, Craters of the Moon NM and
Preserve Hagerman Fossil Beds NM Pavement Preservation at 4 Parks
WA, ID,
MT
WA05,
ID01,
ID02,
MTAL $1,300 Category 1
2023 Wilson’s Creek NB Construct Roundabout with Missouri Department of Transportation MO MO07 $100 Category 1
2023 Yosemite NP
Relieve Congestion Through Circulation Changes on Valley Loop
Roads CA CA05 $6,500 Category 1
2023 Zion NP Construct Bus Charging Station UT UT02 $4,000 Category 1
2023 Servicewide Engineering and Construction Management Multiple Multiple $71,152
Total $264,257
National Park Service FY 2024 Budget Justifications
FLTP-10
National Park Service
FY 2024 Federal Lands Transportation Program Plan
Budget Authority/Activity
Amount
($000s)
FY 2024 Authorized* $346,237
Adj. Estimated Obligation Ceiling (P.L. 117-58 Sec 11102) $34,624
Est. Available for Programming $311,613
Planning -$24,306
Administration -$9,348
Est. Funds Available for Projects $277,959
Engineering & Construction Mgmt $50,145
* National Park Service (NPS) activities under the FLPP include: long-range transportation plans
(LRTPs); performance management activities—including the development, implementation, and
maintenance of safety, bridge, pavement, and congestion management program related to LRTP;
road and bridge inventory; development of unit-level transportation planning projects; and
support of transportation planning projects and transportation components of unit and multi-unit
management and facility investment plans
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2024 Acadia NP Rehabilitate Eight (8) Historic Motor Road Bridges ME
ME01,
ME02 $2,000 Category 1
2024
Alibates Flint Quarries NM , Amistad NRA,
Big Thicket NPRES, Chamizal National
Memorial, Fort Davis NHS, Guadalupe
Mountains NP, Lake Meredith NRA, Lyndon
B. Johnson NHP, Palo Alto Battlefield NHS,
Padre Island NS, San Antonio Missions NHP,
Aztec Ruins NM, Carlsbad Caverns NP,
Capulin Volcano NM, Chaco Culture NHP, El
Malpais NM, El Morro NM, Fort Union NM,
Gila Cliff Dwellings NM, Pecos NHP,
Petroglyph NM, Salinas Pueblo Missions NM,
White Sands NP
Resurface Roads and Parking Areas, Pavement Preservation Program
- 24 Parks TX, NM
TX02,
TX08,
TX11,
TX13,
TX16,
TX20,
TX21,
TX23,
TX27,
TX28,
TX34,
TX35,
TX36,
NM01,
NM02,
NM03 $4,200 Category 1
2024 Arkansas Post NM Buffalo NSR Replace Failing Culvert and Weakened Pavement AR AR01 $100 Category 1
2024 Assateague Island NS Rehabilitate Assateague Channel and Sheepshead Roads MD
MD01,
VA02 $625 Category 1
National Park Service FY 2024 Budget Justifications
FLTP-11
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2024 Blue Ridge Parkway Repair/Repave Mainline Road VA
VA05,
VA06,
VA09 $5,000 Category 1
2024 Blue Ridge Parkway Rehabilitate James River Bridge VA
VA05,
VA06,
VA09 $4,455 Category 1
2024 Blue Ridge Parkway Pavement Preservation Projects NC, VA
NC05,
NC10,
NC11,
VA05,
VA06,
VA09 $3,500 Category 1
2024 Blue Ridge Parkway Conduct Bridge Preservation Project NC, VA
NC05,
NC10,
NC11,
VA05,
VA06,
VA09 $400 Category 1
2024 Canaveral NS Pavement Preservation FL
FL07,
FL08 $2,784 Category 1
2024 Cape Cod NS
Extend Beach Shuttle to Replace Nauset Light Beach Parking for
Coastal Resiliency MA MA09 $775 Category 3
2024 Capitol Reef NP Rehabilitate Three Roads UT UT02 $8,200 Category 1
2024
Castillo de San Marcos NM Fort Matanzas
NM Pavement Preservation FL FL05 $154 Category 1
2024 Channel Islands National Park
Renovate Santa Barbara Island Wharf (20% match for Ferry Boat
Program grant) CA CA24 $377 Category 3
2024 Chesapeake & Ohio Canal NHP Repair Access Road Tunnels at C&O Canal DC, MD
DCAL,
MD06,
MD08 $3,245 Category 1
2024 Chesapeake & Ohio Canal NHP Improve Accessibility at Byron Bridge (TAP Match) MD MD06 $500 Category 3
2024 Chesapeake & Ohio Canal NHP Resurface Towpath MD MD06 $500 Category 3
2024 Cuyahoga Valley NP Repave Station Road, Parking Lot and Improve Drainage OH
OH07,
OH11,
OH13 $550 Category 1
2024 Delaware Water Gap NRA Repair and Reconstruct U.S. Route 209 and McDade Trail PA
PA07,
PA08 $4,500 Category 1
2024 Delaware Water Gap NRA Repair Dingmans Falls Access Bridge PA
PA07,
PA08 $2,600 Category 1
2024 Delaware Water Gap NRA Support Emergency Repairs for McDade Trail PA PA08 $1,200 Category 3
National Park Service FY 2024 Budget Justifications
FLTP-12
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2024 Delaware Water Gap NRA Repair Dingmans Falls Access Bridge #1 PA
PA07,
PA08 $650 Category 1
2024 Delaware Water Gap NRA Repair Route 615 Emergency Storm Damage NJ
NJ05,
NJ07 $375 Category 1
2024 Denali NP & NPRES Replace Ghiglione Bridge That Cannot Be Seismically Retrofitted AK AKAL $2,900 Category 1
2024 Denali NP & NPRES Improve Polychrome Area - Compliance Mitigation Efforts AK AKAL $250 Category 1
2024 Denali NP & NPRES Construct Antler/Bison Ridge Trailhead (FLAP Match) AK AKAL $41 Category 3
2024 DeSoto NM Rehabilitate Route 0900 FL FL16 $660 Category 1
2024 DeSoto NM Pavement Preservation FL FL16 $211 Category 1
2024
Dinosaur NM, Golden Spike NHP,
Timpanogos Cave NM
Resurface Roads and Parking Areas, Pavement Preservation Program
Northern Utah CO, UT
CO03,
UT01,
UT02 $5,000 Category 1
2024 Effigy Mounds NM Rehabilitate Parking Area IA IA02 $757 Category 1
2024 Fire Island NS Reconstruct West Entrance Road NY NY02 $115 Category 1
2024 Fort Caroline NM Pavement Preservation FL FL05 $255 Category 1
2024 Fort Pulaski NM Pavement Preservation GA GA01 $466 Category 1
2024 Fort Sumter and Fort Moultrie NHP Pavement Preservation SC SC01 $130 Category 1
2024 Fredericksburg & Spotsylvania NMP Pavement Preservation of Routes Parkwide VA VA07 $3,250 Category 1
2024 Gateway NRA Repair Sandy Hook Roadway and Parking Lot NJ NJ06 $2,000 Category 1
2024 Gateway NRA Rehabilitate Route 0664 NJ NJ06 $850 Category 1
2024 Gateway NRA Apply Preventive Maintenance Treatment to Atlantic Drive NJ NJ06 $400 Category 1
2024 George Washington Memorial Parkway Rehabilitate Memorial Avenue Bridge and Rosslyn Circle Ramp
DC, MD,
VA
