1407058-2A-A 5
1407058-2A-A 4
8
9
10
11
12
6
5
8
7
13
14
15
CLEANNING INSTRUCTIONS
INSTALLATION CHECKOUT
Ensure that all connections are tightened.
Ensure all setscrews face straight down.
All finishes: clean the finish with mild soap and warm water. Wipe entire surface completely dry with clean soft
cloth. Many cleaners may contain chemicals, such as ammonia, chlorine, toilet cleaner etc. which could adversely
affect the finish are not recommended for cleaning.
Do not use abrasive cleaners or solvents on Kohler faucets and fitting.
Install The Pivoted Toilet Paper Holder
As shown on the right, select a location on the vertical wall
to stick the templet, ensure the templet is horizontal. Drill
hole in the finished wall as required.
Select a location on the vertical wall to install the
bracket. Mark anchor mounting hole location on
wall as shown, ensure two screw holes of brack
-et(3) are vertical. Drill hole in the finished wall
as required.
Press the anchor(1) into the hole. Orienting the
slotted mounting hole of the bracket downward.
Secure the bracket(2) with the self-tapping
screw(3).
Press the anchor(1) into the hole. Orienting the
slotted mounting hole of the bracket downward.
Secure the bracket(2) with the self-tapping
screw(3).
Slide the escutcheon(8) onto the bracket. Orient
the “KOHLER” icon on escutcheon upward. Slide
the main body(9) onto the bracket and keep the
screw hole downward. Tighten the screw(6) with
the hex wrench(7).
Slide the escutcheon(10) onto the bracket. Orient
the “KOHLER” icon on escutcheon upward. Slide
the main body(11) onto the bracket and keep the
screw hole downward. Tighten the screw(12) with
the hex wrench(7).
Slide the escutcheon(5) onto the bracket. Slide the
main body(4) onto the bracket and keep the screw
hole downward. Tighten the screw(6) with the hex
wrench(7).
Press the anchor(1) into the hole. Orienting the slotted
mounting hole of the bracket downward. Secure the brac
-ket(2) with the self-tapping screw(3).
As shown on the right, slide the escutcheon(5) onto the
left bracket, slide the escutcheon(8) onto the right bracket,
and orient the “KOHLER” icon on escutcheon(8) upward.
Then slide the left extension kit(15) onto the left bracket
and slide the right extension kit(14) onto the right bracket,
keep the screw hole on the extension kit(15)&(14) down
-ward. Tighten the screw(6) with the hex wrench(7).
Rotate the pivoted lever(13) on the left escutcheon to load
the roll paper towel as required.
slotted mounting hole
slotted mounting hole
slotted mounting hole
Install The Single Bracket Product