DCAL,
MD08,
VA08 $1,950 Category 1
2024 George Washington Memorial Parkway Rehabilitate Mount Vernon Trail - Zones 2 and 3 (Smartscale Match) VA VA08 $1,200 Category 3
2024 Gettysburg NMP Preserve Pavements Park Wide PA PA13 $275 Category 1
2024 Glacier NP Replace Sprinter Buses in the Park’s Transit System MT MT01 $327 Category 3
2024 Golden Gate NRA Widen & Reconstruct Long Avenue for safer Multi-modal Access CA
CA02,
CA11,
CA15,
CA16 $1,600 Category 3
2024 Golden Gate NRA Construct and Install Improvements to West Bluff Trail/Arrival Area CA
CA02,
CA11,
CA15,
CA16 $1,525 Category 3
2024 Golden Gate NRA
Matching Funds for Alcatraz Ferry Boat Program (20% Match for
Ferry Boat Program grant) CA
CA02,
CA11,
CA15,
CA16 $435 Category 3
National Park Service FY 2024 Budget Justifications
FLTP-13
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2024 Grand Canyon NP
Complete Major Rehab of Park’s 2011 Compressed Natural Gas
Buses AZ
AZ02,
AZ09 $1,012 Category 3
2024 Grand Canyon NP Construct Four Bus Stops Along Hermit Road AZ
AZ02,
AZ09 $731 Category 3
2024 Grand Canyon NP Implement an Intelligent Traffic Management System AZ
AZ02,
AZ09 $709 Category 3
2024 Grand Canyon NP Modernize Grand Canyon Shuttle AZ
AZ02,
AZ09 $500 Category 3
2024 Great Smoky Mountains NP Replace Wiley Oakley Crossover Bridge TN
TN01,
TN02 $6,000 Category 1
2024 Great Smoky Mountains NP
Rehabilitate Cosby Campground Entrance Road and Picnic Area
Roads TN
TN01,
TN02 $5,730 Category 1
2024 Gulf Islands NS Replace Traffic Barrier Guardrails on Davis Bayou Park Road MS MS04 $3,352 Category 1
2024 Gulf Islands NS Replace Traffic Barrier Guardrails on Davis Bayou Park Road MS MS04 $1,514 Category 1
2024 Harper’s Ferry NHP Rehabilitate and Electrify Bus Maintenance Facility WV WV02 $1,650 Category 3
2024 Harper’s Ferry NHP Repair Four Harpers Ferry Bridges WV WV02 $1,400 Category 3
2024 Harper’s Ferry NHP Replace Diesel Fleet with New Electric Buses (FLAP Match) WV WV02 $1,200 Category 3
2024 Indiana Dunes NP Construct Marquette Greenway Trail IN IN01 $2,501 Category 3
2024 Indiana Dunes NP Develop Paddle Share Program IN IN01 $88 Category 3
2024 Indiana Dunes NP Implement Intelligent Transportation System IN IN01 $70 Category 3
2024
Isle Royale NP Keweenaw NHP Pictured
Rocks NL Replace Steel Bridge and Lamprey Barrier - Miners River MI MI01 $2,400 Category 1
2024 Kennesaw Mountain NBP Redesign Kennesaw Mountain Road GA GA11 $900 Category 3
2024 Kennesaw Mountain NBP Procure Vehicle For Shuttle Service to Mountain Top GA GA11 $175 Category 3
2024 Kings Canyon NP Rehabilitate Mineral King Road CA
CA05,
CA20 $4,000 Category 1
2024 Kings Canyon NP
Evaluate Congestion, Circulation and Transportation Demand
Management Strategies CA
CA05,
CA20 $700 Category 3
2024 Kings Canyon NP Improve Wayfinding to Giant Forest and Grant Grove CA
CA05,
CA20 $160 Category 3
2024 Kings Canyon NP Replace Upper Kings River Bridge CA
CA05,
CA20 $50 Category 1
2024 Lake Mead NRA Rehabilitate Cottonwood Cove Access Road NV NV01 $14,759 Category 1
2024 Lake Roosevelt NRA Realign and Stabilize Hawk Creek Road WA
WA04,
WA05 $1,000 Category 1
2024 Little Bighorn Battlefield NM Rehabilitate Route 10 MT MT02 $10,300 Category 1
2024
Little Bighorn Battlefield NM, Grand Teton
NP, Petrified Forest NP Bridge Preservation at 3 Parks
AZ, MT,
WY
AZ01,
MTAL,
WYAL $3,000 Category 1
National Park Service FY 2024 Budget Justifications
FLTP-14
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2024 Lowell NHP Replace Track Platforms and Track Ties at 4 Park Track Platforms MA
MA03,
MA05 $1,650 Category 3
2024 Lowell NHP Repair Trolley Track and Poles - Wye to Carbarn MA
MA03,
MA05 $700 Category 3
2024 Mammoth Cave NP Resolve Safety Issues at Frozen Niagara Intersection KY KY02 $3,000 Category 1
2024 Marsh-Billings-Rockefeller NHP Rehabilitate Park Entrance Park Shuttle VT VTAL $225 Category 3
2024 Marsh-Billings-Rockefeller NHP Expand Existing Storage Bay on Structure for Park Shuttle VT VTAL $200 Category 3
2024 Marsh-Billings-Rockefeller NHP
Rehabilitate Pathway from the Park’s Shuttle Dropoff to Mansion
Entryway for Accessibility VT VTAL $125 Category 3
2024 Mississippi NR & RA
Implement Trail Safety and Improvement Features on Mississippi
River Greenway MN
MN02,
MN03,
MN04,
MN05,
MN06 $668 Category 3
2024 Mississippi NR & RA Improve Safety at Road-Grade Crossing MS
MN02,
MN03,
MN04,
MN05,
MN06 $640 Category 3
2024 Mississippi NR & RA
Construct New Trailhead for Mississippi River Greenway Regional
Trail MS
MN02,
MN03,
MN04,
MN05,
MN06 $380 Category 3
2024 Mississippi NR & RA Convert Busy At-Grade Trail Road Crossing to Underpass MN
MN02,
MN03,
MN04,
MN05,
MN06 $200 Category 3
2024 Mississippi NR & RA Establish Wayfinding and Support Facilities MS
MN02,
MN03,
MN04,
MN05,
MN06 $36 Category 3
2024 Mount Rainer NP Rehabilitate Highway 123 WA
WA03,
WA08 $8,140 Category 1
2024 Mount Rainer NP
Develop Transportation Demand Management Strategies to Address
Parking and Traffic Congestion WA
WA03,
WA08 $300 Category 3
2024 Natchez Trace NST Reconstruct Parkway in Ridgeland MS
MS01,
MS02,
MS03 $3,500 Category 1
National Park Service FY 2024 Budget Justifications
FLTP-15
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2024 Natchez Trace NST Rehabilitate Multi-Use Trail Phases 1, 2, & 3 MS MS02 $3,375 Category 3
2024 Natchez Trace NST Repair Multiple Bridges
AL, MS,
TN
AL05,
MS01,
MS02,
MS03,
TN04,
TN06,
TN07 $565 Category 1
2024 Natchez Trace NST Evaluate John Coffee Memorial Bridge Phase 1 AL AL05 $100 Category 1
2024 National Capital Parks – East Improve Multimodal Safety Across the National Mall DC DCAL $12,287 Category 1
2024 National Capital Parks – East Rehabilitate Bridge and Capstone MD
MD03,
MD04,
MD05,
MD07 $3,850 Category 1
2024 New River Gorge NP and PRES Repair Cunard Road Slips WV WV01 $1,768 Category 1
2024 North Cascades NP
Construct Public Transit Bus Stops at Crane Flat, Big Oak Flat and
Tioga Roads and Replace Four Buses for Stehekin Shuttle System.
Tours and Transit WA
WA02,
WA08 $800 Category 3
2024 Olympic NP Repair Mora Road WA WA06 $3,900 Category 1
2024 Paterson Great Falls NHP Rehabilitate Upper Raceway Trail and Bridges NJ NJ09, $932 Category 3
2024 Petersburg NB Rehabilitate Multiple Routes VA VA04 $1,621 Category 1
2024 Point Reyes NS Replace Failing Culverts on Limatour Road CA CA02 $5,000 Category 1
2024 Rock Creek Park Rehabilitate Six Roadways in Rock Creek Park DC DCAL $8,000 Category 1
2024 Saguaro NP (East)
Relocate and Construct Visitor Access Entrance, Roads, Parking, and
Trails AZ
AZ06,
AZ07 $5,387 Category 1
2024 Sleeping Bear Dunes NL Install Dune Climb Turn Lanes MI MI01 $2,500 Category 1
2024 Sleeping Bear Dunes NL Construct Heritage Trail MI MI01 $1,000 Category 3
2024 Various Preserve Pavement and Bridges
DC, MD,
VA, WV Various $3,850 Category 1
2024 Various
Construct Various Emergency & Safety Projects throughout the
Region
CA, ID,
NV, OR,
WA Various $3,312 Category 1
2024 Various Develop Emerging Mobility Pilot Match
CA, ID,
NV, OR,
WA Various $500 Category 3
2024 Vicksburg NMP Repair Union Ave. sites MS MS02 $2,930 Category 1
2024 Vicksburg NMP Complete Urgent Erosion Repairs on Grant Ave. MS MS02 $1,950 Category 1
2024 Wrangell-St. Elias NP & NPRES Repair Asphalt Parking Lot at Copper Center Visitor Center AK AKAL $110 Category 1
2024 Yosemite NP Stabilize Wawona Road Embankments (4 higher priority sites) CA CA05 $4,095 Category 1
2024 Zion NP Realign South Entrance and Visitor Center Access Road UT UT02 $5,030 Category 1
National Park Service FY 2024 Budget Justifications
FLTP-16
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2024 Servicewide Engineering and Construction Management Multiple Multiple $50,145
Total $277,959
National Park Service FY 2024 Budget Justifications
FLTP-17
National Park Service
FY 2025 Federal Lands Transportation Program Plan
Budget Authority/Activity
Amount
($000s)
FY 2025 Authorized* $353,607
Adj. Estimated Obligation Ceiling (P.L. 117-58 Sec 11102) $35,361
Est. Available for Programming $318,246
Planning -$25,275
Administration -$9,547
Est. Funds Available for Projects $283,424
Engineering & Construction Mgmt $44,466
* National Park Service (NPS) activities under the FLPP include: long-range transportation plans
(LRTPs); performance management activities—including the development, implementation, and
maintenance of safety, bridge, pavement, and congestion management program related to LRTP;
road and bridge inventory; development of unit-level transportation planning projects; and
support of transportation planning projects and transportation components of unit and multi-unit
management and facility investment plans
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2025 Acadia NP Repave Five (5) Miles of Park Loop Road System ME
ME01,
ME02 $2,796 Category 1
2025 Acadia NP Rehabilitate 11 Historic Motor Road Bridges ME
ME01,
ME02 $2,000 Category 1
2025 Andersonville NHS Pavement Preservation GA GA02 $483 Category 1
2025 Blue Ridge Parkway Rehabilitate US 421 Bridge at Deep Gap NC
NC05,
NC10,
NC11 $6,700 Category 1
2025 Blue Ridge Parkway Pavement Preservation Projects NC, VA
NC05,
NC10,
NC11,
VA05,
VA06,
VA09 $3,000 Category 1
2025 Blue Ridge Parkway Conduct Bridge Preventive Maintenance Projects NC, VA
NC05,
NC10,
NC11,
VA05,
VA06,
VA09 $500 Category 1
National Park Service FY 2024 Budget Justifications
FLTP-18
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2025 Buffalo NSR Resurface Steel Creek Road AR
AR01,
AR03 $2,000 Category 1
2025 Chattahoochee River NRA Pavement Preservation GA
GA05,
GA06,
GA07,
GA11 $712 Category 1
2025 Chesapeake & Ohio Canal NHP Improve Safety at Fletcher’s Boathouse Entrance DC DCAL $5,000 Category 1
2025 Chesapeake & Ohio Canal NHP Rehabilitate Capital Crescent Trail (TAP Match) DC DCAL $2,500 Category 3
2025 Chesapeake & Ohio Canal NHP Repair or Replace Nine Pedestrian Bridges MD MD06 $2,500 Category 3
2025 Chesapeake & Ohio Canal NHP Repair Evitts Creek Aqueduct Bridge MD MD06 $400 Category 3
2025 Chesapeake & Ohio Canal NHP Resurface Towpath MD MD06 $300 Category 3
2025 Chickamauga & Chattanooga NMP Pavement Preservation GA GA14 $1,830 Category 1
2025 Colonial NHP Repair Bridge on Mainline VA
VA01,
VA04 $2,600 Category 1
2025 Cumberland Gap NHP Repair the Little Yellow Creek Bridge KY KY05 $800 Category 1
2025 Cumberland Gap NHP Repair the Little Yellow Creek Culvert Number 1 KY KY05 $45 Category 1
2025 Cumberland Gap NHP Repair the Little Yellow Creek Culvert Number 2 KY KY05 $31 Category 1
2025 Delaware Water Gap NRA Repair Route 209 PA
PA07,
PA08 $3,650 Category 1
2025 Delaware Water Gap NRA Rehabilitate Part of Old Mine Road South NJ
NJ05,
NJ07 $1,750 Category 1
2025 Delaware Water Gap NRA Rehabilitate 5 bridges PA
PA07,
PA08 $1,421 Category 1
2025 Denali NP & NPRES Complete Deferred Maintenance Restoration to Denali Park Road AK AKAL $12,765 Category 1
2025 Denali NP & NPRES Repave Riley Creek Campground AK AKAL $2,000 Category 1
2025 Denali NP & NPRES Perform Gravel Processing for Materials for Denali Park Road AK AKAL $1,590 Category 1
2025 Denali NP & NPRES
Construct Denali Pedestrian Bridge and Trail Connector (FLAP
Match) AK AKAL $1,500 Category 3
2025
Devils Tower NM, Fossil Butte NM, Bighorn
Canyon NRA, Grant-Kohrs Ranch NHS, Little
Bighorn Battlefield NM, Chickasaw NRA,
Washita Battlefield NHS
Resurface Roads and Parking Areas, Pavement Preservation Program
- 7 Parks
MT, OK,
WY
MTAL,
OK03,
OK04,
WYAL $9,000 Category 1
2025 Fort Washington Park Rehabilitate Fort Washington Roads and Parking MD MD04 $1,100 Category 1
2025 Fredericksburg & Spotsylvania NMP Rehabilitate 3 bridges VA VA07 $983 Category 1
2025 Gateway NRA Apply Preventive Maintenance to Hartshorne Avenue NJ NJ06 $1,850 Category 1
2025 Gateway NRA Design and Construct Connector for Sandy Hook Multi Use Path NJ NJ06 $914 Category 3
2025 Glacier NP Rehabilitate the Many Glacier Road MT MT01 $5,001 Category 1
2025 Glacier NP Replace Sprinter Buses in the Park’s Transit System MT MT01 $376 Category 3
National Park Service FY 2024 Budget Justifications
FLTP-19
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2025 Golden Gate NRA Construct Fort Mason Safety and Recreation Access Improvements CA
CA02,
CA11,
CA15,
CA16 $4,000 Category 3
2025 Golden Gate NRA
Perform Bridge Preservation Treatments at Golden Gate National
Recreation Area CA
CA02,
CA11,
CA15,
CA16 $300 Category 1
2025 Golden Gate NRA
Matching Funds for Alcatraz Ferry Boat Program (20% Match for
Ferry Boat Program grant) CA
CA02,
CA11,
CA15,
CA16 $76 Category 3
2025 Grand Canyon NP
Procure Ten New Compressed Natural Gas Buses to Replace 20-
year-old Buses AZ
AZ02,
AZ09 $1,755 Category 3
2025 Grand Canyon NP Modernize Grand Canyon Shuttle AZ
AZ02,
AZ09 $500 Category 3
2025 Grand Canyon NP Construct Four Bus Stops Along Hermit Road AZ
AZ02,
AZ09 $48 Category 3
2025 Grand Teton NP Repair Road and Parking at Leeks Marina WY WYAL $483 Category 1
2025 Great Smoky Mountains NP Replace Wiley Oakley Crossover Bridge TN
TN01,
TN02 $6,000 Category 1
2025 Great Smoky Mountains NP Preserve Pavement of Newfound Gap Road NC NC11 $3,000 Category 1
2025 Great Smoky Mountains NP Implement Safety Improvements on Gatlinburg Spur Road TN
TN01,
TN02 $2,000 Category 1
2025 Horseshoe Bend NMP Pavement Preservation AL AL03 $413 Category 1
2025 Indiana Dunes NP Construct Marquette Greenway Trail Ph 1 & 2 IN IN01 $3,750 Category 3
2025 Indiana Dunes NP Preserve Road and Parking Lot Pavement Park-Wide IN IN01 $3,600 Category 1
2025 Indiana Dunes NP Implement Intelligent Transportation System IN IN01 $20 Category 3
2025
Isle Royale NP Keweenaw NHP Pictured
Rocks NL Rehabilitate Miners Beach Parking Lot MI MI01 $175 Category 1
2025 Jean Lafitte NHP & PRES (French Quarter) Repair Deficiencies in Bayou Des Familles Road Bridge LA
LA01,
LA02,
LA03 $266 Category 1
2025 Jimmy Carter NHP Pavement Preservation GA GA02 $163 Category 1
2025
John Day Fossil Beds NM, Lewis and Clark
NHP, Fort Vancouver NHS Perform Pavement Preservation for three Parks OR, WA
OR01,
OR02,
OR03,
WA03 $1,000 Category 1
2025 Kennesaw Mountain NBP Pavement Preservation GA GA11 $763 Category 1
2025 Kings Canyon NP Rehabilitate Lewis Creek Bridge CA
CA05,
CA20 $8,900 Category 1
National Park Service FY 2024 Budget Justifications
FLTP-20
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2025 Little River Canyon NPRES Pavement Preservation AL AL04 $15 Category 1
2025 Lowell NHP Reconstruct Bridge Street and Mass Mills Trolley Crossing MA
MA03,
MA05 $782 Category 3
2025 Lowell NHP Replace Accessible Wheelchair Lifts on Three (3) Park Trolleys MA
MA03,
MA05 $150 Category 3
2025 Martin Luther King, JR. NHP Pavement Preservation GA GA05 $235 Category 1
2025 Mesa Verde NP Yucca House NM Rehabilitate 3 Park Roads CO CO03 $3,967 Category 1
2025 Mojave National Preserve Rehabilitate Kelso-Cima Road Phase 1 CA CA23 $39,688 Category 1
2025 Muir Woods NM Construct Access Improvements at Muir Woods CA CA02 $2,000 Category 3
2025 Natchez Trace NST Install Suicide Deterrent Barrier for TN Route 96 Bridge TN TN07 $4,500 Category 1
2025 Natchez Trace NST Construct Multi Use Trail Sections 3P19 and 3P20 MS MS03 $4,200 Category 3
2025 Natchez Trace NST Overlay Park Road TN
TN04,
TN06,
TN07 $2,400 Category 1
2025 Natchez Trace NST Repair Multiple Bridges
AL, MS,
TN
AL05,
MS01,
MS02,
MS03,
TN04,
TN06,
TN07 $500 Category 1
2025 National Mall and Memorial Parks Improve Multimodal Safety Across the National Mall DC DCAL $10,862 Category 1
2025 National Capital Parks – East Construct Suitland Parkway Trail (Phase I) MD MD04 $1,400 Category 3
2025 New River Gorge NP and PRES Conduct Critical Repairs and Improvements to Rend Trail Bridges WV WV01 $3,000 Category 3
2025 New River Gorge NP and PRES Repair Cunard Road Slips WV WV01 $192 Category 1
2025 Petersburg NB
Rehabilitate Norfolk Southern Railroad Bridge and VA 36 Highway
Overpass Bridge VA VA04 $150 Category 1
2025 River Raisin NBP Reconstruct Battlefield Parking Lot MI MI05 $400 Category 1
2025 Rock Creek Park Preserve Pavement on Rock Creek Parkway and Ramps DC DCAL $8,000 Category 1
2025 Rock Creek Park Repair L Street Bridge Over Rock Creek DC DCAL $1,100 Category 1
2025 Rocky Mountain NP Reconstruct Holzwarth Culvert CO CO02 $1,000 Category 1
2025 Russell Cave NM Pavement Preservation AL AL05 $16 Category 1
2025 Selma to Montgomery NHT Pavement Preservation AL
AL02,
AL03,
AL07 $503 Category 1
2025 Stones River NB Construct Parking Lot at Tour Stop 5 TN TN04 $798 Category 1
2025 Tuskegee Airmen NHS Pavement Preservation AL AL03 $292 Category 1
2025 Tuskegee Institute NHS Pavement Preservation AL AL03 $104 Category 1
2025 Valley Forge NHP Rehabilitate 2 Routes PA
PA04,
PA06 $1,800 Category 1
National Park Service FY 2024 Budget Justifications
FLTP-21
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2025 Valley Forge NHP Construct North Gulph Trail Link to Neighboring Community PA
PA04,
PA06 $800 Category 3
2025 Various
Construct Various Emergency & Safety Projects throughout the
Region CA Various $3,940 Category 1
2025 Various Preserve Pavement and Bridges
DC, MD,
VA, WV Various $2,855 Category 1
2025 Various Develop Emerging Mobility Pilot Match
CA, ID,
NV, OR,
WA Various $500 Category 3
2025 Various Conduct Bridge Preventive Maintenance Projects
AL, FL,
GA, KY,
LA, MS,
NC, SC,
TN Various $500 Category 1
2025 Yellowstone NP Reconstruct Norris to Golden Gate Road Phase 3 WY WYAL $20,000 Category 1
2025 Yellowstone NP Perform Bridge Preservation WY WYAL $2,000 Category 1
2025 Yosemite NP Rehabilitate Big Oak Flat Road CA CA05 $5,000 Category 1
2025 Servicewide Engineering and Construction Management Multiple Multiple $44,466
Total $283,424
National Park Service FY 2024 Budget Justifications
FLTP-22
National Park Service
FY 2026 Federal Lands Transportation Program Plan
Budget Authority/Activity
Amount
($000s)
FY 2026 Authorized* $360,047
Adj. Estimated Obligation Ceiling (P.L. 117-58 Sec 11102) $36,005
Est. Available for Programming $324,042
Planning -$24,823
Administration -$9,721
Est. Funds Available for Projects $289,498
Engineering & Construction Mgmt $48,629
* National Park Service (NPS) activities under the FLPP include: long-range transportation plans
(LRTPs); performance management activities—including the development, implementation, and
maintenance of safety, bridge, pavement, and congestion management program related to LRTP;
road and bridge inventory; development of unit-level transportation planning projects; and
support of transportation planning projects and transportation components of unit and multi-unit
management and facility investment plans
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2026 Acadia NP Enhance Island Explorer Bus System Phase 2 ME
ME01,
ME02 $1,364 Category 3
2026 Acadia NP Repave Five (5) Miles of Park Loop Road System ME
ME01,
ME02 $1,329 Category 1
2026 Apostle Islands NL Repair/Rehabilitate Outer Island Dock Phase 2 WI WI08 $1,400 Category 3
2026 Arches NP Reconstruct 3 Bridges Along the Delicate Arch Road UT UT03 $9,733 Category 1
2026 Arches NP Improve Entrance Road UT UT03 $1,335 Category 1
2026 Assateague Island NS Preserve Pavement on Bayberry Road MD MD01 $2,000 Category 1
2026 Baltimore-Washington Parkway Rehabilitate Baltimore-Washington Parkway Mainline {Phase 1) MD
MD03,
MD04,
MD07 $6,914 Category 1
2026 Blue Ridge Parkway Rehabilitate Big Pine Creek Bridge #5 NC
NC05,
NC10,
NC11 $5,000 Category 1
2026 Blue Ridge Parkway Pavement Preservation Projects NC, VA
NC05,
NC10,
NC11,
VA05,
VA06,
VA09 $4,500 Category 1
National Park Service FY 2024 Budget Justifications
FLTP-23
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2026 Blue Ridge Parkway Paint and Repair, I-77 Bridge VA
VA05,
VA06,
VA09 $1,400 Category 1
2026 Buffalo NSR Resurface Buffalo Point Roads and Paved Parking Area AR
AR01,
AR03 $1,000 Category 1
2026 Cape Cod NS Construct Pole Barn for Tram Storage MA MA09 $2,000 Category 3
2026 Cape Cod NS Replace Three Pedestrian Bridges on Nauset Trail MA MA09 $135 Category 3
2026 Cape Hatteras NS Pavement Preservation NC NC03 $4,023 Category 1
2026 Cape Lookout NS Pavement Preservation NC NC03 $323 Category 1
2026 Carl Sandburg Home NHS Pavement Preservation NC NC11 $79 Category 1
2026 Chesapeake & Ohio Canal NHP Rehabilitate and Extend Western Maryland Rail Trail to Paw Paw MD MD06 $3,000 Category 3
2026 Chesapeake & Ohio Canal NHP Repair or Replace Nine Pedestrian Bridges MD MD06 $2,500 Category 3
2026 Chesapeake & Ohio Canal NHP Rehabilitate Capital Crescent Trail (Tap Match) DC DCAL $1,250 Category 3
2026 Congaree NP Pavement Preservation SC SC06 $510 Category 1
2026 Cowpens NB Pavement Preservation SC SC05 $1,465 Category 1
2026 Crater Lake NP Perform Bridge Preservation Treatments at Crater Lake OR OR02 $500 Category 1
2026 Delaware Water Gap NRA Rehabilitate River Road PA
PA07,
PA08 $3,500 Category 1
2026 Delaware Water Gap NRA Rehabilitate Part of Old Mine Road South NJ
NJ05,
NJ07 $2,870 Category 1
2026 Delaware Water Gap NRA Repair Route 209 PA
PA07,
PA08 $2,000 Category 1
2026 Delaware Water Gap NRA Rehabilitate Route 615 PA
PA07,
PA08 $1,500 Category 1
2026 Delaware Water Gap NRA Rehabilitate Johnny Bee Road and Dingmans Falls Road PA
PA07,
PA08 $1,000 Category 1
2026 Denali NP & NPRES Repave Riley Creek Campground to Address Drainage Issues AK AKAL $2,500 Category 1
2026 Denali NP & NPRES Preserve Park Road Surface AK AKAL $2,100 Category 1
2026 Fort Raleigh NHS Pavement Preservation NC NC03 $200 Category 1
2026 George Washington Memorial Parkway
Rehabilitate Cabin John Creek Bridge, Cabin John Overpass at
Ericsson Road and Carderock Access Bridge MD MD08 $2,400 Category 1
2026 George Washington Memorial Parkway Rehabilitate Fort Hunt Roads and Parking VA VA08 $2,400 Category 1
2026 Glacier NP Rehabilitate Two Medicine Road MT MT01 $10,123 Category 1
2026 Glacier NP Replace Sprinter Buses in the Park’s Transit System MT MT01 $429 Category 3
2026 Golden Gate NRA
Construct Non-motorized Circulation and Safety Improvements at
MacArthur Ave, Upper Fort Mason CA
CA02,
CA11,
CA15,
CA16 $803 Category 3
2026 Grand Canyon NP Procure New Alternative Fuel Buses to Replace 20-year-old Buses AZ
AZ02,
AZ09 $4,766 Category 3
National Park Service FY 2024 Budget Justifications
FLTP-24
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2026 Grand Teton NP Pavement Preservation WY WYAL $8,800 Category 1
2026 Grand Teton NP Repair, Pulverize, and Overlay 3 Miles of Teton Park Road WY WYAL $6,408 Category 1
2026 Great Smoky Mountains NP Replace Wiley Oakley Crossover Bridge TN
TN01,
TN02 $5,730 Category 1
2026 Great Smoky Mountains NP Modify and Reroute Oconaluftee River Trail NC NC11 $3,000 Category 3
2026 Great Smoky Mountains NP Repair Raven Fork Bridge on Big Cove Access Road NC NC11 $801 Category 1
2026 Great Smoky Mountains NP
Rehabilitate Parson Branch Bridge #2 and Oconaluftee Entrance
Road NC NC11 $685 Category 1
2026 Great Smoky Mountains NP Rehabilitate and Reconstruct Bridges in Cataloochee Area NC NC11 $350 Category 1
2026 Guilford Courthouse NMP Pavement Preservation NC NC06 $875 Category 1
2026 Indiana Dunes NP Construct Marquette Greenway Trail IN IN01 $2,000 Category 3
2026 Kings Mountain NMP Pavement Preservation SC SC05 $905 Category 1
2026 Lowell NHP Repair Trolley Track and Poles - Wye to Carbarn MA
MA03,
MA05 $1,085 Category 3
2026 Lowell NHP Repair Various Park Trolley and Pedestrian Bridges Phase 1 MA
MA03,
MA05 $625 Category 3
2026 Minute Man NHP Build, Rehabilitate, Improve Battle Road Trail Connectors MA
MA03,
MA05 $850 Category 3
2026 Mississippi NR & RA Improve Safety at Road-Grade Crossing MN MN05 $150 Category 3
2026 Mojave National Preserve Rehabilitate Kelso-Cima Road Phase 1 CA CA23 $45,121 Category 1
2026 Moores Creek NB Pavement Preservation NC NC07 $95 Category 1
2026 Mount Rainer NP Replace Fryingpan Creek Bridge WA
WA03,
WA08 $11,500 Category 1
2026 Mount Rainer NP Perform Pavement Preservation WA
WA03,
WA08 $1,000 Category 1
2026 Natchez Trace NST Overlay Park Road MS
MS01,
MS02,
MS03 $12,155 Category 1
2026 Natchez Trace NST Repair Bridges
AL, MS,
TN
AL05,
MS01,
MS02,
MS03,
TN04,
TN06,
TN07 $500 Category 1
2026 National Capital Parks – East Rehabilitate Suitland Parkway and Safety/Guardrail Improvements MD
MD03,
MD04,
MD05,
MD07 $9,400 Category 1
2026 National Capital Parks – East Repair Baltimore-Washington Parkway Bridge and Access Ramp MD MD04 $2,900 Category 1
2026 New River Gorge NP and PRES Repair Glade Creek Road WV WV01 $700 Category 1
National Park Service FY 2024 Budget Justifications
FLTP-25
Year Park Name Project Name State
Park
Cong.
District
Funding
Estimate
($000s)
Funding
Category
2026 Ninety Six NHS Pavement Preservation SC SC03 $90 Category 1
2026 Pictured Rocks NL Construct Multi-Use Trail - Sand Point MI MI01 $2,000 Category 3
2026 Pinnacles NP Rehabilitate Old Pinnacles Trailhead Parking Area Shuttle Stop CA CA18 $500 Category 3
2026 Theodore Roosevelt NP Preserve Road and Parking Lot Pavement Park-Wide ND NDAL $5,000 Category 1
2026 Vanderbilt Mansion NHS Reconstruct Dock Street Bridge NY NY18 $5,000 Category 1
2026 Various
Construct Various Emergency & Safety Projects throughout the
Region
CA, ID,
NV, OR,
WA Various $5,684 Category 1
2026 Various Preserve Pavement and Bridges DC DCAL $4,008 Category 1
2026 Various Develop Emerging Mobility Pilot Match
AZ, CO,
MT,
NM,
OK, TX,
UT Various $500 Category 3
2026 Various Conduct Bridge Preventive Maintenance Projects
AL, FL,
GA, KY,
LA, MS,
NC, SC,
TN Various $500 Category 1
2026 Vicksburg NMP Rehabilitate Battery DeGolyer Bridge MS MS02 $1,400 Category 1
2026 Wrangell-St. Elias NP & NPRES
Extend Visitor Center Interpretive Trail by Adding a Bike Trail with
Bike Parking Area AK AKAL $1,068 Category 3
2026 Wright Brothers NM Pavement Preservation NC NC03 $545 Category 1
2026 Yellowstone NP Perform Bridge Preservation WY WYAL $2,000 Category 1
2026 Yosemite NP Repair and Replace 2 Bridges in Poor Condition CA CA05 $5,000 Category 1
2026 Yosemite NP Improve the Existing Multi-Use Path System in Yosemite Valley CA CA05 $3,588 Category 3
2026 Servicewide Engineering and Construction Management Multiple Multiple $48,629
Total $289,498
National Park Service FY 2024 Budget Justifications
FLTP-26
THIS PAGE INTENTIONALLY LEFT BLANK
National Park Service FY 2024 Budget Justifications
SpecEx-1
Special Exhibits
Exhibit A: Deferred Maintenance & Repairs
The National Park Service (NPS) reports on Deferred Maintenance & Repairs (DM&R) annually. DM&R
is defined as the cost of maintenance and repairs that were not performed when they should have been or
were scheduled to be and which are put off or delayed for a future period. Maintenance and repairs are
activities directed toward keeping fixed assets in an acceptable condition. Activities include preventive
maintenance; replacement of parts, systems, or components; and other activities needed to preserve or
maintain the asset. Maintenance and repairs, as distinguished from capital improvements, exclude
activities directed towards expanding the capacity of an asset or otherwise upgrading it to serve needs
different from, or significantly greater than, its current use. As of end of FY 2022, the NPS DM&R
estimate is $22.3 billion.
Estimating Deferred Maintenance & Repair Needs
In FY 2022, the National Park Service (NPS) updated its methodology used to perform condition
assessments on facilities and generate Deferred Maintenance and Repairs (DM&R) estimates used for
reporting. These changes streamline the condition assessment process and provide a more comprehensive,
consistent, and timely identification of condition deficiencies and estimate of the NPS portfolio repair
needs.
DM&R needs for the NPS portfolio are calculated using three components: Parametric condition
assessments (PCA) for industry standard assets, Federal Highways Administration (FHWA) assessments
for paved roads, parking, bridge and tunnel assets, and work orders for concessions-occupied assets and
non-industry standard assets.
The PCA method is an accepted industry standard as recognized by the Federal Accounting Standards
Advisory Board (FASAB) and Federal Real Property Profile (FRPP) guidance. A key component of the
PCA methodology is the rapid visual assessment, which involves scoring the condition of major
components and systems of assets. Models based on asset type within the PCA scoring tool are used to
estimate a DM&R figure for each asset based on condition of individual components and systems and the
relation of those components and systems to the total Current Replacement Value (CRV) of the asset.
These parametric results are combined with existing inspection data for Federal Highway Administration
(FHWA) inspected assets, and work orders for concessions-occupied and non-industry standard assets to
produce total DM&R for the NPS portfolio.
National Park Service FY 2024 Budget Justifications
SpecEx-2
Deferred Maintenance and Repairs
DM&R is spread across a diverse inventory of real property assets with a wide variety of maintenance
and repair needs.
National Park Service
FY 2022 Deferred Maintenance and Repair by Asset Category
(dollars in millions)
Asset Category Asset Count Deferred
Maintenance &
Repair ($)
Buildings 25,163 $6,783
Housing 3,661 $383
Campgrounds 1,657 $288
Trails 6,244 $677
Wastewater Systems 1,767 $804
Water Systems 1,578 $1,064
Paved Roads 11,961 $5,413
Unpaved Roads 5,664 $883
All Others* 17,737 $5,994
Total 75,432 $22,289
**All Others captures non-industry standard assets including utility systems, dams,
constructed waterways, marinas, aviation systems, railroads, ships, monuments,
fortifications, towers, interpretive media and amphitheaters. Note that the work
order methodology is still being used to calculate DM&R for these assets as the NPS
continues to improve the data quality for this subset of the portfolio.
National Park Service FY 2024 Budget Justifications
SpecEx-3
Exhibit B: Allocations Received from Other Accounts
Obligations incurred under allocations from other accounts are included in the schedules of the parent
appropriations as follows:
Allocations Received from Other Accounts
Federal Department Agency Account Title
Department of Agriculture US Forest Service
State and Private Forestry
Department of Transportation Federal Highway Administration
Federal Aid-Highways
(Liquidation of Contract
Authorization) (Highway Trust
Fund)
Highway Studies, Feasibility,
Design, Environmental,
Engineering
Nationally Significant Federal
Lands and Tribal Projects
(NSFLTP) Grants
Department of the Interior Bureau of Land Management
Southern Nevada Public Lands
Management
Department of the Interior Departmentwide Programs
Central Hazardous Materials
Fund
Natural Resource Damage
Assessment and Restoration
Fund
National Parks and Public Land
Legacy Restoration Fund (LRF)
Bipartisan Infrastructure Law
(P.L. 117-58)
Inflation Reduction Act (P.L.
117-169)
Department of the Interior Departmental Offices
Wildland Fire Management
Salaries and Expenses
National Park Service FY 2024 Budget Justifications
SpecEx-4
Exhibit C: Budget Realignment
In a January 2005 audit (CIN-NPS-0013-2004), the Department of the Interior Office of the Inspector
General recommended that the National Park Service realign the budget request to more closely reflect
the actual facility operations and facility maintenance obligations within the facility operations and
maintenance subactivity. During the FY 2010 appropriations process, NPS received approval from
Congress to annually update the ONPS Park Management budget subactivity and program component
displays in the Congressional Justifications to reflect how the funds were actually utilized, giving the
Committees and other stakeholders a transparent presentation of how appropriated dollars are used to
support NPS resource stewardship, visitor services, park protection, facility operations and maintenance,
and park support activities.
Within the FY 2024 budget presentation for the ONPS Park Management budget activity, the FY 2022
column represents adjusted amounts by budget subactivity and program component based on an analysis
of charges in the accounting system for FY 2022. The table below shows the variance between FY 2022
enacted and actual charges in FY 2022 by ONPS subactivity.
This FY 2022 ONPS Park Management variance results from the cumulative impact of decisions made by
park superintendents to execute park budgets over several fiscal years. The FY 2019 President’s Budget
Request was the most recent request to be built off adjusted figures. In order to more transparently request
inclusion of an adjustment for this variance, the FY 2024 budget presentation incorporates the amounts in
the “Variance” column below into the “Internal Transfers” column in the FY 2024 President’s Budget
Request, seen in the ONPS sections of this Budget Justification.
National Park Service
FY 2022 Budget Realignment
Based on FY 2022 Actuals Obligations
(dollars in thousands)
Operation of the National Park System/
PARK MANAGEMENT Subactivity
FY 2022
Enacted
FY 2022
Actual Variance
Percent
Variance
RESOURCE STEWARDSHIP
382,147 364,330 -17,817 -4.7%
VISITOR SERVICES
289,221 260,210 -29,011 -10.0%
PARK PROTECTION
407,057 407,757 +700 +0.2%
FACILITY OPERATIONS & MAINT.
911,478 914,790 +3,312 +0.4%
PARK SUPPORT
569,838 612,654 +42,816 +7.5%
Total PARK MANAGEMENT
2,559,741 2,559,741 0 0.0%
EXTERNAL ADMINISTRATIVE COSTS
207,287 207,287 0 0.0%
TOTAL ONPS APPROPRIATION
2,767,028 2,767,028 0 0.0%
National Park Service FY 2024 Budget Justifications
SpecEx-5
Exhibit D: Compliance with Section 403
Section 343 of the 2004 Interior and Related Agencies Appropriations Act (P.L. 108-108) mandated
disclosure of program assessments used to support Government-wide, Departmental, or Agency
initiatives or general operations be presented in annual budget justifications. This was reiterated in later
Appropriations Acts, including most recently in the Consolidated Appropriations Act, 2023 (P.L. 117-
328). The specific requirement follows:
SEC. 403. The amount and basis of estimated overhead charges, deductions, reserves or
holdbacks, including working capital fund and cost pool charges, from programs,
projects, activities and subactivities to support government-wide, departmental, agency,
or bureau administrative functions or headquarters, regional, or central operations shall
be presented in annual budget justifications and subject to approval by the Committees
on Appropriations of the House of Representatives and the Senate. Changes to such
estimates shall be presented to the Committees on Appropriations for approval.
In accordance with OMB Circular A-25, the NPS charges an indirect cost rate to recover the full costs
associated with reimbursable activities.
Working Capital Fund Billings
The National Park Service budget includes payments to the Department of the Interior Working Capital
Fund for centralized and direct business and administrative services. The following table summarizes
WCF estimated billings to NPS for FY 2023 and FY 2024:
Working Capital Fund ($ in thousands)
Activity 2023
Central
Estimate
2023
Direct
Estimate
2023
Total
Estimate
2024
Central
Estimate
2024
Direct
Estimate
2024
Total
Estimate
OS Shared Services
8,334 4,515 12,849 8,147 4,495 12,642
OS Activities
18,601 3,950 22,551 25,309 1,385 26,694
IT Shared Services
27,125 30,775 57,900 28,240 32,593 60,833
Interior Business Center
9,648 3,362 13,010 12,184 3,372 15,556
TOTAL, WCF Billing 63,708 42,602 106,311 73,879 41,845 115,724
Note: Numbers may not add to total due to rounding.
Regional Contingency Accounts
NPS regions and headquarters assess up to one percent of allocations of ONPS Park Management activity
funds for parks, field offices and servicewide programs for contingency purposes. The contingency
account, the only assessment of funds that is allowed, enables the Director and Regional Directors to
respond to unforeseen emergencies and other specific unfunded needs. The Director and Regional
Directors have established criteria for prioritizing and approving requests for the funds in the contingency
account.
Permitted uses of this account include:
Specific park operating problems, caused by budgetary shortfalls, until permanent solutions can
be found through formal budget increases or reprogramming actions.
National Park Service FY 2024 Budget Justifications
SpecEx-6
Storm damage expenses.
Emergency law and order incidents expenses.
Employee benefit costs for relocation payments, lump sum leave payments, and awards.
Special Events Team and All Risk Team readiness and deployment.
Unanticipated Employee Assistance Programs and local transportation subsidy costs.
The Regional Contingency Accounts totaled $15.6 million in FY 2022. NPS used the contingency funds
for the following purposes in FY 2022:
FY 2022 NPS Contingency Costs
Contingency Category ($000)
Emergency Damage Response Costs 1,427
Law Enforcement Readiness and Response 932
Park Employee Relocation Costs 4,149
Operational Needs at Parks 7,501
Extraordinary Personnel Costs 1,677
Total 2022 Contingency Costs 15,686
An explanation of the major uses of the contingency accounts follows:
Emergencies/Law Enforcement: $2.4 million to address unforeseen events requiring rapid action
by first responders.
Park Employee Relocation Costs: $4.1 million to cover the cost of relocating park employees.
Parks with small annual budgets cannot afford these moves, accomplished according to Federal
rules, without help from a central fund.
Operational Needs at Parks: $7.5 million returned to parks to address unfunded, non-recurring
park projects to meet operational requirements.
Extraordinary Personnel Costs: $1.7 million for unexpected, but unavoidable personnel
expenses.
The amount of funds to be used for contingencies during both FY 2023 and FY 2024 is difficult to
estimate due to the nature of the expenditures. The criteria upon which the funds are assembled and spent
will remain the same. In all cases, headquarters and regions will be required to report on the uses of the
contingency funds with sufficient detail to ensure conformance with the established criteria.
National Park Service FY 2024 Budget Justifications
SpecEx-7
Exhibit E: Statement on Land Exchanges
NATIONAL PARK SERVICE
STATEMENT ON LAND EXCHANGES IN FY 2023
The following information is provided pursuant to House Report 99-714, which advises each acquisition
agency to provide a detailed listing of proposed exchanges and related expenditures. The following is a
tentative list, by State, of land exchanges that the National Park Service expects to be working on and the
related costs in FY 2023. The actual exchanges to be worked in the fiscal year may vary considerably
from the list because there can be no certainty about the time of completion of exchanges now in
progress, their success rate, or the availability of funds needed to cover exchange-related costs. Costs
shown include: (1) direct personnel costs needed to accomplish exchanges, paid from Acquisition
Administration funds, and (2) costs of appraisals, surveys, and similar items, paid from funds
appropriated for acquisition at specified park units or under the project activity “Inholdings/Exchanges”
in the Federal Land Acquisition budget.
Proposed NPS Land Exchanges, FY 2023
STATE PARK UNIT PLANNED ESTIMATED
Alaska Denali National Park and Preserve 1 $700,000
Alaska Gates of the Arctic National Park and Preserve 1 $200,000
Alaska Wrangel-St. Elias National Park and Preserve 1 $500,000
California Death Valley National Park 1 $75,000
California Kings Canyon National Park 1 $90,000
Georgia Chattahoochee River National Recreation Area 1 $20,000
Georgia Cumberland Island National Seashore 4 $500,000
Indiana George Rogers Clark National Historical Park 1 $25,000
Maine Acadia National Park 4 $90,000
Maine Katahdin Woods and Waters National Monument 1 $15,000
Maryland Catoctin Mountain Park 1 $50,000
Maryland National Capital Parks 1 $15,000
Massachusetts Cape Cod National Seashore 2 $125,000
Massachusetts Lowell National Historical Park 1 $15,000
Michigan Sleeping Bear Dunes National Lakeshore 1 $35,000
Minnesota St. Croix National Scenic Riverway 1 $30,000
Minnesota Voyageurs National Park 1 $20,000
Mississippi Gulf Islands National Seashore 1 $50,000
New York Gateway National Recreation Area 2 $55,000
New Hampshire Appalachian National Scenic Trail 1 $50,000
Ohio Cuyahoga Valley National Park 1 $30,000
Pennsylvania Appalachian National Scenic Trail 1 $25,000
Pennsylvania Delaware Water Gap National Recreation Area 1 $30,000
Tennessee Chickamauga & Chattanooga National Military Park 1 $10,000
Tennessee Obed Wild and Scenic River 1 $15,000
Virginia George Washington Memorial Parkway 1 $25,000
Virginia Prince William Forest Park 1 $10,000
West Virginia New River Gorge National River 1 $10,000
TOTAL 36 $2,815,000
National Park Service FY 2024 Budget Justifications
SpecEx-8
NATIONAL PARK SERVICE
STATEMENT ON LAND EXCHANGES IN FY 2024
The following information is provided pursuant to House Report 99-714, which advises each acquisition
agency to provide a detailed listing of proposed exchanges and related expenditures. The following is a
tentative list, by State, of land exchanges that the National Park Service expects to be working on and the
related costs in FY 2024. The actual exchanges to be worked in the fiscal year may vary considerably
from the list because there can be no certainty about the time of completion of exchanges now in
progress, their success rate, or the availability of funds needed to cover exchange-related costs. Costs
shown include: (1) direct personnel costs needed to accomplish exchanges, paid from Acquisition
Administration funds, and (2) costs of appraisals, surveys, and similar items, paid from funds
appropriated for acquisition at specified park units or under the project activity “Inholdings/Exchanges”
in the Federal Land Acquisition budget.
Proposed NPS Land Exchanges, FY 2024
STATE PARK UNIT PLANNED ESTIMATED
Alaska Denali National Park and Preserve 1 $700,000
Alaska Gates of the Arctic National Park and Preserve 1 $200,000
Alaska Wrangel-St. Elias National Park and Preserve 2 $700,000
California Death Valley National Park 1 $75,000
California Kings Canyon National Park 1 $90,000
Georgia Chattahoochee River National Recreation Area 1 $20,000
Georgia Cumberland Island National Seashore 4 $500,000
Indiana George Rogers Clark National Historical Park 1 $25,000
Maine Acadia National Park 3 $70,000
Maine Katahdin Woods and Waters National Monument 1 $15,000
Maryland Catoctin Mountain Park 1 $50,000
Maryland National Capital Parks 2 $30,000
Massachusetts Cape Cod National Seashore 2 $125,000
Massachusetts Lowell National Historical Park 1 $15,000
Michigan Sleeping Bear Dunes National Lakeshore 1 $35,000
Minnesota St. Croix National Scenic Riverway 1 $30,000
Minnesota Voyageurs National Park 1 $20,000
New Hampshire Appalachian National Scenic Trail 1 $50,000
New York Gateway National Recreation Area 2 $55,000
Ohio Cuyahoga Valley National Park 1 $30,000
Pennsylvania Appalachian National Scenic Trail 1 $25,000
Pennsylvania Delaware Water Gap National Recreation Area 1 $30,000
Tennessee Chickamauga & Chattanooga National Military Park 1 $10,000
Virginia George Washington Memorial Parkway 1 $10,000
Virginia National Capital Parks 1 $10,000
Virginia Prince William Forest Park 1 $10,000
Virgin Islands Virgin Islands National Park 1 $25,000
TOTAL 36 $2,955,000
National Park Service FY 2024 Budget Justifications
SpecEx-9
Exhibit F: Employee Count by Grade
National Park Service
Employee Count by Grade
(Total Employment)
Position Type/Grade FY 2022
Actual
FY 2023
Estimate
FY 2024
Estimate
Executive Level V 1 1 1
SES 30 30 30
Subtotal 31 31 31
SL00 - - -
ST00 - - -
Subtotal - - -
GS15 185 185 185
GS14 562 562 563
GS-13 1,419 1,419 1,419
GS-12 2,314 2,438 2,660
GS-11 2,289 2,411 2,632
GS-10 6 6 6
GS–9 2,402 2,530 2,762
GS–8 189 189 189
GS–7 1,924 2,027 2,213
GS–6 596 628 686
GS–5 2,999 3,159 3,449
GS–4 612 645 704
GS–3 122 122 122
GS–2 10 10 10
GS–1 2 2 2
Subtotal 15,631 16,333 17,602
Other Pay Schedule Systems 5,447 5,738 6,264
Total Employment Estimates 21,109 22,102 23,897
National Park Service FY 2024 Budget Justifications
SpecEx-10
Exhibit G: Administrative Provisions
Administrative Provisions
(Including Transfer of Funds)
Appropriation Language
In addition to other uses set forth in section 101917(c)(2) of title 54, United States Code, franchise fees
credited to a sub-account shall be available for expenditure by the Secretary, without further
appropriation, for use at any unit within the National Park System to extinguish or reduce liability for
Possessory Interest or leasehold surrender interest. Such funds may only be used for this purpose to the
extent that the benefitting unit anticipated franchise fee receipts over the term of the contract at that unit
exceed the amount of funds used to extinguish or reduce liability. Franchise fees at the benefitting unit
shall be credited to the sub-account of the originating unit over a period not to exceed the term of a single
contract at the benefitting unit, in the amount of funds so expended to extinguish or reduce liability.
For the costs of administration of the Land and Water Conservation Fund grants authorized by section
105(a)(2)(B) of the Gulf of Mexico Energy Security Act of 2006 (Public Law 109-432), the National Park
Service may retain up to 3 percent of the amounts which are authorized to be disbursed under such
section, such retained amounts to remain available until expended.
National Park Service funds may be transferred to the Federal Highway Administration (FHWA),
Department of Transportation, for purposes authorized under 23 U.S.C. 203. Transfers may include a
reasonable amount for FHWA administrative support costs.
Justification of Major Proposed Language Changes
No major changes are requested when compared to FY 2023 Enacted.
Appropriations Language Citations
1. In addition to other uses set forth in section 101917(c)(2) of title 54, United States Code,
franchise fees credited to a sub-account shall be available for expenditure by the Secretary,
without further appropriation, for use at any unit within the National Park System to
extinguish or reduce liability for Possessory Interest or leasehold surrender interest. Such
funds may only be used for this purpose to the extent that the benefitting unit anticipated
franchise fee receipts over the term of the contract at that unit exceed the amount of funds
used to extinguish or reduce liability. Franchise fees at the benefitting unit shall be credited
to the sub-account of the originating unit over a period not to exceed the term of a single
contract at the benefitting unit, in the amount of funds so expended to extinguish or reduce
liability.
54 U.S.C. 101917(c)(2) establishes new requirements for the NPS Concession Program and was
intended by Congress to update the NPS concessions management statutory requirements and
policies established by the Concessions Policy Act of 1965 (Public Law 89-249).
2. For the costs of administration of the Land and Water Conservation Fund grants
authorized by section 105(a)(2)(B) of the Gulf of Mexico Energy Security Act of 2006
(Public Law 109-432), the National Park Service may retain up to 3 percent of the amounts
National Park Service FY 2024 Budget Justifications
SpecEx-11
which are authorized to be disbursed under such section, such retained amounts to remain
available until expended.
Gulf of Mexico Energy Security Act of 2006 allows significant enhancements to Outer Shelf
(OCS) oil and gas leasing activities and revenue in the Gulf. Under the Act, a portion of the funds
are to be distributed in accordance with the Land and Water Conservation Act of 1965.
3. National Park Service funds may be transferred to the Federal Highway Administration
(FHWA), Department of Transportation, for purposes authorized under 23 U.S.C. 203.
Transfers may include a reasonable amount for FHWA administrative support costs.
23 U.S.C. 203 provides certain authority to the Department of Transportation to work jointly with
other Departments in recognition of the desirability to have Federally funded road projects
coordinated between State and Federal agencies by a central Federal entity to ensure efficiency,
consistency and uniformity in managing the nation’s road network.
National Park Service FY 2024 Budget Justifications
SpecEx-12
Exhibit H: FY 2024 General Provisions
Impacting the National Park Service
Interior, Environment, and Related Agencies
TITLE I – GENERAL PROVISIONS
(INCLUDING TRANSFERS OF FUNDS)
ELLIS, GOVERNORS, AND LIBERTY ISLANDS
SEC. 106. Notwithstanding any other provision of law, the Secretary of the Interior is authorized to
acquire lands, waters, or interests therein, including the use of all or part of any pier, dock, or landing
within the State of New York and the State of New Jersey, for the purpose of operating and maintaining
facilities in the support of transportation and accommodation of visitors to Ellis, Governors, and Liberty
Islands, and of other program and administrative activities, by donation or with appropriated funds,
including franchise fees (and other monetary consideration), or by exchange; and the Secretary is
authorized to negotiate and enter into leases, subleases, concession contracts, or other agreements for the
use of such facilities on such terms and conditions as the Secretary may determine reasonable. That for
the purposes of 54 U.S.C. 200306(a), such lands, waters, or interests acquired under this heading shall
be considered to be within the exterior boundary of a System unit authorized or established.
Purpose: The provision authorizes the Secretary to acquire lands, waters, or interests therein to operate
and maintain facilities in support of transportation and accommodation of visitors to Ellis, Governors, or
Liberty Islands, by donation or with appropriated funds, including franchise fees, or by exchange. The
provision also authorizes the Secretary to negotiate and enter into leases, subleases, concession contracts,
or other agreements for the use of such facilities. The new proviso treats land or land interests acquired
through this authority as part of the authorized boundary of the unit, which enables the use of LWCF
funds for these purposes.
STATE CONSERVATION GRANTS
SEC. [121] 117. For expenses necessary to carry out section 200305 of title 54, United States Code, the
National Park Service may retain up to 7 percent of the State Conservation Grants program to provide to
States, the District of Columbia, and insular areas, as matching grants to support state program
administrative costs.
Purpose: To provide States the authority to use up to seven percent of their apportionment for
administrative responsibilities.
RETENTION OF CONCESSION FRANCHISE FEES
Sec. 119. Section 101917(c) of title 54, United States Code, is amended by adding at the end the following
new paragraph: “(3) Reduction.--The Secretary may reduce the percentage allocation otherwise
applicable under paragraph (2) to a unit or area of the National Park Service for a fiscal year if the
Secretary determines that the revenues collected at the unit or area exceed the reasonable needs of the
unit or area for which expenditures may be made for that fiscal year. In no event may a percentage
allocation be reduced below 60 percent.”
National Park Service FY 2024 Budget Justifications
SpecEx-13
Purpose: The NPS proposes a General Provision to allow for the reduction of the percentage of
concession franchise fee revenue that is retained at a park unit under certain circumstances to achieve
programmatic goals.
HISTORIC PRESERVATION FUND
Sec 120. Section 303102 of title 54, United States Code, is amended by striking “2023” and inserting
“2024”.
Purpose: The authority to deposit receipts of $150.0 million annually into the Historic Preservation Fund,
to be subject to annual appropriations, expires at the end of FY 2023. The NPS proposes to extend the
authority for funds to be deposited into the account to continue support for the programs funded from the
Historic Preservation Fund.
EBEY’S LANDING NATIONAL HISTORIC RESERVE
Sec. 124. Section 508(f) of Public Law 95-625 (92 stat. 3509) is amended by striking “not to exceed
$5,000,000” and inserting “such sums as may be necessary”.
Purpose: The NPS proposes to remove the land acquisition funding ceiling limitation at Ebey’s Landing
National Historic Reserve, which was established when the unit was created. The ceiling limits the
amount of funds that can be used for land acquisition. Due to increasing property prices and inflation, the
ceiling restricts the park’s ability to acquire key tracts of land that would protect resources and provide for
visitor safety.
TITLE IV – GENERAL PROVISIONS
(INCLUDING TRANSFERS OF FUNDS)
RECREATION FEES
SEC. [421] 420. Section 810 of the Federal Lands Recreation Enhancement Act (16 U.S.C. 6809) shall be
applied by substituting “October 1, [2024]2025” for “ September 30, 2019”.
Purpose: This provision extends the authority for the Recreation Fee program authorized by the Federal
Lands Recreation Enhancement Act.